Article 1
In order to be awarded the Community eco-label under Regulation (EC) No 1980/2000, a hard floor covering must fall within the product group “hard floor coverings” as defined in Article 2 of this Decision and must comply with the ecological criteria set out in the Annex.
Article 2
The product group “hard floor-coverings” shall comprise the following hard products for internal/external flooring use, without any relevant structural function: natural stones, agglomerated stones, concrete paving units, terrazzo tiles, ceramic tiles and clay tiles.
Article 3
For administrative purposes the code number assigned to the product group “hard floor-coverings” shall be “021”.
Article 4
This Decision shall apply from 1 April 2002 until 31 March 2006. If on 31 March 2006, revised criteria for this product group have not been adopted, this Decision shall apply until 31 March 2007.
Article 5
This Decision is addressed to the Member States.
Done at Brussels, 25 March 2002.
For the Commission
Margot Wallström
Member of the Commission
(1) OJ L 237, 21.9.2000, p. 1.
Done at Brussels, 25 March 2002.
For the Commission
Margot Wallström
Member of the Commission
(1) OJ L 237, 21.9.2000, p. 1.
These criteria aim in particular at promoting:
– the reduction of impacts on habitats and associated resources,
– the reduction of energy consumption,
– the reduction of discharges of toxic or otherwise polluting substances into the environment,
– the reduction of use of dangerous substances,
– information that will enable the consumer to use the product in an efficient way which minimises the whole environmental impact.
The criteria are set at levels that promote the labelling of hard floor-coverings that are produced with low environmental impact.
Assessment and verification requirements
The specific assessment and verification requirements are indicated within each criterion.
The product group is structured in the following way (CEN definitions are reported in brackets) and can be subdivided into 2 major subgroups, “natural products” and “processed products” as follows.
Natural stones (CEN TC 246) are pieces of naturally occurring rock, and include marble, granite and other natural stones. “Other” natural stones refers to natural stones whose technical characteristics are on the whole different from those of marble and granite as defined by CEN/TC 246/N.237 prEN 12670 “Natural stones – Terminology”. Generally, such stones do not readily take a mirror polish and are not always extracted by blocks: sandstone, quartzite, slate, tuff, schist.
The group of “processed stones” can be divided into hardened and fired products. Hardened products are agglomerated stones, concrete paving units and terrazzo tiles. Fired products are ceramic tiles and clay tiles.
Agglomerated Stones are industrial products manufactured from a mixture of aggregates, mainly from natural stone grit, and a binder as defined by CEN/TC 246-229. The grit is normally composed of marble and granite quarry granulate and the binder is made from artificial components as unsaturated polyester resin or hydraulic cement. This group includes also artificial stones and compacted marble.
Concrete paving units are products for outer floor-coverings obtained by mixing sands, gravel, cement, inorganic pigments and additives, and vibro-compression as defined by CEN/TC 178. This group also includes concrete flags and concrete tiles.
Terrazzo tiles are a suitably compacted element of uniform shape and thickness, which meets specific geometrical requirements as defined by CEN/TC 229. The tiles are single or dual-layered. The single-layered are tiles completely made of granulates or chipping of a suitable aggregate, embedded in grey and white cement and water. The dual-layered tiles are terrazzo tiles made up of the first face or wear layer (with single-layered composition) and a second layer, known as backing or base concrete layer, whose surface is not exposed during normal use and which may be partially removed. Ceramic tiles are thin slabs from clays and/or other inorganic raw materials, such as feldspar and quartz as defined by CEN/TC 67. They are usually shaped by extruding or pressing at room temperature, dried and subsequently fired at temperatures sufficient to develop the required properties. Tiles can be glazed or unglazed, are non-combustible and generally unaffected by light.
Clay tiles are units which satisfy certain shape and dimensional requirements, used for the surface course of pavements and manufactured predominantly from clay or other materials, with or without additions as defined by CEN. The specific weight of such tiles shall not exceed 40 kg/m2.
Where so indicated, certain criteria apply specifically to one of the above subgroups. If no particular mention is given, the criterion applies to all products. Details on calculation procedures are given in the Technical Appendix.
Where appropriate, test methods other than those indicated for each criterion may be used if their equivalence is accepted by the competent body assessing the application.
Where possible, testing should be performed by appropriately accredited laboratories or laboratories that meet the general requirements expressed in standard EN ISO 17025.
Where appropriate, competent bodies may require supporting documentation and may carry out independent verifications.
The competent bodies are recommended to take into account the implementation of recognised environmental management schemes, such as EMAS or ISO14001, when assessing applications and monitoring compliance with the criteria(note:
it is not required to implement such management schemes).
1. Raw materials extraction
1.1. Extraction management (for natural products only)
The overall extraction management score for natural stones shall be calculated as the total score based on a matrix of 9 main indicators (I). The final score results from the sum of the individual scores given to each indicator, after multiplication by a corrective weighting (W) if appropriate (see Technical Appendix – A1 for calculation procedures). Quarries shall reach a weighted score of at least 25 points. The score for each indicator shall be within the bounds indicated by the exclusion hurdle (where one is given).
In addition, all of the following conditions shall be met:
– there shall be no interference with any deep confined waterbed (see Technical Appendix – A1),
– there shall be no interference with surface water-bodies with civil catching or springs, or if the water-body is included in the Register of Protected Areas established by a Member State according to Directive 2000/60/EC of the European Parliament and the Council of 23 October 2000 establishing a framework for Community action in the field of water policy(1) or if the watercourse’s average flow is >5 m3/s (see Technical Appendix – A1),
– there shall be a waste water recovery closed system for avoiding sawing waste dispersion to the environment and to feed the recycling loop. Water shall be contained in close proximity to the place where it is used in quarrying operations and then it shall be conveyed by closed pipes to the suitable processing plant. After clearing, water shall be recycled.
Assessment and verification: the applicant shall provide the calculation of the weighted overall extraction management score, and related data for each of the nine indicators (showing amongst others that each score is within the bounds of the corresponding exclusion hurdle, if one is given), according to the following matrix and to the corresponding instructions in the Technical Appendix – A1. The applicant shall also provide appropriate documentation and/or declarations that prove compliance with all of the abovementioned criteria.
List of weights (to be used only where specified):
W1. Nature conservation: If the quarry area is located in:
– notified sites of Community importance pursuant to Council Directive 92/43/EEC of 21 May 1992 on the conservation of natural habitats and of wild fauna and flora(2), and its subsequent amendments,
– or in Natura 2000 network areas, composed of the special protection areas pursuant to Council Directive 79/409/EEC of 2 April 1979 on the conservation of wild birds(3), and its subsequent amendments, and those areas under Directive 92/43/EEC together,
– or in equivalent areas located outside the European Community that fall under the corresponding provisions of the United Nations’ Convention on Biological Diversity(4),
then W1 is relevant to the following indicators: rehabilitation simultaneity degree (I.2), air quality (I.6), water quality (I.7), noise (I.8), visual impact (I.9). The same rules shall apply if the quarry is outside such sites but could have significant effects on them, either individually or in combination with other plans and projects(5). The corresponding specific weight is 0,3.
Assessment and verification: the applicant shall provide a declaration accompanied by appropriate documentation to show if the quarry area is located in or adjacent to sites of Community importance pursuant to the Directives 92/43/EEC and 79/409/EEC, as detailed above. The sites forming the Natura 2000 network areas are listed and reported on maps drawn up by the Member States. In areas outside the European Community, the applicant shall provide a declaration accompanied by appropriate documentation to show if the quarry area is located in or adjacent to protected areas as determined under the United Nations’ Convention on Biological Diversity 1992.
W2. Soil protection: for rehabilitation simultaneity degree (I.2) and water quality (I.7) indicators, three different values of weights are considered, as a function of land use potentialities (see Technical Appendix – A1 for details):
Assessment and verification: the applicant shall provide appropriate documentation, including a map, of the land capability classification of the quarry site.
W3. Population density of settlements which lie within a 5 km radius (distance) from the quarry site: rehabilitation simultaneity degree (I.2), air quality (I.6), water quality (I.7) and noise (I.8), visual impact (I.9) indicators are weighted in function of three density ranges:
Assessment and verification: the applicant shall provide a map and appropriate documentation to verify the population density of settlements lying within 5 km radius (distance) from the quarry border (authorised area). In the case of existing quarries and expanding settlements in the area concerned, the weight factor indicated in brackets shall be used. This does not refer to major extensions of the already authorised area of such quarries ( >75 %).
W4. If the quarry interferes with surface water-bodies (average flow < 5 m3/s) there is a weight of 0,5 on both the indicators about water recycling ratio (I.1) and water quality (I.7).
Assessment and verification: the applicant shall provide appropriate documentation to show whether or not there is any interference between the quarry and the surface water-body.
1.2. Extraction management (for processed products only)
The raw materials used in the production of processed hard floor-coverings shall comply with the following requirements for the related extraction activities:
Assessment and verification: the applicant shall provide the related data and documents including a map of the area.
2. Raw materials selection (for all flooring products)
No substances or preparations that are assigned, or may be assigned at the time of application, any of the following risk phrases (or combinations thereof):
R45 (may cause cancer);