Commission Implementing Decision (EU) 2025/489 of 17 March 2025 concerning the extension of the action taken by Malta Competition and Consumer Affairs Authority permitting the making available on the market and use of the biocidal product Biobor JF in accordance with Regulation (EU) No 528/2012 of the European Parliament and of the Council (notified under document C(2025) 1560)

Official Journalof the European Union ENL series
2025/489 18.3.2025
(1) On 5 May 2024, Malta Competition and Consumer Affairs Authority (‘the Maltese competent authority’) adopted a decision in accordance with Article 55(1), first subparagraph, of Regulation (EU) No 528/2012 to permit until 1 November 2024 the making available on the market for, and use by, professional users of the biocidal product Biobor JF for the antimicrobial treatment of aircraft fuel tanks and fuel systems (‘the action’). The Maltese competent authority informed the Commission and the competent authorities of the other Member States of the action and the justification for it in accordance with Article 55(1), second subparagraph, of that Regulation.
(2) According to the information provided by the Maltese competent authority, the action was necessary in order to protect public health. Microbiological contamination of aircraft fuel tanks and fuel systems is caused by micro-organisms, such as bacteria, mould and yeast, that grow in the stagnant water and feed off the hydrocarbons in the fuel at the fuel-to-water interface. If left untreated, the microbiological contamination of aircraft fuel tanks and fuel systems can lead to malfunctions of the aircraft engine and endanger the aircraft airworthiness, thus endangering the safety of passengers and crew. The prevention of microbiological contamination and, when such contamination is detected, its treatment are therefore crucial in order to avoid operational problems in aircraft.
(3) Biobor JF contains 2,2’-(1-methyltrimethylenedioxy)bis-(4-methyl-1,3,2-dioxaborinane) (CAS number 2665-13-6) and 2,2’-oxybis (4,4,6-trimethyl-1,3,2-dioxaborinane) (CAS number 14697-50-8) as active substances. Biobor JF is a biocidal product of product-type 6 (‘preservatives for products during storage’), as defined in Annex V to Regulation (EU) No 528/2012. 2,2’-(1-methyltrimethylenedioxy)bis-(4-methyl-1,3,2-dioxaborinane) and 2,2’-oxybis (4,4,6-trimethyl-1,3,2-dioxaborinane) have not been evaluated for use in biocidal products of product-type 6. As those substances are not listed among the substance/product-type combinations included in the review programme on 17 March 2022, as set out in Annex II to Commission Delegated Regulation (EU) No 1062/2014(2), they are not included in the work programme for the systematic examination of all existing active substances contained in biocidal products referred to in Regulation (EU) No 528/2012. Article 89 of Regulation (EU) No 528/2012 therefore does not apply to those active substances and they have to be assessed and approved before biocidal products containing them can be authorised also at national level.
(4) On 21 October 2024, the Commission received a reasoned request from the Maltese competent authority to allow the extension of the action in accordance with Article 55(1), third subparagraph, of Regulation (EU) No 528/2012. The reasoned request was based on concerns that air transport safety might continue to be endangered by microbiological contamination of aircraft fuel tanks and fuel systems and on the argument that Biobor JF is essential in order to control such microbiological contamination.
(5) According to the information provided by the Maltese competent authority, the only alternative biocidal product recommended by aircraft and aircraft engine manufacturers for the treatment of microbiological contamination (namely, Kathon™ FP 1.5) was withdrawn from the market in March 2020 due to severe behaviour anomalies that were noticed after the treatment of aircraft engines with that product. Biobor JF is therefore the only available product for that use recommended by aircraft and aircraft engine manufacturers.
(6) As indicated by the Maltese competent authority, the mechanical treatment of microbiological contamination of aircraft fuel tanks and fuel systems is not always possible and the procedures recommended by engine manufacturers require the treatment with a biocidal product even when mechanical cleaning is possible. Moreover, mechanical treatment would expose workers to toxic gases and should therefore be avoided.
(7) According to the available information provided to the Commission, the manufacturer of Biobor JF has taken steps towards an authorisation of the product. An application for approval of the active substances that Biobor JF contains is expected to be submitted by mid-2025. The approval of the active substances and the authorisation of the biocidal product would constitute a permanent solution for the future, but a significant amount of time would be needed for the completion of the approval and authorisation procedures.
(8) The lack of control of microbiological contamination of aircraft fuel tanks and fuel systems might endanger air transport safety and that danger cannot be adequately contained by using another biocidal product or by other means. It is therefore appropriate to allow the Maltese competent authority to extend the action.
(9) As the action expired on 1 November 2024, this Decision should apply retroactively.
(10) The measures provided for in this Decision are in accordance with the opinion of the Standing Committee on Biocidal Products,
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) No 528/2012 of the European Parliament and of the Council of 22 May 2012 concerning the making available on the market and use of biocidal products (1), and in particular Article 55(1), third subparagraph, thereof,
Whereas:
(1) On 5 May 2024, Malta Competition and Consumer Affairs Authority (‘the Maltese competent authority’) adopted a decision in accordance with Article 55(1), first subparagraph, of Regulation (EU) No 528/2012 to permit until 1 November 2024 the making available on the market for, and use by, professional users of the biocidal product Biobor JF for the antimicrobial treatment of aircraft fuel tanks and fuel systems (‘the action’). The Maltese competent authority informed the Commission and the competent authorities of the other Member States of the action and the justification for it in accordance with Article 55(1), second subparagraph, of that Regulation.
(2) According to the information provided by the Maltese competent authority, the action was necessary in order to protect public health. Microbiological contamination of aircraft fuel tanks and fuel systems is caused by micro-organisms, such as bacteria, mould and yeast, that grow in the stagnant water and feed off the hydrocarbons in the fuel at the fuel-to-water interface. If left untreated, the microbiological contamination of aircraft fuel tanks and fuel systems can lead to malfunctions of the aircraft engine and endanger the aircraft airworthiness, thus endangering the safety of passengers and crew. The prevention of microbiological contamination and, when such contamination is detected, its treatment are therefore crucial in order to avoid operational problems in aircraft.
(3) Biobor JF contains 2,2’-(1-methyltrimethylenedioxy)bis-(4-methyl-1,3,2-dioxaborinane) (CAS number 2665-13-6) and 2,2’-oxybis (4,4,6-trimethyl-1,3,2-dioxaborinane) (CAS number 14697-50-8) as active substances. Biobor JF is a biocidal product of product-type 6 (‘preservatives for products during storage’), as defined in Annex V to Regulation (EU) No 528/2012. 2,2’-(1-methyltrimethylenedioxy)bis-(4-methyl-1,3,2-dioxaborinane) and 2,2’-oxybis (4,4,6-trimethyl-1,3,2-dioxaborinane) have not been evaluated for use in biocidal products of product-type 6. As those substances are not listed among the substance/product-type combinations included in the review programme on 17 March 2022, as set out in Annex II to Commission Delegated Regulation (EU) No 1062/2014 (2), they are not included in the work programme for the systematic examination of all existing active substances contained in biocidal products referred to in Regulation (EU) No 528/2012. Article 89 of Regulation (EU) No 528/2012 therefore does not apply to those active substances and they have to be assessed and approved before biocidal products containing them can be authorised also at national level.
(4) On 21 October 2024, the Commission received a reasoned request from the Maltese competent authority to allow the extension of the action in accordance with Article 55(1), third subparagraph, of Regulation (EU) No 528/2012. The reasoned request was based on concerns that air transport safety might continue to be endangered by microbiological contamination of aircraft fuel tanks and fuel systems and on the argument that Biobor JF is essential in order to control such microbiological contamination.
(5) According to the information provided by the Maltese competent authority, the only alternative biocidal product recommended by aircraft and aircraft engine manufacturers for the treatment of microbiological contamination (namely, Kathon™ FP 1.5) was withdrawn from the market in March 2020 due to severe behaviour anomalies that were noticed after the treatment of aircraft engines with that product. Biobor JF is therefore the only available product for that use recommended by aircraft and aircraft engine manufacturers.
(6) As indicated by the Maltese competent authority, the mechanical treatment of microbiological contamination of aircraft fuel tanks and fuel systems is not always possible and the procedures recommended by engine manufacturers require the treatment with a biocidal product even when mechanical cleaning is possible. Moreover, mechanical treatment would expose workers to toxic gases and should therefore be avoided.
(7) According to the available information provided to the Commission, the manufacturer of Biobor JF has taken steps towards an authorisation of the product. An application for approval of the active substances that Biobor JF contains is expected to be submitted by mid-2025. The approval of the active substances and the authorisation of the biocidal product would constitute a permanent solution for the future, but a significant amount of time would be needed for the completion of the approval and authorisation procedures.
(8) The lack of control of microbiological contamination of aircraft fuel tanks and fuel systems might endanger air transport safety and that danger cannot be adequately contained by using another biocidal product or by other means. It is therefore appropriate to allow the Maltese competent authority to extend the action.
(9) As the action expired on 1 November 2024, this Decision should apply retroactively.
(10) The measures provided for in this Decision are in accordance with the opinion of the Standing Committee on Biocidal Products,
HAS ADOPTED THIS DECISION:
Malta Competition and Consumer Affairs Authority may extend until 6 May 2026 the action to permit the making available on the market for, and use by, professional users of the biocidal product Biobor JF for the antimicrobial treatment of aircraft fuel tanks and fuel systems.
This Decision is addressed to Malta Competition and Consumer Affairs Authority.
It shall apply from 2 November 2024.

Council Decision (CFSP) 2025/488 of 11 March 2025 amending Decision (CFSP) 2020/472 on the European Union military operation in the Mediterranean (EUNAVFOR MED IRINI)

Official Journalof the European Union ENL series
2025/488 12.3.2025
(1) On 31 March 2020, the Council adopted Decision (CFSP) 2020/472(1), which established a European Union military operation in the Mediterranean (EUNAVFOR MED IRINI).
(2) On 20 March 2023, the Council adopted Decision (CFSP) 2023/653(2), which extended EUNAVFOR MED IRINI until 31 March 2025.
(3) In the context of a Strategic Review of the operation, the Political and Security Committee (PSC) agreed that EUNAVFOR MED IRINI should be extended until 31 March 2027.
(4) The PSC furthermore agreed that a new task should be added to the mandate of EUNAVFOR MED IRINI to improve Maritime Situational Awareness in the Area of Operation and the Joint Operation Area of the operation by gathering information on potentially illegal activities not already covered under the current mandate and by gathering information useful for the protection of critical maritime infrastructure and for contingency planning.
(5) The PSC moreover agreed that capacity building and training should be extended, beyond the Libyan Coast Guards and Navy, to relevant Libyan institutions responsible for law enforcement and for search and rescue at sea.
(6) Decision (CFSP) 2020/472 should therefore be amended accordingly,
(1) the following article is inserted:‘Article 3aContributing to maritime situational awareness on other illicit activities1.   As a secondary task, and within its means and capabilities, EUNAVFOR MED IRINI shall conduct monitoring and surveillance activities and gather information on illicit activities other than the trafficking of arms and related materiel and illicit exports of petroleum from Libya, as well as information useful to the protection of critical maritime infrastructure and to contingency planning, thereby contributing further to maritime situational awareness in the Area of Operation and in the Joint Operation Area.2.   The information gathered in this context may be stored and released to the relevant law authorities of Member States and to competent Union bodies.’;
(2) in Article 4, paragraph 1 is replaced by the following:‘1.   As a further secondary task, EUNAVFOR MED IRINI shall assist the relevant Libyan institutions responsible for law enforcement and for search and rescue at sea, in particular the Libyan Coast Guard and Navy, in the development of their capacities and in their training in law enforcement at sea, in particular to prevent human smuggling and trafficking.’;
(3) in Article 13, the following paragraph is added:‘5.   For the period from 1 April 2025 until 31 March 2027, the reference amount for the common costs of EUNAVFOR MED IRINI shall be EUR 16 350 000. The percentage of the reference amount referred to in Article 51(2) of Decision (CFSP) 2021/509 shall be 10 % for commitments and 5 % for payments.’;
(4) in Article 15, paragraph 2 is replaced by the following:‘2.   EUNAVFOR MED IRINI shall end on 31 March 2027.’.
THE COUNCIL OF THE EUROPEAN UNION,
Having regard to the Treaty on European Union, and in particular Article 42(4) and Article 43(2) thereof,
Having regard to the proposal from the High Representative of the Union for Foreign Affairs and Security Policy,
Whereas:
(1) On 31 March 2020, the Council adopted Decision (CFSP) 2020/472 (1), which established a European Union military operation in the Mediterranean (EUNAVFOR MED IRINI).
(2) On 20 March 2023, the Council adopted Decision (CFSP) 2023/653 (2), which extended EUNAVFOR MED IRINI until 31 March 2025.
(3) In the context of a Strategic Review of the operation, the Political and Security Committee (PSC) agreed that EUNAVFOR MED IRINI should be extended until 31 March 2027.
(4) The PSC furthermore agreed that a new task should be added to the mandate of EUNAVFOR MED IRINI to improve Maritime Situational Awareness in the Area of Operation and the Joint Operation Area of the operation by gathering information on potentially illegal activities not already covered under the current mandate and by gathering information useful for the protection of critical maritime infrastructure and for contingency planning.
(5) The PSC moreover agreed that capacity building and training should be extended, beyond the Libyan Coast Guards and Navy, to relevant Libyan institutions responsible for law enforcement and for search and rescue at sea.
(6) Decision (CFSP) 2020/472 should therefore be amended accordingly,
HAS ADOPTED THIS DECISION:
Decision (CFSP) 2020/472 is amended as follows:

(1) the following article is inserted:
‘Article 3a
Contributing to maritime situational awareness on other illicit activities 1. As a secondary task, and within its means and capabilities, EUNAVFOR MED IRINI shall conduct monitoring and surveillance activities and gather information on illicit activities other than the trafficking of arms and related materiel and illicit exports of petroleum from Libya, as well as information useful to the protection of critical maritime infrastructure and to contingency planning, thereby contributing further to maritime situational awareness in the Area of Operation and in the Joint Operation Area. 2. The information gathered in this context may be stored and released to the relevant law authorities of Member States and to competent Union bodies.’
;
(2) in Article 4, paragraph 1 is replaced by the following:
‘1. As a further secondary task, EUNAVFOR MED IRINI shall assist the relevant Libyan institutions responsible for law enforcement and for search and rescue at sea, in particular the Libyan Coast Guard and Navy, in the development of their capacities and in their training in law enforcement at sea, in particular to prevent human smuggling and trafficking.’
;
(3) in Article 13, the following paragraph is added:
‘5. For the period from 1 April 2025 until 31 March 2027, the reference amount for the common costs of EUNAVFOR MED IRINI shall be EUR 16 350 000. The percentage of the reference amount referred to in Article 51(2) of Decision (CFSP) 2021/509 shall be 10 % for commitments and 5 % for payments.’
;
(4) in Article 15, paragraph 2 is replaced by the following:
‘2. EUNAVFOR MED IRINI shall end on 31 March 2027.’.

This Decision shall enter into force on the date of its adoption.

Commission Implementing Decision (EU) 2025/485 of 17 March 2025 concerning the extension of the action taken by the Health and Safety Executive of the United Kingdom permitting the making available on the market and use of the biocidal product Biobor JF in accordance with Regulation (EU) No 528/2012 of the European Parliament and of the Council (notified under document C(2025) 1565)

Official Journalof the European Union ENL series
2025/485 18.3.2025
(1) On 1 May 2024, the Health and Safety Executive of the United Kingdom acting on behalf of the Health and Safety Executive for Northern Ireland (‘the UK competent authority’) adopted a decision in accordance with Article 55(1), first subparagraph, of Regulation (EU) No 528/2012 to permit from 3 May 2024 until 30 October 2024 the making available on the market and use of the biocidal product Biobor JF for antimicrobial treatment of aircraft fuel tanks and fuel systems in the United Kingdom in respect of Northern Ireland (‘the action’). The UK competent authority informed the Commission and the competent authorities of the other Member States about the action and the justification for it, in accordance with Article 55(1), second subparagraph, of that Regulation.
(2) According to the information provided by the UK competent authority, the action was necessary in order to protect public health. Microbiological contamination of aircraft fuel tanks and fuel systems is caused by micro-organisms, such as bacteria, mould and yeast, that grow in the settled water and feed off the hydrocarbons in the fuel at the fuel-to-water interface. If left untreated, the microbiological contamination of aircraft fuel tanks and fuel systems can lead to malfunctions of the aircraft engine and endanger the aircraft airworthiness, thus endangering the safety of passengers and crew. The prevention and treatment of microbiological contamination, when detected, are therefore crucial in order to avoid operational problems in aircraft.
(3) Biobor JF contains 2,2'-(1-methyltrimethylenedioxy)bis-(4-methyl-1,3,2-dioxaborinane) (CAS number 2665-13-6) and 2,2'-oxybis (4,4,6-trimethyl-1,3,2-dioxaborinane) (CAS number 14697-50-8) as active substances. Biobor JF is a biocidal product of product-type 6, namely ‘preservative for products during storage’, as defined in Annex V to Regulation (EU) No 528/2012. 2,2'-(1-methyltrimethylenedioxy)bis-(4-methyl-1,3,2-dioxaborinane) and 2,2'-oxybis (4,4,6-trimethyl-1,3,2-dioxaborinane) have not been evaluated for use in biocidal products of product-type 6. As those substances are not listed among the substance/product-type combinations included in the review programme on 17 March 2022, as set out in Annex II to Commission Delegated Regulation (EU) No 1062/2014(2), they are not included in the work programme for the systematic examination of all existing active substances contained in biocidal products referred to in Regulation (EU) No 528/2012. Article 89 of Regulation (EU) No 528/2012 therefore does not apply to those active substances and they have to be assessed and approved before biocidal products containing them can be authorised also at national level.
(4) On 2 October 2024, the Commission received a reasoned request from the UK competent authority to allow the extension of the action in the United Kingdom in respect of Northern Ireland, in accordance with Article 55(1), third subparagraph, of Regulation (EU) No 528/2012. The reasoned request was made on the basis of concerns that air transport safety might continue to be endangered by microbiological contamination of aircraft fuel tanks and fuel systems and the argument that Biobor JF is essential in order to control such microbiological contamination.
(5) According to the information provided by the UK competent authority, the only alternative biocidal product recommended by aircraft and aircraft engine manufacturers for the treatment of microbiological contamination (Kathon™ FP 1.5) was withdrawn from the market in March 2020 due to severe behaviour anomalies in aircraft engines that were noticed after the treatment with that product. Biobor JF is therefore the only available product for that use recommended by aircraft and aircraft engine manufacturers.
(6) As indicated by the UK competent authority, the alternative procedure for treating an existing microbiological contamination is manual removal in-tank, following defueling and purging of the aircraft fuel system. However, that procedure may not always be possible to perform and would expose workers to toxic gases and therefore, it should be avoided.
(7) According to the available information provided to the Commission,] the manufacturer of Biobor JF has taken steps towards an authorisation of the product. An application for approval of the active substances that Biobor JF contains is expected to be submitted by mid-2025. The approval of the active substances and the authorisation of the biocidal product would constitute a permanent solution for the future, but a significant amount of time would be needed for the completion of the approval and authorisation procedures.
(8) The lack of control of microbiological contamination of aircraft fuel tanks and fuel systems might endanger air transport safety and that danger cannot be adequately controlled by using another biocidal product or by other means. It is therefore appropriate to allow the UK competent authority to extend the action in the United Kingdom in respect of Northern Ireland.
(9) As the action expired on 30 October 2024, this Decision should apply retroactively.
(10) The measures provided for in this Decision are in accordance with the opinion of the Standing Committee on Biocidal Products,
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) No 528/2012 of the European Parliament and of the Council of 22 May 2012 concerning the making available on the market and use of biocidal products (1), and in particular Article 55(1), third subparagraph, thereof, in conjunction with Article 5(4) of the Protocol on Ireland/Northern Ireland to the Agreement on the withdrawal of the United Kingdom of Great Britain and Northern Ireland from the European Union and the European Atomic Energy Community,
Whereas:
(1) On 1 May 2024, the Health and Safety Executive of the United Kingdom acting on behalf of the Health and Safety Executive for Northern Ireland (‘the UK competent authority’) adopted a decision in accordance with Article 55(1), first subparagraph, of Regulation (EU) No 528/2012 to permit from 3 May 2024 until 30 October 2024 the making available on the market and use of the biocidal product Biobor JF for antimicrobial treatment of aircraft fuel tanks and fuel systems in the United Kingdom in respect of Northern Ireland (‘the action’). The UK competent authority informed the Commission and the competent authorities of the other Member States about the action and the justification for it, in accordance with Article 55(1), second subparagraph, of that Regulation.
(2) According to the information provided by the UK competent authority, the action was necessary in order to protect public health. Microbiological contamination of aircraft fuel tanks and fuel systems is caused by micro-organisms, such as bacteria, mould and yeast, that grow in the settled water and feed off the hydrocarbons in the fuel at the fuel-to-water interface. If left untreated, the microbiological contamination of aircraft fuel tanks and fuel systems can lead to malfunctions of the aircraft engine and endanger the aircraft airworthiness, thus endangering the safety of passengers and crew. The prevention and treatment of microbiological contamination, when detected, are therefore crucial in order to avoid operational problems in aircraft.
(3) Biobor JF contains 2,2′-(1-methyltrimethylenedioxy)bis-(4-methyl-1,3,2-dioxaborinane) (CAS number 2665-13-6) and 2,2′-oxybis (4,4,6-trimethyl-1,3,2-dioxaborinane) (CAS number 14697-50-8) as active substances. Biobor JF is a biocidal product of product-type 6, namely ‘preservative for products during storage’, as defined in Annex V to Regulation (EU) No 528/2012. 2,2′-(1-methyltrimethylenedioxy)bis-(4-methyl-1,3,2-dioxaborinane) and 2,2′-oxybis (4,4,6-trimethyl-1,3,2-dioxaborinane) have not been evaluated for use in biocidal products of product-type 6. As those substances are not listed among the substance/product-type combinations included in the review programme on 17 March 2022, as set out in Annex II to Commission Delegated Regulation (EU) No 1062/2014 (2), they are not included in the work programme for the systematic examination of all existing active substances contained in biocidal products referred to in Regulation (EU) No 528/2012. Article 89 of Regulation (EU) No 528/2012 therefore does not apply to those active substances and they have to be assessed and approved before biocidal products containing them can be authorised also at national level.
(4) On 2 October 2024, the Commission received a reasoned request from the UK competent authority to allow the extension of the action in the United Kingdom in respect of Northern Ireland, in accordance with Article 55(1), third subparagraph, of Regulation (EU) No 528/2012. The reasoned request was made on the basis of concerns that air transport safety might continue to be endangered by microbiological contamination of aircraft fuel tanks and fuel systems and the argument that Biobor JF is essential in order to control such microbiological contamination.
(5) According to the information provided by the UK competent authority, the only alternative biocidal product recommended by aircraft and aircraft engine manufacturers for the treatment of microbiological contamination (Kathon™ FP 1.5) was withdrawn from the market in March 2020 due to severe behaviour anomalies in aircraft engines that were noticed after the treatment with that product. Biobor JF is therefore the only available product for that use recommended by aircraft and aircraft engine manufacturers.
(6) As indicated by the UK competent authority, the alternative procedure for treating an existing microbiological contamination is manual removal in-tank, following defueling and purging of the aircraft fuel system. However, that procedure may not always be possible to perform and would expose workers to toxic gases and therefore, it should be avoided.
(7) According to the available information provided to the Commission,] the manufacturer of Biobor JF has taken steps towards an authorisation of the product. An application for approval of the active substances that Biobor JF contains is expected to be submitted by mid-2025. The approval of the active substances and the authorisation of the biocidal product would constitute a permanent solution for the future, but a significant amount of time would be needed for the completion of the approval and authorisation procedures.
(8) The lack of control of microbiological contamination of aircraft fuel tanks and fuel systems might endanger air transport safety and that danger cannot be adequately controlled by using another biocidal product or by other means. It is therefore appropriate to allow the UK competent authority to extend the action in the United Kingdom in respect of Northern Ireland.
(9) As the action expired on 30 October 2024, this Decision should apply retroactively.
(10) The measures provided for in this Decision are in accordance with the opinion of the Standing Committee on Biocidal Products,
HAS ADOPTED THIS DECISION:
The Health and Safety Executive of the United Kingdom, acting on behalf of the Health and Safety Executive for Northern Ireland, may extend until 4 May 2026 the permit for the making available on the market and use of the biocidal product Biobor JF for antimicrobial treatment of aircraft fuel tanks and fuel systems, in the United Kingdom in respect of Northern Ireland.
This Decision is addressed to the Health and Safety Executive of the United Kingdom, acting on behalf of the Health and Safety Executive for Northern Ireland.
It shall apply from 31 October 2024.

Council Decision (CFSP) 2025/484 of 11 March 2025 amending Decision (CFSP) 2019/1894 concerning restrictive measures in view of Türkiye’s unauthorised drilling activities in the Eastern Mediterranean

Official Journalof the European Union ENL series
2025/484 12.3.2025
(1) On 11 November 2019, the Council adopted Decision (CFSP) 2019/1894(1).
(2) On the basis of a review by the Council, the entry for one person subject to restrictive measures should be deleted.
(3) Decision (CFSP) 2019/1894 should be amended accordingly,
1. Mehmet Ferruh AKALIN.
THE COUNCIL OF THE EUROPEAN UNION,
Having regard to the Treaty on European Union, and in particular Article 29 thereof,
Having regard to the proposal from the High Representative of the Union for Foreign Affairs and Security Policy,
Whereas:
(1) On 11 November 2019, the Council adopted Decision (CFSP) 2019/1894 (1).
(2) On the basis of a review by the Council, the entry for one person subject to restrictive measures should be deleted.
(3) Decision (CFSP) 2019/1894 should be amended accordingly,
HAS ADOPTED THIS DECISION:
The Annex to Decision (CFSP) 2019/1894 is amended in accordance with the Annex to this Decision.
This Decision shall enter into force on the day following that of its publication in the Official Journal of the European Union.

In the Annex to Decision (CFSP) 2019/1894, the entry for the following person is deleted:
1. Mehmet Ferruh AKALIN.

Commission Implementing Decision (EU) 2025/483 of 14 March 2025 not granting a Union authorisation for the biocidal product family INTERKOKASK in accordance with Regulation (EU) No 528/2012 of the European Parliament and of the Council (notified under document C(2025) 1556)

Official Journalof the European Union ENL series
2025/483 17.3.2025
(1) On 23 March 2018, Interhygiene GmbH submitted to the European Chemicals Agency (‘the Agency’) an application in accordance with Article 43(1) of Regulation (EU) No 528/2012 for Union authorisation for the making available on the market and the use of a biocidal product family named ‘INTERKOKASK’ of product-type 3, as described in Annex V to that Regulation consisting of three product subgroups (‘meta SPCs’). Interhygiene GmbH also provided written confirmation that the competent authority of Germany had agreed to evaluate the application. The application was recorded under case number BC-TF038372-40 in the Register for Biocidal Products.
(2) ‘INTERKOKASK’ contains chlorocresol as the active substance, which is included in the Union list of approved active substances referred to in Article 9(2) of Regulation (EU) No 528/2012 for product-type 3.
(3) On 5 January 2024, the evaluating authority gave Interhygiene GmbH the opportunity to provide written comments on the draft assessment report and the conclusions of the evaluation within 30 days, in accordance with Article 44(1), second subparagraph, of Regulation (EU) No 528/2012. On 12 February 2024, Interhygiene GmbH sent its comments to the evaluating competent authority. The evaluating competent authority took account of those comments when finalising its evaluation and provided responses to the comments on 22 March 2024.
(4) On 22 March 2024, the evaluating competent authority submitted, in accordance with Article 44(1) of Regulation (EU) No 528/2012, an assessment report and the conclusions of its evaluation to the Agency.
(5) During the preparation of the Agency’s opinion in accordance with Article 44(3) of Regulation (EU) No 528/2012, Interhygiene GmbH was given the opportunity to be involved in the process of the preparation of the Agency’s opinion in accordance with the Agency’s working procedure for Union authorisation applications. Between 22 March 2024 and 18 September 2024, Interhygiene GmbH was informed about the status of the procedure, invited to participate in the relevant meetings of the working groups and the Biocidal Products Committee of the Agency and invited to comment. Interhygiene GmbH did not attend the meetings and did not provide comments. On 18 September 2024, the final opinion was adopted by the Biocidal Products Committee of the Agency(2).
(6) On 24 September 2024, the Agency submitted to the Commission its opinion on the application for Union authorisation of ‘INTERKOKASK’ together with the assessment report, in accordance with Article 44(3) of Regulation (EU) No 528/2012.
(7) The opinion concludes that ‘INTERKOKASK’ does not meet the definition of a biocidal product family laid down in Article 3(1), point (s), of Regulation (EU) No 528/2012, and that the products would, in principle, be eligible for Union authorisation in accordance with Article 42(1) of Regulation (EU) No 528/2012, but that based on the information provided by Interhygiene GmbH in accordance with Article 20(1) and Article 44(2) of that Regulation, the group of biocidal products does not meet the conditions laid down in Article 19(1), point (b)(iii) and and point (d), of that Regulation. In addition, the conditions laid down in Article 19(1), point (b)(iv) and point (c), of that Regulation are only fulfilled for some of the meta SPCs.
(8) According to the opinion of the Agency, the products included in the application differ in their composition to such an extent that they are not considered to be a group of biocidal products having a similar composition as required by the definition of a biocidal product family in Article 3(1), point (s)(iii) of Regulation (EU) No 528/2012. The Agency also considers that the information provided by the applicant has shown an unacceptable risk for professional users and non-professional users of the products and therefore concluded that the conditions laid down in Article 19(1) point (b)(iii) of Regulation (EU) No 528/2012 are not met.
(9) The opinion of the Agency also concludes that the physico-chemical properties are not deemed acceptable for the appropriate use, storage and transportation of the products of meta SPC 1 due to the results of the dilution stability test that show residues above the acceptable limit, which may lead to an unacceptable risk for the operator or affect the efficacy of the products. The physico-chemical properties are deemed acceptable for the appropriate use, storage and transportation for the products of meta SPC 2 and 3. However, a classification regarding the physical hazards of the products in all meta SPCs was not possible due to different results of flammability testing for the products of meta SPC 1 and 2, different results of corrosiveness to metals testing for the products of meta SPC 1 and data gaps for explosive properties for products of all meta SPCs, for corrosiveness to metal testing for products of meta SPC 2 and for flash point testing for products of meta SPC 3. Therefore, the condition of Article 19(1), point (d) of Regulation (EU) No 528/2012 is not considered to be met for all meta SPCs. The Agency concludes that without an unambiguous classification, it cannot be assured that a new member of a biocidal product family notified according to Article 17 (6) of Regulation (EU) No 528/2012 is assigned to the correct meta SPC.
(10) Furthermore, the opinion of the Agency identifies, for the products of meta SPC 1 and 3, an unacceptable risk for the environment for the application of the product in stables of various animal categories, leading to the conclusion that the condition of Article 19(1), point (b)(iv) of Regulation (EU) No 528/2012 is not met for those animal categories. In addition, the opinion of the Agency considers that for part of the group of products, a validated analytical method for the determination of the concentration of the active substance had not been provided and the opinion concludes that the condition of Article 19(1), point (c) of that Regulation is not met for products of meta SPC 2.
(11) The Agency therefore proposes not to authorise the biocidal product family ‘INTERKOKASK’.
(12) The Commission concurs with the opinion of the Agency that ‘INTERKOKASK’ does not meet the definition of of a biocidal product family laid down in Article 3(1), point (s)(iii) of Regulation (EU) No 528/2012 and does not meet the conditions laid down in Article 19(1), point (b)(iii) and point (d) of that Regulation. The Commission also agrees with the Agency’s conclusion that the application fulfils only partially the conditions set out in Article 19(1), point (b)(iv) and point (c) of Regulation (EU) No 528/2012. Therefore, the Commission considers it appropriate to not grant a Union authorisation for ‘INTERKOKASK’.
(13) The measures provided for in this Decision are in accordance with the opinion of the Standing Committee on Biocidal Products,
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) No 528/2012 of the European Parliament and of the Council of 22 May 2012 concerning the making available on the market and use of biocidal products (1), and in particular Article 44(5), first subparagraph, thereof,
Whereas:
(1) On 23 March 2018, Interhygiene GmbH submitted to the European Chemicals Agency (‘the Agency’) an application in accordance with Article 43(1) of Regulation (EU) No 528/2012 for Union authorisation for the making available on the market and the use of a biocidal product family named ‘INTERKOKASK’ of product-type 3, as described in Annex V to that Regulation consisting of three product subgroups (‘meta SPCs’). Interhygiene GmbH also provided written confirmation that the competent authority of Germany had agreed to evaluate the application. The application was recorded under case number BC-TF038372-40 in the Register for Biocidal Products.
(2) ‘INTERKOKASK’ contains chlorocresol as the active substance, which is included in the Union list of approved active substances referred to in Article 9(2) of Regulation (EU) No 528/2012 for product-type 3.
(3) On 5 January 2024, the evaluating authority gave Interhygiene GmbH the opportunity to provide written comments on the draft assessment report and the conclusions of the evaluation within 30 days, in accordance with Article 44(1), second subparagraph, of Regulation (EU) No 528/2012. On 12 February 2024, Interhygiene GmbH sent its comments to the evaluating competent authority. The evaluating competent authority took account of those comments when finalising its evaluation and provided responses to the comments on 22 March 2024.
(4) On 22 March 2024, the evaluating competent authority submitted, in accordance with Article 44(1) of Regulation (EU) No 528/2012, an assessment report and the conclusions of its evaluation to the Agency.
(5) During the preparation of the Agency’s opinion in accordance with Article 44(3) of Regulation (EU) No 528/2012, Interhygiene GmbH was given the opportunity to be involved in the process of the preparation of the Agency’s opinion in accordance with the Agency’s working procedure for Union authorisation applications. Between 22 March 2024 and 18 September 2024, Interhygiene GmbH was informed about the status of the procedure, invited to participate in the relevant meetings of the working groups and the Biocidal Products Committee of the Agency and invited to comment. Interhygiene GmbH did not attend the meetings and did not provide comments. On 18 September 2024, the final opinion was adopted by the Biocidal Products Committee of the Agency (2).
(6) On 24 September 2024, the Agency submitted to the Commission its opinion on the application for Union authorisation of ‘INTERKOKASK’ together with the assessment report, in accordance with Article 44(3) of Regulation (EU) No 528/2012.
(7) The opinion concludes that ‘INTERKOKASK’ does not meet the definition of a biocidal product family laid down in Article 3(1), point (s), of Regulation (EU) No 528/2012, and that the products would, in principle, be eligible for Union authorisation in accordance with Article 42(1) of Regulation (EU) No 528/2012, but that based on the information provided by Interhygiene GmbH in accordance with Article 20(1) and Article 44(2) of that Regulation, the group of biocidal products does not meet the conditions laid down in Article 19(1), point (b)(iii) and and point (d), of that Regulation. In addition, the conditions laid down in Article 19(1), point (b)(iv) and point (c), of that Regulation are only fulfilled for some of the meta SPCs.
(8) According to the opinion of the Agency, the products included in the application differ in their composition to such an extent that they are not considered to be a group of biocidal products having a similar composition as required by the definition of a biocidal product family in Article 3(1), point (s)(iii) of Regulation (EU) No 528/2012. The Agency also considers that the information provided by the applicant has shown an unacceptable risk for professional users and non-professional users of the products and therefore concluded that the conditions laid down in Article 19(1) point (b)(iii) of Regulation (EU) No 528/2012 are not met.
(9) The opinion of the Agency also concludes that the physico-chemical properties are not deemed acceptable for the appropriate use, storage and transportation of the products of meta SPC 1 due to the results of the dilution stability test that show residues above the acceptable limit, which may lead to an unacceptable risk for the operator or affect the efficacy of the products. The physico-chemical properties are deemed acceptable for the appropriate use, storage and transportation for the products of meta SPC 2 and 3. However, a classification regarding the physical hazards of the products in all meta SPCs was not possible due to different results of flammability testing for the products of meta SPC 1 and 2, different results of corrosiveness to metals testing for the products of meta SPC 1 and data gaps for explosive properties for products of all meta SPCs, for corrosiveness to metal testing for products of meta SPC 2 and for flash point testing for products of meta SPC 3. Therefore, the condition of Article 19(1), point (d) of Regulation (EU) No 528/2012 is not considered to be met for all meta SPCs. The Agency concludes that without an unambiguous classification, it cannot be assured that a new member of a biocidal product family notified according to Article 17 (6) of Regulation (EU) No 528/2012 is assigned to the correct meta SPC.
(10) Furthermore, the opinion of the Agency identifies, for the products of meta SPC 1 and 3, an unacceptable risk for the environment for the application of the product in stables of various animal categories, leading to the conclusion that the condition of Article 19(1), point (b)(iv) of Regulation (EU) No 528/2012 is not met for those animal categories. In addition, the opinion of the Agency considers that for part of the group of products, a validated analytical method for the determination of the concentration of the active substance had not been provided and the opinion concludes that the condition of Article 19(1), point (c) of that Regulation is not met for products of meta SPC 2.
(11) The Agency therefore proposes not to authorise the biocidal product family ‘INTERKOKASK’.
(12) The Commission concurs with the opinion of the Agency that ‘INTERKOKASK’ does not meet the definition of of a biocidal product family laid down in Article 3(1), point (s)(iii) of Regulation (EU) No 528/2012 and does not meet the conditions laid down in Article 19(1), point (b)(iii) and point (d) of that Regulation. The Commission also agrees with the Agency’s conclusion that the application fulfils only partially the conditions set out in Article 19(1), point (b)(iv) and point (c) of Regulation (EU) No 528/2012. Therefore, the Commission considers it appropriate to not grant a Union authorisation for ‘INTERKOKASK’.
(13) The measures provided for in this Decision are in accordance with the opinion of the Standing Committee on Biocidal Products,
HAS ADOPTED THIS DECISION:
A Union authorisation is not granted to Interhygiene GmbH for the making available on the market and use of the biocidal product family ‘INTERKOKASK’.
This Decision is addressed to Interhygiene GmbH, Neufelder Str. 30, 27472 Cuxhaven, Germany.

Council Decision (EU) 2025/479 of 18 February 2025 on the conclusion of the Agreement between the European Union and the Republic of Serbia on operational activities carried out by the European Border and Coast Guard Agency in the Republic of Serbia

Official Journalof the European Union ENL series
2025/479 13.3.2025
(1) In accordance with Council Decision (EU) 2024/1639(2), the Agreement between the European Union and the Republic of Serbia on operational activities carried out by the European Border and Coast Guard Agency in the Republic of Serbia (the ‘Agreement’) was signed on 25 June 2024, subject to its conclusion at a later date.
(2) Pursuant to Article 73(3) of Regulation (EU) 2019/1896 of the European Parliament and of the Council(3), in circumstances requiring the deployment of border management teams from the standing corps of the European Border and Coast Guard to a third country where the members of the teams will exercise executive powers, a status agreement is to be concluded by the Union with the third country concerned on the basis of Article 218 of the Treaty on the Functioning of the European Union.
(3) This Decision constitutes a development of the provisions of the Schengenacquisin which Ireland does not take part, in accordance with Council Decision 2002/192/EC(4); Ireland is therefore not taking part in the adoption of this Decision and is not bound by it nor subject to its application.
(4) In accordance with Articles 1 and 2 of Protocol No 22 on the position of Denmark, annexed to the Treaty on European Union and to the Treaty on the Functioning of the European Union, Denmark is not taking part in the adoption of this Decision and is not bound by it or subject to its application. Given that this Decision builds upon the Schengenacquis, Denmark shall, in accordance with Article 4 of that Protocol, decide within a period of six months after the Council has decided on this Decision whether it will implement it in its national law.
(5) The Agreement should be approved.
(6) In accordance with the Treaties, the Commission should make the notification provided for in Article 22(1) of the Agreement,
THE COUNCIL OF THE EUROPEAN UNION,
Having regard to the Treaty on the Functioning of the European Union, and in particular Article 77(2), points (b) and (d), and Article 79(2), point (c), in conjunction with Article 218(6), point (a), thereof,
Having regard to the proposal from the European Commission,
Having regard to the consent of the European Parliament (1),
Whereas:
(1) In accordance with Council Decision (EU) 2024/1639 (2), the Agreement between the European Union and the Republic of Serbia on operational activities carried out by the European Border and Coast Guard Agency in the Republic of Serbia (the ‘Agreement’) was signed on 25 June 2024, subject to its conclusion at a later date.
(2) Pursuant to Article 73(3) of Regulation (EU) 2019/1896 of the European Parliament and of the Council (3), in circumstances requiring the deployment of border management teams from the standing corps of the European Border and Coast Guard to a third country where the members of the teams will exercise executive powers, a status agreement is to be concluded by the Union with the third country concerned on the basis of Article 218 of the Treaty on the Functioning of the European Union.
(3) This Decision constitutes a development of the provisions of the Schengen acquis in which Ireland does not take part, in accordance with Council Decision 2002/192/EC (4); Ireland is therefore not taking part in the adoption of this Decision and is not bound by it nor subject to its application.
(4) In accordance with Articles 1 and 2 of Protocol No 22 on the position of Denmark, annexed to the Treaty on European Union and to the Treaty on the Functioning of the European Union, Denmark is not taking part in the adoption of this Decision and is not bound by it or subject to its application. Given that this Decision builds upon the Schengen acquis, Denmark shall, in accordance with Article 4 of that Protocol, decide within a period of six months after the Council has decided on this Decision whether it will implement it in its national law.
(5) The Agreement should be approved.
(6) In accordance with the Treaties, the Commission should make the notification provided for in Article 22(1) of the Agreement,
HAS ADOPTED THIS DECISION:
The Agreement between the European Union and the Republic of Serbia on operational activities carried out by the European Border and Coast Guard Agency in the Republic of Serbia (‘the Agreement’) is hereby approved on behalf of the Union (5).
The Commission shall proceed, on behalf of the Union, to make the notification provided for in Article 22(1) of the Agreement, in order to express the consent of the Union to be bound by the Agreement (6).
This Decision shall enter into force on the day of its adoption.

Commission Implementing Decision (EU) 2025/478 of 12 March 2025 recognising that the report submitted by Slovakia under Article 31(2) of Directive (EU) 2018/2001 of the European Parliament and of the Council contains accurate data for the purposes of measuring greenhouse gas emissions associated with the cultivation of rapeseed and maize grain in that Member State

Official Journalof the European Union ENL series
2025/478 13.3.2025
(1) Directive (EU) 2018/2001 requires biofuels, bioliquids and biomass fuels to save significant greenhouse gas emissions compared to fossil fuels, so that they can be counted towards the targets set in that Directive. For that purpose, Article 29(10) of that Directive sets specific emission savings thresholds for those fuels, and Article 31 regulates how to calculate the greenhouse gas emission savings from their use. When making those calculations, it is possible to use the default values set out in Annexes V and VI to Directive (EU) 2018/2001. Instead of the default values of greenhouse gas emissions from the cultivation of agricultural raw materials, it is possible to use typical values under some conditions. Those typical values, representing the average value in a specific area, may be reported to the Commission by Member States or third countries. The typical values may only be used if the Commission recognises them to be accurate.
(2) On 30 October 2024, Slovakia submitted to the Commission the two final reports with data for the purposes of measuring the greenhouse gas emissions associated with the cultivation of rapeseed and maize grain typically produced in areas on its territory classified as level 2 in the nomenclature of territorial units for statistics (NUTS), in accordance with Regulation (EC) No 1059/2003 of the European Parliament and of the Council(2). Slovakia asked for the data to be recognised as accurate in accordance with Article 31(4) of Directive (EU) 2018/2001.
(3) The Commission assessed the report and found that it contains accurate data for the purposes of measuring the greenhouse gas emissions associated with the cultivation of rapeseed and maize grain typically produced in NUTS 2 regions in Slovakia.
(4) The measures provided for in this Decision are in accordance with the opinion of the Committee on the Sustainability of Biofuels, Bioliquids and Biomass Fuels,
NUTS 2 region according to Regulation (EC) No 1059/2003 Soil N2O Embedded Fuel use Seed Total
Direct Indirect Fertiliser Neutralisation Pesticide
SK010 172,5 23,4 186,9 25,8 11,5 108,5 1,1 529,7
SK021 163,1 18,2 178,2 22,5 11,3 102,9 1,1 497,2
SK022 251,8 22,8 160,4 25,0 12,0 100,5 1,0 573,5
SK023 161,2 22,9 183,0 23,7 11,8 99,0 1,0 502,6
SK031 545,7 18,3 219,8 32,6 15,8 119,9 1,2 953,2
SK032 211,5 30,4 172,6 27,9 12,9 117,4 1,2 573,8
SK041 418,5 29,9 205,1 31,1 15,0 131,0 1,4 832,0
SK042 200,6 34,2 177,2 30,1 12,5 112,3 1,2 568,1
NUTS 2 region according to Regulation (EC) No 1059/2003 Soil N2O Embedded Fuel use Seed Total
Direct Indirect Fertiliser Neutralisation Pesticide
SK010 70,7 20,7 53,1 12,0 2,7 88,7 1,1 249,0
SK021 67,6 16,6 52,3 10,8 2,7 79,3 0,9 230,1
SK022 98,9 17,5 40,4 11,2 2,2 74,4 0,9 245,4
SK023 73,7 23,1 63,9 14,5 3,3 81,1 1,0 260,5
SK031 166,8 17,7 34,6 10,3 3,2 82,4 1,0 315,9
SK032 95,2 22,8 49,6 13,2 3,1 88,1 1,9 273,1
SK041 174,9 20,8 49,2 12,9 2,7 90,1 1,1 351,7
SK042 82,8 19,3 61,5 13,5 2,7 82,1 1,0 262,8
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (1), and in particular Article 31(4) thereof,
Whereas:
(1) Directive (EU) 2018/2001 requires biofuels, bioliquids and biomass fuels to save significant greenhouse gas emissions compared to fossil fuels, so that they can be counted towards the targets set in that Directive. For that purpose, Article 29(10) of that Directive sets specific emission savings thresholds for those fuels, and Article 31 regulates how to calculate the greenhouse gas emission savings from their use. When making those calculations, it is possible to use the default values set out in Annexes V and VI to Directive (EU) 2018/2001. Instead of the default values of greenhouse gas emissions from the cultivation of agricultural raw materials, it is possible to use typical values under some conditions. Those typical values, representing the average value in a specific area, may be reported to the Commission by Member States or third countries. The typical values may only be used if the Commission recognises them to be accurate.
(2) On 30 October 2024, Slovakia submitted to the Commission the two final reports with data for the purposes of measuring the greenhouse gas emissions associated with the cultivation of rapeseed and maize grain typically produced in areas on its territory classified as level 2 in the nomenclature of territorial units for statistics (NUTS), in accordance with Regulation (EC) No 1059/2003 of the European Parliament and of the Council (2). Slovakia asked for the data to be recognised as accurate in accordance with Article 31(4) of Directive (EU) 2018/2001.
(3) The Commission assessed the report and found that it contains accurate data for the purposes of measuring the greenhouse gas emissions associated with the cultivation of rapeseed and maize grain typically produced in NUTS 2 regions in Slovakia.
(4) The measures provided for in this Decision are in accordance with the opinion of the Committee on the Sustainability of Biofuels, Bioliquids and Biomass Fuels,
HAS ADOPTED THIS DECISION:
The report submitted for recognition to the Commission by Slovakia on 30 October 2024 contains accurate data for the purposes of measuring the greenhouse gas emissions associated with the cultivation of rapeseed and maize grain typically produced in NUTS 2 regions in Slovakia. The summary of the report’s data is set out in the Annex.
If the data contained in the report as submitted for recognition to the Commission on 30 October 2024, changes in a way that might affect the accuracy of the data and thereby the basis for this Decision, Slovakia shall notify the Commission of such changes immediately. The Commission shall assess the notified changes to determine whether the report still provides the accurate data for which it is recognised.
This Decision shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.
It shall cease to apply on 2 April 2030.

Greenhouse gas emissions arising from the cultivation of rapeseed in Slovakia (kg CO2-eq/tonne of rapeseed harvested on dry matter basis)

NUTS 2 region according to Regulation (EC) No 1059/2003
Soil N2O
Embedded
Fuel use
Seed
Total
Direct
Indirect
Fertiliser
Neutralisation
Pesticide
SK010
172,5
23,4
186,9
25,8
11,5
108,5
1,1
529,7
SK021
163,1
18,2
178,2
22,5
11,3
102,9
1,1
497,2
SK022
251,8
22,8
160,4
25,0
12,0
100,5
1,0
573,5
SK023
161,2
22,9
183,0
23,7
11,8
99,0
1,0
502,6
SK031
545,7
18,3
219,8
32,6
15,8
119,9
1,2
953,2
SK032
211,5
30,4
172,6
27,9
12,9
117,4
1,2
573,8
SK041
418,5
29,9
205,1
31,1
15,0
131,0
1,4
832,0
SK042
200,6
34,2
177,2
30,1
12,5
112,3
1,2
568,1

Greenhouse gas emissions arising from the cultivation of maize grain in Slovakia (kg CO2-eq/tonne of maize grain harvested on dry matter basis)

NUTS 2 region according to Regulation (EC) No 1059/2003
Soil N2O
Embedded
Fuel use
Seed
Total
Direct
Indirect
Fertiliser
Neutralisation
Pesticide
SK010
70,7
20,7
53,1
12,0
2,7
88,7
1,1
249,0
SK021
67,6
16,6
52,3
10,8
2,7
79,3
0,9
230,1
SK022
98,9
17,5
40,4
11,2
2,2
74,4
0,9
245,4
SK023
73,7
23,1
63,9
14,5
3,3
81,1
1,0
260,5
SK031
166,8
17,7
34,6
10,3
3,2
82,4
1,0
315,9
SK032
95,2
22,8
49,6
13,2
3,1
88,1
1,9
273,1
SK041
174,9
20,8
49,2
12,9
2,7
90,1
1,1
351,7
SK042
82,8
19,3
61,5
13,5
2,7
82,1
1,0
262,8

Commission Implementing Decision (EU) 2025/477 of 6 March 2025 on the applicability of Article 34 of Directive 2014/25/EU of the European Parliament and of the Council to the award of contracts for the activities related to the generation and wholesale of electricity in Belgium, with the exception of electricity generated in the Doel 4 and Tihange 3 nuclear power plants (notified under document C(2025) 1381)

Official Journalof the European Union ENL series
2025/477 13.3.2025
(1) On 24 July 2024, the Belgian authorities submitted a request to the Commission pursuant to Article 35(1) of Directive 2014/25/EU (‘the request’) on behalf of Luminus, Norther and Ørsted (‘the applicants’) concerning electricity generation and wholesale in Belgium, with the exception of electricity generated in the Doel 4 and Tihange 3 nuclear power plants. The request complies with the formal requirements set out in Article 1(1) of Commission Implementing Decision (EU) 2016/1804(2)and in Annex I to that Implementing Decision.
(2) Luminus is 68,63 % owned by Electricité de France (‘EDF’) Belgium SA, a subsidiary of the EDF Group, and is mainly active on the electricity markets and on the gas and energy services markets in France and Belgium.
(3) Norther is 50 % owned by Elnu NV, a subsidiary of Elicio SA-NV, fully owned by Nethys SA-NV, and 50 % owned by Boreas Wind Offshore NV, a fully owned subsidiary of Eneco Wind Belgium NV. Eneco Wind Belgium NV is a subsidiary of Eneco BV, an international producer and supplier of electricity, natural gas and heat, Norther operates an offshore wind farm in the North Sea within the Belgian Exclusive Economic Zone.
(4) Ørsted is part of the Ørsted Group which is 50,12 % owned by the Danish state. Ørsted has currently no energy generation or trading activities in Belgium but is considering initiating renewable energy activities in Belgium.
(5) The request was not accompanied by a reasoned and substantiated position of the Belgian competition authority.
(6) In accordance with point 1(a) of Annex IV to Directive 2014/25/EU, considering that free access to the market can be presumed on the basis of Article 34(3), first subparagraph, of that Directive, as also indicated in recital 15 of this Decision, the Commission is to adopt an implementing act referred to in article 35 of Directive 2014/25/EU within 105 working days.
(7) On 30 July 2024, the Commission asked the Belgian authorities to confirm within 10 working days that the data provided by the applicants concerning market shares was valid, even if it differed from the official data published by the Belgian Federal Commission for Electricity and Gas Regulation (CREG). The Commission received CREG’s confirmation on 2 September 2024. The Commission asked further clarifications to the Belgian authorities on 28 November 2024, which were provided on 27 January 2025. Pursuant to point 2 of Annex IV to Directive 2014/25/EU, the deadline to adopt an implementing decision is consequently set at 6 March 2025.
(8) Directive 2014/25/EU applies to the award of contracts for the pursuit of activities related to electricity generation and wholesale referred to in Article 9(1)(b) of that Directive unless that activity is exempted pursuant to Article 34 of that Directive.
(9) Directive 2014/25/EU imposes on public authorities and publicly controlled undertakings in the water, energy, transport and postal services sectors the public procurement discipline to ensure the free movement of goods, the freedom of establishment and the freedom to provide services as well as respect for the principles deriving from those freedoms. The reasons for this legislative choice, according to recital 1 of the Directive, are the fact that national authorities continue to be able to influence the behaviour of those entities and the closed nature of the markets in which the entities in those sectors operate.
(10) Pursuant to Article 34(1) of Directive 2014/25/EU, contracts intended to enable the performance of an activity to which that Directive applies are, upon request by a Member State or a contracting entity, not to be subject to that Directive if, in the Member State in which it is carried out, the activity is directly exposed to competition on markets to which access is not restricted.
(11) Direct exposure to competition is to be assessed on the basis of objective criteria, taking account of the specific characteristics of the sector concerned. This assessment is, however, limited by the short deadlines applicable and by the need to rely on the information available to the Commission. That information originates either from already available sources or from the information obtained in the context of the request pursuant to Article 35 of Directive 2014/25/EU and cannot be supplemented by more time-consuming methods, including, in particular, public inquiries addressed to the economic operators concerned(3).
(12) Direct exposure to competition in a particular market should be evaluated on the basis of various criteria, none of which are by themselves decisive.
(13) For the purposes of assessing whether the relevant activities are subject to direct competition in the markets concerned by this Decision, the market share of the main players, as well as the existence and the extent of support to renewable electricity generation and wholesale in Belgium through public schemes are to be taken into account.
(14) As recalled by the General Court(4), the burden of proof lies on the applicant to demonstrate that the conditions laid down in Article 34 of Directive 2014/25/EU are fulfilled and, hence, to benefit from an exemption from the application of Directive 2014/25/EU. This implies that the applicant should accompany its request with comprehensive evidence to demonstrate that the conditions for the exemption are met.
(15) For the purpose of implementing Article 34 of Directive 2014/25/EU, this Decision must establish whether the activities concerned by the request are, in markets to which access is not restricted within the meaning of that provision, exposed to a level of competition which ensures that, also in the absence of the procurement discipline brought about by the detailed procurement rules laid down in Directive 2014/25/EU, procurement for the pursuit of the activity concerned will be carried out in a transparent and non-discriminatory manner based on criteria allowing purchasers to identify the solution which overall is the economically most advantageous one.
(16) This Decision is based on the legal and factual situation as of July 2024 and on the information submitted by the applicants and information that is publicly available. It may be revised, should significant changes in the legal or factual situation mean that the conditions for the applicability of Article 34(1) of Directive 2014/25/EU are no longer met.
(17) Access to a market is deemed to be unrestricted if the Member State concerned has implemented and applied the relevant Union legal acts listed in Annex III to Directive 2014/25/EU, which includes, as regards electricity generation and wholesale, Directive (EU) 2019/944 of the European Parliament and of the Council(5).
(18) On the basis of the information available to the Commission, Belgium has implemented and applied Directive (EU) 2019/944(6). Consequently, access to the relevant market is deemed not to be restricted within the meaning of Article 34(3) of Directive 2014/25/EU.
(19) According to the applicants, the relevant product market is the market for conventional and renewable electricity generation and wholesale. This is in line with the Commission’s decisional practice regarding exemption requests related to electricity generation and wholesale. The product market definition retained in this decision is without prejudice to the application of the Union competition rules.
(20) In past decisions, the Commission has found that some subsidy schemes did not stand in the way of the conclusion that electricity generation benefiting from them could belong to the relevant product market. In Commission Implementing Decision (EU) 2018/71(7)addressed to the Netherlands, the Commission noted in recitals 19 and 21 that the electricity generated from renewable sources was sold directly on the market, and that the Dutch Stimulering Duurzame Energieproductie (SDE+) system encouraged competitive bids, whereas the competitors would try to minimise their cost (hence the feed in premium they would receive). The Commission therefore considered that electricity generated from renewable sources belonged to the same market as conventional electricity generation. In Commission Implementing Decision (EU) 2020/1499(8)addressed to Italy, the Commission remarked in recitals 37 and 38 that some renewable electricity schemes were subject to a bidding process with a high number of applicants. Consequently, electricity generation benefiting from those schemes was found to be part of the same market as conventional electricity generation. In Commission Implementing Decision (EU) 2020/1500(9)addressed to Lithuania, the Commission stated in recital 30 that electricity produced under the third support scheme received premium-based support established through a competitive bidding procedure and found that it was part of the same market as conventional electricity generation. In Commission Implementing Decision (EU) 2022/1376(10)addressed to Denmark, the Commission found in recital 29 that the allocation of the public funding was exposed to competition through a bidding process, which disciplined the behaviour of renewable electricity producers with regard to their procurement policy. As a result, it concluded that the renewable electricity generation facilities subject to the request belonged to the same market as conventional electricity generation. In Commission Implementing Decision (EU) 2023/1978(11)addressed to Germany, the Commission concluded in recital 47 that renewable electricity generation and wholesale receiving no subsidies or subsidies directly linked to market price were directly exposed to competition.
(21) In general, the Commission concluded that renewable electricity generation could be found to compete with conventional electricity generation either if it did not receive subsidies or if the subsidies it received were granted through a mechanism guaranteeing that the level of subsidies was directly linked to a market price. In a number of cases, the Commission found that the existence of a bidding process ensured that the subsidies were linked to a market price.
(22) The Commission notes that electricity generation in Belgium is supported by three categories of schemes with different characteristics. They are the capacity remuneration mechanism (‘CRM’), the subsidy scheme for Doel 4 and Tihange 3 nuclear power plants as extended beyond 2025(12)and the subsidy schemes for renewable electricity.
(23) The applicants describe the situation as follows. Belgium plans to close all nuclear reactors on its territory by 2025, with the exception of the two most recent reactors, one at Doel and one at Tihange. According to Belgian Transmission System Operator Elia(13), this closure will require the installation of between 2 and 4 GW of additional capacity between now and 2030. However, the operation of the wholesale markets does not provide sufficient incentives for such investment. It is however essential to the energy system that flexible capacity is available. From the point of view of demand, renewable energies, which are intermittent and random, need to be complemented by sufficiently flexible means of production.
(24) The applicants add that Belgium has introduced the CRM for this reason. As long as a producer can guarantee availability, it is eligible to the mechanism, which is neutral with regard to the technology or source of origin of the energy. The CRM, which came into force in March 2021, encourages investment by guaranteeing sufficient profitability for projects providing peak production and balancing mechanisms. It operates by competitive auction. This mechanism was approved by Commission Decision (EU) 2022/639(14)in 2021.
(25) According to the applicants, the activities benefitting from the CRM mechanism belong to the overall wholesale and generation market as (i) electricity is sold directly on the wholesale market; (ii) does not benefit from injection priority; or (iii) from exemption of balancing responsibility; (iv) the subsidy delivers no hedge from market risk; (v) the amount of subsidy covers no more than the net extra costs associated with the costs of building, maintaining and operating a thermal power plant operated to guarantee the security of supply minus the relevant market revenues of this power plant. The Commission shares this view.
(26) The applicants proposed to group the applicable subsidy schemes for renewable electricity generation in Belgium into the following categories.
(27) This category includes: the C-Power, Belwind, Northwind and Nobelwind offshore wind parks, the first green certificates (‘GC’) scheme of the Brussels region (facilities installed between 2004 and June 2011), the first and second GC scheme of the Walloon region (facilities installed between 2002 and July 2014), the first GC scheme of the Flemish region (facilities installed between 2009 and 2012).
(28) The applicants claim that those offshore wind parks should be regarded as belonging to the general generation and wholesale market, given that the subsidies received cover no more than the net extra costs of the projects. However, the Commission has, in the decisions referred to in recital 18, repeatedly taken the view that installations receiving fixed subsidies were not part of the overall electricity generation and wholesale market. For the Commission, such subsidies shield beneficiaries from competition by providing guaranteed levels of revenue. The Commission sees no reason to depart from this approach.
(29) This category includes: the second GC scheme of the Brussels region (facilities installed from July 2011), the third GC scheme of the Walloon region (facilities installed from July 2014), the first GC scheme of the Flemish region (facilities installed from 2013), the Norther, Rentel, Seamade, Northwester II offshore wind parks.
(30) For the regional schemes, project costs are re-assessed yearly, and the estimated project cost of installed projects is indexed to take into account variations in operating expenditure. For the offshore wind parks, the subsidy is subject to a project specific monthly indexation on a consumer price index.
(31) The applicants claim that the facilities receiving subsidies that are electricity market price dependent with a legally defined premium are part of the overall electricity generation and wholesale market. The Commission shares this view, as those subsidies are linked to a market price.
(32) This category includes the Princess Elisabeth zone projects. The applicants claim that since the future facilities under that scheme will receive subsidies defined through a competitive auction process, they should be part of the overall generation and wholesale market. The Commission shares this view, as those subsidies are linked to a market price.
(33) This category includes the small to medium capacity solar and onshore wind projects installed in Flanders between 2021 and 2023. The applicants claim that since those facilities receive subsidies defined through a competitive auction process, they should be part of the overall electricity generation and wholesale market. The Commission shares this view, as those subsidies are linked to a market price.
(34) The applicants claim that facilities which have ceased to receive subsidies should be part of the overall generation and wholesale market. The Commission shares this view, as these facilities do not receive any subsidy and sell their production receiving only the electricity market price. This is in line with the approach taken in previous exemption decisions, such as Implementing Decision (EU) 2023/1978 concerning Germany.
(35) The Commission finds that the overall electricity generation and wholesale market is composed of conventional electricity generation and wholesale, electricity generation and wholesale supported by the CRM and renewable electricity generation and wholesale that receive subsidies based on market prices. Electricity generation and wholesale from renewable energy sources receiving fixed and legally defined premiums form a separate market.
(36) According to the applicants, based on the decisional practice of the Commission, the relevant geographic market should be defined as national, comprising the territory of Belgium(15). The applicants underline that Belgium has strong links with the other countries of the central and western Europe region (Austria, Belgium, France, Germany, Luxembourg and the Netherlands).
(37) In its previous practice(16), the Commission took the view that the market for electricity generation and wholesale is national in scope. The applicants’ position is in line with the Commission’s practice.
(38) In the absence of any indication of a different scope of the geographic market, for the purposes of the assessment under this Decision and without prejudice to Union competition law, the geographic scope of the generation and wholesale of electricity from conventional and renewable sources can be considered to consist in the territory of Belgium.
(39) The Commission aims to assess at this stage whether or not the activities concerned by the request are exposed to a sufficient level of competition to ensure that the procurement discipline of Directive 2014/25/EU is not required. In the present case, the factors that are to be taken into account to carry out this assessment are the market shares, the concentration levels and the influence of electricity imports on competition on the Belgian electricity generation and wholesale market.
(40) In line with its previous decisions referred to in recital 18, the Commission finds in the present case that fixed and legally defined subsidies for renewable electricity generation do not ensure that the facilities benefitting from such subsidies are directly exposed to competition.
(41) Consequently, since the conditions set out in Article 34 of Directive 2014/25/EU are not met, Directive 2014/25/EU should continue to apply to contracts intended to enable the pursuit of renewable electricity generation receiving fixed and legally defined premiums in Belgium.
(42) The applicants provide the following overview of market shares over the 2019-2023 period on the electricity generation and wholesale market.Market shares of the largest five producers in Belgium (energy produced, in MWh)20192020202120222023Engie64  %64  %62,4  %53,5  %52,2  %Luminus13,7  %13,7  %11,9  %13,7  %14,1  %RWE2,6  %2,6  %3  %2,8  %2,7  %Eneco3,1  %3,1  %3,2  %4,4  %4,2  %Total Energies2,5  %2,5  %3,5  %3,5  %3,3  %Market shares of the largest five producers in Belgium (installed capacity, in MW)20192020202120222023Engie43,7  %43,7  %41,9  %37,8  %33,5  %Luminus11,4  %11,4  %11,1  %10,5  %10,2  %RWE2,6  %2,6  %2,4  %2,4  %2,5  %Eneco4,2  %4,2  %4,1  %4,3  %4,5  %Total Energies3,7  %3,7  %3,5  %3,8  %3,9  % Market shares of the largest five producers in Belgium (energy produced, in MWh) 2019 2020 2021 2022 2023 Engie 64  % 64  % 62,4  % 53,5  % 52,2  % Luminus 13,7  % 13,7  % 11,9  % 13,7  % 14,1  % RWE 2,6  % 2,6  % 3  % 2,8  % 2,7  % Eneco 3,1  % 3,1  % 3,2  % 4,4  % 4,2  % Total Energies 2,5  % 2,5  % 3,5  % 3,5  % 3,3  % Market shares of the largest five producers in Belgium (installed capacity, in MW) 2019 2020 2021 2022 2023 Engie 43,7  % 43,7  % 41,9  % 37,8  % 33,5  % Luminus 11,4  % 11,4  % 11,1  % 10,5  % 10,2  % RWE 2,6  % 2,6  % 2,4  % 2,4  % 2,5  % Eneco 4,2  % 4,2  % 4,1  % 4,3  % 4,5  % Total Energies 3,7  % 3,7  % 3,5  % 3,8  % 3,9  %
Market shares of the largest five producers in Belgium (energy produced, in MWh) 2019 2020 2021 2022 2023
Engie 64  % 64  % 62,4  % 53,5  % 52,2  %
Luminus 13,7  % 13,7  % 11,9  % 13,7  % 14,1  %
RWE 2,6  % 2,6  % 3  % 2,8  % 2,7  %
Eneco 3,1  % 3,1  % 3,2  % 4,4  % 4,2  %
Total Energies 2,5  % 2,5  % 3,5  % 3,5  % 3,3  %
Market shares of the largest five producers in Belgium (installed capacity, in MW) 2019 2020 2021 2022 2023
Engie 43,7  % 43,7  % 41,9  % 37,8  % 33,5  %
Luminus 11,4  % 11,4  % 11,1  % 10,5  % 10,2  %
RWE 2,6  % 2,6  % 2,4  % 2,4  % 2,5  %
Eneco 4,2  % 4,2  % 4,1  % 4,3  % 4,5  %
Total Energies 3,7  % 3,7  % 3,5  % 3,8  % 3,9  %
Market shares of the largest five producers in Belgium (energy produced, in MWh) 2019 2020 2021 2022 2023
Engie 64  % 64  % 62,4  % 53,5  % 52,2  %
Luminus 13,7  % 13,7  % 11,9  % 13,7  % 14,1  %
RWE 2,6  % 2,6  % 3  % 2,8  % 2,7  %
Eneco 3,1  % 3,1  % 3,2  % 4,4  % 4,2  %
Total Energies 2,5  % 2,5  % 3,5  % 3,5  % 3,3  %
Market shares of the largest five producers in Belgium (installed capacity, in MW) 2019 2020 2021 2022 2023
Engie 43,7  % 43,7  % 41,9  % 37,8  % 33,5  %
Luminus 11,4  % 11,4  % 11,1  % 10,5  % 10,2  %
RWE 2,6  % 2,6  % 2,4  % 2,4  % 2,5  %
Eneco 4,2  % 4,2  % 4,1  % 4,3  % 4,5  %
Total Energies 3,7  % 3,7  % 3,5  % 3,8  % 3,9  %
(43) The decrease in Engie’s market share in 2022 and 2023 can mainly be attributed to the closure of the Doel 3 (September 2022) and Tihange 2 (March 2023) nuclear reactors.
(44) Engie’s market share is expected to decrease further as of 2025, with the closure of three further reactors, Doel 1, Doel 2 and Tihange 1. The remaining nuclear reactors, Doel 4 and Tihange 3, will be operated until 2035 following an agreement between the Belgian government and Engie.
(45) According to the applicants, Engie’s market share of electricity generation and wholesale in Belgium would be 52 % in 2023, 44 % in 2024 and 32 % in 2025. This is due to the fact that, from 2025 onwards, the production of the two remaining nuclear reactors is considered to be split between Engie and the Belgian State, as the reactors will be operated by BE-NUC, a joint venture between Engie and the Belgian state, each owning 50 %.
(46) The Herfindahl-Hirschman Index (HHI), which measures market concentration, stands at the following (very high to high) levels for the market for electricity generation and wholesale in Belgium:HHI201920202021202220234 1083 9964 3434 1153 150It is expected to decrease significantly (2 253) in 2025 and afterwards, as the generation from nuclear reactors will remain stable while generation from renewable sources will increase. HHI 2019 2020 2021 2022 2023 4 108 3 996 4 343 4 115 3 150
HHI 2019 2020 2021 2022 2023
4 108 3 996 4 343 4 115 3 150
HHI 2019 2020 2021 2022 2023
4 108 3 996 4 343 4 115 3 150
(47) The market share of the largest three undertakings on the market for electricity production and wholesale has decreased from 79 % to 72 % between 2019 and 2023.
(48) The Commission observes that the Belgian market for electricity production and wholesale has been highly concentrated until now. The concentration should be reduced after 2025 with the planned closure of three further nuclear reactors.
(49) The applicants explain that, while the market concentration is high, electricity imports exert an important competitive pressure.
(50) The Commission recognises that electricity imports exert some competitive pressure. However, the Commission also notes that Belgium has, over the past 10 years, been mostly exporting electricity to neighbouring countries. According to figures provided by the applicants(17), Belgium has been a net importer of electricity in 2023, but was a net exporter between 2018 and 2022. In the coming years, Belgium is likely to import more electricity due to the closure of nuclear reactors.
(51) The applicants compare the situation in Belgium to the situation of Lithuania, where the Commission acknowledged the significance of electricity imports(18). However, the two cases are different, as in Lithuania imports represented 80 % of electricity demand in 2018, while in Belgium imports would make up to 20 to 40 % of electricity demand in the next 10 years according to a study by CREG referenced in the request(19).
(52) Therefore, the Commission does not share the applicants’ view that that the importance of imports is comparable in the Belgian and Lithuanian cases. In view of the differences exposed in recitals 46 and 47, the Commission concludes that electricity imports cannot be taken as a decisive factor to measure exposure to competition for the Belgian electricity generation and wholesale market.
(53) The Commission recognises however that electricity imports may exert a competitive pressure on the electricity generation in the future as Belgium’s capacity will be reduced with the planned closure of three nuclear reactors in 2025. That trend has not yet materialised, as Belgium has mostly been a net exporter in the last five years.
(54) The applicants explain that Luminus is a contracting entity, given that it is 68,63 % owned by EDF Belgium SA, which is a 100 % subsidiary of the EDF Group, a public limited company under French law, owned by the French state.
(55) The applicants consider that Norther is a contracting entity, given that it is 50 % owned by Nethys, itself a 100 % owned subsidiary of Enodia, an ‘intercommunale’ owned by the province of Liège, 74 communes of the Liège area and the Walloon region. The Commission agrees that Norther is to be considered a contracting entity. In addition to Norther, Nethys controls through its subsidiary Elicio a number of subsidiaries in Belgium(20)active in the renewable electricity generation and wholesale activity (hereinafter the ‘the other subsidiaries of Nethys’), which the Commission considers to be contracting entities.
(56) According to the applicants, contracting entities (a group in which the applicants include Luminus and Norther but not yet Ørsted, as the latter is not yet active in Belgium) have combined market shares on the market for overall electricity generation and wholesale in Belgium of between 20 and 30 % in capacity and 15 and 20 % in generation over the 2019-2023 period(21).
(57) Despite the fact that the applicants indicate that Engie is 23,64 % owned by the French state, which controls 33,97 % of the voting rights, they state that Engie does not operate on the European public procurement platforms because it is in the applicants’ view not subject to the Directive.(22)
(58) The Caisse des Dépôts et Consignations (‘CDC’), a French public institution, holds 3,63 % of shares and 3,53 % of voting rights(23). The French public shareholders, with 27,27 % of shares and 38,03 % of voting rights, have a blocking minority.
(59) The remaining significant shareholders of Engie are The Capital Group Companies (6,37 % of shares, 5,05 % of voting rights), Blackrock (4,51 % of shares and 3,44 % of voting rights) and Engie’s employees (3,49 % of shares and 4,18 % of voting rights). The French contracting authorities together are therefore by far Engie’s largest shareholder.
(60) At the last five annual general meetings (AGM) of Engie’s shareholders, the French state and the CDC have held more than half of the votes actually cast by shareholders. Based on the AGM voting sheets available on Engie’s website(24), the Commission makes the following calculation of the exercise of voting rights:20202021202220232024Share of French public entities (State + CDC) (in % of total voting rights)36,936,9137,337,338,03Percentage of votes cast (in % of total voting rights)71,68268,47270,674,1772,1Percentage of the voting rights held by the French contracting authorities (in % of votes cast)51,4853,952,8350,2952,75 2020 2021 2022 2023 2024 Share of French public entities (State + CDC) (in % of total voting rights) 36,9 36,91 37,3 37,3 38,03 Percentage of votes cast (in % of total voting rights) 71,682 68,472 70,6 74,17 72,1 Percentage of the voting rights held by the French contracting authorities (in % of votes cast) 51,48 53,9 52,83 50,29 52,75
2020 2021 2022 2023 2024
Share of French public entities (State + CDC) (in % of total voting rights) 36,9 36,91 37,3 37,3 38,03
Percentage of votes cast (in % of total voting rights) 71,682 68,472 70,6 74,17 72,1
Percentage of the voting rights held by the French contracting authorities (in % of votes cast) 51,48 53,9 52,83 50,29 52,75
2020 2021 2022 2023 2024
Share of French public entities (State + CDC) (in % of total voting rights) 36,9 36,91 37,3 37,3 38,03
Percentage of votes cast (in % of total voting rights) 71,682 68,472 70,6 74,17 72,1
Percentage of the voting rights held by the French contracting authorities (in % of votes cast) 51,48 53,9 52,83 50,29 52,75
(61) Under French law(25), the French state also has the possibility to turn an ordinary share of Engie into a golden share via a decree if the essential national interests, in particular in continuity and security of supply, are at stake. This golden share gives specific rights to the state, such as opposing the sale of strategic assets to a third party or conditioning the entry of new shareholders into the company’s capital above a given threshold to the minister of economy’s agreement.
(62) The Commission gave Engie the opportunity to provide comments on this specific point, which it did on 24 December 2024. Engie argues that the State and the CDC should not be regarded as a single contracting authority and that, even if they were, they cannot be presumed to exert a dominant influence on Engie. Engie adds that the French state only appoints three of the fourteen members of Engie’s board.
(63) Engie argues that, under Article 4(2)(b) of the Directive, only the majority of votes attached to shares issued by the undertaking is relevant, not the percentage of votes expressed at general shareholders’ meetings. However, the definition of a public undertaking in Article 4(2) first sentence of the Directive includes dominant influence exercised by contracting authorities through the majority of votes cast at general shareholders’ meetings. Dominant influence via control of the majority of votes attached to shares issued by the undertaking, as referred to in Article 4(2)(b), is one of the cases where such dominant influence is presumed; it does not preclude dominant influence in other situations.
(64) The Commission takes the view that, in light of the elements described in recitals 57 to 63, contracting authorities exercise a dominant influence on Engie within the meaning of Article 4(2) of Directive 2014/25/EU. Consequently, Engie should be regarded as a contracting entity pursuant to that Article.
(65) The Commission considers that the competitive situation of Engie and Luminus, on the one hand, and Norther, the other subsidiaries of Nethys as well as Ørsted, on the other, is very different. Engie and Luminus both have a long-standing strong presence in the Belgian electricity generation and wholesale market. In 2019, their market shares were 64 % and 13,7 % respectively, and in 2023 they were 52,2 % and 14,1 %.(26). Even after 2025, based on the applicants’ forecasts, Engie and Luminus would retain a very strong position on the Belgian electricity generation and wholesale market, as they are expected to remain by far the largest market players until at least 2034(27).
(66) Engie’s and Luminus’ cumulated strong positions in the Belgian generation and wholesale electricity market are reinforced by their diversified generation portfolios. Those include production from nuclear power plants located in Belgium(28), which gives them access to a stable and (thanks to its low marginal cost) competitive flexible baseload electricity generation source. They also both operate hydro and gas-fired power plants in Belgium which provide flexible peak electricity generation.
(67) In addition, the HHI index, referred to in recital 46 shows high market concentration levels and, in relation with market shares, evidences the fact that competitors are taking a long time to challenge the dominance of well-established players. Actually, the market concentration is only expected to drop significantly in relation with the planned closure of nuclear reactors in Belgium, and not because of market entry or expansion.
(68) The situation of the contracting entities Norther, the other subsidiaries of Nethys and Ørsted is, however, different. Norther only operates a wind farm at present. Electricity generation from wind is not flexible and is dependent on weather conditions. Ørsted is not yet present on the Belgian electricity generation and wholesale market. Even in the next 10 years, these two companies are not expected to become major players in Belgium(29). Both of them face the competition from the major players Engie and Luminus. It follows that the activities of Norther and Ørsted on the electricity generation and wholesale market in Belgium should be considered to be directly exposed to competition.
(69) While the exemption foreseen by Articles 34 and 35 of Directive 2014/25/EU has, in light of relevant circumstances, hitherto been granted or refused with respect to the activity on the relevant market taken as a whole, the present case presents features which would render such an approach incompatible with the objective pursued by this Directive, i.e. ensuring the respect of the internal market freedoms in the procurement of government-dominated network-operating entities without unnecessarily burdening activities that are directly exposed to competition.
(70) The economic sectors covered by Directive 2014/25/EU are characterised by the presence of former State monopolies, still controlled or influenced by public authorities, which may be facing varying degrees of competition and the market shares of which, although declining, often remain high. The influence of public authorities over contracting entities generates the risk that, in the absence of applicability of the public procurement directive, national suppliers are favoured in the procurement of the contracting entity concerned. The situation is however different in the present case, as some of the applicants are contracting entities having a small market share, and sometimes are merely a potential competitor or a new entrant on the relevant market. It is apparent that while the activity of some of the applicants can for that reason be considered to be directly exposed to competition, in particular from the established contracting entities that are incumbents with large market shares, an exemption cannot be granted to all the applicants, nor to the activity taken as whole on the electricity generation and wholesale market in Belgium and carried out by all the entities active therein. However, refusing to grant the exemption to those applicants whose activities are directly exposed to competition because the activities of other major market players are not directly exposed to competition would go against the objective Article 34 of Directive 2014/25/EU pursues. Consequently, the Commission deems it appropriate in light of the characteristics of the market in this case to grant the exemption only to some applicants.
(71) Since the conditions set out for an exemption in Article 34 of Directive 2014/25/EU are not met, Directive 2014/25/EU should continue to apply to contracts intended to enable the pursuit of renewable electricity generation receiving fixed and legally defined premiums in Belgium.
(72) In view of the factors examined in recitals 40 to 70, the condition of direct exposure to competition laid down in Article 34(1) of Directive 2014/25/EU should be considered not to be met in Belgium in respect of the activities of Engie and Luminus related to the overall electricity generation and wholesale market in Belgium.
(73) Directive 2014/25/EU should therefore continue to apply when Engie and Luminus award contracts intended to enable those activities, or when design contests as defined in Article 2, point 17, of Directive 2014/25/EU are organised for the pursuit of such activities in that geographic area.
(74) In view of the factors examined in recitals 40 to 70, the condition of direct exposure to competition laid down in Article 34(1) of Directive 2014/25/EU should be considered to be met in Belgium in respect of the activities of Norther, the other subsidiaries of Nethys and Ørsted related to the overall electricity generation and wholesale market in Belgium.
(75) On the contrary, Directive 2014/25/EU should not apply when Norther, the other subsidiaries of Nethys and Ørsted award contracts intended to enable those activities, or when design contests as defined in Article 2, point 17, of Directive 2014/25/EU are organised for the pursuit of such activities in that geographic area.
(76) This Decision is without prejudice to the application of the Union rules on competition and of the provisions in other fields of Union law. In particular, the criteria and the methodology used to assess direct exposure to competition under Article 34 of Directive 2014/25/EU are not necessarily identical to those used to perform an assessment under Article 101 or 102 of the Treaty or Council Regulation (EC) No 139/2004(30)as confirmed by the General Court of the European Union(31),
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Directive 2014/25/EU of the European Parliament and of the Council of 26 February 2014 on procurement by entities operating in the water, energy, transport and postal services sectors and repealing Directive 2004/17/EC (1), and in particular Article 35(3) thereof,
After consulting the Advisory Committee for Public Contracts,
Whereas:
1. FACTS AND PROCEDURE
(1) On 24 July 2024, the Belgian authorities submitted a request to the Commission pursuant to Article 35(1) of Directive 2014/25/EU (‘the request’) on behalf of Luminus, Norther and Ørsted (‘the applicants’) concerning electricity generation and wholesale in Belgium, with the exception of electricity generated in the Doel 4 and Tihange 3 nuclear power plants. The request complies with the formal requirements set out in Article 1(1) of Commission Implementing Decision (EU) 2016/1804 (2) and in Annex I to that Implementing Decision.
(2) Luminus is 68,63 % owned by Electricité de France (‘EDF’) Belgium SA, a subsidiary of the EDF Group, and is mainly active on the electricity markets and on the gas and energy services markets in France and Belgium.
(3) Norther is 50 % owned by Elnu NV, a subsidiary of Elicio SA-NV, fully owned by Nethys SA-NV, and 50 % owned by Boreas Wind Offshore NV, a fully owned subsidiary of Eneco Wind Belgium NV. Eneco Wind Belgium NV is a subsidiary of Eneco BV, an international producer and supplier of electricity, natural gas and heat, Norther operates an offshore wind farm in the North Sea within the Belgian Exclusive Economic Zone.
(4) Ørsted is part of the Ørsted Group which is 50,12 % owned by the Danish state. Ørsted has currently no energy generation or trading activities in Belgium but is considering initiating renewable energy activities in Belgium.
(5) The request was not accompanied by a reasoned and substantiated position of the Belgian competition authority.
(6) In accordance with point 1(a) of Annex IV to Directive 2014/25/EU, considering that free access to the market can be presumed on the basis of Article 34(3), first subparagraph, of that Directive, as also indicated in recital 15 of this Decision, the Commission is to adopt an implementing act referred to in article 35 of Directive 2014/25/EU within 105 working days.
(7) On 30 July 2024, the Commission asked the Belgian authorities to confirm within 10 working days that the data provided by the applicants concerning market shares was valid, even if it differed from the official data published by the Belgian Federal Commission for Electricity and Gas Regulation (CREG). The Commission received CREG’s confirmation on 2 September 2024. The Commission asked further clarifications to the Belgian authorities on 28 November 2024, which were provided on 27 January 2025. Pursuant to point 2 of Annex IV to Directive 2014/25/EU, the deadline to adopt an implementing decision is consequently set at 6 March 2025.
2. LEGAL FRAMEWORK
(8) Directive 2014/25/EU applies to the award of contracts for the pursuit of activities related to electricity generation and wholesale referred to in Article 9(1)(b) of that Directive unless that activity is exempted pursuant to Article 34 of that Directive.
(9) Directive 2014/25/EU imposes on public authorities and publicly controlled undertakings in the water, energy, transport and postal services sectors the public procurement discipline to ensure the free movement of goods, the freedom of establishment and the freedom to provide services as well as respect for the principles deriving from those freedoms. The reasons for this legislative choice, according to recital 1 of the Directive, are the fact that national authorities continue to be able to influence the behaviour of those entities and the closed nature of the markets in which the entities in those sectors operate.
(10) Pursuant to Article 34(1) of Directive 2014/25/EU, contracts intended to enable the performance of an activity to which that Directive applies are, upon request by a Member State or a contracting entity, not to be subject to that Directive if, in the Member State in which it is carried out, the activity is directly exposed to competition on markets to which access is not restricted.
(11) Direct exposure to competition is to be assessed on the basis of objective criteria, taking account of the specific characteristics of the sector concerned. This assessment is, however, limited by the short deadlines applicable and by the need to rely on the information available to the Commission. That information originates either from already available sources or from the information obtained in the context of the request pursuant to Article 35 of Directive 2014/25/EU and cannot be supplemented by more time-consuming methods, including, in particular, public inquiries addressed to the economic operators concerned (3).
(12) Direct exposure to competition in a particular market should be evaluated on the basis of various criteria, none of which are by themselves decisive.
(13) For the purposes of assessing whether the relevant activities are subject to direct competition in the markets concerned by this Decision, the market share of the main players, as well as the existence and the extent of support to renewable electricity generation and wholesale in Belgium through public schemes are to be taken into account.
(14) As recalled by the General Court (4), the burden of proof lies on the applicant to demonstrate that the conditions laid down in Article 34 of Directive 2014/25/EU are fulfilled and, hence, to benefit from an exemption from the application of Directive 2014/25/EU. This implies that the applicant should accompany its request with comprehensive evidence to demonstrate that the conditions for the exemption are met.
3. ASSESSMENT
(15) For the purpose of implementing Article 34 of Directive 2014/25/EU, this Decision must establish whether the activities concerned by the request are, in markets to which access is not restricted within the meaning of that provision, exposed to a level of competition which ensures that, also in the absence of the procurement discipline brought about by the detailed procurement rules laid down in Directive 2014/25/EU, procurement for the pursuit of the activity concerned will be carried out in a transparent and non-discriminatory manner based on criteria allowing purchasers to identify the solution which overall is the economically most advantageous one.
(16) This Decision is based on the legal and factual situation as of July 2024 and on the information submitted by the applicants and information that is publicly available. It may be revised, should significant changes in the legal or factual situation mean that the conditions for the applicability of Article 34(1) of Directive 2014/25/EU are no longer met.
3.1. Unrestricted access to the market
(17) Access to a market is deemed to be unrestricted if the Member State concerned has implemented and applied the relevant Union legal acts listed in Annex III to Directive 2014/25/EU, which includes, as regards electricity generation and wholesale, Directive (EU) 2019/944 of the European Parliament and of the Council (5).
(18) On the basis of the information available to the Commission, Belgium has implemented and applied Directive (EU) 2019/944 (6). Consequently, access to the relevant market is deemed not to be restricted within the meaning of Article 34(3) of Directive 2014/25/EU.
3.2. Competition assessment
3.2.1.
Relevant product market definition
(19) According to the applicants, the relevant product market is the market for conventional and renewable electricity generation and wholesale. This is in line with the Commission’s decisional practice regarding exemption requests related to electricity generation and wholesale. The product market definition retained in this decision is without prejudice to the application of the Union competition rules.
(20) In past decisions, the Commission has found that some subsidy schemes did not stand in the way of the conclusion that electricity generation benefiting from them could belong to the relevant product market. In Commission Implementing Decision (EU) 2018/71 (7) addressed to the Netherlands, the Commission noted in recitals 19 and 21 that the electricity generated from renewable sources was sold directly on the market, and that the Dutch Stimulering Duurzame Energieproductie (SDE+) system encouraged competitive bids, whereas the competitors would try to minimise their cost (hence the feed in premium they would receive). The Commission therefore considered that electricity generated from renewable sources belonged to the same market as conventional electricity generation. In Commission Implementing Decision (EU) 2020/1499 (8) addressed to Italy, the Commission remarked in recitals 37 and 38 that some renewable electricity schemes were subject to a bidding process with a high number of applicants. Consequently, electricity generation benefiting from those schemes was found to be part of the same market as conventional electricity generation. In Commission Implementing Decision (EU) 2020/1500 (9) addressed to Lithuania, the Commission stated in recital 30 that electricity produced under the third support scheme received premium-based support established through a competitive bidding procedure and found that it was part of the same market as conventional electricity generation. In Commission Implementing Decision (EU) 2022/1376 (10) addressed to Denmark, the Commission found in recital 29 that the allocation of the public funding was exposed to competition through a bidding process, which disciplined the behaviour of renewable electricity producers with regard to their procurement policy. As a result, it concluded that the renewable electricity generation facilities subject to the request belonged to the same market as conventional electricity generation. In Commission Implementing Decision (EU) 2023/1978 (11) addressed to Germany, the Commission concluded in recital 47 that renewable electricity generation and wholesale receiving no subsidies or subsidies directly linked to market price were directly exposed to competition.
(21) In general, the Commission concluded that renewable electricity generation could be found to compete with conventional electricity generation either if it did not receive subsidies or if the subsidies it received were granted through a mechanism guaranteeing that the level of subsidies was directly linked to a market price. In a number of cases, the Commission found that the existence of a bidding process ensured that the subsidies were linked to a market price.
(22) The Commission notes that electricity generation in Belgium is supported by three categories of schemes with different characteristics. They are the capacity remuneration mechanism (‘CRM’), the subsidy scheme for Doel 4 and Tihange 3 nuclear power plants as extended beyond 2025 (12) and the subsidy schemes for renewable electricity.
3.2.1.1. The Capacity Remuneration Mechanism (CRM)
(23) The applicants describe the situation as follows. Belgium plans to close all nuclear reactors on its territory by 2025, with the exception of the two most recent reactors, one at Doel and one at Tihange. According to Belgian Transmission System Operator Elia (13), this closure will require the installation of between 2 and 4 GW of additional capacity between now and 2030. However, the operation of the wholesale markets does not provide sufficient incentives for such investment. It is however essential to the energy system that flexible capacity is available. From the point of view of demand, renewable energies, which are intermittent and random, need to be complemented by sufficiently flexible means of production.
(24) The applicants add that Belgium has introduced the CRM for this reason. As long as a producer can guarantee availability, it is eligible to the mechanism, which is neutral with regard to the technology or source of origin of the energy. The CRM, which came into force in March 2021, encourages investment by guaranteeing sufficient profitability for projects providing peak production and balancing mechanisms. It operates by competitive auction. This mechanism was approved by Commission Decision (EU) 2022/639 (14) in 2021.
(25) According to the applicants, the activities benefitting from the CRM mechanism belong to the overall wholesale and generation market as (i) electricity is sold directly on the wholesale market; (ii) does not benefit from injection priority; or (iii) from exemption of balancing responsibility; (iv) the subsidy delivers no hedge from market risk; (v) the amount of subsidy covers no more than the net extra costs associated with the costs of building, maintaining and operating a thermal power plant operated to guarantee the security of supply minus the relevant market revenues of this power plant. The Commission shares this view.
3.2.1.2. The subsidy schemes for renewable electricity
(26) The applicants proposed to group the applicable subsidy schemes for renewable electricity generation in Belgium into the following categories.
3.2.1.2.1. Fixed and legally defined premiums
(27) This category includes: the C-Power, Belwind, Northwind and Nobelwind offshore wind parks, the first green certificates (‘GC’) scheme of the Brussels region (facilities installed between 2004 and June 2011), the first and second GC scheme of the Walloon region (facilities installed between 2002 and July 2014), the first GC scheme of the Flemish region (facilities installed between 2009 and 2012).
(28) The applicants claim that those offshore wind parks should be regarded as belonging to the general generation and wholesale market, given that the subsidies received cover no more than the net extra costs of the projects. However, the Commission has, in the decisions referred to in recital 18, repeatedly taken the view that installations receiving fixed subsidies were not part of the overall electricity generation and wholesale market. For the Commission, such subsidies shield beneficiaries from competition by providing guaranteed levels of revenue. The Commission sees no reason to depart from this approach.
3.2.1.2.2. Electricity market price dependent and legally defined premium
(29) This category includes: the second GC scheme of the Brussels region (facilities installed from July 2011), the third GC scheme of the Walloon region (facilities installed from July 2014), the first GC scheme of the Flemish region (facilities installed from 2013), the Norther, Rentel, Seamade, Northwester II offshore wind parks.
(30) For the regional schemes, project costs are re-assessed yearly, and the estimated project cost of installed projects is indexed to take into account variations in operating expenditure. For the offshore wind parks, the subsidy is subject to a project specific monthly indexation on a consumer price index.
(31) The applicants claim that the facilities receiving subsidies that are electricity market price dependent with a legally defined premium are part of the overall electricity generation and wholesale market. The Commission shares this view, as those subsidies are linked to a market price.
3.2.1.2.3. Electricity market price dependent premium defined through a competitive auction process
(32) This category includes the Princess Elisabeth zone projects. The applicants claim that since the future facilities under that scheme will receive subsidies defined through a competitive auction process, they should be part of the overall generation and wholesale market. The Commission shares this view, as those subsidies are linked to a market price.
3.2.1.2.4. Capacity based subsidy – level of subsidy defined through a competitive auction process
(33) This category includes the small to medium capacity solar and onshore wind projects installed in Flanders between 2021 and 2023. The applicants claim that since those facilities receive subsidies defined through a competitive auction process, they should be part of the overall electricity generation and wholesale market. The Commission shares this view, as those subsidies are linked to a market price.
3.2.1.2.5. Facilities that no longer receive subsidies
(34) The applicants claim that facilities which have ceased to receive subsidies should be part of the overall generation and wholesale market. The Commission shares this view, as these facilities do not receive any subsidy and sell their production receiving only the electricity market price. This is in line with the approach taken in previous exemption decisions, such as Implementing Decision (EU) 2023/1978 concerning Germany.
(35) The Commission finds that the overall electricity generation and wholesale market is composed of conventional electricity generation and wholesale, electricity generation and wholesale supported by the CRM and renewable electricity generation and wholesale that receive subsidies based on market prices. Electricity generation and wholesale from renewable energy sources receiving fixed and legally defined premiums form a separate market.
3.2.2.
Relevant geographic market definition
(36) According to the applicants, based on the decisional practice of the Commission, the relevant geographic market should be defined as national, comprising the territory of Belgium (15). The applicants underline that Belgium has strong links with the other countries of the central and western Europe region (Austria, Belgium, France, Germany, Luxembourg and the Netherlands).
(37) In its previous practice (16), the Commission took the view that the market for electricity generation and wholesale is national in scope. The applicants’ position is in line with the Commission’s practice.
(38) In the absence of any indication of a different scope of the geographic market, for the purposes of the assessment under this Decision and without prejudice to Union competition law, the geographic scope of the generation and wholesale of electricity from conventional and renewable sources can be considered to consist in the territory of Belgium.
3.2.3.
Market analysis
(39) The Commission aims to assess at this stage whether or not the activities concerned by the request are exposed to a sufficient level of competition to ensure that the procurement discipline of Directive 2014/25/EU is not required. In the present case, the factors that are to be taken into account to carry out this assessment are the market shares, the concentration levels and the influence of electricity imports on competition on the Belgian electricity generation and wholesale market.
3.2.3.1. Renewable electricity generation facilities receiving fixed and legally defined premiums
(40) In line with its previous decisions referred to in recital 18, the Commission finds in the present case that fixed and legally defined subsidies for renewable electricity generation do not ensure that the facilities benefitting from such subsidies are directly exposed to competition.
(41) Consequently, since the conditions set out in Article 34 of Directive 2014/25/EU are not met, Directive 2014/25/EU should continue to apply to contracts intended to enable the pursuit of renewable electricity generation receiving fixed and legally defined premiums in Belgium.
3.2.3.2. Market shares in the overall electricity generation and wholesale market in Belgium
(42) The applicants provide the following overview of market shares over the 2019-2023 period on the electricity generation and wholesale market.
Market shares of the largest five producers in Belgium (energy produced, in MWh)
2019
2020
2021
2022
2023
Engie
64 %
64 %
62,4 %
53,5 %
52,2 %
Luminus
13,7 %
13,7 %
11,9 %
13,7 %
14,1 %
RWE
2,6 %
2,6 %
3 %
2,8 %
2,7 %
Eneco
3,1 %
3,1 %
3,2 %
4,4 %
4,2 %
Total Energies
2,5 %
2,5 %
3,5 %
3,5 %
3,3 %
Market shares of the largest five producers in Belgium (installed capacity, in MW)
2019
2020
2021
2022
2023
Engie
43,7 %
43,7 %
41,9 %
37,8 %
33,5 %
Luminus
11,4 %
11,4 %
11,1 %
10,5 %
10,2 %
RWE
2,6 %
2,6 %
2,4 %
2,4 %
2,5 %
Eneco
4,2 %
4,2 %
4,1 %
4,3 %
4,5 %
Total Energies
3,7 %
3,7 %
3,5 %
3,8 %
3,9 %
(43) The decrease in Engie’s market share in 2022 and 2023 can mainly be attributed to the closure of the Doel 3 (September 2022) and Tihange 2 (March 2023) nuclear reactors.
(44) Engie’s market share is expected to decrease further as of 2025, with the closure of three further reactors, Doel 1, Doel 2 and Tihange 1. The remaining nuclear reactors, Doel 4 and Tihange 3, will be operated until 2035 following an agreement between the Belgian government and Engie.
(45) According to the applicants, Engie’s market share of electricity generation and wholesale in Belgium would be 52 % in 2023, 44 % in 2024 and 32 % in 2025. This is due to the fact that, from 2025 onwards, the production of the two remaining nuclear reactors is considered to be split between Engie and the Belgian State, as the reactors will be operated by BE-NUC, a joint venture between Engie and the Belgian state, each owning 50 %.
(46) The Herfindahl-Hirschman Index (HHI), which measures market concentration, stands at the following (very high to high) levels for the market for electricity generation and wholesale in Belgium:
HHI
2019
2020
2021
2022
2023
4 108
3 996
4 343
4 115
3 150
It is expected to decrease significantly (2 253) in 2025 and afterwards, as the generation from nuclear reactors will remain stable while generation from renewable sources will increase.
(47) The market share of the largest three undertakings on the market for electricity production and wholesale has decreased from 79 % to 72 % between 2019 and 2023.
(48) The Commission observes that the Belgian market for electricity production and wholesale has been highly concentrated until now. The concentration should be reduced after 2025 with the planned closure of three further nuclear reactors.
3.2.3.3. Analysis of the competitive pressure exerted by electricity imports
(49) The applicants explain that, while the market concentration is high, electricity imports exert an important competitive pressure.
(50) The Commission recognises that electricity imports exert some competitive pressure. However, the Commission also notes that Belgium has, over the past 10 years, been mostly exporting electricity to neighbouring countries. According to figures provided by the applicants (17), Belgium has been a net importer of electricity in 2023, but was a net exporter between 2018 and 2022. In the coming years, Belgium is likely to import more electricity due to the closure of nuclear reactors.
(51) The applicants compare the situation in Belgium to the situation of Lithuania, where the Commission acknowledged the significance of electricity imports (18). However, the two cases are different, as in Lithuania imports represented 80 % of electricity demand in 2018, while in Belgium imports would make up to 20 to 40 % of electricity demand in the next 10 years according to a study by CREG referenced in the request (19).
(52) Therefore, the Commission does not share the applicants’ view that that the importance of imports is comparable in the Belgian and Lithuanian cases. In view of the differences exposed in recitals 46 and 47, the Commission concludes that electricity imports cannot be taken as a decisive factor to measure exposure to competition for the Belgian electricity generation and wholesale market.
(53) The Commission recognises however that electricity imports may exert a competitive pressure on the electricity generation in the future as Belgium’s capacity will be reduced with the planned closure of three nuclear reactors in 2025. That trend has not yet materialised, as Belgium has mostly been a net exporter in the last five years.
3.2.3.4. Contracting entities active in the overall electricity generation and wholesale market in Belgium
(54) The applicants explain that Luminus is a contracting entity, given that it is 68,63 % owned by EDF Belgium SA, which is a 100 % subsidiary of the EDF Group, a public limited company under French law, owned by the French state.
(55) The applicants consider that Norther is a contracting entity, given that it is 50 % owned by Nethys, itself a 100 % owned subsidiary of Enodia, an ‘intercommunale’ owned by the province of Liège, 74 communes of the Liège area and the Walloon region. The Commission agrees that Norther is to be considered a contracting entity. In addition to Norther, Nethys controls through its subsidiary Elicio a number of subsidiaries in Belgium (20) active in the renewable electricity generation and wholesale activity (hereinafter the ‘the other subsidiaries of Nethys’), which the Commission considers to be contracting entities.
(56) According to the applicants, contracting entities (a group in which the applicants include Luminus and Norther but not yet Ørsted, as the latter is not yet active in Belgium) have combined market shares on the market for overall electricity generation and wholesale in Belgium of between 20 and 30 % in capacity and 15 and 20 % in generation over the 2019-2023 period (21).
(57) Despite the fact that the applicants indicate that Engie is 23,64 % owned by the French state, which controls 33,97 % of the voting rights, they state that Engie does not operate on the European public procurement platforms because it is in the applicants’ view not subject to the Directive. (22) (58) The Caisse des Dépôts et Consignations (‘CDC’), a French public institution, holds 3,63 % of shares and 3,53 % of voting rights (23). The French public shareholders, with 27,27 % of shares and 38,03 % of voting rights, have a blocking minority.
(59) The remaining significant shareholders of Engie are The Capital Group Companies (6,37 % of shares, 5,05 % of voting rights), Blackrock (4,51 % of shares and 3,44 % of voting rights) and Engie’s employees (3,49 % of shares and 4,18 % of voting rights). The French contracting authorities together are therefore by far Engie’s largest shareholder.
(60) At the last five annual general meetings (AGM) of Engie’s shareholders, the French state and the CDC have held more than half of the votes actually cast by shareholders. Based on the AGM voting sheets available on Engie’s website (24), the Commission makes the following calculation of the exercise of voting rights:
2020
2021
2022
2023
2024
Share of French public entities (State + CDC) (in % of total voting rights)
36,9
36,91
37,3
37,3
38,03
Percentage of votes cast (in % of total voting rights)
71,682
68,472
70,6
74,17
72,1
Percentage of the voting rights held by the French contracting authorities (in % of votes cast)
51,48
53,9
52,83
50,29
52,75
(61) Under French law (25), the French state also has the possibility to turn an ordinary share of Engie into a golden share via a decree if the essential national interests, in particular in continuity and security of supply, are at stake. This golden share gives specific rights to the state, such as opposing the sale of strategic assets to a third party or conditioning the entry of new shareholders into the company’s capital above a given threshold to the minister of economy’s agreement.
(62) The Commission gave Engie the opportunity to provide comments on this specific point, which it did on 24 December 2024. Engie argues that the State and the CDC should not be regarded as a single contracting authority and that, even if they were, they cannot be presumed to exert a dominant influence on Engie. Engie adds that the French state only appoints three of the fourteen members of Engie’s board.
(63) Engie argues that, under Article 4(2)(b) of the Directive, only the majority of votes attached to shares issued by the undertaking is relevant, not the percentage of votes expressed at general shareholders’ meetings. However, the definition of a public undertaking in Article 4(2) first sentence of the Directive includes dominant influence exercised by contracting authorities through the majority of votes cast at general shareholders’ meetings. Dominant influence via control of the majority of votes attached to shares issued by the undertaking, as referred to in Article 4(2)(b), is one of the cases where such dominant influence is presumed; it does not preclude dominant influence in other situations.
(64) The Commission takes the view that, in light of the elements described in recitals 57 to 63, contracting authorities exercise a dominant influence on Engie within the meaning of Article 4(2) of Directive 2014/25/EU. Consequently, Engie should be regarded as a contracting entity pursuant to that Article.
(65) The Commission considers that the competitive situation of Engie and Luminus, on the one hand, and Norther, the other subsidiaries of Nethys as well as Ørsted, on the other, is very different. Engie and Luminus both have a long-standing strong presence in the Belgian electricity generation and wholesale market. In 2019, their market shares were 64 % and 13,7 % respectively, and in 2023 they were 52,2 % and 14,1 %. (26). Even after 2025, based on the applicants’ forecasts, Engie and Luminus would retain a very strong position on the Belgian electricity generation and wholesale market, as they are expected to remain by far the largest market players until at least 2034 (27).
(66) Engie’s and Luminus’ cumulated strong positions in the Belgian generation and wholesale electricity market are reinforced by their diversified generation portfolios. Those include production from nuclear power plants located in Belgium (28), which gives them access to a stable and (thanks to its low marginal cost) competitive flexible baseload electricity generation source. They also both operate hydro and gas-fired power plants in Belgium which provide flexible peak electricity generation.
(67) In addition, the HHI index, referred to in recital 46 shows high market concentration levels and, in relation with market shares, evidences the fact that competitors are taking a long time to challenge the dominance of well-established players. Actually, the market concentration is only expected to drop significantly in relation with the planned closure of nuclear reactors in Belgium, and not because of market entry or expansion.
(68) The situation of the contracting entities Norther, the other subsidiaries of Nethys and Ørsted is, however, different. Norther only operates a wind farm at present. Electricity generation from wind is not flexible and is dependent on weather conditions. Ørsted is not yet present on the Belgian electricity generation and wholesale market. Even in the next 10 years, these two companies are not expected to become major players in Belgium (29). Both of them face the competition from the major players Engie and Luminus. It follows that the activities of Norther and Ørsted on the electricity generation and wholesale market in Belgium should be considered to be directly exposed to competition.
(69) While the exemption foreseen by Articles 34 and 35 of Directive 2014/25/EU has, in light of relevant circumstances, hitherto been granted or refused with respect to the activity on the relevant market taken as a whole, the present case presents features which would render such an approach incompatible with the objective pursued by this Directive, i.e. ensuring the respect of the internal market freedoms in the procurement of government-dominated network-operating entities without unnecessarily burdening activities that are directly exposed to competition.
(70) The economic sectors covered by Directive 2014/25/EU are characterised by the presence of former State monopolies, still controlled or influenced by public authorities, which may be facing varying degrees of competition and the market shares of which, although declining, often remain high. The influence of public authorities over contracting entities generates the risk that, in the absence of applicability of the public procurement directive, national suppliers are favoured in the procurement of the contracting entity concerned. The situation is however different in the present case, as some of the applicants are contracting entities having a small market share, and sometimes are merely a potential competitor or a new entrant on the relevant market. It is apparent that while the activity of some of the applicants can for that reason be considered to be directly exposed to competition, in particular from the established contracting entities that are incumbents with large market shares, an exemption cannot be granted to all the applicants, nor to the activity taken as whole on the electricity generation and wholesale market in Belgium and carried out by all the entities active therein. However, refusing to grant the exemption to those applicants whose activities are directly exposed to competition because the activities of other major market players are not directly exposed to competition would go against the objective Article 34 of Directive 2014/25/EU pursues. Consequently, the Commission deems it appropriate in light of the characteristics of the market in this case to grant the exemption only to some applicants.
4. CONCLUSION
(71) Since the conditions set out for an exemption in Article 34 of Directive 2014/25/EU are not met, Directive 2014/25/EU should continue to apply to contracts intended to enable the pursuit of renewable electricity generation receiving fixed and legally defined premiums in Belgium.
(72) In view of the factors examined in recitals 40 to 70, the condition of direct exposure to competition laid down in Article 34(1) of Directive 2014/25/EU should be considered not to be met in Belgium in respect of the activities of Engie and Luminus related to the overall electricity generation and wholesale market in Belgium.
(73) Directive 2014/25/EU should therefore continue to apply when Engie and Luminus award contracts intended to enable those activities, or when design contests as defined in Article 2, point 17, of Directive 2014/25/EU are organised for the pursuit of such activities in that geographic area.
(74) In view of the factors examined in recitals 40 to 70, the condition of direct exposure to competition laid down in Article 34(1) of Directive 2014/25/EU should be considered to be met in Belgium in respect of the activities of Norther, the other subsidiaries of Nethys and Ørsted related to the overall electricity generation and wholesale market in Belgium.
(75) On the contrary, Directive 2014/25/EU should not apply when Norther, the other subsidiaries of Nethys and Ørsted award contracts intended to enable those activities, or when design contests as defined in Article 2, point 17, of Directive 2014/25/EU are organised for the pursuit of such activities in that geographic area.
(76) This Decision is without prejudice to the application of the Union rules on competition and of the provisions in other fields of Union law. In particular, the criteria and the methodology used to assess direct exposure to competition under Article 34 of Directive 2014/25/EU are not necessarily identical to those used to perform an assessment under Article 101 or 102 of the Treaty or Council Regulation (EC) No 139/2004 (30) as confirmed by the General Court of the European Union (31),
HAS ADOPTED THIS DECISION:
Directive 2014/25/EU shall continue to apply to the awarding by contracting entities of contracts intended to enable the electricity generation and wholesale activities from renewable energy sources receiving fixed and legally defined premiums to be carried out in Belgium.
Without prejudice to Article 1, Directive 2014/25/EU shall not apply to the awarding by Norther, the other subsidiaries of Nethys and Ørsted of contracts intended to enable the electricity generation and wholesale activities to be carried out in Belgium. Directive 2014/25/EU shall continue to apply to the awarding by other contracting entities of contracts intended to enable the electricity generation and wholesale activities to be carried out in Belgium.
This decision is addressed to the Kingdom of Belgium.

Commission Implementing Decision (EU) 2025/476 of 11 February 2025 laying down rules for the application of Directive (EU) 2016/797 of the European Parliament and of the Council as regards a request from the Netherlands not to apply certain requirements concerning the external sound pressure level of audible alert signals set out in Commission Regulation (EU) No 1300/2014 (notified under document C(2025) 789)

Official Journalof the European Union ENL series
2025/476 11.3.2025
(1) On 18 April 2024, the Netherlands submitted to the Commission, in accordance with Article 7(4) of Directive (EU) 2016/797, a request not to apply point 4.2.2.3.2.(12) of the Annex to Commission Regulation (EU) No 1300/2014(2)with respect to the requirement on external sound pressure level of audible alert signals for external doors in the project of upgrading certain vehicles, which form part of the VIRM4 train fleet.
(2) Point 4.2.2.3.2.(12) of the Annex to Regulation (EU) No 1300/2014 specifies the requirements related to the passenger door audible signals for exterior doors, i.e. the signals for door opening, door closing and door finding). However, it follows from Appendix F to that Regulation that the application of the requirements to provide door opening and closing signals is only mandatory when the door control system is renewed or upgraded.
(3) The project referred to in the request concerns upgrading certain vehicles of the VIRM4 train fleet which consists of a type of interregional, electric multiple unit double-decker trains operated in the Netherlands. The scope of the project does not include the renewal or upgrade of the door control system and the application of the requirement set out in point 4.2.2.3.2.(12) of the Annex to Regulation (EU) No 1300/2014 is therefore not mandatory.
(4) Nonetheless, to improve the accessibility of the VIRM4 train fleet, the Netherlands intends to apply audible alert signals for the passenger doors that are identical to the signals already implemented in the rest of the fleet series, namely the VIRMm1 and VIRMm2 train fleets. Those audible alert signals will not fully comply with the technical specifications for the external sound pressure level set out in Appendix G of Regulation (EU) No 1300/2014, which are mandatory when the audible alert signals are used.
(5) According to the documents submitted by the Netherlands, complying with the required external sound pressure level for the VIRM4 fleet would entail an additional cost of approximately EUR 1 500 000 including maintenance and minimum spare parts inventory.
(6) In addition, full compliance with the specification for the door opening and closing signal, as defined in Appendix G of Regulation (EU) No 1300/2014, for the VIRM4 fleet would result in non-conformity with the VIRMm1 and VIRMm2 fleets. This would entail additional maintenance costs. At the same time, the cost associated with fully complying with the specification, as defined in Appendix G of Regulation (EU) No 1300/2014, for the entire fleet (VIRMm1, VIRMm2/3 and VIRM4) would amount to an additional cost of EUR 4 500 000, including minimum spare parts inventory, non-availability of the rolling stock for the period of retrofitting and maintenance.
(7) The user groups consulted by the Netherlands consider the equipping of the VIRM4 fleet with audible alert signals to be an improvement, although the external sound pressure levels would not reach the levels specified in Appendix G of Regulation (EU) No 1300/2014.
(8) As an alternative, the Netherlands proposes to implement non-adaptive devices for the audible alert signals providing an external sound pressure level of 65dB LAeq,T(+ 5dB/– 4dB), which is slightly lower than the 70 dB (+ 6dB/– 0dB) set out in Appendix G of Regulation (EU) No 1300/2014.
(9) In case of a future project including the renewal or upgrade of the door control system, point 4.2.2.3.2. (12) of the Annex to Regulation (EU) No 1300/2014 will apply. This notably includes the level of the external sound pressure level set out in Appendix G of that Regulation.
(10) In addition, the non-application will be strictly limited to the individual VIRM4 fleet vehicles covered by the Netherlands’ request. To avoid the need for a new decision, the Netherlands should be allowed to change the precise identification numbers of those vehicles by informing the Commission thereof. If such a change is made, it should be notified to the Commission without delay.
(11) Based on the justification for the request provided by the Netherlands and the alternative provisions proposed, the conditions set out in Article 7(1), point (c) and Article 7(4) of Directive (EU) 2016/797 can be considered as fulfilled for the VIRM4 fleet upgrade project. The request from the Netherlands should therefore be accepted.
(12) The measures provided for in this Decision are in accordance with the opinion of the Committee referred to in Article 51(1) of Directive (EU) 2016/797,
Vehicle type Trainset Number Vehicle Number (EVN)
VIRM 4-IV 9547 948449212596
VIRM 4-IV 9547 948449212604
VIRM 4-IV 9547 948449251479
VIRM 4-IV 9547 948449151281
VIRM 4-IV 9548 948449212612
VIRM 4-IV 9548 948449212620
VIRM 4-IV 9548 948449251487
VIRM 4-IV 9548 948449151299
VIRM 4-IV 9549 948449212638
VIRM 4-IV 9549 948449212646
VIRM 4-IV 9549 948449251495
VIRM 4-IV 9549 948449151307
VIRM 4-IV 9550 948449212653
VIRM 4-IV 9550 948449212661
VIRM 4-IV 9550 948449251503
VIRM 4-IV 9550 948449151315
VIRM 4-IV 9551 948449212679
VIRM 4-IV 9551 948449212687
VIRM 4-IV 9551 948449251511
VIRM 4-IV 9551 948449151323
VIRM 4-IV 9552 948449212695
VIRM 4-IV 9552 948449212703
VIRM 4-IV 9552 948449251529
VIRM 4-IV 9552 948449151331
VIRM 4-IV 9553 948449212711
VIRM 4-IV 9553 948449212729
VIRM 4-IV 9553 948449251537
VIRM 4-IV 9553 948449151349
VIRM 4-IV 9554 948449212737
VIRM 4-IV 9554 948449212745
VIRM 4-IV 9554 948449251545
VIRM 4-IV 9554 948449151356
VIRM 4-IV 9555 948449212752
VIRM 4-IV 9555 948449212760
VIRM 4-IV 9555 948449251552
VIRM 4-IV 9555 948449151364
VIRM 4-IV 9556 948449212778
VIRM 4-IV 9556 948449212786
VIRM 4-IV 9556 948449251560
VIRM 4-IV 9556 948449151372
VIRM 4-IV 9557 948449212794
VIRM 4-IV 9557 948449212802
VIRM 4-IV 9557 948449251578
VIRM 4-IV 9557 948449151380
VIRM 4-IV 9558 948449212810
VIRM 4-IV 9558 948449212828
VIRM 4-IV 9558 948449251586
VIRM 4-IV 9558 948449151398
VIRM 4-IV 9559 948449212836
VIRM 4-IV 9559 948449212844
VIRM 4-IV 9559 948449251594
VIRM 4-IV 9559 948449151406
VIRM 4-IV 9560 948449212851
VIRM 4-IV 9560 948449212869
VIRM 4-IV 9560 948449251602
VIRM 4-IV 9560 948449151414
VIRM 4-IV 9561 948449212877
VIRM 4-IV 9561 948449212885
VIRM 4-IV 9561 948449251610
VIRM 4-IV 9561 948449151422
VIRM 4-IV 9562 948449212893
VIRM 4-IV 9562 948449212901
VIRM 4-IV 9562 948449251628
VIRM 4-IV 9562 948449151430
VIRM 4-IV 9563 948449212919
VIRM 4-IV 9563 948449212927
VIRM 4-IV 9563 948449251636
VIRM 4-IV 9563 948449151448
VIRM 4-IV 9564 948449212935
VIRM 4-IV 9564 948449212943
VIRM 4-IV 9564 948449251644
VIRM 4-IV 9564 948449151455
VIRM 4-IV 9565 948449212950
VIRM 4-IV 9565 948449212968
VIRM 4-IV 9565 948449251651
VIRM 4-IV 9565 948449151463
VIRM 4-IV 9566 948449212976
VIRM 4-IV 9566 948449212984
VIRM 4-IV 9566 948449251669
VIRM 4-IV 9566 948449151471
VIRM 4-IV 9567 948449212992
VIRM 4-IV 9567 948449213008
VIRM 4-IV 9567 948449251677
VIRM 4-IV 9567 948449151489
VIRM 4-IV 9568 948449213016
VIRM 4-IV 9568 948449213024
VIRM 4-IV 9568 948449251685
VIRM 4-IV 9568 948449151497
VIRM 4-IV 9569 948449213032
VIRM 4-IV 9569 948449213040
VIRM 4-IV 9569 948449251693
VIRM 4-IV 9569 948449151505
VIRM 4-IV 9570 948449213057
VIRM 4-IV 9570 948449213065
VIRM 4-IV 9570 948449251701
VIRM 4-IV 9570 948449151513
VIRM 4-IV 9571 948449213073
VIRM 4-IV 9571 948449213081
VIRM 4-IV 9571 948449251719
VIRM 4-IV 9571 948449151521
VIRM 4-IV 9572 948449213099
VIRM 4-IV 9572 948449213107
VIRM 4-IV 9572 948449251727
VIRM 4-IV 9572 948449151539
VIRM 4-IV 9573 948449213115
VIRM 4-IV 9573 948449213123
VIRM 4-IV 9573 948449251735
VIRM 4-IV 9573 948449151547
VIRM 4-IV 9574 948449213131
VIRM 4-IV 9574 948449213149
VIRM 4-IV 9574 948449251743
VIRM 4-IV 9574 948449151554
VIRM 4-IV 9575 948449213156
VIRM 4-IV 9575 948449213164
VIRM 4-IV 9575 948449251750
VIRM 4-IV 9575 948449151562
VIRM 4-IV 9576 948449213172
VIRM 4-IV 9576 948449213180
VIRM 4-IV 9576 948449251768
VIRM 4-IV 9576 948449151570
VIRM 4-IV 9577 948449213198
VIRM 4-IV 9577 948449213206
VIRM 4-IV 9577 948449251776
VIRM 4-IV 9577 948449151588
VIRM 4-IV 9578 948449213222
VIRM 4-IV 9578 948449251784
VIRM 4-IV 9578 948449151596
VIRM 4-IV 9578 948449213610
VIRM 4-IV 9579 948449213230
VIRM 4-IV 9579 948449213248
VIRM 4-IV 9579 948449251792
VIRM 4-IV 9579 948449151604
VIRM 4-IV 9580 948449213255
VIRM 4-IV 9580 948449213263
VIRM 4-IV 9580 948449251800
VIRM 4-IV 9580 948449151612
VIRM 4-IV 9581 948449213271
VIRM 4-IV 9581 948449213289
VIRM 4-IV 9581 948449251818
VIRM 4-IV 9581 948449151620
VIRM 4-IV 9582 948449213214
VIRM 4-IV 9582 948449213305
VIRM 4-IV 9582 948449251826
VIRM 4-IV 9582 948449151638
VIRM 4-IV 9582 948449213297
VIRM 4-IV 9583 948449213313
VIRM 4-IV 9583 948449213321
VIRM 4-IV 9583 948449251834
VIRM 4-IV 9583 948449151646
VIRM 4-IV 9584 948449213339
VIRM 4-IV 9584 948449213347
VIRM 4-IV 9584 948449251842
VIRM 4-IV 9584 948449151653
VIRM 4-IV 9585 948449213354
VIRM 4-IV 9585 948449213362
VIRM 4-IV 9585 948449251859
VIRM 4-IV 9585 948449151661
VIRM 4-IV 9586 948449213370
VIRM 4-IV 9586 948449213388
VIRM 4-IV 9586 948449251867
VIRM 4-IV 9586 948449151679
VIRM 4-IV 9587 948449213396
VIRM 4-IV 9587 948449213404
VIRM 4-IV 9587 948449251875
VIRM 4-IV 9587 948449151687
VIRM 4-IV 9588 948449213412
VIRM 4-IV 9588 948449213420
VIRM 4-IV 9588 948449251883
VIRM 4-IV 9588 948449151695
VIRM 4-IV 9589 948449213438
VIRM 4-IV 9589 948449213446
VIRM 4-IV 9589 948449251891
VIRM 4-IV 9589 948449151703
VIRM 4-IV 9590 948449213453
VIRM 4-IV 9590 948449213461
VIRM 4-IV 9590 948449251909
VIRM 4-IV 9590 948449151711
VIRM 4-IV 9591 948449213479
VIRM 4-IV 9591 948449213487
VIRM 4-IV 9591 948449251917
VIRM 4-IV 9591 948449151729
VIRM 4-IV 9592 948449213495
VIRM 4-IV 9592 948449213503
VIRM 4-IV 9592 948449251925
VIRM 4-IV 9592 948449151737
VIRM 4-IV 9593 948449213511
VIRM 4-IV 9593 948449213529
VIRM 4-IV 9593 948449251933
VIRM 4-IV 9593 948449151745
VIRM 4-IV 9594 948449213537
VIRM 4-IV 9594 948449213545
VIRM 4-IV 9594 948449251941
VIRM 4-IV 9594 948449151752
VIRM 4-IV 9595 948449213552
VIRM 4-IV 9595 948449213560
VIRM 4-IV 9595 948449251958
VIRM 4-IV 9595 948449151760
VIRM 4-IV 9596 948449213578
VIRM 4-IV 9596 948449213586
VIRM 4-IV 9596 948449251966
VIRM 4-IV 9596 948449151778
VIRM 4-IV 9597 948449213594
VIRM 4-IV 9597 948449213602
VIRM 4-IV 9597 948449251974
VIRM 4-IV 9597 948449151786
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Directive (EU) 2016/797 of the European Parliament and of the Council of 11 May 2016 on the interoperability of the rail system within the European Union (1), and in particular Article 7(4) thereof,
Whereas:
(1) On 18 April 2024, the Netherlands submitted to the Commission, in accordance with Article 7(4) of Directive (EU) 2016/797, a request not to apply point 4.2.2.3.2.(12) of the Annex to Commission Regulation (EU) No 1300/2014 (2) with respect to the requirement on external sound pressure level of audible alert signals for external doors in the project of upgrading certain vehicles, which form part of the VIRM4 train fleet.
(2) Point 4.2.2.3.2.(12) of the Annex to Regulation (EU) No 1300/2014 specifies the requirements related to the passenger door audible signals for exterior doors, i.e. the signals for door opening, door closing and door finding). However, it follows from Appendix F to that Regulation that the application of the requirements to provide door opening and closing signals is only mandatory when the door control system is renewed or upgraded.
(3) The project referred to in the request concerns upgrading certain vehicles of the VIRM4 train fleet which consists of a type of interregional, electric multiple unit double-decker trains operated in the Netherlands. The scope of the project does not include the renewal or upgrade of the door control system and the application of the requirement set out in point 4.2.2.3.2.(12) of the Annex to Regulation (EU) No 1300/2014 is therefore not mandatory.
(4) Nonetheless, to improve the accessibility of the VIRM4 train fleet, the Netherlands intends to apply audible alert signals for the passenger doors that are identical to the signals already implemented in the rest of the fleet series, namely the VIRMm1 and VIRMm2 train fleets. Those audible alert signals will not fully comply with the technical specifications for the external sound pressure level set out in Appendix G of Regulation (EU) No 1300/2014, which are mandatory when the audible alert signals are used.
(5) According to the documents submitted by the Netherlands, complying with the required external sound pressure level for the VIRM4 fleet would entail an additional cost of approximately EUR 1 500 000 including maintenance and minimum spare parts inventory.
(6) In addition, full compliance with the specification for the door opening and closing signal, as defined in Appendix G of Regulation (EU) No 1300/2014, for the VIRM4 fleet would result in non-conformity with the VIRMm1 and VIRMm2 fleets. This would entail additional maintenance costs. At the same time, the cost associated with fully complying with the specification, as defined in Appendix G of Regulation (EU) No 1300/2014, for the entire fleet (VIRMm1, VIRMm2/3 and VIRM4) would amount to an additional cost of EUR 4 500 000, including minimum spare parts inventory, non-availability of the rolling stock for the period of retrofitting and maintenance.
(7) The user groups consulted by the Netherlands consider the equipping of the VIRM4 fleet with audible alert signals to be an improvement, although the external sound pressure levels would not reach the levels specified in Appendix G of Regulation (EU) No 1300/2014.
(8) As an alternative, the Netherlands proposes to implement non-adaptive devices for the audible alert signals providing an external sound pressure level of 65dB LAeq,T (+ 5dB/– 4dB), which is slightly lower than the 70 dB (+ 6dB/– 0dB) set out in Appendix G of Regulation (EU) No 1300/2014.
(9) In case of a future project including the renewal or upgrade of the door control system, point 4.2.2.3.2. (12) of the Annex to Regulation (EU) No 1300/2014 will apply. This notably includes the level of the external sound pressure level set out in Appendix G of that Regulation.
(10) In addition, the non-application will be strictly limited to the individual VIRM4 fleet vehicles covered by the Netherlands’ request. To avoid the need for a new decision, the Netherlands should be allowed to change the precise identification numbers of those vehicles by informing the Commission thereof. If such a change is made, it should be notified to the Commission without delay.
(11) Based on the justification for the request provided by the Netherlands and the alternative provisions proposed, the conditions set out in Article 7(1), point (c) and Article 7(4) of Directive (EU) 2016/797 can be considered as fulfilled for the VIRM4 fleet upgrade project. The request from the Netherlands should therefore be accepted.
(12) The measures provided for in this Decision are in accordance with the opinion of the Committee referred to in Article 51(1) of Directive (EU) 2016/797,
HAS ADOPTED THIS DECISION:
The request of the Netherlands for non-application of point 4.2.2.3.2.(12) of the Annex to Regulation (EU) No 1300/2014 with respect to the required external sound pressure level of audible alert signals for external doors is accepted for the vehicles listed in the Annex to this Decision.
The Netherlands shall notify the Commission without delay of any changes to the identifiers of the vehicles listed in the Annex.
This Decision is addressed to the Kingdom of the Netherlands.

Vehicle type
Trainset Number
Vehicle Number (EVN)
VIRM 4-IV
9547
948449212596
VIRM 4-IV
9547
948449212604
VIRM 4-IV
9547
948449251479
VIRM 4-IV
9547
948449151281
VIRM 4-IV
9548
948449212612
VIRM 4-IV
9548
948449212620
VIRM 4-IV
9548
948449251487
VIRM 4-IV
9548
948449151299
VIRM 4-IV
9549
948449212638
VIRM 4-IV
9549
948449212646
VIRM 4-IV
9549
948449251495
VIRM 4-IV
9549
948449151307
VIRM 4-IV
9550
948449212653
VIRM 4-IV
9550
948449212661
VIRM 4-IV
9550
948449251503
VIRM 4-IV
9550
948449151315
VIRM 4-IV
9551
948449212679
VIRM 4-IV
9551
948449212687
VIRM 4-IV
9551
948449251511
VIRM 4-IV
9551
948449151323
VIRM 4-IV
9552
948449212695
VIRM 4-IV
9552
948449212703
VIRM 4-IV
9552
948449251529
VIRM 4-IV
9552
948449151331
VIRM 4-IV
9553
948449212711
VIRM 4-IV
9553
948449212729
VIRM 4-IV
9553
948449251537
VIRM 4-IV
9553
948449151349
VIRM 4-IV
9554
948449212737
VIRM 4-IV
9554
948449212745
VIRM 4-IV
9554
948449251545
VIRM 4-IV
9554
948449151356
VIRM 4-IV
9555
948449212752
VIRM 4-IV
9555
948449212760
VIRM 4-IV
9555
948449251552
VIRM 4-IV
9555
948449151364
VIRM 4-IV
9556
948449212778
VIRM 4-IV
9556
948449212786
VIRM 4-IV
9556
948449251560
VIRM 4-IV
9556
948449151372
VIRM 4-IV
9557
948449212794
VIRM 4-IV
9557
948449212802
VIRM 4-IV
9557
948449251578
VIRM 4-IV
9557
948449151380
VIRM 4-IV
9558
948449212810
VIRM 4-IV
9558
948449212828
VIRM 4-IV
9558
948449251586
VIRM 4-IV
9558
948449151398
VIRM 4-IV
9559
948449212836
VIRM 4-IV
9559
948449212844
VIRM 4-IV
9559
948449251594
VIRM 4-IV
9559
948449151406
VIRM 4-IV
9560
948449212851
VIRM 4-IV
9560
948449212869
VIRM 4-IV
9560
948449251602
VIRM 4-IV
9560
948449151414
VIRM 4-IV
9561
948449212877
VIRM 4-IV
9561
948449212885
VIRM 4-IV
9561
948449251610
VIRM 4-IV
9561
948449151422
VIRM 4-IV
9562
948449212893
VIRM 4-IV
9562
948449212901
VIRM 4-IV
9562
948449251628
VIRM 4-IV
9562
948449151430
VIRM 4-IV
9563
948449212919
VIRM 4-IV
9563
948449212927
VIRM 4-IV
9563
948449251636
VIRM 4-IV
9563
948449151448
VIRM 4-IV
9564
948449212935
VIRM 4-IV
9564
948449212943
VIRM 4-IV
9564
948449251644
VIRM 4-IV
9564
948449151455
VIRM 4-IV
9565
948449212950
VIRM 4-IV
9565
948449212968
VIRM 4-IV
9565
948449251651
VIRM 4-IV
9565
948449151463
VIRM 4-IV
9566
948449212976
VIRM 4-IV
9566
948449212984
VIRM 4-IV
9566
948449251669
VIRM 4-IV
9566
948449151471
VIRM 4-IV
9567
948449212992
VIRM 4-IV
9567
948449213008
VIRM 4-IV
9567
948449251677
VIRM 4-IV
9567
948449151489
VIRM 4-IV
9568
948449213016
VIRM 4-IV
9568
948449213024
VIRM 4-IV
9568
948449251685
VIRM 4-IV
9568
948449151497
VIRM 4-IV
9569
948449213032
VIRM 4-IV
9569
948449213040
VIRM 4-IV
9569
948449251693
VIRM 4-IV
9569
948449151505
VIRM 4-IV
9570
948449213057
VIRM 4-IV
9570
948449213065
VIRM 4-IV
9570
948449251701
VIRM 4-IV
9570
948449151513
VIRM 4-IV
9571
948449213073
VIRM 4-IV
9571
948449213081
VIRM 4-IV
9571
948449251719
VIRM 4-IV
9571
948449151521
VIRM 4-IV
9572
948449213099
VIRM 4-IV
9572
948449213107
VIRM 4-IV
9572
948449251727
VIRM 4-IV
9572
948449151539
VIRM 4-IV
9573
948449213115
VIRM 4-IV
9573
948449213123
VIRM 4-IV
9573
948449251735
VIRM 4-IV
9573
948449151547
VIRM 4-IV
9574
948449213131
VIRM 4-IV
9574
948449213149
VIRM 4-IV
9574
948449251743
VIRM 4-IV
9574
948449151554
VIRM 4-IV
9575
948449213156
VIRM 4-IV
9575
948449213164
VIRM 4-IV
9575
948449251750
VIRM 4-IV
9575
948449151562
VIRM 4-IV
9576
948449213172
VIRM 4-IV
9576
948449213180
VIRM 4-IV
9576
948449251768
VIRM 4-IV
9576
948449151570
VIRM 4-IV
9577
948449213198
VIRM 4-IV
9577
948449213206
VIRM 4-IV
9577
948449251776
VIRM 4-IV
9577
948449151588
VIRM 4-IV
9578
948449213222
VIRM 4-IV
9578
948449251784
VIRM 4-IV
9578
948449151596
VIRM 4-IV
9578
948449213610
VIRM 4-IV
9579
948449213230
VIRM 4-IV
9579
948449213248
VIRM 4-IV
9579
948449251792
VIRM 4-IV
9579
948449151604
VIRM 4-IV
9580
948449213255
VIRM 4-IV
9580
948449213263
VIRM 4-IV
9580
948449251800
VIRM 4-IV
9580
948449151612
VIRM 4-IV
9581
948449213271
VIRM 4-IV
9581
948449213289
VIRM 4-IV
9581
948449251818
VIRM 4-IV
9581
948449151620
VIRM 4-IV
9582
948449213214
VIRM 4-IV
9582
948449213305
VIRM 4-IV
9582
948449251826
VIRM 4-IV
9582
948449151638
VIRM 4-IV
9582
948449213297
VIRM 4-IV
9583
948449213313
VIRM 4-IV
9583
948449213321
VIRM 4-IV
9583
948449251834
VIRM 4-IV
9583
948449151646
VIRM 4-IV
9584
948449213339
VIRM 4-IV
9584
948449213347
VIRM 4-IV
9584
948449251842
VIRM 4-IV
9584
948449151653
VIRM 4-IV
9585
948449213354
VIRM 4-IV
9585
948449213362
VIRM 4-IV
9585
948449251859
VIRM 4-IV
9585
948449151661
VIRM 4-IV
9586
948449213370
VIRM 4-IV
9586
948449213388
VIRM 4-IV
9586
948449251867
VIRM 4-IV
9586
948449151679
VIRM 4-IV
9587
948449213396
VIRM 4-IV
9587
948449213404
VIRM 4-IV
9587
948449251875
VIRM 4-IV
9587
948449151687
VIRM 4-IV
9588
948449213412
VIRM 4-IV
9588
948449213420
VIRM 4-IV
9588
948449251883
VIRM 4-IV
9588
948449151695
VIRM 4-IV
9589
948449213438
VIRM 4-IV
9589
948449213446
VIRM 4-IV
9589
948449251891
VIRM 4-IV
9589
948449151703
VIRM 4-IV
9590
948449213453
VIRM 4-IV
9590
948449213461
VIRM 4-IV
9590
948449251909
VIRM 4-IV
9590
948449151711
VIRM 4-IV
9591
948449213479
VIRM 4-IV
9591
948449213487
VIRM 4-IV
9591
948449251917
VIRM 4-IV
9591
948449151729
VIRM 4-IV
9592
948449213495
VIRM 4-IV
9592
948449213503
VIRM 4-IV
9592
948449251925
VIRM 4-IV
9592
948449151737
VIRM 4-IV
9593
948449213511
VIRM 4-IV
9593
948449213529
VIRM 4-IV
9593
948449251933
VIRM 4-IV
9593
948449151745
VIRM 4-IV
9594
948449213537
VIRM 4-IV
9594
948449213545
VIRM 4-IV
9594
948449251941
VIRM 4-IV
9594
948449151752
VIRM 4-IV
9595
948449213552
VIRM 4-IV
9595
948449213560
VIRM 4-IV
9595
948449251958
VIRM 4-IV
9595
948449151760
VIRM 4-IV
9596
948449213578
VIRM 4-IV
9596
948449213586
VIRM 4-IV
9596
948449251966
VIRM 4-IV
9596
948449151778
VIRM 4-IV
9597
948449213594
VIRM 4-IV
9597
948449213602
VIRM 4-IV
9597
948449251974
VIRM 4-IV
9597
948449151786

Commission Implementing Decision (EU) 2025/469 of 12 March 2025 laying down rules for the application of Regulation (EU) 2021/696 of the European Parliament and of the Council as regards the selection of the Union space weather service for the space weather event sub-component of the Union Space Programme

Official Journalof the European Union ENL series
2025/469 14.3.2025
(1) Risks of extreme and major space weather events may threaten the safety of citizens and disrupt the operations of space-based and ground-based infrastructure. In response to these risks, the Space Weather Event (‘SWE’) sub-component has been established as part the Space Situational Awareness component of the Union Space Programme.
(2) In accordance with Article 60 of Regulation (EU) 2021/696, the Commission is to select the SWE services to be provided at Union level.
(3) Article 60(2), point (b) of Regulation (EU) 2021/696 lists the different domains that might be considered for the Space Weather service, which are the space, transport, Global Navigation Satellite Systems (GNSS), electric power grids, and communications. In line with Article 45(2), point (c) of Regulation (EU) 2021/696, the Galileo component of the Union Space Programme will provide space weather information relevant to GNSS, via the GNSS Service Centre.
(4) In accordance with the contribution agreement between the Commission and the European Space Agency (ESA) on the implementation of parts of the Union Space Programme and Horizon Europe under the Financial Framework Partnership Agreement, ESA launched a study to assess the needs to each SWE user, the technological readiness of the services and a risk assessment in accordance with the criteria listed in Article 60(2), point (a). Based on that assessment, the services that was selected included power systems, telecommunication, and space domains. Furthermore, the study showed that the space domain service had the most amount of technical mature service products, and the ability to best reduce the risks linked to extreme space weather events.
(5) Based on this study, the Commission has prioritised the space domain service as best suited to be selected for the SWE service. Due to budgetary constraints, only one service could be selected.
(6) The SWE risks to the space domain include radiation storms that can damage spacecraft electronics leaving them unusable in the worst case, and geomagnetic storms that can dramatically increase drag, hereby affecting the predicted trajectory of space objects, consequently complicating spacecraft operations and Space Traffic Coordination temporarily. The users of a space domain SWE service should therefore include spacecraft operators, and Space Traffic Coordination entities, such as Space Surveillance and Tracking entities.
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) 2021/696 of the European Parliament and of the Council of 28 April 2021 establishing the Union Space Programme and the European Union Agency for the Space Programme and repealing Regulations (EU) No 912/2010, (EU) No 1285/2013 and (EU) No 377/2014 and Decision No 541/2014/EU (1), and in particular Article 60(2) thereof,
After consulting the Programme committee established under Article 107(1) of the Regulation (EU) 2021/696,
Whereas:
(1) Risks of extreme and major space weather events may threaten the safety of citizens and disrupt the operations of space-based and ground-based infrastructure. In response to these risks, the Space Weather Event (‘SWE’) sub-component has been established as part the Space Situational Awareness component of the Union Space Programme.
(2) In accordance with Article 60 of Regulation (EU) 2021/696, the Commission is to select the SWE services to be provided at Union level.
(3) Article 60(2), point (b) of Regulation (EU) 2021/696 lists the different domains that might be considered for the Space Weather service, which are the space, transport, Global Navigation Satellite Systems (GNSS), electric power grids, and communications. In line with Article 45(2), point (c) of Regulation (EU) 2021/696, the Galileo component of the Union Space Programme will provide space weather information relevant to GNSS, via the GNSS Service Centre.
(4) In accordance with the contribution agreement between the Commission and the European Space Agency (ESA) on the implementation of parts of the Union Space Programme and Horizon Europe under the Financial Framework Partnership Agreement, ESA launched a study to assess the needs to each SWE user, the technological readiness of the services and a risk assessment in accordance with the criteria listed in Article 60(2), point (a). Based on that assessment, the services that was selected included power systems, telecommunication, and space domains. Furthermore, the study showed that the space domain service had the most amount of technical mature service products, and the ability to best reduce the risks linked to extreme space weather events.
(5) Based on this study, the Commission has prioritised the space domain service as best suited to be selected for the SWE service. Due to budgetary constraints, only one service could be selected.
(6) The SWE risks to the space domain include radiation storms that can damage spacecraft electronics leaving them unusable in the worst case, and geomagnetic storms that can dramatically increase drag, hereby affecting the predicted trajectory of space objects, consequently complicating spacecraft operations and Space Traffic Coordination temporarily. The users of a space domain SWE service should therefore include spacecraft operators, and Space Traffic Coordination entities, such as Space Surveillance and Tracking entities.
HAS ADOPTED THIS DECISION:
The space weather event service is the space domain service.
This Decision shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.