| Official Journalof the European Union | ENL series |
| 2024/1956 | 17.7.2024 |
| (1) | Article 6(2), point (a), of Regulation (EU) No 1257/2013 requires ship owners to ensure that ships destined to be recycled are only recycled at ship recycling facilities included in the European List of ship recycling facilities (‘European List’) published pursuant to Article 16(2) of that Regulation. |
| (2) | The European List is set out in Commission Implementing Decision (EU) 2016/2323(2). |
| (3) | The authorisations of Arise Recycling AS, a ship recycling facility located in Norway, is due to expire on 1 October 2024. The Commission has received information from Norway that the authorisation to conduct ship recycling granted to that facility has been verified, in accordance with Article 14 of Regulation (EU) No 1257/2013. The European List should therefore be updated accordingly. |
| (4) | The authorisation of Sagro Aannemingsmaatschappij Zeeland B.V. located in the Netherlands expired on 28 March 2024 and the competent authority informed the Commission that the facility did not request to renew its permit. That facility should therefore be removed from the European List. |
| (5) | The authorisation of UAB Demeksa located in Lithuania expired on 25 May 2024 and the competent authority informed the Commission that the facility did not request to renew its permit. That facility should therefore be removed from the European List. |
| (6) | The authorisation of Ship and Industrial Service Ltd located in Bulgaria expired on 25 January 2024 and the competent authority informed the Commission that the facility is ceasing its activity. That facility should therefore be removed from the European List. |
| (7) | Denmark informed the Commission that the facility JATOB ApS has changed name to Jatob Frederikshavn ApS and the Netherlands informed the Commission about a change in the method of recycling for Damen Verolme Rotterdam B.V. Furthermore, Kiliçlar asked to add an information in their contact details. The European List should therefore be updated to reflect these changes. |
| (8) | The Commission has received two applications, in accordance with Article 15(1) of Regulation (EU) No 1257/2013, for Dortel Gemi Söküm Demir Celik San. Ve Tic. Ltd. Şti. and Ege Gemi Söküm San Ve Metal San.Tic. A.Ş., ship recycling facilities located in Türkiye, to be included in the European List. Having assessed the information and supporting evidence provided and gathered in accordance with Article 15 of that Regulation, the Commission considers that the facilities comply with the requirements set out in Article 13 of that Regulation to conduct ship recycling and to be included in the European List. The European List should therefore be updated to include those facilities. |
| (9) | Anadolu Gemi Sokum located in Türkiye has demonstrated that it complies with the requirements of the Regulation with respect to the safe and environmentally sound dismantling of floating platforms and included specific procedure in its ship recycling facility plan. The limitation related to the dismantling of rigs should therefore be removed in the European List. At the same time, it should be recalled that the yards remain bound by the limit of the width of the vessels they can receive. The limit set by the width of the vessel could only be considered to be removed following the review of a cooperation agreement with an EU listed neighbouring ship recycling facility which would cover in a satisfactory way the nature and conditions of such cooperation. To be consistent with the terminology used under the definition in Article 3(1), point (1), of Regulation (EU) No 1257/2013, and taking into account the need for specific dismantling procedures, the limitations for ‘rigs’ should be replaced by a limitation for ‘floating platforms’. The European List should therefore be updated to reflect these changes. |
| (10) | Implementing Decision (EU) 2016/2323 should therefore be amended accordingly. |
| (11) | The measures provided for in this Decision are in accordance with the opinion of the Committee established by Article 25 of Regulation (EU) No 1257/2013, |
| Name of the facility | Method of recycling | Type and size of ships that can be recycled | Limitations and conditions under which the ship recycling facility operates, including as regards hazardous waste management | Details on the explicit or tacit procedure for the approval of the ship recycling plan by the competent authority(1) | Maximum annual ship recycling output, calculated as the sum of the weight of ships expressed in LDT that have been recycled in a given year in that facility(2) | Date of expiry of inclusion in the European List(3) | |||||||||
| BELGIUM | |||||||||||||||
| NV Galloo Recycling GhentScheepszatestraat 99000 GentBelgiumPhone: +32(0)9/251 25 21Email:[email protected] | NV Galloo Recycling Ghent | Scheepszatestraat 9 | 9000 Gent | Belgium | Alongside (wet berth), slope | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 265 metersWidth: 37 metersDraught: 12,5 meters | Tacit approval, with a maximum review period of 30 days | 34 000(4) | 31 March 2025 | ||||||
| NV Galloo Recycling Ghent | |||||||||||||||
| Scheepszatestraat 9 | |||||||||||||||
| 9000 Gent | |||||||||||||||
| Belgium | |||||||||||||||
| DENMARK | |||||||||||||||
| FAYARD A/SKystvejen 100DK-5330 MunkeboDenmarkwww.fayard.dkPhone: +45 7592 0000Email:[email protected] | FAYARD A/S | Kystvejen 100 | DK-5330 Munkebo | Denmark | Drydock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 415 metersWidth: 90 metersDraught: 7,8 meters | The ship recycling facility is regulated in accordance with applicable legislation and with the conditions set out in Environmental Permit of 7 November 2018 issued by the Municipality of Kerteminde. The Environmental Permit includes conditions for operating hours, special operating conditions, handling and storage of waste and also includes a condition that the activity must be carried out in a dry dock. | Tacit approval, with a maximum review period of 14 days. | 916,34(5) | 22 May 2028 | |||||
| FAYARD A/S | |||||||||||||||
| Kystvejen 100 | |||||||||||||||
| DK-5330 Munkebo | |||||||||||||||
| Denmark | |||||||||||||||
| Fornæs ApSRolshøjvej 12-168500 GrenaaDenmarkwww.fornaes.comPhone: +45 86326393Email:[email protected] | Fornæs ApS | Rolshøjvej 12-16 | 8500 Grenaa | Denmark | Alongside, drydock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 150 metersWidth: 25 metersDraught: 7 metersGT: 10 000 | The municipality of Norddjurs has the right to allocate hazardous waste for environmentally approved reception facilities. | Tacit approval, with a maximum review period of 14 days. | 30 000(6) | 12 May 2026 | |||||
| Fornæs ApS | |||||||||||||||
| Rolshøjvej 12-16 | |||||||||||||||
| 8500 Grenaa | |||||||||||||||
| Denmark | |||||||||||||||
| Jatob Frederikshavn ApSLangerak 129900 FrederikshavnDenmarkwww.jatob.dkPhone: +45 8668 1689Email:[email protected]@jatob.dk | Alongside, slipway | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 150 metersWidth: 30 metersDraught: 6 meters | Handling and storage of waste fractions is given by Environmental Authorization. Intermediate storage of hazardous waste may occur for up to one year at the site. | Tacit approval, with a maximum review period of 14 days. | 13 000(7) | 9 March 2025 | |||||||||
| Modern American Recycling Services Europe (M.A.R.S)Sandholm 609900 FrederikshavnDenmarkwww.modernamericanrecyclingservices.com/Phone: +45 30307763Email:[email protected] | Modern American Recycling Services Europe (M.A.R.S) | Sandholm 60 | 9900 Frederikshavn | Denmark | Slipway | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 400 meters Width: 90 meters Draught: 14 meters | The conditions under which the ship recycling facility operates are defined in the Environmental Permit of 9 March 2018 and Addendum to Environmental Permit of 12 July 2022 issued by the Municipality of Frederikshavn.The Municipality of Frederikshavn has the right to allocate hazardous waste to environmentally approved reception facilities.The facility must not store hazardous waste for more than one year. | Tacit approval, with a review period of 14 days. | 60 000(8) | 27 January 2028 | |||||
| Modern American Recycling Services Europe (M.A.R.S) | |||||||||||||||
| Sandholm 60 | |||||||||||||||
| 9900 Frederikshavn | |||||||||||||||
| Denmark | |||||||||||||||
| Smedegaarden A/SVikingkaj 56700 EsbjergDenmarkwww.smedegaarden.netPhone: +45 75128888E-mail:[email protected] | Smedegaarden A/S | Vikingkaj 5 | 6700 Esbjerg | Denmark | Alongside, slipway | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 200 meters *Width: 48 metersDraught: 7,5 meters(* If length > 170 meters,acceptation from theMunicipality of Esbjergis required) | The conditions under which the ship recycling facility operates are defined in the Environmental Permit of 4 June 2015 issued by the Municipality of Esbjerg.The Municipality of Esbjerg has the right to allocate hazardous waste to environmentally approved reception facilities. | Tacit approval, with a maximum review period of 14 days | 20 000(9) | 11 March 2026 | |||||
| Smedegaarden A/S | |||||||||||||||
| Vikingkaj 5 | |||||||||||||||
| 6700 Esbjerg | |||||||||||||||
| Denmark | |||||||||||||||
| ESTONIA | |||||||||||||||
| BLRT Refonda Baltic OÜKopli 103, 11712 Tallinn, EstoniaPhone: +372 610 2933Fax: +372 610 2444Email:[email protected] | BLRT Refonda Baltic OÜ | Kopli 103, 11712 Tallinn, Estonia | Afloat at the quayside and in the floating dock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 197 metersWidth: 32 metersDraught: 9,6 meters | Waste permit No. KL-511809. Hazardous waste management licence No 0546. Rules of the Vene-Balti Port, Manual on Ships Recycling MSR-Refonda. Environmental Management System, Waste management EP 4.4.6-1-13The facility can recycle only the hazardous materials for which it has been licensed. | Tacit approval, with a maximum review period of 30 days. | 24 364(10) | 15 February 2026 | |||||||
| BLRT Refonda Baltic OÜ | |||||||||||||||
| Kopli 103, 11712 Tallinn, Estonia | |||||||||||||||
| SPAIN | |||||||||||||||
| DESGUACE INDUSTRIAL Y NAVAL, S.L.U. (DINA)Vega de Tapia, s/n48903 Barakaldo-BizkaiaSpainPhone: +34 944971552Email:[email protected] | DESGUACE INDUSTRIAL Y NAVAL, S.L.U. (DINA) | Vega de Tapia, s/n | 48903 Barakaldo-Bizkaia | Spain | Alongside, dismantling ramp | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 120 metersWidth: 20 metersDraught: 6 meters | The limitations are included in the integrated environmental authorisation. | Tacit approval. The competent authority for approval is the environmental authority of the Autonomous Community where the facility is located. | 2 086(11) | 3 March 2026 | |||||
| DESGUACE INDUSTRIAL Y NAVAL, S.L.U. (DINA) | |||||||||||||||
| Vega de Tapia, s/n | |||||||||||||||
| 48903 Barakaldo-Bizkaia | |||||||||||||||
| Spain | |||||||||||||||
| DDR VESSELS XXI, S.L.Port of "El Musel"GijonSpainPhone: +34 630 14 44 16Email:[email protected] | DDR VESSELS XXI, S.L. | Port of "El Musel" | Gijon | Spain | Alongside, dismantling ramp | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 169,9 meters(Ships above that size which can operate a zero rollover or negative ramp movement may be accepted depending on the outcome of a detailed feasibility study)Width: 25 meters | The limitations are included in the integrated environmental authorisation. | Tacit approval. The competent authority for approval is the environmental authority of the Autonomous Community where the facility is located. | 3 600(12) | 28 July 2025 | |||||
| DDR VESSELS XXI, S.L. | |||||||||||||||
| Port of "El Musel" | |||||||||||||||
| Gijon | |||||||||||||||
| Spain | |||||||||||||||
| FRANCE | |||||||||||||||
| Démonaval RecyclingZI du MalaquisRue François Arago76580 LE TRAITFrancePhone: (+33) (0)7 69 79 12 80Email:[email protected] | Démonaval Recycling | ZI du Malaquis | Rue François Arago | 76580 LE TRAIT | France | Alongside, drydock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 140 metersWidth: 25 metersDepth: 5 meters | Environmental limitations are defined in the prefectural authorisation. | Explicit approval – The competent authority for the approval decision is the minister of environment | 1 500(13) | 21 September 2027 | ||||
| Démonaval Recycling | |||||||||||||||
| ZI du Malaquis | |||||||||||||||
| Rue François Arago | |||||||||||||||
| 76580 LE TRAIT | |||||||||||||||
| France | |||||||||||||||
| GARDET & DE BEZENAC Recycling/ Groupe BAUDELET ENVIRONNEMENT – GIE MUG616, Boulevard Jules Durand76600 Le HavreFrancePhone: +33(0)2 35 95 16 34Email:[email protected] | GARDET & DE BEZENAC Recycling | / Groupe BAUDELET ENVIRONNEMENT – GIE MUG | 616, Boulevard Jules Durand | 76600 Le Havre | France | Floating and slipway | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 150 metersWidth: 18 metersDepth: 7 metersLDT: 7 000 | Environmental limitations are defined in the prefectural authorisation. | Explicit approval – The competent authority for the approval decision is the minister of environment. | 7 730(14) | 29 December 2026 | ||||
| GARDET & DE BEZENAC Recycling | |||||||||||||||
| / Groupe BAUDELET ENVIRONNEMENT – GIE MUG | |||||||||||||||
| 616, Boulevard Jules Durand | |||||||||||||||
| 76600 Le Havre | |||||||||||||||
| France | |||||||||||||||
| Grand Port Maritime de Bordeaux152, Quai de Bacalan – CS 41320 – 33082 Bordeaux CedexFrancePhone: +33(0)5 56 90 58 00Email:[email protected] | Grand Port Maritime de Bordeaux | 152, Quai de Bacalan – CS 41320 – 33082 Bordeaux Cedex | France | Alongside, drydock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 240 metersWidth: 37 metersDepth: 17 meters | Environmental limitations are defined in the prefectural authorisation. | Explicit approval – The competent authority for the approval decision is the minister of environment. | 9 000(15) | 27 September 2026 | ||||||
| Grand Port Maritime de Bordeaux | |||||||||||||||
| 152, Quai de Bacalan – CS 41320 – 33082 Bordeaux Cedex | |||||||||||||||
| France | |||||||||||||||
| Recycleurs Bretons – Navaléo170 rue Jacqueline Auriol29470 GuipavasFrancePhone: +33(0)2 98 01 11 06Email:[email protected] | Recycleurs Bretons – Navaléo | 170 rue Jacqueline Auriol | 29470 Guipavas | France | Alongside, drydock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 225 metersWidth: 34 metersDepth: 27 meters | Environmental limitations are defined in the prefectural authorisation. | Explicit approval – The competent authority for the approval decision is the minister of environment. | 15 000(16) | 19 June 2025 | |||||
| Recycleurs Bretons – Navaléo | |||||||||||||||
| 170 rue Jacqueline Auriol | |||||||||||||||
| 29470 Guipavas | |||||||||||||||
| France | |||||||||||||||
| ITALY | |||||||||||||||
| San Giorgio del Porto S.p.A.Calata Boccardo 816128 – Genova –ItalyPhone: +39 (0)10 251561Email:[email protected];[email protected] | San Giorgio del Porto S.p.A. | Calata Boccardo 8 | 16128 – Genova – | Italy | Alongside, drydock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 350 metersWidth: 75 metersDepth: 16 metersGT: 130 000 | The limitations and restrictions are included in the integrated environmental authorisation. | Explicit approval | 38 564(17) | 6 June 2028 | |||||
| San Giorgio del Porto S.p.A. | |||||||||||||||
| Calata Boccardo 8 | |||||||||||||||
| 16128 – Genova – | |||||||||||||||
| Italy | |||||||||||||||
| LATVIA | |||||||||||||||
| “Galaksis N”, Ltd.Kapsedes street 2D,Liepāja, LV – 3414LatviaPhone: +371 29410506Email:[email protected] | “Galaksis N”, Ltd. | Kapsedes street 2D, | Liepāja, LV – 3414 | Latvia | Alongside (wet berth), drydock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 165 metersWidth:22 metersDepth: 7 metersGT: 12 000 | See national permit No. LI12IB0053 | Explicit approval – written notification in 30 working days | 2 490(18) | 17 July 2024 | |||||
| “Galaksis N”, Ltd. | |||||||||||||||
| Kapsedes street 2D, | |||||||||||||||
| Liepāja, LV – 3414 | |||||||||||||||
| Latvia | |||||||||||||||
| LITHUANIA | |||||||||||||||
| UAB APKMinijos 180 (berth 133A), LT 93269, Klaipėda,LithuaniaPhone: +370 (46) 365776Fax: +370 (46) 365776Email:[email protected] | UAB APK | Minijos 180 (berth 133A), LT 93269, Klaipėda, | Lithuania | Alongside (wet berth) | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 130 metersWidth: 35 metersDepth: 10 metersGT: 3 500 | See national permit No. TL-KL.1-15/2015 | Explicit approval – written notification in 30 working days | 1 500(19) | 12 March 2025 | ||||||
| UAB APK | |||||||||||||||
| Minijos 180 (berth 133A), LT 93269, Klaipėda, | |||||||||||||||
| Lithuania | |||||||||||||||
| UAB ArmarMinijos 180 (berth 131A), LT 93269, Klaipėda,LithuaniaPhone: +370 685 32607Email:[email protected] | UAB Armar | Minijos 180 (berth 131A), LT 93269, Klaipėda, | Lithuania | Alongside (wet berth) | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 80 metersWidth: 16 metersDepth: 5 metersGT: 1 500 | See national permit No. TL-KL.1-51/2017 | Explicit approval – written notification in 30 working days | 3 910(20) | 12 April 2027 | ||||||
| UAB Armar | |||||||||||||||
| Minijos 180 (berth 131A), LT 93269, Klaipėda, | |||||||||||||||
| Lithuania | |||||||||||||||
| UAB Vakarų refondaMinijos 180 (berths 129, 130, 131A, 131, 132, 133A), LT 93269, Klaipėda,LithuaniaPhone: +370 (46) 483940 / 483891Fax: +370 (46) 483891Email:[email protected] | UAB Vakarų refonda | Minijos 180 (berths 129, 130, 131A, 131, 132, 133A), LT 93269, Klaipėda, | Lithuania | Alongside (wet berth) | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 230 metersWidth: 55 metersDepth: 14 metersGT: 70 000 | See national permit No. (11.2)-30-161/2011/TL-KL.1-18/2015 | Explicit approval – written notification in 30 working days | 20 140(21) | 30 April 2025 | ||||||
| UAB Vakarų refonda | |||||||||||||||
| Minijos 180 (berths 129, 130, 131A, 131, 132, 133A), LT 93269, Klaipėda, | |||||||||||||||
| Lithuania | |||||||||||||||
| THE NETHERLANDS | |||||||||||||||
| Damen Verolme Rotterdam B.V.Prof. Gerbrandyweg 253197 KK RotterdamThe NetherlandsPhone: +31 (0)181 23 4353Email:[email protected] | Damen Verolme Rotterdam B.V. | Prof. Gerbrandyweg 25 | 3197 KK Rotterdam | The Netherlands | Preparatory actions along the quayside, placed into drydock for scrapping | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 400 metersWidth: 90 metersDepth: 12 metersHeight: 90 meters | The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner. | Explicit approval | 0(22) | 21 May 2026 | |||||
| Damen Verolme Rotterdam B.V. | |||||||||||||||
| Prof. Gerbrandyweg 25 | |||||||||||||||
| 3197 KK Rotterdam | |||||||||||||||
| The Netherlands | |||||||||||||||
| DECOM Amsterdam B.V.Siciliëweg 10 1045 AS AmsterdamThe NetherlandsPhone: +31 23 558 1937Email:[email protected] | DECOM Amsterdam B.V. | Siciliëweg 10 1045 AS Amsterdam | The Netherlands | Preparatory actions along the quayside, lifted onshore for scrapping | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 240 metersWidth: 50 metersDraught: 9 meters | The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner. | Explicit approval | 17 500(23) | 5 October 2026 | ||||||
| DECOM Amsterdam B.V. | |||||||||||||||
| Siciliëweg 10 1045 AS Amsterdam | |||||||||||||||
| The Netherlands | |||||||||||||||
| Hoondert Services & Decommissioning B.V.Spanjeweg 44455 TW NieuwdorpThe NetherlandsPhone: +31 113352510Email:[email protected] | Hoondert Services & Decommissioning B.V. | Spanjeweg 4 | 4455 TW Nieuwdorp | The Netherlands | Preparatory actions along the quayside, lifted onshore for scrapping | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 175 metersWidth: 40 metersDepth: 10 meters | The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner. | Explicit approval | 30 000(24) | 26 January 2026 | |||||
| Hoondert Services & Decommissioning B.V. | |||||||||||||||
| Spanjeweg 4 | |||||||||||||||
| 4455 TW Nieuwdorp | |||||||||||||||
| The Netherlands | |||||||||||||||
| NORWAY | |||||||||||||||
| Arise Recycling AS (previously ADRS Decom Gulen)Facility address:Sløvågen 2,5960 Dalsøyra,NorwayOffice address:Statsminister Michelsens vei 38,5230 Paradis,Norwayhttps://adrs.no/ | Arise Recycling AS (previously ADRS Decom Gulen) | Facility address: | Sløvågen 2, | 5960 Dalsøyra, | Norway | Office address: | Statsminister Michelsens vei 38, | 5230 Paradis, | Norway | Alongside, slipway, dry/wet-dock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013.Maximum ship dimensions:Length: 360 metersWidth: No limitDepth: No limit | See national permit No. 2019.0501.T | Explicit approval | 0(25) | 20 July 2029 |
| Arise Recycling AS (previously ADRS Decom Gulen) | |||||||||||||||
| Facility address: | |||||||||||||||
| Sløvågen 2, | |||||||||||||||
| 5960 Dalsøyra, | |||||||||||||||
| Norway | |||||||||||||||
| Office address: | |||||||||||||||
| Statsminister Michelsens vei 38, | |||||||||||||||
| 5230 Paradis, | |||||||||||||||
| Norway | |||||||||||||||
| AF Offshore DecomRaunesvegen 597,5578 Nedre VatsNorwayhttps://afgruppen.com/Decommissioning/ | AF Offshore Decom | Raunesvegen 597, | 5578 Nedre Vats | Norway | Alongside, quayside | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 500 metersWidth: no limitDepth: no limit | See national permit No. 2005.0038.T | Explicit approval | 31 000(26) | 10 December 2028(27) | |||||
| AF Offshore Decom | |||||||||||||||
| Raunesvegen 597, | |||||||||||||||
| 5578 Nedre Vats | |||||||||||||||
| Norway | |||||||||||||||
| Green Yard ASAngholmsveien 3044485 Feda,Norwaytlf: +4790098185www.greenyard.no | Green Yard AS | Angholmsveien 304 | 4485 Feda, | Norway | Drydock (indoors), slipway | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 230 metersWidth: 25 metersDepth: 20 meters | See national permit No. 2018.0833.TMajor dismantling operations must be performed indoors.The only dismantling and cutting operations that are allowed outside in open air are minor operations necessary to fit ships to the indoor facility. See permit for further details. | Explicit approval | 30 000(28) | 10 December 2028(29) | |||||
| Green Yard AS | |||||||||||||||
| Angholmsveien 304 | |||||||||||||||
| 4485 Feda, | |||||||||||||||
| Norway | |||||||||||||||
| Green Yard Kleven AS6065 UlsteinvikNorwaywww.kleven.no | Green Yard Kleven AS | 6065 Ulsteinvik | Norway | Alongside, slipway | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 170 metersWidth: 35 metersDepth: No limit | See national permit No 2021.0011.T | Explicit approval | 0(30) | 9 April 2026 | ||||||
| Green Yard Kleven AS | |||||||||||||||
| 6065 Ulsteinvik | |||||||||||||||
| Norway | |||||||||||||||
| Fosen Gjenvinning ASStokksundveien 1432,7177 RevsnesNorwayPhone: +47 400 39 479 Email:[email protected] | Fosen Gjenvinning AS | Stokksundveien 1432, | 7177 Revsnes | Norway | Alongside | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013, with the exception of floating platforms or vessels used for extracting hydrocarbonsMaximum ship dimensions:Length: 150 metersWidth: 20 metersDepth: 7 meters | See national permit No. 2006.0250.T | Explicit approval | 8 000(31) | 10 December 2028(32) | |||||
| Fosen Gjenvinning AS | |||||||||||||||
| Stokksundveien 1432, | |||||||||||||||
| 7177 Revsnes | |||||||||||||||
| Norway | |||||||||||||||
| Aker Solutions AS (Stord)Eldøyane 595411 StordNorwaywww.kvaerner.com | Aker Solutions AS (Stord) | Eldøyane 59 | 5411 Stord | Norway | Alongside (wet berth), slipway | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 230 metersWidth: No limitDepth: No limit | See national permit No. 2013.0111.T | Explicit approval | 60 000(33) | 10 December 2028(34) | |||||
| Aker Solutions AS (Stord) | |||||||||||||||
| Eldøyane 59 | |||||||||||||||
| 5411 Stord | |||||||||||||||
| Norway | |||||||||||||||
| Norscrap West ASHanøytangen 122,5310 Hauglandhella,Norwaywww.norscrap.no | Norscrap West AS | Hanøytangen 122, | 5310 Hauglandhella, | Norway | Floating slipway. Optional depending on complexity, in addition: 1. Dismantling by quay and subsequent scrapping on impermeable floors with effective drainage system. 2. Drydock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 150 metersWidth: 34 metersDraught: 5 meters / increasing depending on method of recycling. | See national permit No. 2017.0864.TMaximum 8 000 LDT on floating slipway. Ships exceeding 8 000 LDT need to be dismantled using another method of recycling | Explicit approval | 25 000(35) | 10 December 2028(36) | |||||
| Norscrap West AS | |||||||||||||||
| Hanøytangen 122, | |||||||||||||||
| 5310 Hauglandhella, | |||||||||||||||
| Norway | |||||||||||||||
| FINLAND | |||||||||||||||
| Turun Korjaustelakka Oy (Turku Repair Yard Ltd)Navirentie, 21100 NaantaliFinlandPhone: +358 2 44 [email protected] | Turun Korjaustelakka Oy (Turku Repair Yard Ltd) | Navirentie, 21100 Naantali | Finland | Alongside, drydock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 250 metersWidth: 40 metersDraught: 7,9 meters | The limitations are included in the national environmental permit. | Explicit approval | 20 000(37) | 14 December 2025 | ||||||
| Turun Korjaustelakka Oy (Turku Repair Yard Ltd) | |||||||||||||||
| Navirentie, 21100 Naantali | |||||||||||||||
| Finland | |||||||||||||||
| UNITED KINGDOM – NORTHERN IRELAND | |||||||||||||||
| Harland and Wolff (Belfast) LtdQueen’s IslandBelfastBT3 9DUNorthern IrelandPhone +44(0)2890534189 Fax +44(0)[email protected] | Harland and Wolff (Belfast) Ltd | Queen’s Island | Belfast | BT3 9DU | Northern Ireland | Dry dock and wet berth | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 556 metersWidth: 93 metersDraught: 7,5 metersDWT: 550 000 | The site is authorised by way of a waste management licence, authorisation number LN/20/11 that limits the operations and places conditions on the operator of the facility. | Explicit approval | 12 000(38) | 16 June 2025 | ||||
| Harland and Wolff (Belfast) Ltd | |||||||||||||||
| Queen’s Island | |||||||||||||||
| Belfast | |||||||||||||||
| BT3 9DU | |||||||||||||||
| Northern Ireland |
| NV Galloo Recycling Ghent |
| Scheepszatestraat 9 |
| 9000 Gent |
| Belgium |
| FAYARD A/S |
| Kystvejen 100 |
| DK-5330 Munkebo |
| Denmark |
| Fornæs ApS |
| Rolshøjvej 12-16 |
| 8500 Grenaa |
| Denmark |
| Modern American Recycling Services Europe (M.A.R.S) |
| Sandholm 60 |
| 9900 Frederikshavn |
| Denmark |
| Smedegaarden A/S |
| Vikingkaj 5 |
| 6700 Esbjerg |
| Denmark |
| BLRT Refonda Baltic OÜ |
| Kopli 103, 11712 Tallinn, Estonia |
| DESGUACE INDUSTRIAL Y NAVAL, S.L.U. (DINA) |
| Vega de Tapia, s/n |
| 48903 Barakaldo-Bizkaia |
| Spain |
| DDR VESSELS XXI, S.L. |
| Port of "El Musel" |
| Gijon |
| Spain |
| Démonaval Recycling |
| ZI du Malaquis |
| Rue François Arago |
| 76580 LE TRAIT |
| France |
| GARDET & DE BEZENAC Recycling |
| / Groupe BAUDELET ENVIRONNEMENT – GIE MUG |
| 616, Boulevard Jules Durand |
| 76600 Le Havre |
| France |
| Grand Port Maritime de Bordeaux |
| 152, Quai de Bacalan – CS 41320 – 33082 Bordeaux Cedex |
| France |
| Recycleurs Bretons – Navaléo |
| 170 rue Jacqueline Auriol |
| 29470 Guipavas |
| France |
| San Giorgio del Porto S.p.A. |
| Calata Boccardo 8 |
| 16128 – Genova – |
| Italy |
| “Galaksis N”, Ltd. |
| Kapsedes street 2D, |
| Liepāja, LV – 3414 |
| Latvia |
| UAB APK |
| Minijos 180 (berth 133A), LT 93269, Klaipėda, |
| Lithuania |
| UAB Armar |
| Minijos 180 (berth 131A), LT 93269, Klaipėda, |
| Lithuania |
| UAB Vakarų refonda |
| Minijos 180 (berths 129, 130, 131A, 131, 132, 133A), LT 93269, Klaipėda, |
| Lithuania |
| Damen Verolme Rotterdam B.V. |
| Prof. Gerbrandyweg 25 |
| 3197 KK Rotterdam |
| The Netherlands |
| DECOM Amsterdam B.V. |
| Siciliëweg 10 1045 AS Amsterdam |
| The Netherlands |
| Hoondert Services & Decommissioning B.V. |
| Spanjeweg 4 |
| 4455 TW Nieuwdorp |
| The Netherlands |
| Arise Recycling AS (previously ADRS Decom Gulen) |
| Facility address: |
| Sløvågen 2, |
| 5960 Dalsøyra, |
| Norway |
| Office address: |
| Statsminister Michelsens vei 38, |
| 5230 Paradis, |
| Norway |
| AF Offshore Decom |
| Raunesvegen 597, |
| 5578 Nedre Vats |
| Norway |
| Green Yard AS |
| Angholmsveien 304 |
| 4485 Feda, |
| Norway |
| Green Yard Kleven AS |
| 6065 Ulsteinvik |
| Norway |
| Fosen Gjenvinning AS |
| Stokksundveien 1432, |
| 7177 Revsnes |
| Norway |
| Aker Solutions AS (Stord) |
| Eldøyane 59 |
| 5411 Stord |
| Norway |
| Norscrap West AS |
| Hanøytangen 122, |
| 5310 Hauglandhella, |
| Norway |
| Turun Korjaustelakka Oy (Turku Repair Yard Ltd) |
| Navirentie, 21100 Naantali |
| Finland |
| Harland and Wolff (Belfast) Ltd |
| Queen’s Island |
| Belfast |
| BT3 9DU |
| Northern Ireland |
| Name of the facility | Method of recycling | Type and size of ships that can be recycled | Limitations and conditions under which the ship recycling facility operates, including as regards hazardous waste management | Details on the explicit or tacit procedure for the approval of the ship recycling plan by the competent authority(39) | Maximum annual ship recycling output, calculated as the sum of the weight of ships expressed in LDT that have been recycled in a given year in that facility(40) | Date of expiry of inclusion in the European List(41) | ||||||
| TÜRKIYE | ||||||||||||
| Anadolu Gemi Söküm Orman Ürn. Gida Tur. Nak. San. Ve Tic. A.Ş.Gemi Söküm Tesisleri Parsel No:16 Aliağaİzmir 35800,TürkiyePhone: +90 232 618 21 02Email:[email protected] | Anadolu Gemi Söküm Orman Ürn. Gida Tur. Nak. San. Ve Tic. A.Ş. | Gemi Söküm Tesisleri Parsel No:16 Aliağa | İzmir 35800, | Türkiye | Landing | Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013.Maximum ship dimensions:Length: no limitWidth: 55 metresDraught: 12 metres | The site has a Ship Dismantling Permit, issued by the Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates. | Tacit approval, with a maximum review period of 15 days.The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. | 111 823(42) | 17 August 2028 | ||
| Anadolu Gemi Söküm Orman Ürn. Gida Tur. Nak. San. Ve Tic. A.Ş. | ||||||||||||
| Gemi Söküm Tesisleri Parsel No:16 Aliağa | ||||||||||||
| İzmir 35800, | ||||||||||||
| Türkiye | ||||||||||||
| Avsar Gemi Sokum San. Dis Tic. Ltd. Sti.Gemi Söküm Tesisleri,Parcel 5 Aliağaİzmir 35800,TürkiyePhone: +90 232 618 21 07 – 08 – 09Email:[email protected] | Avsar Gemi Sokum San. Dis Tic. Ltd. Sti. | Gemi Söküm Tesisleri, | Parcel 5 Aliağa | İzmir 35800, | Türkiye | Landing | Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013, with the exception of floating platforms.Maximum ship dimensions:Length: no limitWidth: 50 metersDraught: 15 meters | The site has a Ship Dismantling Permit, issued by the Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates. | Tacit approval, with a maximum review period of 15 days.The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. | 54 224(43) | 2 December 2025 | |
| Avsar Gemi Sokum San. Dis Tic. Ltd. Sti. | ||||||||||||
| Gemi Söküm Tesisleri, | ||||||||||||
| Parcel 5 Aliağa | ||||||||||||
| İzmir 35800, | ||||||||||||
| Türkiye | ||||||||||||
| BMS GEMİ GERİ DÖNÜŞÜM SAN. VE TİC. A.Ş.Atatürk Mah. Aygaz Cad. No:27 Aliaga, İzmir 35800,TürkiyePhone: +90 232 618 22 20Email:[email protected] | BMS GEMİ GERİ DÖNÜŞÜM SAN. VE TİC. A.Ş. | Atatürk Mah. Aygaz Cad. No:27 Aliaga, İzmir 35800, | Türkiye | Landing | Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013, with the exception of floating platformsMaximum ship dimensions:Length: no limitWidth: 49 metresDraught: 10 metres | The site has a Ship Dismantling Permit, issued by the Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates. | Tacit approval, with a maximum review period of 15 days.The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. | 37 132(44) | 17 August 2028 | |||
| BMS GEMİ GERİ DÖNÜŞÜM SAN. VE TİC. A.Ş. | ||||||||||||
| Atatürk Mah. Aygaz Cad. No:27 Aliaga, İzmir 35800, | ||||||||||||
| Türkiye | ||||||||||||
| DORTEL GEMI SOKUM DEMIR CELİK SANAYİ VE TIC.LTD.ŞTIGemi Söküm Tesisleri Parsel No:45 Aliağaİzmir 35800,TürkiyePhone: +90 232 618 2118Email:[email protected] | DORTEL GEMI SOKUM DEMIR CELİK SANAYİ VE TIC.LTD.ŞTI | Gemi Söküm Tesisleri Parsel No:45 Aliağa | İzmir 35800, | Türkiye | Landing | Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013, with the exception of floating platformsMaximum ship dimensions:Length: no limitWidth: 49 metresDraught: 25 metres | The site has a Ship Dismantling Permit, issued by the Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates. | Tacit approval, with a maximum review period of 15 days.The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. | 41 268(45) | 20 July 2029 | ||
| DORTEL GEMI SOKUM DEMIR CELİK SANAYİ VE TIC.LTD.ŞTI | ||||||||||||
| Gemi Söküm Tesisleri Parsel No:45 Aliağa | ||||||||||||
| İzmir 35800, | ||||||||||||
| Türkiye | ||||||||||||
| EGE CELIK SAN. VE TIC. A.S.Gemi Söküm Tesisleri,Parcel 10 Aliağa,Izmir 35800,TürkiyePhone: +90 232 618 21 62Email:[email protected] | EGE CELIK SAN. VE TIC. A.S. | Gemi Söküm Tesisleri, | Parcel 10 Aliağa, | Izmir 35800, | Türkiye | Landing | Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: no limitWidth: 50 metersDraught: 15 meters | The site has a Ship Dismantling Permit, issued by the Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates. | Tacit approval, with a maximum review period of 15 days.The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. | 55 503(46) | 12 February 2025 | |
| EGE CELIK SAN. VE TIC. A.S. | ||||||||||||
| Gemi Söküm Tesisleri, | ||||||||||||
| Parcel 10 Aliağa, | ||||||||||||
| Izmir 35800, | ||||||||||||
| Türkiye | ||||||||||||
| EGE GEMI SÖKÜM SAN. VE TIC. A.S.Gemi Söküm Tesisleri,Parcel 17 Aliağa,Izmir 35800,TürkiyePhone: +90 232 618 20 11Email:[email protected] | EGE GEMI SÖKÜM SAN. VE TIC. A.S. | Gemi Söküm Tesisleri, | Parcel 17 Aliağa, | Izmir 35800, | Türkiye | Landing | Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013, with the exception of floating platformsMaximum ship dimensions:Length: no limitWidth: 49 metersDraught: 25 meters | The site has a Ship Dismantling Permit, issued by the Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates. | Tacit approval, with a maximum review period of 15 days.The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. | 34 986(47) | 20 July 2029 | |
| EGE GEMI SÖKÜM SAN. VE TIC. A.S. | ||||||||||||
| Gemi Söküm Tesisleri, | ||||||||||||
| Parcel 17 Aliağa, | ||||||||||||
| Izmir 35800, | ||||||||||||
| Türkiye | ||||||||||||
| LEYAL GEMİ SÖKÜM SANAYİ ve TİCARET LTD.Gemi Söküm Tesisleri,Parcel 3-4 Aliağa,Izmir 35800,TürkiyePhone: +90 232 618 20 30Email:[email protected] | LEYAL GEMİ SÖKÜM SANAYİ ve TİCARET LTD. | Gemi Söküm Tesisleri, | Parcel 3-4 Aliağa, | Izmir 35800, | Türkiye | Landing | Ships as defined in Article 3(1), point (1),of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: no limitWidth: 100 metersDraught: 15 meters | The site has a Ship Dismantling Permit, issued by the Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates. | Tacit approval, with a maximum review period of 15 daysThe ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. | 64 815(48) | 10 December 2028 | |
| LEYAL GEMİ SÖKÜM SANAYİ ve TİCARET LTD. | ||||||||||||
| Gemi Söküm Tesisleri, | ||||||||||||
| Parcel 3-4 Aliağa, | ||||||||||||
| Izmir 35800, | ||||||||||||
| Türkiye | ||||||||||||
| LEYAL-DEMTAŞ GEMİ SÖKÜM SANAYİ ve TİCARET A.Ş.Gemi Söküm Tesisleri,Parcel 25 Aliağa,Izmir 35800,TürkiyePhone: +90 232 618 20 65Email:[email protected] | LEYAL-DEMTAŞ GEMİ SÖKÜM SANAYİ ve TİCARET A.Ş. | Gemi Söküm Tesisleri, | Parcel 25 Aliağa, | Izmir 35800, | Türkiye | Landing | Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: no limitWidth: 63 metersDraught: 15 meters | The site has a Ship Dismantling Permit, issued by Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates. | Tacit approval, with a maximum review period of 15 daysThe ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. | 57 275(49) | 10 December 2028 | |
| LEYAL-DEMTAŞ GEMİ SÖKÜM SANAYİ ve TİCARET A.Ş. | ||||||||||||
| Gemi Söküm Tesisleri, | ||||||||||||
| Parcel 25 Aliağa, | ||||||||||||
| Izmir 35800, | ||||||||||||
| Türkiye | ||||||||||||
| KILIÇLAR GERİ DÖNÜŞÜMLÜ MADDELER VE METAL SAN. TİC A.Ş.Atatürk Mahallesi, Aygaz Caddesi No : 57 20 nolu parsel Aliaga – İzmir 35800, TürkiyePhone: +90 232 618 22 17Email:[email protected] | KILIÇLAR GERİ DÖNÜŞÜMLÜ MADDELER VE METAL SAN. TİC A.Ş. | Atatürk Mahallesi, Aygaz Caddesi No : 57 20 nolu parsel Aliaga – İzmir 35800, Türkiye | Landing | Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013, with the exception of floating platformsMaximum ship dimensions:Length: no limitWidth: 49 metresDraught: 15 metres | The site has a Ship Dismantling Permit, issued by Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates. | Tacit approval, with a maximum review period of 15 days.The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. | 16 711(50) | 17 August 2028 | ||||
| KILIÇLAR GERİ DÖNÜŞÜMLÜ MADDELER VE METAL SAN. TİC A.Ş. | ||||||||||||
| Atatürk Mahallesi, Aygaz Caddesi No : 57 20 nolu parsel Aliaga – İzmir 35800, Türkiye | ||||||||||||
| ÖGE GEMİ SÖKÜM İTH. İHR. TİC. SAN.AŞ.Gemi Söküm Tesisleri,Parcel 23 Aliağa,Izmir 35800,TürkiyePhone: +90 232 618 21 05Email:[email protected] | ÖGE GEMİ SÖKÜM İTH. İHR. TİC. SAN.AŞ. | Gemi Söküm Tesisleri, | Parcel 23 Aliağa, | Izmir 35800, | Türkiye | Landing | Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: no limitWidth: 70 metersDraught: 15 meters | The site has a Ship Dismantling Permit, issued by Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates. | Tacit approval, with a maximum review period of 15 days.The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. | 62 471(51) | 12 February 2025 | |
| ÖGE GEMİ SÖKÜM İTH. İHR. TİC. SAN.AŞ. | ||||||||||||
| Gemi Söküm Tesisleri, | ||||||||||||
| Parcel 23 Aliağa, | ||||||||||||
| Izmir 35800, | ||||||||||||
| Türkiye | ||||||||||||
| Sök Denizcilik Tic. Ltd. StiGemi Söküm Tesisleri,Parcel 8-9 Aliağa,Izmir 35800,TürkiyePhone: +90 232 618 2092Email:[email protected] | Sök Denizcilik Tic. Ltd. Sti | Gemi Söküm Tesisleri, | Parcel 8-9 Aliağa, | Izmir 35800, | Türkiye | Landing | Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: no limitWidth: 90 metersDraught: 15 meters | The site has a Ship Dismantling Permit, issued by Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates. | Tacit approval, with a maximum review period of 15 days.The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. | 66 167(52) | 12 February 2025 | |
| Sök Denizcilik Tic. Ltd. Sti | ||||||||||||
| Gemi Söküm Tesisleri, | ||||||||||||
| Parcel 8-9 Aliağa, | ||||||||||||
| Izmir 35800, | ||||||||||||
| Türkiye | ||||||||||||
| UNITED KINGDOM | ||||||||||||
| Dales Marine Services LtdImperial Dry DockLeithEdinburghEH6 7DRUnited KingdomPhone: + 44 (0)131 454 3380; + 44 (0)7834 658 588Email:[email protected] | Dales Marine Services Ltd | Imperial Dry Dock | Leith | Edinburgh | EH6 7DR | United Kingdom | Drydock and wet berth | Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013, with the exception of floating platformsMaximum ship dimensions:Length: 165 metersWidth: 20 metersDraught: 7,7 meters | The site is authorised by way of a waste management licence, authorisation number WML/L/1157331 that limits the operations and places conditions on the operator of the facility. | Explicit approval | 5 019(53) | 22 May 2027 |
| Dales Marine Services Ltd | ||||||||||||
| Imperial Dry Dock | ||||||||||||
| Leith | ||||||||||||
| Edinburgh | ||||||||||||
| EH6 7DR | ||||||||||||
| United Kingdom | ||||||||||||
| Kishorn Port LtdKishorn BaseKishornStrathcarronIV54 8XAUnited KingdomPhone: +44 (0)139 777 3840Email:[email protected]@[email protected] | Kishorn Port Ltd | Kishorn Base | Kishorn | Strathcarron | IV54 8XA | United Kingdom | Drydock | Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 160 metersWidth: 160 metersDraught: 13.8 metersLDT: 26 448 | The site is authorised by way of a waste management licence, authorisation number WML/L/1175043 Modification 01’ and ‘WML/L/1175043 Modification 02’ that limits the operations and places conditions on the operator of the facility. | Explicit approval | 38 148(54) | 22 May 2027 |
| Kishorn Port Ltd | ||||||||||||
| Kishorn Base | ||||||||||||
| Kishorn | ||||||||||||
| Strathcarron | ||||||||||||
| IV54 8XA | ||||||||||||
| United Kingdom | ||||||||||||
| UNITED STATES OF AMERICA | ||||||||||||
| International Shipbreaking Limited L.L.C18601 R.L Ostos Road Brownsville TX, 78521United StatesPhone: +1 956-831-2299Email:[email protected]@internationalshipbreaking.com | International Shipbreaking Limited L.L.C | 18601 R.L Ostos Road Brownsville TX, 78521 | United States | Alongside (wet berth), slope | Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 366 meters Width: 48 meters Draught: 9 meters | The conditions under which the facility is authorised to operate are defined in permits, certificates and authorizations issued to the facility by the Environmental Protection Agency, the Texas Commission of Environmental Quality, the Texas General Land Office and the U.S Coast Guard.The U.S. Toxic Substances Control Act prohibits the import into the US of foreign flagged vessels that contain PCB concentrations greater than 50 parts per million.The facility has two slips with ramps for final vessel recycling (East Slip and West Slip). Ships flying a flag of EU Member States shall be recycled exclusively on the East Slip ramp. | There is currently no procedure in US law related to the approval of ship recycling plans | 120 000(55) | 10 December 2028 | |||
| International Shipbreaking Limited L.L.C | ||||||||||||
| 18601 R.L Ostos Road Brownsville TX, 78521 | ||||||||||||
| United States |
| Anadolu Gemi Söküm Orman Ürn. Gida Tur. Nak. San. Ve Tic. A.Ş. |
| Gemi Söküm Tesisleri Parsel No:16 Aliağa |
| İzmir 35800, |
| Türkiye |
| Avsar Gemi Sokum San. Dis Tic. Ltd. Sti. |
| Gemi Söküm Tesisleri, |
| Parcel 5 Aliağa |
| İzmir 35800, |
| Türkiye |
| BMS GEMİ GERİ DÖNÜŞÜM SAN. VE TİC. A.Ş. |
| Atatürk Mah. Aygaz Cad. No:27 Aliaga, İzmir 35800, |
| Türkiye |
| DORTEL GEMI SOKUM DEMIR CELİK SANAYİ VE TIC.LTD.ŞTI |
| Gemi Söküm Tesisleri Parsel No:45 Aliağa |
| İzmir 35800, |
| Türkiye |
| EGE CELIK SAN. VE TIC. A.S. |
| Gemi Söküm Tesisleri, |
| Parcel 10 Aliağa, |
| Izmir 35800, |
| Türkiye |
| EGE GEMI SÖKÜM SAN. VE TIC. A.S. |
| Gemi Söküm Tesisleri, |
| Parcel 17 Aliağa, |
| Izmir 35800, |
| Türkiye |
| LEYAL GEMİ SÖKÜM SANAYİ ve TİCARET LTD. |
| Gemi Söküm Tesisleri, |
| Parcel 3-4 Aliağa, |
| Izmir 35800, |
| Türkiye |
| LEYAL-DEMTAŞ GEMİ SÖKÜM SANAYİ ve TİCARET A.Ş. |
| Gemi Söküm Tesisleri, |
| Parcel 25 Aliağa, |
| Izmir 35800, |
| Türkiye |
| KILIÇLAR GERİ DÖNÜŞÜMLÜ MADDELER VE METAL SAN. TİC A.Ş. |
| Atatürk Mahallesi, Aygaz Caddesi No : 57 20 nolu parsel Aliaga – İzmir 35800, Türkiye |
| ÖGE GEMİ SÖKÜM İTH. İHR. TİC. SAN.AŞ. |
| Gemi Söküm Tesisleri, |
| Parcel 23 Aliağa, |
| Izmir 35800, |
| Türkiye |
| Sök Denizcilik Tic. Ltd. Sti |
| Gemi Söküm Tesisleri, |
| Parcel 8-9 Aliağa, |
| Izmir 35800, |
| Türkiye |
| Dales Marine Services Ltd |
| Imperial Dry Dock |
| Leith |
| Edinburgh |
| EH6 7DR |
| United Kingdom |
| Kishorn Port Ltd |
| Kishorn Base |
| Kishorn |
| Strathcarron |
| IV54 8XA |
| United Kingdom |
| International Shipbreaking Limited L.L.C |
| 18601 R.L Ostos Road Brownsville TX, 78521 |
| United States |
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) No 1257/2013 of the European Parliament and of the Council of 20 November 2013 on ship recycling and amending Regulation (EC) No 1013/2006 and Directive 2009/16/EC (1), and in particular Article 16 thereof,
Whereas:
(1) Article 6(2), point (a), of Regulation (EU) No 1257/2013 requires ship owners to ensure that ships destined to be recycled are only recycled at ship recycling facilities included in the European List of ship recycling facilities (‘European List’) published pursuant to Article 16(2) of that Regulation.
(2) The European List is set out in Commission Implementing Decision (EU) 2016/2323 (2).
(3) The authorisations of Arise Recycling AS, a ship recycling facility located in Norway, is due to expire on 1 October 2024. The Commission has received information from Norway that the authorisation to conduct ship recycling granted to that facility has been verified, in accordance with Article 14 of Regulation (EU) No 1257/2013. The European List should therefore be updated accordingly.
(4) The authorisation of Sagro Aannemingsmaatschappij Zeeland B.V. located in the Netherlands expired on 28 March 2024 and the competent authority informed the Commission that the facility did not request to renew its permit. That facility should therefore be removed from the European List.
(5) The authorisation of UAB Demeksa located in Lithuania expired on 25 May 2024 and the competent authority informed the Commission that the facility did not request to renew its permit. That facility should therefore be removed from the European List.
(6) The authorisation of Ship and Industrial Service Ltd located in Bulgaria expired on 25 January 2024 and the competent authority informed the Commission that the facility is ceasing its activity. That facility should therefore be removed from the European List.
(7) Denmark informed the Commission that the facility JATOB ApS has changed name to Jatob Frederikshavn ApS and the Netherlands informed the Commission about a change in the method of recycling for Damen Verolme Rotterdam B.V. Furthermore, Kiliçlar asked to add an information in their contact details. The European List should therefore be updated to reflect these changes.
(8) The Commission has received two applications, in accordance with Article 15(1) of Regulation (EU) No 1257/2013, for Dortel Gemi Söküm Demir Celik San. Ve Tic. Ltd. Şti. and Ege Gemi Söküm San Ve Metal San.Tic. A.Ş., ship recycling facilities located in Türkiye, to be included in the European List. Having assessed the information and supporting evidence provided and gathered in accordance with Article 15 of that Regulation, the Commission considers that the facilities comply with the requirements set out in Article 13 of that Regulation to conduct ship recycling and to be included in the European List. The European List should therefore be updated to include those facilities.
(9) Anadolu Gemi Sokum located in Türkiye has demonstrated that it complies with the requirements of the Regulation with respect to the safe and environmentally sound dismantling of floating platforms and included specific procedure in its ship recycling facility plan. The limitation related to the dismantling of rigs should therefore be removed in the European List. At the same time, it should be recalled that the yards remain bound by the limit of the width of the vessels they can receive. The limit set by the width of the vessel could only be considered to be removed following the review of a cooperation agreement with an EU listed neighbouring ship recycling facility which would cover in a satisfactory way the nature and conditions of such cooperation. To be consistent with the terminology used under the definition in Article 3(1), point (1), of Regulation (EU) No 1257/2013, and taking into account the need for specific dismantling procedures, the limitations for ‘rigs’ should be replaced by a limitation for ‘floating platforms’. The European List should therefore be updated to reflect these changes.
(10) Implementing Decision (EU) 2016/2323 should therefore be amended accordingly.
(11) The measures provided for in this Decision are in accordance with the opinion of the Committee established by Article 25 of Regulation (EU) No 1257/2013,
HAS ADOPTED THIS DECISION:
‘ANNEX
The European List of ship recycling facilities referred to in Article 16 of Regulation (EU) No 1257/2013
Part A
Ship recycling facilities located in a Member State
Name of the facility
Method of recycling
Type and size of ships that can be recycled
Limitations and conditions under which the ship recycling facility operates, including as regards hazardous waste management
Details on the explicit or tacit procedure for the approval of the ship recycling plan by the competent authority (1) Maximum annual ship recycling output, calculated as the sum of the weight of ships expressed in LDT that have been recycled in a given year in that facility (2) Date of expiry of inclusion in the European List (3) BELGIUM
NV Galloo Recycling Ghent
Scheepszatestraat 9
9000 Gent
Belgium
Phone: +32(0)9/251 25 21
Email: [email protected]
Alongside (wet berth), slope
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 265 meters
Width: 37 meters
Draught: 12,5 meters
Tacit approval, with a maximum review period of 30 days
34 000 (4) 31 March 2025
DENMARK
FAYARD A/S
Kystvejen 100
DK-5330 Munkebo
Denmark
www.fayard.dk
Phone: +45 7592 0000
Email: [email protected]
Drydock
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 415 meters
Width: 90 meters
Draught: 7,8 meters
The ship recycling facility is regulated in accordance with applicable legislation and with the conditions set out in Environmental Permit of 7 November 2018 issued by the Municipality of Kerteminde. The Environmental Permit includes conditions for operating hours, special operating conditions, handling and storage of waste and also includes a condition that the activity must be carried out in a dry dock.
Tacit approval, with a maximum review period of 14 days.
916,34 (5) 22 May 2028
Fornæs ApS
Rolshøjvej 12-16
8500 Grenaa
Denmark
www.fornaes.com
Phone: +45 86326393
Email: [email protected]
Alongside, drydock
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 150 meters
Width: 25 meters
Draught: 7 meters
GT: 10 000
The municipality of Norddjurs has the right to allocate hazardous waste for environmentally approved reception facilities.
Tacit approval, with a maximum review period of 14 days.
30 000 (6) 12 May 2026
Jatob Frederikshavn ApS
Langerak 12
9900 Frederikshavn
Denmark
www.jatob.dk
Phone: +45 8668 1689
Email: [email protected]
[email protected]
Alongside, slipway
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 150 meters
Width: 30 meters
Draught: 6 meters
Handling and storage of waste fractions is given by Environmental Authorization. Intermediate storage of hazardous waste may occur for up to one year at the site.
Tacit approval, with a maximum review period of 14 days.
13 000 (7) 9 March 2025
Modern American Recycling Services Europe (M.A.R.S)
Sandholm 60
9900 Frederikshavn
Denmark
www.modernamericanrecyclingservices.com/
Phone: +45 30307763
Email: [email protected]
Slipway
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 400 meters Width: 90 meters Draught: 14 meters
The conditions under which the ship recycling facility operates are defined in the Environmental Permit of 9 March 2018 and Addendum to Environmental Permit of 12 July 2022 issued by the Municipality of Frederikshavn.
The Municipality of Frederikshavn has the right to allocate hazardous waste to environmentally approved reception facilities.
The facility must not store hazardous waste for more than one year.
Tacit approval, with a review period of 14 days.
60 000 (8) 27 January 2028
Smedegaarden A/S
Vikingkaj 5
6700 Esbjerg
Denmark
www.smedegaarden.net
Phone: +45 75128888
E-mail:
[email protected]
Alongside, slipway
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 200 meters *
Width: 48 meters
Draught: 7,5 meters
(* If length > 170 meters,
acceptation from the
Municipality of Esbjerg
is required)
The conditions under which the ship recycling facility operates are defined in the Environmental Permit of 4 June 2015 issued by the Municipality of Esbjerg.
The Municipality of Esbjerg has the right to allocate hazardous waste to environmentally approved reception facilities.
Tacit approval, with a maximum review period of 14 days
20 000 (9) 11 March 2026
ESTONIA
BLRT Refonda Baltic OÜ
Kopli 103, 11712 Tallinn, Estonia
Phone: +372 610 2933
Fax: +372 610 2444
Email: [email protected]
www.refonda.ee
Afloat at the quayside and in the floating dock
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 197 meters
Width: 32 meters
Draught: 9,6 meters
Waste permit No. KL-511809. Hazardous waste management licence No 0546. Rules of the Vene-Balti Port, Manual on Ships Recycling MSR-Refonda. Environmental Management System, Waste management EP 4.4.6-1-13
The facility can recycle only the hazardous materials for which it has been licensed.
Tacit approval, with a maximum review period of 30 days.
24 364 (10) 15 February 2026
SPAIN
DESGUACE INDUSTRIAL Y NAVAL, S.L.U. (DINA)
Vega de Tapia, s/n
48903 Barakaldo-Bizkaia
Spain
Phone: +34 944971552
Email: [email protected]
www.redena.es
Alongside, dismantling ramp
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 120 meters
Width: 20 meters
Draught: 6 meters
The limitations are included in the integrated environmental authorisation.
Tacit approval. The competent authority for approval is the environmental authority of the Autonomous Community where the facility is located.
2 086 (11) 3 March 2026
DDR VESSELS XXI, S.L.
Port of “El Musel”
Gijon
Spain
Phone: +34 630 14 44 16
Email: [email protected]
Alongside, dismantling ramp
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 169,9 meters
(Ships above that size which can operate a zero rollover or negative ramp movement may be accepted depending on the outcome of a detailed feasibility study)
Width: 25 meters
The limitations are included in the integrated environmental authorisation.
Tacit approval. The competent authority for approval is the environmental authority of the Autonomous Community where the facility is located.
3 600 (12) 28 July 2025
FRANCE
Démonaval Recycling
ZI du Malaquis
Rue François Arago
76580 LE TRAIT
France
Phone: (+33) (0)7 69 79 12 80
Email:
[email protected]
Alongside, drydock
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 140 meters
Width: 25 meters
Depth: 5 meters
Environmental limitations are defined in the prefectural authorisation.
Explicit approval – The competent authority for the approval decision is the minister of environment
1 500 (13) 21 September 2027
GARDET & DE BEZENAC Recycling
/ Groupe BAUDELET ENVIRONNEMENT – GIE MUG
616, Boulevard Jules Durand
76600 Le Havre
France
Phone: +33(0)2 35 95 16 34
Email: [email protected]
Floating and slipway
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 150 meters
Width: 18 meters
Depth: 7 meters
LDT: 7 000
Environmental limitations are defined in the prefectural authorisation.
Explicit approval – The competent authority for the approval decision is the minister of environment.
7 730 (14) 29 December 2026
Grand Port Maritime de Bordeaux
152, Quai de Bacalan – CS 41320 – 33082 Bordeaux Cedex
France
Phone: +33(0)5 56 90 58 00
Email: [email protected]
Alongside, drydock
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 240 meters
Width: 37 meters
Depth: 17 meters
Environmental limitations are defined in the prefectural authorisation.
Explicit approval – The competent authority for the approval decision is the minister of environment.
9 000 (15) 27 September 2026
Recycleurs Bretons – Navaléo
170 rue Jacqueline Auriol
29470 Guipavas
France
Phone: +33(0)2 98 01 11 06
Email: [email protected]
Alongside, drydock
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 225 meters
Width: 34 meters
Depth: 27 meters
Environmental limitations are defined in the prefectural authorisation.
Explicit approval – The competent authority for the approval decision is the minister of environment.
15 000 (16) 19 June 2025
ITALY
San Giorgio del Porto S.p.A.
Calata Boccardo 8
16128 – Genova –
Italy
Phone: +39 (0)10 251561
Email:
[email protected];
[email protected]
www.sgdp.it
Alongside, drydock
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 350 meters
Width: 75 meters
Depth: 16 meters
GT: 130 000
The limitations and restrictions are included in the integrated environmental authorisation.
Explicit approval
38 564 (17) 6 June 2028
LATVIA
“Galaksis N”, Ltd.
Kapsedes street 2D,
Liepāja, LV – 3414
Latvia
Phone: +371 29410506
Email: [email protected]
Alongside (wet berth), drydock
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 165 meters
Width:22 meters
Depth: 7 meters
GT: 12 000
See national permit No. LI12IB0053
Explicit approval – written notification in 30 working days
2 490 (18) 17 July 2024
LITHUANIA
UAB APK
Minijos 180 (berth 133A), LT 93269, Klaipėda,
Lithuania
Phone: +370 (46) 365776
Fax: +370 (46) 365776
Email: [email protected]
Alongside (wet berth)
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 130 meters
Width: 35 meters
Depth: 10 meters
GT: 3 500
See national permit No. TL-KL.1-15/2015
Explicit approval – written notification in 30 working days
1 500 (19) 12 March 2025
UAB Armar
Minijos 180 (berth 131A), LT 93269, Klaipėda,
Lithuania
Phone: +370 685 32607
Email: [email protected]
Alongside (wet berth)
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 80 meters
Width: 16 meters
Depth: 5 meters
GT: 1 500
See national permit No. TL-KL.1-51/2017
Explicit approval – written notification in 30 working days
3 910 (20) 12 April 2027
UAB Vakarų refonda
Minijos 180 (berths 129, 130, 131A, 131, 132, 133A), LT 93269, Klaipėda,
Lithuania
Phone: +370 (46) 483940 / 483891
Fax: +370 (46) 483891
Email: [email protected]
Alongside (wet berth)
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 230 meters
Width: 55 meters
Depth: 14 meters
GT: 70 000
See national permit No. (11.2)-30-161/2011/TL-KL.1-18/2015
Explicit approval – written notification in 30 working days
20 140 (21) 30 April 2025
THE NETHERLANDS
Damen Verolme Rotterdam B.V.
Prof. Gerbrandyweg 25
3197 KK Rotterdam
The Netherlands
Phone: +31 (0)181 23 4353
Email: [email protected]
Preparatory actions along the quayside, placed into drydock for scrapping
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 400 meters
Width: 90 meters
Depth: 12 meters
Height: 90 meters
The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner.
Explicit approval
0 (22) 21 May 2026
DECOM Amsterdam B.V.
Siciliëweg 10 1045 AS Amsterdam
The Netherlands
Phone: +31 23 558 1937
Email: [email protected]
Preparatory actions along the quayside, lifted onshore for scrapping
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 240 meters
Width: 50 meters
Draught: 9 meters
The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner.
Explicit approval
17 500 (23) 5 October 2026
Hoondert Services & Decommissioning B.V.
Spanjeweg 4
4455 TW Nieuwdorp
The Netherlands
Phone: +31 113352510
Email: [email protected]
Preparatory actions along the quayside, lifted onshore for scrapping
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 175 meters
Width: 40 meters
Depth: 10 meters
The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner.
Explicit approval
30 000 (24) 26 January 2026
NORWAY
Arise Recycling AS (previously ADRS Decom Gulen)
Facility address:
Sløvågen 2,
5960 Dalsøyra,
Norway
Office address:
Statsminister Michelsens vei 38,
5230 Paradis,
Norway
https://adrs.no/
Alongside, slipway, dry/wet-dock
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013. Maximum ship dimensions:
Length: 360 meters
Width: No limit
Depth: No limit
See national permit No. 2019.0501.T
Explicit approval
0 (25) 20 July 2029
AF Offshore Decom
Raunesvegen 597,
5578 Nedre Vats
Norway
https://afgruppen.com/Decommissioning/
Alongside, quayside
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 500 meters
Width: no limit
Depth: no limit
See national permit No. 2005.0038.T
Explicit approval
31 000 (26) 10 December 2028 (27) Green Yard AS
Angholmsveien 304
4485 Feda,
Norway
tlf: +4790098185
www.greenyard.no
Drydock (indoors), slipway
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 230 meters
Width: 25 meters
Depth: 20 meters
See national permit No. 2018.0833.T
Major dismantling operations must be performed indoors.
The only dismantling and cutting operations that are allowed outside in open air are minor operations necessary to fit ships to the indoor facility. See permit for further details.
Explicit approval
30 000 (28) 10 December 2028 (29) Green Yard Kleven AS
6065 Ulsteinvik
Norway
www.kleven.no
Alongside, slipway
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 170 meters
Width: 35 meters
Depth: No limit
See national permit No 2021.0011.T
Explicit approval
0 (30) 9 April 2026
Fosen Gjenvinning AS
Stokksundveien 1432,
7177 Revsnes
Norway
Phone: +47 400 39 479 Email: [email protected]
Alongside
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013, with the exception of floating platforms or vessels used for extracting hydrocarbons
Maximum ship dimensions:
Length: 150 meters
Width: 20 meters
Depth: 7 meters
See national permit No. 2006.0250.T
Explicit approval
8 000 (31) 10 December 2028 (32) Aker Solutions AS (Stord)
Eldøyane 59
5411 Stord
Norway
www.kvaerner.com
Alongside (wet berth), slipway
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 230 meters
Width: No limit
Depth: No limit
See national permit No. 2013.0111.T
Explicit approval
60 000 (33) 10 December 2028 (34) Norscrap West AS
Hanøytangen 122,
5310 Hauglandhella,
Norway
www.norscrap.no
Floating slipway. Optional depending on complexity, in addition: 1. Dismantling by quay and subsequent scrapping on impermeable floors with effective drainage system. 2. Drydock
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 150 meters
Width: 34 meters
Draught: 5 meters / increasing depending on method of recycling.
See national permit No. 2017.0864.T
Maximum 8 000 LDT on floating slipway. Ships exceeding 8 000 LDT need to be dismantled using another method of recycling
Explicit approval
25 000 (35) 10 December 2028 (36) FINLAND
Turun Korjaustelakka Oy (Turku Repair Yard Ltd)
Navirentie, 21100 Naantali
Finland
Phone: +358 2 44 511
Email [email protected]
Alongside, drydock
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 250 meters
Width: 40 meters
Draught: 7,9 meters
The limitations are included in the national environmental permit.
Explicit approval
20 000 (37) 14 December 2025
UNITED KINGDOM – NORTHERN IRELAND
Harland and Wolff (Belfast) Ltd
Queen’s Island
Belfast
BT3 9DU
Northern Ireland
Phone +44(0)2890534189 Fax +44(0)2890458515
E-mail [email protected]
Dry dock and wet berth
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 556 meters
Width: 93 meters
Draught: 7,5 meters
DWT: 550 000
The site is authorised by way of a waste management licence, authorisation number LN/20/11 that limits the operations and places conditions on the operator of the facility.
Explicit approval
12 000 (38) 16 June 2025
Part B
Ship recycling facilities located in a third country
Name of the facility
Method of recycling
Type and size of ships that can be recycled
Limitations and conditions under which the ship recycling facility operates, including as regards hazardous waste management
Details on the explicit or tacit procedure for the approval of the ship recycling plan by the competent authority (39) Maximum annual ship recycling output, calculated as the sum of the weight of ships expressed in LDT that have been recycled in a given year in that facility (40) Date of expiry of inclusion in the European List (41) TÜRKIYE
Anadolu Gemi Söküm Orman Ürn. Gida Tur. Nak. San. Ve Tic. A.Ş.
Gemi Söküm Tesisleri Parsel No:16 Aliağa
İzmir 35800,
Türkiye
Phone: +90 232 618 21 02
Email: [email protected]
Landing
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013. Maximum ship dimensions:
Length: no limit
Width: 55 metres
Draught: 12 metres
The site has a Ship Dismantling Permit, issued by the Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates.
Tacit approval, with a maximum review period of 15 days.
The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document.
111 823 (42) 17 August 2028
Avsar Gemi Sokum San. Dis Tic. Ltd. Sti.
Gemi Söküm Tesisleri,
Parcel 5 Aliağa
İzmir 35800,
Türkiye
Phone: +90 232 618 21 07 – 08 – 09
Email: [email protected]
Landing
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013, with the exception of floating platforms.
Maximum ship dimensions:
Length: no limit
Width: 50 meters
Draught: 15 meters
The site has a Ship Dismantling Permit, issued by the Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates.
Tacit approval, with a maximum review period of 15 days.
The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document.
54 224 (43) 2 December 2025
BMS GEMİ GERİ DÖNÜŞÜM SAN. VE TİC. A.Ş.
Atatürk Mah. Aygaz Cad. No:27 Aliaga, İzmir 35800,
Türkiye
Phone: +90 232 618 22 20
Email: [email protected]
Landing
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013, with the exception of floating platforms
Maximum ship dimensions:
Length: no limit
Width: 49 metres
Draught: 10 metres
The site has a Ship Dismantling Permit, issued by the Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates.
Tacit approval, with a maximum review period of 15 days.
The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document.
37 132 (44) 17 August 2028
DORTEL GEMI SOKUM DEMIR CELİK SANAYİ VE TIC.LTD.ŞTI
Gemi Söküm Tesisleri Parsel No:45 Aliağa
İzmir 35800,
Türkiye
Phone: +90 232 618 2118
Email: [email protected]
Landing
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013, with the exception of floating platforms
Maximum ship dimensions:
Length: no limit
Width: 49 metres
Draught: 25 metres
The site has a Ship Dismantling Permit, issued by the Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates.
Tacit approval, with a maximum review period of 15 days.
The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document.
41 268 (45) 20 July 2029
EGE CELIK SAN. VE TIC. A.S.
Gemi Söküm Tesisleri,
Parcel 10 Aliağa,
Izmir 35800,
Türkiye
Phone: +90 232 618 21 62
Email: [email protected]
Landing
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: no limit
Width: 50 meters
Draught: 15 meters
The site has a Ship Dismantling Permit, issued by the Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates.
Tacit approval, with a maximum review period of 15 days.
The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document.
55 503 (46) 12 February 2025
EGE GEMI SÖKÜM SAN. VE TIC. A.S.
Gemi Söküm Tesisleri,
Parcel 17 Aliağa,
Izmir 35800,
Türkiye
Phone: +90 232 618 20 11
Email: [email protected]
Landing
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013, with the exception of floating platforms
Maximum ship dimensions:
Length: no limit
Width: 49 meters
Draught: 25 meters
The site has a Ship Dismantling Permit, issued by the Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates.
Tacit approval, with a maximum review period of 15 days.
The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document.
34 986 (47) 20 July 2029
LEYAL GEMİ SÖKÜM SANAYİ ve TİCARET LTD.
Gemi Söküm Tesisleri,
Parcel 3-4 Aliağa,
Izmir 35800,
Türkiye
Phone: +90 232 618 20 30
Email: [email protected]
Landing
Ships as defined in Article 3(1), point (1),of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: no limit
Width: 100 meters
Draught: 15 meters
The site has a Ship Dismantling Permit, issued by the Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates.
Tacit approval, with a maximum review period of 15 days
The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document.
64 815 (48) 10 December 2028
LEYAL-DEMTAŞ GEMİ SÖKÜM SANAYİ ve TİCARET A.Ş.
Gemi Söküm Tesisleri,
Parcel 25 Aliağa,
Izmir 35800,
Türkiye
Phone: +90 232 618 20 65
Email: [email protected]
Landing
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: no limit
Width: 63 meters
Draught: 15 meters
The site has a Ship Dismantling Permit, issued by Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates.
Tacit approval, with a maximum review period of 15 days
The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document.
57 275 (49) 10 December 2028
KILIÇLAR GERİ DÖNÜŞÜMLÜ MADDELER VE METAL SAN. TİC A.Ş.
Atatürk Mahallesi, Aygaz Caddesi No : 57 20 nolu parsel Aliaga – İzmir 35800, Türkiye
Phone: +90 232 618 22 17
Email: [email protected]
www.kiliclarshiprecycling.com
Landing
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013, with the exception of floating platforms
Maximum ship dimensions:
Length: no limit
Width: 49 metres
Draught: 15 metres
The site has a Ship Dismantling Permit, issued by Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates.
Tacit approval, with a maximum review period of 15 days.
The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document.
16 711 (50) 17 August 2028
ÖGE GEMİ SÖKÜM İTH. İHR. TİC. SAN.AŞ.
Gemi Söküm Tesisleri,
Parcel 23 Aliağa,
Izmir 35800,
Türkiye
Phone: +90 232 618 21 05
Email: [email protected]
www.ogegemi.com
Landing
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: no limit
Width: 70 meters
Draught: 15 meters
The site has a Ship Dismantling Permit, issued by Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates.
Tacit approval, with a maximum review period of 15 days.
The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document.
62 471 (51) 12 February 2025
Sök Denizcilik Tic. Ltd. Sti
Gemi Söküm Tesisleri,
Parcel 8-9 Aliağa,
Izmir 35800,
Türkiye
Phone: +90 232 618 2092
Email: [email protected]
Landing
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: no limit
Width: 90 meters
Draught: 15 meters
The site has a Ship Dismantling Permit, issued by Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates.
Tacit approval, with a maximum review period of 15 days.
The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document.
66 167 (52) 12 February 2025
UNITED KINGDOM
Dales Marine Services Ltd
Imperial Dry Dock
Leith
Edinburgh
EH6 7DR
United Kingdom
Phone: + 44 (0)131 454 3380; + 44 (0)7834 658 588
Email: [email protected]
Drydock and wet berth
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013, with the exception of floating platforms
Maximum ship dimensions:
Length: 165 meters
Width: 20 meters
Draught: 7,7 meters
The site is authorised by way of a waste management licence, authorisation number WML/L/1157331 that limits the operations and places conditions on the operator of the facility.
Explicit approval
5 019 (53) 22 May 2027
Kishorn Port Ltd
Kishorn Base
Kishorn
Strathcarron
IV54 8XA
United Kingdom
Phone: +44 (0)139 777 3840
Email: [email protected]
[email protected]
[email protected]
Drydock
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 160 meters
Width: 160 meters
Draught: 13.8 meters
LDT: 26 448
The site is authorised by way of a waste management licence, authorisation number WML/L/1175043 Modification 01’ and ‘WML/L/1175043 Modification 02’ that limits the operations and places conditions on the operator of the facility.
Explicit approval
38 148 (54) 22 May 2027
UNITED STATES OF AMERICA
International Shipbreaking Limited L.L.C
18601 R.L Ostos Road Brownsville TX, 78521
United States
Phone: +1 956-831-2299
Email: [email protected]
[email protected]
Alongside (wet berth), slope
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 366 meters Width: 48 meters Draught: 9 meters
The conditions under which the facility is authorised to operate are defined in permits, certificates and authorizations issued to the facility by the Environmental Protection Agency, the Texas Commission of Environmental Quality, the Texas General Land Office and the U.S Coast Guard.
The U.S. Toxic Substances Control Act prohibits the import into the US of foreign flagged vessels that contain PCB concentrations greater than 50 parts per million.
The facility has two slips with ramps for final vessel recycling (East Slip and West Slip). Ships flying a flag of EU Member States shall be recycled exclusively on the East Slip ramp.
There is currently no procedure in US law related to the approval of ship recycling plans
120 000 (55) 10 December 2028
’
(1) As referred to in Article 7(3) of Regulation (EU) No 1257/2013.
(2) As referred to in Article 32(1), point (a), third sentence, of Regulation (EU) No 1257/2013.
(3) The date of expiry of inclusion in the European List corresponds to the date of expiry of the permit or authorisation granted to the facility in the Member State.
(4) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 50 000 LDT per year.
(5) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 30 000 LDT per year.
(6) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 50 000 LDT per year.
(7) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 30 000 LDT per year.
(8) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 200 000 LDT per year.
(9) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 50 000 LDT per year.
(10) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 36 000 LDT per year.
(11) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 6 000 LDT per year.
(12) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 60 000 LDT per year.
(13) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 15 000 LDT per year.
(14) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 12 000 LDT per year.
(15) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 23 000 LDT per year.
(16) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 40 000 LDT per year.
(17) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 60 000 LDT per year.
(18) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 10 000 LDT per year.
(19) According to its permit, the facility is authorised to recycle a maximum 30 000 LDT per year.
(20) According to its permit, the facility is authorised to recycle a maximum 6 000 LDT per year.
(21) According to its permit, the facility is authorised to recycle a maximum 45 000 LDT per year.
(22) According to its permit, the theoretical maximum annual ship recycling capacity of the facility is 100 000 LDT per year.
(23) According to its permit, the theoretical maximum annual ship recycling capacity of the facility is 47 500 LDT per year.
(24) According to its permit, the theoretical maximum annual ship recycling capacity of the facility is 100 000 LDT per year.
(25) According to its permit, the facility is authorised to recycle a maximum 75 000 LDT per year.
(26) According to its permit, the facility is authorised to recycle a maximum 75 000 LDT per year.
(27) This date of expiry is set by reference to a period of validity corresponding to five years from the date of entry into force of this Decision.
(28) According to its permit, the facility is authorised to recycle a maximum 30 000 LDT per year.
(29) This date of expiry is set by reference to a period of validity corresponding to five years from the date of entry into force of this Decision.
(30) According to its permit, the facility is authorised to recycle a maximum 30 000 LDT per year.
(31) According to its permit, the facility is authorised to recycle a maximum 10 000 LDT per year.
(32) This date of expiry is set by reference to a period of validity corresponding to five years from the date of entry into force of this Decision.
(33) According to its permit, the facility is authorised to recycle a maximum 85 000 LDT per year.
(34) This date of expiry is set by reference to a period of validity corresponding to five years from the date of entry into force of this Decision.
(35) According to its permit, the facility is authorised to recycle a maximum 85 000 LDT per year
(36) This date of expiry is set by reference to a period of validity corresponding to five years from the date of entry into force of this Decision.
(37) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 40 000 LDT per year
(38) According to its permit, the facility is authorised to recycle a maximum of 300 000 LDT per year.
(39) As referred to in Article 7(3) of Regulation (EU) No 1257/2013.
(40) As referred to in Article 32(1), point (a), third sentence, of Regulation (EU) No 1257/2013.
(41) The inclusion of a ship recycling facility located in a third country in the European List is valid for a period of five years from the date of entry into force of the relevant Commission Implementing Decision which provides for the inclusion of that facility, unless otherwise stated.
(42) The theoretical maximum annual ship recycling capacity of the facility is 120 000 LDT per year.
(43) The theoretical maximum annual ship recycling capacity of the facility is 60 000 LDT per year.
(44) The theoretical maximum annual ship recycling capacity of the facility is 75 000 LDT per year.
(45) The theoretical maximum annual ship recycling capacity of the facility is 75 000 LDT per year.
(46) The theoretical maximum annual ship recycling capacity of the facility is 60 000 LDT per year.
(47) The theoretical maximum annual ship recycling capacity of the facility is 70 000 LDT per year.
(48) The theoretical maximum annual ship recycling capacity of the facility is 80 000 LDT per year.
(49) The theoretical maximum annual ship recycling capacity of the facility is 70 000 LDT per year.
(50) The theoretical maximum annual ship recycling capacity of the facility is 30 000 LDT per year.
(51) The theoretical maximum annual ship recycling capacity of the facility is 90 000 LDT per year.
(52) The theoretical maximum annual ship recycling capacity of the facility is 100 000 LDT per year.
(53) According to its permit, the facility is authorised to recycle a maximum of 7 275 LDT per year.
(54) According to its permit, the facility is authorised to recycle a maximum of 38 148 LDT per year.
(55) The theoretical maximum annual ship recycling capacity of the facility is 120 000 LDT per year.