Commission Implementing Decision (EU) 2025/1756 of 19 August 2025 amending Implementing Decision (EU) 2024/2207 concerning certain emergency measures relating to sheep pox and goat pox in Greece (notified under document C(2025) 5766)

Official Journalof the European Union ENL series
2025/1756 22.8.2025
(1) Sheep pox and goat pox is an infectious viral disease affecting caprine and ovine animals and it can have a severe impact on the concerned animal populations and the profitability of farming causing disturbance to movements of consignments of those animals and products thereof within the Union and exports to third countries.
(2) In the event of an outbreak of sheep pox and goat pox in caprine or ovine animals, there is a serious risk of the spread of that disease to other establishments of caprine or ovine animals.
(3) Commission Delegated Regulation (EU) 2020/687(2)supplements the rules for the control of the listed diseases referred to in Article 9(1), points (a), (b) and (c), of Regulation (EU) 2016/429, and defined as category A, B and C diseases in Commission Implementing Regulation (EU) 2018/1882(3). In particular, Articles 21 and 22 of Delegated Regulation (EU) 2020/687 provide for the establishment of a restricted zone in the event of an outbreak of a category A disease, including sheep pox and goat pox, and for certain measures to be applied therein. Article 21(1) of that Delegated Regulation provides that the restricted zone is to comprise a protection zone, a surveillance zone, and, if necessary, further restricted zones around or adjacent to the protection and surveillance zones.
(4) In order to address outbreaks of sheep pox and goat pox in Greece, notified in August 2024, the Commission adopted Commission Implementing Decision (EU) 2024/2207(4), which lays down certain emergency measures relating to that disease in Greece. In particular, it provides that the protection, surveillance, and further restricted zones to be established by that Member State, in accordance with Delegated Regulation (EU) 2020/687, are to comprise at least the areas listed in the Annex to that Implementing Decision.
(5) Since the last amendment of Implementing Decision (EU) 2024/2207, Greece has notified the Commission of two hundred and thirty eight new confirmed outbreaks of sheep pox and goat pox, which were reported between 12 June and 4 August 2025, in establishments where ovine and caprine animals were kept, in the regional units of Chalkidiki, Aetolia-Acarnania, Phocis, Evros, Florina, Karditsa, Xanthi, Magnesia, Pieria, Rhodopi, Serres, Trikala and Larisa,. The majority of these outbreaks were confirmed in areas where restrictions in relation to sheep pox and goat pox were already in place indicating localised spread of the disease within the affected areas, with the exception of the outbreaks reported in the newly affected regional units of Florina, Karditsa, Pieria, Rhodopi, Serres and Trikala.
(6) In light of the current epidemiological situation, there is a high risk of the continuous persistence and further spread of the disease as outbreaks continue to be confirmed in regional units such as Chalkidiki, Aetolia-Acarnania, Phocis, Xanthi, Larisa and Magnesia, while new outbreaks have also been confirmed in previously unaffected regional units such as Florina, Karditsa, Pieria, Rhodopi, Serres and Trikala. This fact suggests that the disease continues to circulate and spread despite the measures already put in place in accordance with Delegated Regulation (EU) 2020/687.
(7) Article 3 of Implementing Decision (EU) 2024/2207 provides for additional emergency measures to be applied in the restricted zones, set out in the Annex to that Implementing Decision. In view of the very long duration of the ongoing epidemic, and the prolonged animal movement prohibitions in the restricted zones, it is necessary to provide for alternative conditions as regards movements of goats and sheep within a restricted zone , in addition to those already in place, to allow movements of those animals for slaughter, in an economically viable manner for operators, that at the same time pose a minimum risk for the spread of the disease. Accordingly, Article 3, point (b)(ii), of that Implementing Decision (EU) 2024/2207 should be amended accordingly.
(8) Furthermore, Article 3, point (e), of Implementing Decision (EU) 2024/2207 prohibits movements of sheep and goats from the territory of Greece to a destination located outside Greece until 31 October 2025. However, in view of the occurrence of the two hundred and thirty eight new outbreaks of sheep pox and goat pox in Greece, since the last amendment of Implementing Decision (EU) 2024/2207, it is also necessary to prolong that prohibition, in order to avoid the spread of the disease to the rest of the Union or to third countries, as well as any unjustified barriers to trade being imposed by third countries. Therefore, Article 3, point (e), of that Implementing Decision should be amended accordingly.
(9) In addition, taking into account the new outbreaks in Greece, the areas listed as protection, surveillance, and further restricted zones for Greece in the Annex to Implementing Decision (EU) 2024/2207, as well as the duration of the measures applicable therein, should be adjusted in order to prevent the further spread of the disease in Greece or to the rest of the Union as well as unjustified barriers to trade being imposed by third countries. Accordingly, it is necessary to amend the list of restricted zones, and the duration of the measures to be applied therein, set out in the Annex to that Implementing Decision.
(10) The size of the protection, surveillance, and further restricted zones, and the duration of the measures to be applied therein, are based on the criteria laid down in Article 64(1) of Regulation (EU) 2016/429, as well as the rules laid down in Delegated Regulation (EU) 2020/687. The criteria applied for the choice of the size of the protection, surveillance, and further restricted zones, as well as of the duration of the measures to be applied therein, include a consideration of not only the epidemiological situation as regards sheep pox and goat pox in the areas affected by that disease, but also of the overall epidemiological situation of sheep pox and goat pox in the entire territory of the Member State concerned by that disease, as well as the level of risk for the further spread of the disease. The chosen duration of the measures has also taken into account the international standards of the Terrestrial Animal Health Code of the World Organisation for Animal Health(5).
(11) The measures provided for in this Decision are in accordance with the opinion of the Standing Committee on Plants, Animals, Food and Feed,
(1) in Article 3, point (b)(ii) is replaced by the following:‘(ii)a number of randomly selected animals, either:—within the same lot to be moved, and sufficient to detect 10 % disease prevalence with 95 % level of confidence, have been sampled and subjected to a PCR test of saliva samples, collected within 48 hours before the time of movement, with negative results,or—at the establishment of origin, and sufficient to detect 10 % disease prevalence with 95 % level of confidence, have been sampled and subjected to a PCR test of saliva samples, collected no earlier than 21 days prior to the date of movement and no later than 48 hours before the time of movement, with negative results;’; ‘(ii) a number of randomly selected animals, either:—within the same lot to be moved, and sufficient to detect 10 % disease prevalence with 95 % level of confidence, have been sampled and subjected to a PCR test of saliva samples, collected within 48 hours before the time of movement, with negative results,or—at the establishment of origin, and sufficient to detect 10 % disease prevalence with 95 % level of confidence, have been sampled and subjected to a PCR test of saliva samples, collected no earlier than 21 days prior to the date of movement and no later than 48 hours before the time of movement, with negative results;’; — within the same lot to be moved, and sufficient to detect 10 % disease prevalence with 95 % level of confidence, have been sampled and subjected to a PCR test of saliva samples, collected within 48 hours before the time of movement, with negative results,or — at the establishment of origin, and sufficient to detect 10 % disease prevalence with 95 % level of confidence, have been sampled and subjected to a PCR test of saliva samples, collected no earlier than 21 days prior to the date of movement and no later than 48 hours before the time of movement, with negative results;’;
‘(ii) a number of randomly selected animals, either:—within the same lot to be moved, and sufficient to detect 10 % disease prevalence with 95 % level of confidence, have been sampled and subjected to a PCR test of saliva samples, collected within 48 hours before the time of movement, with negative results,or—at the establishment of origin, and sufficient to detect 10 % disease prevalence with 95 % level of confidence, have been sampled and subjected to a PCR test of saliva samples, collected no earlier than 21 days prior to the date of movement and no later than 48 hours before the time of movement, with negative results;’; — within the same lot to be moved, and sufficient to detect 10 % disease prevalence with 95 % level of confidence, have been sampled and subjected to a PCR test of saliva samples, collected within 48 hours before the time of movement, with negative results,or — at the establishment of origin, and sufficient to detect 10 % disease prevalence with 95 % level of confidence, have been sampled and subjected to a PCR test of saliva samples, collected no earlier than 21 days prior to the date of movement and no later than 48 hours before the time of movement, with negative results;’;
— within the same lot to be moved, and sufficient to detect 10 % disease prevalence with 95 % level of confidence, have been sampled and subjected to a PCR test of saliva samples, collected within 48 hours before the time of movement, with negative results,or
— at the establishment of origin, and sufficient to detect 10 % disease prevalence with 95 % level of confidence, have been sampled and subjected to a PCR test of saliva samples, collected no earlier than 21 days prior to the date of movement and no later than 48 hours before the time of movement, with negative results;’;
‘(ii) a number of randomly selected animals, either:—within the same lot to be moved, and sufficient to detect 10 % disease prevalence with 95 % level of confidence, have been sampled and subjected to a PCR test of saliva samples, collected within 48 hours before the time of movement, with negative results,or—at the establishment of origin, and sufficient to detect 10 % disease prevalence with 95 % level of confidence, have been sampled and subjected to a PCR test of saliva samples, collected no earlier than 21 days prior to the date of movement and no later than 48 hours before the time of movement, with negative results;’; — within the same lot to be moved, and sufficient to detect 10 % disease prevalence with 95 % level of confidence, have been sampled and subjected to a PCR test of saliva samples, collected within 48 hours before the time of movement, with negative results,or — at the establishment of origin, and sufficient to detect 10 % disease prevalence with 95 % level of confidence, have been sampled and subjected to a PCR test of saliva samples, collected no earlier than 21 days prior to the date of movement and no later than 48 hours before the time of movement, with negative results;’;
— within the same lot to be moved, and sufficient to detect 10 % disease prevalence with 95 % level of confidence, have been sampled and subjected to a PCR test of saliva samples, collected within 48 hours before the time of movement, with negative results,or
— at the establishment of origin, and sufficient to detect 10 % disease prevalence with 95 % level of confidence, have been sampled and subjected to a PCR test of saliva samples, collected no earlier than 21 days prior to the date of movement and no later than 48 hours before the time of movement, with negative results;’;
— within the same lot to be moved, and sufficient to detect 10 % disease prevalence with 95 % level of confidence, have been sampled and subjected to a PCR test of saliva samples, collected within 48 hours before the time of movement, with negative results,or
— at the establishment of origin, and sufficient to detect 10 % disease prevalence with 95 % level of confidence, have been sampled and subjected to a PCR test of saliva samples, collected no earlier than 21 days prior to the date of movement and no later than 48 hours before the time of movement, with negative results;’;
(2) in Article 3, point (e), the date ‘31 October 2025’ is replaced by ‘31 December 2025’;
(3) the Annex is replaced by the text set out in the Annex to this Decision.
Regional unit and ADIS reference number of the outbreaks Areas established as protection and surveillance zones, part of the restricted zone in Greece referred to in Article 2 Date until applicable
Regional unit of PhocisGR-CAPRIPOX-2025-00058GR-CAPRIPOX-2025-00059GR-CAPRIPOX-2025-00060GR-CAPRIPOX-2025-00061GR-CAPRIPOX-2025-00069GR-CAPRIPOX-2025-00070GR-CAPRIPOX-2025-00071GR-CAPRIPOX-2025-00072GR-CAPRIPOX-2025-00073GR-CAPRIPOX-2025-00074GR-CAPRIPOX-2025-00075GR-CAPRIPOX-2025-00077GR-CAPRIPOX-2025-00082GR-CAPRIPOX-2025-00083GR-CAPRIPOX-2025-00084GR-CAPRIPOX-2025-00085GR-CAPRIPOX-2025-00086GR-CAPRIPOX-2025-00103GR-CAPRIPOX-2025-00104GR-CAPRIPOX-2025-00105GR-CAPRIPOX-2025-00106GR-CAPRIPOX-2025-00107GR-CAPRIPOX-2025-00108GR-CAPRIPOX-2025-00109GR-CAPRIPOX-2025-00128GR-CAPRIPOX-2025-00129GR-CAPRIPOX-2025-00130GR-CAPRIPOX-2025-00133GR-CAPRIPOX-2025-00135GR-CAPRIPOX-2025-00136GR-CAPRIPOX-2025-00154GR-CAPRIPOX-2025-00155GR-CAPRIPOX-2025-00156GR-CAPRIPOX-2025-00157GR-CAPRIPOX-2025-00159GR-CAPRIPOX-2025-00164GR-CAPRIPOX-2025-00167GR-CAPRIPOX-2025-00168GR-CAPRIPOX-2025-00187GR-CAPRIPOX-2025-00188GR-CAPRIPOX-2025-00189GR-CAPRIPOX-2025-00196GR-CAPRIPOX-2025-00197GR-CAPRIPOX-2025-00205GR-CAPRIPOX-2025-00206GR-CAPRIPOX-2025-00207GR-CAPRIPOX-2025-00208GR-CAPRIPOX-2025-00239GR-CAPRIPOX-2025-00240GR-CAPRIPOX-2025-00252GR-CAPRIPOX-2025-00253GR-CAPRIPOX-2025-00282GR-CAPRIPOX-2025-00272GR-CAPRIPOX-2025-00273GR-CAPRIPOX-2025-00274GR-CAPRIPOX-2025-00312GR-CAPRIPOX-2025-00313GR-CAPRIPOX-2025-00349 Protection zone:Those parts of the regional units of Phocis and Aetolia-Acarnania contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 38.39722222, Long. 21.88472222 (2025/00058), Lat. 38.37944444, Long. 21.88916667 (2025/59), Lat. 38.39194444, Long. 21.88555556 (2025/60), Lat. 38.37861111, Long. 21.87972222 (2025/61), Lat. 38.38805556, Long. 21.86638889 (2025/69), Lat. 38.39 Long. 21.88361111 (2025/70), Lat. 38.38333333, Long. 21.87333333 (2025/71), Lat. 38.39305556, Long. 21.88305556 (2025/72), Lat. 38.39323882, Long. 21.86530682 (2025/73), Lat. 38.391111, Long. 21.872222 (2025/74), Lat. 38.381944, Long. 21.888611 (2025/75), Lat. 38.39583333, Long. 21.90666667 (2025/77), Lat. 38.37388889, Long. 21.8825 (2025/83), Lat. 38.3918889, Long. 21.8969(2025/84), Lat. 38.39444444, Long. 21.89472222 (2025/85), Lat. 38.38444444, Long. 21.88055556 (2025/86), Lat. 38.41972222, Long. 21.91277778 (2025/103), Lat. 38.39583333, Long. 21.90666667 (2025/104), Lat. 38.38611111, Long. 21.90305556 (2025/105), Lat. 38.415, Long. 21.90333333 (2025/106), Lat. 38.41527778, Long. 21.91305556 (2025/107), Lat. 38.39305556, Long. 21.895 (2025/108), Lat. 38.385, Long. 21.87583333 (2025/109), Lat. 38.39555556, Long. 21.87111111 (2025/128), Lat. 38.38166667, Long. 21.90277778 (2025/129), Lat. 38.38972222, Long. 21.87944444 (2025/130), Lat. 38.395, Long. 21.87527778 (2025/133), Lat. 38.39222222, Long. 21.87361111 (2025/135), Lat. 38.40888889, Long. 21.89777778 (2025/136), Lat. 38.38694444. Long. 21.88611111 (2025/154), Lat. 38.38333333 Long. 21.88805556 (2025/155), Long. 38.38694444, Lat. 21.88666667 (2025/156), Lat. 38.39583333, Long. 21.87055556 (2025/157), Lat. 38.40833333, Long. 21.89694444 (2025/159), Lat. 38.42527778, Lat. 21.90722222 (2025/164), Lat. 38.42722222, Long. 21.9(2025/167), Lat. 38.4038889, Long. 21.89638889 (2025/168), Lat. 38.38861111, Long. 21.89083333 (2025/187), Lat. 38.41972222, Long. 21.92055556 (2025/188), Lat. 38.38555556, Long. 21.87166007 (2025/189), Lat. 38.40722222, Long. 21.90138889 (2025/196), Lat. 38.43527778, Long. 21.89333333 (2025/197), Lat. 38.38111111, Long. 21.85694444 (2025/205), Lat. 38.41194444, Long. 21.8875 (2025/206), Lat. 38.41277778, Long. 21.88861111 (2025/207), Lat. 38.39444444, Long. 21.86638889 (2025/208), Lat. 38.40083, Long. 21.87972 (2025/239), Long. 38.39444, Lat. 21.88778 (2025/240), Long. 38.40667, Lat. 21.89861 (2025/252), Lat. 38.41361, Long 21.89861 (2025/253), Long. 38.379819 Lat. 21.853486 (2025/253), Long. 38.398611, Lat. 21.898333 (2025/272), Long. 38.400556, Lat. 21.878333 (2025/273), Long. 38.400833, Lat. 21.879722 (2025/274), Long. 38.400833 Lat. 38.4175 (2025/312), Long. 38.42528, Lat. 21.91333 (2025/313), Long. 38.40027778, Lat. 21.8775 (2025/349). 15.9.2025
Surveillance zone:Those parts of the regional units of Phocis and Aetolia-Acarnania contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 38.39722222, Long. 21.88472222 (2025/00058), Lat. 38.37944444, Long. 21.88916667 (2025/59), Lat. 38.39194444, Long. 21.88555556 (2025/60), Lat. 38.37861111, Long. 2 1.87972222 (2025/61), Lat. 38.38805556, Long. 21.86638889 (2025/69), Lat. 38.39, Long. 21.88361111(2025/70), Lat. 38.38333333, Long. 21.87333333 (2025/71), Lat. 38.39305556, Long. 21.88305556 (2025/72), Lat. 38.39323882, Long. 21.86530682 (2025/73), Lat. 38.391111, Long. 21.872222 (2025/74), Lat. 38.381944, Long. 21.888611 (2025/75), Lat. 38.39583333, Long. 21.90666667 (2025/77), Lat. 38.41388, Long. 21.87694 (2025/82), Lat. 38.37388889, Long. 21.8825 (2025/83), Lat. 38.3918889, Long. 21.8969 (2025/84), Lat. 38.39444444, Long. 21.89472222 (2025/85), Lat. 38.38444444, Long. 21.88055556 (2025/86), Lat. 38.41972222, Long. 21.91277778 (2025/103), Lat. 38.39583333, Long. 21.90666667 (2025/104), Lat. 38.38611111, Long. 21.90305556 (2025/105), Lat. 38.415, Long. 21.90333333 (2025/106), Lat. 38.41527778, Long. 21.91305556 (2025/107), Lat. 38.39305556, Long. 21.895 (2025/108), Lat. 38.385, Long. 21.87583333 (2025/109), Lat. 38.39555556, Long. 21.87111111 (2025/128), Lat. 38.38166667, Long. 21.90277778 (2025/129), Lat. 38.38972222, Long. 21.87944444 (2025/130), Lat. 38.395, Long. 21.87527778 (2025/133), Lat. 38.39222222, Long. 21.87361111 (2025/135), Lat. 38.40888889, Long. 21.89777778 (2025/136) Lat. 38.38694444. Long. 21.88611111 (2025/154), Lat. 38.38333333 Long. 21.88805556 (2025/155), Long. 38.38694444, Lat. 21.88666667 (2025/156), Lat. 38.39583333, Long. 21.87055556 (2025/157), Lat. 38.40833333, Long. 21.89694444 (2025/159), Lat. 38.42527778, Lat. 21.90722222 (2025/164), Lat. 38.42722222, Long. 21.9(2025/167), Lat. 38.4038889, Long. 21.89638889 (2025/168), Lat. 38.38861111, Long. 21.89083333 (2025/187), Lat. 38.41972222, Long. 21.92055556 (2025/188), Lat. 38.38555556, Long. 21.87166007 (2025/189), Lat. 38.40722222, Long. 21.90138889 (2025/196), Lat. 38.43527778, Long. 21.89333333 (2025/197), Lat. 38.38111111, Long. 21.85694444 (2025/205), Lat. 38.41194444, Long. 21.8875 (2025/206), Lat. 38.41277778, Long. 21.88861111 (2025/207), Lat. 38.39444444, Long. 21.86638889 (2025/208), Lat 38.40083, Long. 21.87972 (2025/239), Long. 38.39444, Lat. 21.88778 (2025/240), Long. 38.379819, Lat. 21.853486 (2025/253), Long. 38.398611, Lat. 21.898333 (2025/272), Long. 38.400556, Lat. 21.878333 (2025/273), Long. 38.400833, Lat. 21.879722 (2025/274), Long. 38.400833 Lat. 38.4175 (2025/312), Long. 38.42528, Lat. 21.91333 (2025/313), Long. 38.40027778, Lat. 21.8775 (2025/349) excluding the areas contained in any protection zone 25.9.2025
Surveillance zone:Those parts of the regional units of Phocis and Aetolia-Acarnania contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 38.39722222, Long. 21.88472222 (2025/00058), Lat. 38.37944444, Long. 21.88916667 (2025/59), Lat. 38.39194444, Long. 21.88555556 (2025/60), Lat. 38.37861111, Long. 21.87972222 (2025/61), Lat. 38.38805556, Long. 21.86638889 (2025/69), Lat. 38.39, Long. 21.88361111 (2025/70), Lat. 38.38333333, Long. 21.87333333 (2025/71), Lat. 38.39305556, Long. 21.88305556 (2025/72), Lat. 38.39323882, Long. 21.86530682 (2025/73), Lat. 38.391111, Long. 21.872222 (2025/74), Lat. 38.381944, Long. 21.888611 (2025/75), Lat. 38.39583333, Long. 21.90666667 (2025/77), Lat. 38.41388, Long. 21.87694 (2025/82), Lat. 38.37388889, Long. 21.8825 (2025/83), Lat. 38.3918889, Long. 21.8969 (2025/84), Lat. 38.39444444, Long. 21.89472222 (2025/85), Lat. 38.38444444, Long. 21.88055556 (2025/86), Lat. 38.41972222, Long. 21.91277778 (2025/103), Lat. 38.39583333, Long. 21.90666667 (2025/104), Lat. 38.38611111, Long. 21.90305556 (2025/105), Lat. 38.415, Long. 21.90333333 (2025/106), Lat. 38.41527778, Long. 21.91305556 (2025/107), Lat. 38.39305556, Long. 21.895 (2025/108), Lat. 38.385, Long. 21.87583333 (2025/109), Lat. 38.39555556, Long. 21.87111111 (2025/128), Lat. 38.38166667, Long. 21.90277778 (2025/129), Lat. 38.38972222, Long. 21.87944444 (2025/130), Lat. 38.395, Long. 21.87527778 (2025/133), Lat. 38.39222222, Long. 21.87361111 (2025/135), Lat. 38.40888889, Long. 21.89777778 (2025/136), Lat. 38.38694444. Long. 21.88611111 (2025/154), Lat. 38.38333333 Long. 21.88805556 (2025/155), Long. 38.38694444, Lat. 21.88666667 (2025/156), Lat. 38.39583333, Long. 21.87055556 (2025/157), Lat. 38.40833333, Long. 21.89694444 (2025/159), Lat. 38.42527778, Lat. 21.90722222 (2025/164), Lat. 38.42722222, Long. 21.9(2025/167), Lat. 38.4038889, Long. 21.89638889 (2025/168), Lat. 38.38861111, Long. 21.89083333 (2025/187), Lat. 38.41972222, Long. 21.92055556 (2025/188), Lat. 38.38555556, Long. 21.87166007 (2025/189), Lat. 38.40722222, Long. 21.90138889 (2025/196), Lat. 38.43527778, Long. 21.89333333 (2025/197), Lat. 38.38111111, Long. 21.85694444 (2025/205), Lat. 38.41194444, Long. 21.8875 (2025/206), Lat. 38.41277778, Long. 21.88861111 (2025/207), Lat. 38.39444444, Long. 21.86638889 (2025/208), Lat. 38.40083, Long. 21.87972 (2025/239), Long. 38.39444, Lat. 21.88778 (2025/240), Long. 38.379819, Lat. 21.853486 (2025/253), Long. 38.398611, Lat. 21.898333 (2025/272), Long. 38.400556, Lat. 21.878333 (2025/273), Long. 38.400833, Lat. 21.879722 (2025/274), Long. 38.400833 Lat. 38.4175 (2025/312), Long. 38.42528, Lat. 21.91333 (2025/313), Long. 38.40027778, Lat. 21.8775 (2025/349). 16.9.2025- 25.9.2025
Regional unit of Evros, excluding the municipality of SamothraceGR-CAPRIPOX-2025-00289GR-CAPRIPOX-2025-00343GR-CAPRIPOX-2025-00344GR-CAPRIPOX-2025-00368GR-CAPRIPOX-2025-00369 Protection zone:Those parts of the regional unit of Evros contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 41.62365, Long. 26.418672 (2025/289), Lat. 41.718406, Long. 26.200319 (2025/343), Lat. 41.66125833, Long. 26.41248333 (2025/344), Lat. 41.643906, Long. 26.409917 (2025/368), Lat. 41.643689, Long. 26.409508 (2025/369). 20.9.2025
Surveillance zone:Those parts of the regional unit of Evros contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 41.62365, Long. 26.418672 (2025/289), Lat. 41.718406, Long. 26.200319 (2025/343), Lat. 41.66125833, Long. 26.41248333 (2025/344), Lat. 41.643906, Long. 26.409917 (2025/368), Lat. 41.643689, Long. 26.409508 (2025/369), excluding the areas contained in any protection zone. 30.9.2025
Surveillance zone:Those parts of the regional unit of Evros contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 41.62365, Long. 26.418672 (2025/289), Lat. 41.718406, Long. 26.200319 (2025/343), Lat. 41.66125833, Long. 26.41248333 (2025/344), Lat. 41.643906, Long. 26.409917 (2025/368), Lat. 41.643689, Long. 26.409508 (2025/369). 21.9.2025-30.9.2025
Regional unit of Evros,Municipality of SamothraceGR-CAPRIPOX-2025-00306GR-CAPRIPOX-2025-00322GR-CAPRIPOX-2025-00383 Protection zone:Those parts of the Municipality of Samothrace contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 40.438273, Long. 25.516617 25.509911 (2025/306), Lat. 40.472744, Long. 25.480941 (2025/322), Lat. 40.463938, Long. 25.662964 (2025/383). 20.9.2025
Surveillance zone:Those parts of the Municipality of Samothrace contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 40.438273, Long. 25.516617 (2025/306), Lat. 40.472744, Long. 25.480941 (2025/322), Lat. 40.463938, Long. 25.662964 (2025/383) excluding the areas contained in any protection zone. 30.9.2025
Surveillance zone:Those parts of the Municipality of Samothrace contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Long. 25.516617 (2025/306), Lat. 40.472744, Long. 25.480941 (2025/322), Lat. 40.463938, Long. 25.662964 (2025/383). 21.9.2025-30.9.2025
Regional unit of Aetolia-AcarnaniaGR-CAPRIPOX-2025-00045GR-CAPRIPOX-2025-00053GR-CAPRIPOX-2025-00055GR-CAPRIPOX-2025-00056GR-CAPRIPOX-2025-00067GR-CAPRIPOX-2025-00078GR-CAPRIPOX-2025-00079GR-CAPRIPOX-2025-00080GR-CAPRIPOX-2025-00087GR-CAPRIPOX-2025-00088GR-CAPRIPOX-2025-00093GR-CAPRIPOX-2025-00097GR-CAPRIPOX-2025-00098GR-CAPRIPOX-2025-00099GR-CAPRIPOX-2025-00117GR-CAPRIPOX-2025-00146GR-CAPRIPOX-2025-00158GR-CAPRIPOX-2025-00190GR-CAPRIPOX-2025-00241GR-CAPRIPOX-2025-00282GR-CAPRIPOX-2025-00304GR-CAPRIPOX-2025-00386 Protection zone:Those parts of the regional unit of Aetolia-Acarnania and Phocis contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 38.39148, Long. 21.854 (2025/45), Lat. 38.395, Long. 21.852 (2025/53), Lat. 38.409, Long. 21.855 (2025/55), Lat. 38.425, Long. 21.849 (2025/56), Lat. 38.40511111, Long. 21.84713611 (2025/67), Lat. 38.40842222, Long. 21.86290556 (2025/78), Lat. 38.41496111, Long. 21.86307778 (2025/79), Lat. 38.43037778, Long. 21.85106111 (2025/80), Lat. 38.35896389, Long. 21.721575 (2025/87), Lat. 38.41903056, Long. 21.850975 (2025/88), Lat. 38.41855556, Long. 21.86651111 (2025/93), Lat. 38.41310833, Long. 21.87608333 (2025/97), Lat. 38.39337222, Long. 21.85480278 (2025/98), Lat. 38.39963333, Long. 21.86517778 (2025/99), Lat. 38.40029, Long. 21.85655 (2025/117), Lat. 38.41303611, Long. 21.87314722 (2025/146), Lat. 38.41083333 Long. 21.87388889, (2025/158), Lat. 38.42106667 Long.21.86550833 (2025/190), Lat. 38.3975, Long. 21.8704 (2025/241), Lat. 38.379819, Long. 21.853486 (2025/282), Lat. 38.387911, Long. 21.850506 (2025/304), Lat. 38.381458, Long. 21.852069 (2025/386). 22.8.2025
Surveillance zone:Those parts of the regional units of Aetolia-Acarnania and Phocis contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 38.391486, Long. 21.854056 (2025/00045), Lat. 38.39565278, Long. 21.85270278 (2025/53), Lat. 38.40945556, Long. 21.85508889 (2025/55), Lat. 38.42558056, Long. 21.84985 (2025/56) Lat. 38.40511111, Long. 21.84713611 (2025/67), Lat. 38.40842222, Long. 21.86290556 (2025/78), Lat. 38.41496111, Long. 21.86307778 (2025/79), Lat. 38.43037778, Long. 21.85106111 (2025/80), Lat. 38.35896389, Long. 21.721575 (2025/87), Lat. 38.41903056, Long. 21.850975 (2025/88), Lat. 38.41855556, Long. 21.86651111 (2025/93), Lat. 38.41310833, Long. 21.87608333 (2025/97), Lat. 38.39337222, Long. 21.85480278 (2025/98), Lat. 38.39963333, Long. 21.86517778 (2025/99), Lat. 38.40029, Long. 21.85655 (2025/117), Lat. 38.41303611, Long. 21.87314722 (2025/146), Lat. 38.41083333 Long. 21.87388889, (2025/158), Lat. 38.42106667 Long.21.86550833(2025/190), Lat. 38.3975, Long. 21.8704(2025/241), Lat. 38.379819, Long. 21.853486 (2025/282), Lat. 38.387911, Long. 21.850506 (2025/304), Lat. 38.381458, Long. 21.852069 (2025/386) excluding the areas contained in any protection zone 1.9.2025
Surveillance zone:Those parts of the regional units of Aetolia-Acarnania and Phocis contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 38.391486, Long. 21.854056 (2025/00045), Lat. 38.39565278, Long. 21.85270278 (2025/53), Lat. 38.40945556, Long. 21.85508889 (2025/55), Lat. 38.42558056, Long. 21.84985 (2025/56), Lat. 38.40511111, Long. 21.84713611 (2025/67), Lat. 38.40842222, Long. 21.86290556 (2025/78), Lat. 38.41496111, Long. 21.86307778 (2025/79), Lat. 38.43037778, Long. 21.85106111 (2025/80), Lat. 38.35896389, Long. 21.721575 (2025/87), Lat. 38.41903056, Long. 21.850975 (2025/88), Lat. 38.41855556, Long. 21.86651111 (2025/93), Lat. 38.41310833, Long. 21.87608333 (2025/97), Lat. 38.39337222, Long. 21.85480278 (2025/98), Lat. 38.39963333, Long. 21.86517778 (2025/99), Lat. 38.40029, Long. 21.85655 (2025/117), Lat. 38.41303611, Long. 21.87314722 (2025/146), Lat. 38.41083333 Long. 21.87388889, (2025/158), Lat. 38.42106667, Long.21.86550833(2025/190), Lat. 38.3975, Long. 21.8704(2025/241), Lat. 38.379819, Long. 21.853486 (2025/282), Lat. 38.387911, Long. 21.850506 (2025/304), Lat. 38.381458, Long. 21.852069 (2025/386). 23.8.2025 – 1.9.2025
Regional unit of ChalkidikiGR-CAPRIPOX-2025-00062GR-CAPRIPOX-2025-00063GR-CAPRIPOX-2025-00064GR-CAPRIPOX-2025-00065GR-CAPRIPOX-2025-00066GR-CAPRIPOX-2025-00081GR-CAPRIPOX-2025-00089GR-CAPRIPOX-2025-00092GR-CAPRIPOX-2025-00094GR-CAPRIPOX-2025-00110GR-CAPRIPOX-2025-00120GR-CAPRIPOX-2025-00148GR-CAPRIPOX-2025-00169 Protection zone:Those parts of the regional unit of Chalkidiki contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 40.124539, Long. 23.378264 (2025/00062), Lat. 40.130724, Long. 23.344954 (2025/00063), Lat. 40.1153, Long. 23.33861 (2025/00064), Lat. 40.121511, Long. 23.347854 (2025/00065), Lat. 40.125054, Long. 23.397489 (2025/00066), Lat. 40.083481, Long. 23.33424 (2025/81), Lat. 40.03813, Long. 23.3899 (2025/89), Lat. 40.165328, Long. 23.34533 (2025/92), Lat. 40.19133, Long. 23.332393 (2025/94), Lat. 40.051, Long. 23.3629 (2025/110), Lat. 40.063233, Long. 23.441135 (2025/120), Lat. 40.377544, Long. 23.904983 (2025/148), Lat.40.053144, Long. 23.405067 (2025/169). 8.8.2025
Surveillance zone:Those parts of the regional unit of Chalkidiki contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 40.124539, Long. 23.378264 (2025/00062), Lat. 40.130724, Long. 23.344954 (2025/00063), Lat. 40.1153, Long. 23.33861 (2025/00064), Lat. 40.121511, Long. 23.347854 (2025/00065), Lat. 40.125054, Long. 23.397489 (2025/00066), Lat. 40.083481, Long. 23.33424(2025/81), Lat. 40.03813, Long. 23.3899 (2025/89), Lat. 40.165328, Long. 23.34533 (2025/92), Lat. 40.19133, Long. 23.332393 (2025/94), Lat. 40.051, Long. 23.3629 (2025/110), Lat. 40.063233, Long. 23.441135 (2025/120), Lat. 40.377544, Long. 23.904983 (2025/148), Lat. 40.053144, Long. 23.405067 (2025/169) excluding the areas contained in any protection zone 18.8.2025
Surveillance zone:Those parts of the regional unit of Chalkidiki contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 40.124539, Long. 23.378264 (2025/00062), Lat. 40.130724, Long. 23.344954 (2025/00063), Lat. 40.1153, Long. 23.33861 (2025/00064), Lat. 40.121511, Long. 23.347854 (2025/00065), Lat. 40.125054, Long. 23.397489 (2025/00066), Lat. 40.083481, Long. 23.33424 (2025/81), Lat. 40.03813, Long. 23.3899 (2025/89), Lat. 40.165328, Long. 23.34533 (2025/92), Lat. 40.19133, Long. 23.332393 (2025/94), Lat. 40.051, Long. 23.3629 (2025/110), Lat. 40.063233, Long. 23.441135 (2025/120), Lat. 40.377544, Long. 23.904983 (2025/148), Lat. 40.053144, Long.23.405067 (2025/169) 9.8.2025 – 18.8.2025
Regional unit of XanthiGR-CAPRIPOX-2025-00068GR-CAPRIPOX-2025-00090GR-CAPRIPOX-2025-00091GR-CAPRIPOX-2025-00096GR-CAPRIPOX-2025-00100GR-CAPRIPOX-2025-00101GR-CAPRIPOX-2025-00102GR-CAPRIPOX-2025-00111GR-CAPRIPOX-2025-00112GR-CAPRIPOX-2025-00113GR-CAPRIPOX-2025-00114GR-CAPRIPOX-2025-00115GR-CAPRIPOX-2025-00116GR-CAPRIPOX-2025-00118GR-CAPRIPOX-2025-00119GR-CAPRIPOX-2025-00122GR-CAPRIPOX-2025-00124GR-CAPRIPOX-2025-00125GR-CAPRIPOX-2025-00126GR-CAPRIPOX-2025-00127GR-CAPRIPOX-2025-00137GR-CAPRIPOX-2025-00138GR-CAPRIPOX-2025-00139GR-CAPRIPOX-2025-00151GR-CAPRIPOX-2025-00152GR-CAPRIPOX-2025-00153GR-CAPRIPOX-2025-00165GR-CAPRIPOX-2025-00166GR-CAPRIPOX-2025-00176GR-CAPRIPOX-2025-00177GR-CAPRIPOX-2025-00178GR-CAPRIPOX-2025-00179GR-CAPRIPOX-2025-00180GR-CAPRIPOX-2025-00181GR-CAPRIPOX-2025-00182GR-CAPRIPOX-2025-00183GR-CAPRIPOX-2025-00184GR-CAPRIPOX-2025-00195GR-CAPRIPOX-2025-00204GR-CAPRIPOX-2025-00209GR-CAPRIPOX-2025-00210GR-CAPRIPOX-2025-00219GR-CAPRIPOX-2025-00220GR-CAPRIPOX-2025-00221GR-CAPRIPOX-2025-00222GR-CAPRIPOX-2025-00223GR-CAPRIPOX-2025-00224GR-CAPRIPOX-2025-00225GR-CAPRIPOX-2025-00226GR-CAPRIPOX-2025-00228GR-CAPRIPOX-2025-00237GR-CAPRIPOX-2025-00238GR-CAPRIPOX-2025-00249GR-CAPRIPOX-2025-00250GR-CAPRIPOX-2025-00251GR-CAPRIPOX-2025-00254GR-CAPRIPOX-2025-00255GR-CAPRIPOX-2025-00256GR-CAPRIPOX-2025-00257GR-CAPRIPOX-2025-00258GR-CAPRIPOX-2025-00264GR-CAPRIPOX-2025-00299GR-CAPRIPOX-2025-00300GR-CAPRIPOX-2025-00301GR-CAPRIPOX-2025-00309GR-CAPRIPOX-2025-00325GR-CAPRIPOX-2025-00326GR-CAPRIPOX-2025-00327GR-CAPRIPOX-2025-00345GR-CAPRIPOX-2025-00353GR-CAPRIPOX-2025-00354GR-CAPRIPOX-2025-00355GR-CAPRIPOX-2025-00356GR-CAPRIPOX-2025-00370GR-CAPRIPOX-2025-00371GR-CAPRIPOX-2025-00372 Protection zone:Those parts of the regional units of Xanthi and Kavala contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 40.99623611, Long. 24.83029167 (2025/68), Lat. 40.99545556, Long. 24.83029167 (2025/90), Lat. 40.99517778, Long. 24.84001667 (2025/91), Lat. 41.08872222, Long. 24.80329444 (2025/96), Lat. 40.94198, Long. 24.859461 (2025/100), Lat. 41.02248, Long. 24.79513056 (2025/101), Lat. 41.02248, Long. 24.79513056 (2025/102), Lat. 40.98371667, Long. 24.80023889 (2025/111), Lat. 40.935475, Long. 24.815203 (2025/112), Lat. 40.978975, Long. 24.968347 (2025/113), Lat. 40.97081389, Long. 24.853175 (2025/114), Lat. 40.97081389, Long. 24.853175 (2025/115), Lat. 40.92546111, Long. 24.77911389 (2025/116), Lat. 40.97432, Long. 24.93116 (2025/118), Lat. 40.96386, Long. 24.85581 (2025/119), Lat. 40.901775, Long. 24.853047 (2025/122), Lat. 41.00742222, Long 24.89307778 (2025/124), Lat. 40.95253611, Long. 24.87093056 (2025/125), Lat. 40.94319167, Long. 24.93811389 (2025/126), Lat. 41.04519722, Long. 24.820325 (2025/127), Lat. 41.02537222, Long. 24.86315556 (2025/137), Lat. 40.98996389, Long. 24.82399444 (2025/138), Lat. 40.96556667, Long. 24.9095 (2025/139), Lat. 40.96178056, Long. 24.93472222 (2025/151), Lat. 40.99215, Long. 24.83043611 (2025/152), Lat. 40.990675, Long. 24.82167778 (2025/153), Lat. 40.93966944, Long. 24.87886389 (2025/165), Lat. 40.98928333, Long. 24.77680556 (2025/166), Lat. 40.950008, Long. 24.817541 (2025/176), Lat. 40.956202, Long. 24.784566 (2025/177), Lat. 40.9339, Long. 24.837438 (2025/178), Lat. 40.96318, Long. 24.812155 (2025/179), Lat. 40.95993, Long. 24.934561 (2025/180), Lat. 40.94878, Long. 24.89205 (2025/181), Lat. 40.94525, Long. 24.950172 (2025/182), Lat. 41.02525278, Long. 24.91927778 (2025/183), Lat. 40.980056, Long. 24.967289 (2025/184), Lat. 40.93934722, Long. 24.94205278 (2025/195), Lat. 41.001836, Long. 24.86944 (2025/204), Lat. 40.94748056, Long. 24.86959167 (2025/209), Lat. 41.042347, Long. 24.854008 (2025/210), Lat. 41.01641, Long. 24.89005 (2025/219), Lat. 40.99797, Long. 24.79668 (2025/220), Lat. 40.92859, Long. 24.88322 (2025/221), Lat. 40.94748, Long. 24.89024 (2025/222), Lat. 40.98469, Long 24.94486 (2025/223), Lat. 40.96229, Long. 24.90589 (2025/224), Lat. 40.98139, Long. 24.84509 (2025/225), Lat. 40.9802, Long 24.84051 (2025/226), Lat. 41.11868, Long. 24.95574 (2025/228), Lat. 41.00244, Long. 25.00836 (2025/237), Lat. 40.92675, Long. 24.83386 (2025/238), Long. 41.03354, Lat. 24.93621 (2025/249), Long. 40.98524, Lat. 24.93988 (2025/250), Long. 40.99613 Lat. 24.79702 (2025/251), Long. 38.41361 Lat. 21.89861 (2025/254), Long. 41.058486 Lat. 24.954978 (2025/255), Long. 40.984936 Lat. 24.784575 (2025/256), Long. 40.971103 Lat. 24.931775 (2025/257), Long. 40.915533 Lat. (2025/258), Lat. 40.98793611, Long. 24.83078056 (2025/264), Lat. 40.956883, Long. 24.786581 (2025/299), Lat. 40.967108, Long. 24.815525 (2025/300), Lat. 40.925822, Long. 24.8287 (2025/301), Lat. 41.03041, Long. 24.86334 (2025/309), Lat. 40.970889, Long. 24.79435 (2025/325), Lat. 41.023147, Long. 24.897725 (2025/326), Lat. 41.033328, Long. 24.805542 (2025/327), Lat. 41.033675, Long. 24.935781 (2025/345), Lat. 40.948125, Long. 24.968808 (2025/353), Lat. 41.035872, Long. 24.850331 (2025/354), Lat. 40.967503, Long. 24.793678 (2025/355), Lat. 41.077656, Long. 24.883311 (2025/356), Lat. 41.074514, Long. 24.941714 (2025/370), Lat. 40.991764, Long. 24.828736 (2025/371), Lat. 41.020433, Long. 24.857022 (2025/372). 21.9.2025
Surveillance zone:Those parts of the regional units of Xanthi, Rhodopi and Kavala contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 40.99623611, Long. 24.83029167 (2025/68), Lat. 40.99545556, Long. 24.83029167 (2025/90), Lat. 40.99517778, Long. 24.84001667 (2025/91), Lat. 41.08872222, Long. 24.80329444 (2025/96), Lat. 40.94198, Long. 24.859461 (2025/100), Lat. 41.02248, Long. 24.79513056 (2025/101), Lat. 41.02248, Long. 24.79513056 (2025/102), Lat. 40.98371667, Long. 24.80023889 (2025/111), Lat. 40.935475, Long. 24.815203 (2025/112), Lat. 40.978975, Long. 24.968347 (2025/113), Lat. 40.97081389, Long. 24.853175 (2025/114), Lat. 40.97081389, Long. 24.853175 (2025/115), Lat. 40.92546111, Long. 24.77911389 (2025/116), Lat. 40.97432, Long. 24.93116 (2025/118), Lat. 40.96386, Long. 24.85581 (2025/119), Lat. 40.901775, Long. 24.853047 (2025/122), Lat. 41.00742222, Long. 24.89307778 (2025/124), Lat. 40.95253611, Long. 24.87093056 (2025/125), Lat. 40.94319167, Long. 24.93811389 (2025/126), Lat. 41.04519722, Long. 24.820325 (2025/127), Lat. 41.02537222, Long. 24.86315556 (2025/137), Lat. 40.98996389, Long. 24.82399444 (2025/138), Lat. 40.96556667, Long. 24.9095 (2025/139), Lat. 40.96178056, Long. 24.93472222 (2025/151), Lat. 40.99215, Long. 24.83043611 (2025/152), Lat. 40.990675, Long. 24.82167778 (2025/153), Lat. 40.93966944, Long. 24.87886389 (2025/165), Lat. 40.98928333, Long. 24.77680556 (2025/166), Lat. 40.950008, Long. 24.817541 (2025/176), Lat. 40.956202, Long. 24.784566 (2025/177), Lat. 40.9339, Long. 24.837438 (2025/178), Lat. 40.96318, Long. 24.812155 (2025/179), Lat. 40.95993, Long, 24.934561 (2025/180), Lat. 40.94878, Long. 24.89205 (2025/181), Lat. 40.94525, Long. 24.950172 (2025/182), Lat. 41.02525278, Long. 24.91927778 (2025/183), Lat. 40.980056, Long. 24.967289 (2025/184), Lat. 40.93934722, Long. 24.94205278 (2025/195), Lat. 41.001836, Long. 24.86944 (2025/204), Lat. 40.94748056, Long. 24.86959167 (2025/209), Lat. 41.042347, Long. 24.854008 (2025/210), Lat. 41.01641, Long. 24.89005 (2025/219), Lat. 40.99797, Long 24.79668 (2025/220), Lat. 40.92859, Long. 24.88322 (2025/221), Lat. 40.94748, Long. 24.89024 (2025/222), Lat. 40.98469, Long. 24.94486 (2025/223), Lat. 40.96229, Long. 24.90589 (2025/224), Lat. 40.98139, Long. 24.84509 (2025/225), Lat. 40.9802, Long. 24.84051 (2025/226), Lat. 41.11868, Long. 24.95574 (2025/228), Lat. 41.00244, Long. 25.00836 (2025/237), Lat. 40.92675, Long. 24.83386 (2025/238), Long. 41.03354, Lat. 24.93621 (2025/249), Long. 40.98524, Lat. 24.93988 (2025/250), Long. 40.99613 Lat. 24.79702 (2025/251), Long. 38.41361 Lat. 21.89861 (2025/254), Long. 41.058486 Lat. 24.954978 (2025/255), Long. 40.984936 Lat. 24.784575 (2025/256), Long. 40.971103 Lat. 24.931775 (2025/257), Long. 40.915533, Lat. (2025/258), Lat. 40.98793611, Long. 24.83078056 (2025/264) Lat. 40.956883, Long. 24.786581 (2025/299), Lat. 40.967108, Long. 24.815525 (2025/300), Lat. 40.925822, Long. 24.8287 (2025/301), Lat. 41.03041, Long. 24.86334 (2025/309), Lat. 40.970889, Long. 24.79435 (2025/325), Lat. 41.023147, Long. 24.897725 (2025/326), Lat. 41.033328, Long. 24.805542 (2025/327), Lat. 41.033675, Long. 24.935781 (2025/345), Lat. 40.948125, Long. 24.968808 (2025/353), Lat. 41.035872, Long. 24.850331 (2025/354), Lat. 40.967503, Long. 24.793678 (2025/355), Lat. 41.077656, Long. 24.883311 (2025/356), Lat. 41.074514, Long. 24.941714 (2025/370), Lat. 40.991764, Long. 24.828736 (2025/371), Lat. 41.020433, Long. 24.857022 (2025/372), excluding the areas contained in any protection zone. 1.10.2025
Surveillance zone:Those parts of the regional units of Xanthi and Kavala contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 40.99623611, Long. 24.83029167 (2025/68), Lat. 40.99545556, Long. 24.83029167 (2025/90), Lat. 40.99517778, Long. 24.84001667 (2025/91), Lat. 41.08872222, Long. 24.80329444 (2025/96), Lat. 40.94198, Long. 24.859461 (2025/100), Lat. 41.02248, Long 24.79513056 (2025/101), Lat. 41.02248, Long. 24.79513056 (2025/102), Lat. 40.98371667, Long. 24.80023889 (2025/111), Lat. 40.935475, Long. 24.815203 (2025/112), Lat. 40.978975, Long. 24.968347 (2025/113), Lat. 40.97081389, Long. 24.853175 (2025/114), Lat. 40.97081389, Long. 24.853175 (2025/115), Lat. 40.92546111, Long. 24.77911389 (2025/116), Lat. 40.97432, Long. 24.93116 (2025/118), Lat. 40.96386, Long. 24.85581 (2025/119), Lat. 40.901775, Long. 24.853047 (2025/122), Lat. 41.00742222, Long. 24.89307778 (2025/124), Lat. 40.95253611, Long. 24.87093056 (2025/125), Lat. 40.94319167, Long. 24.93811389 (2025/126), Lat. 41.04519722, Long. 24.820325 (2025/127), Lat. 41.02537222, Long. 24.86315556 (2025/137), Lat. 40.98996389, Long. 24.82399444 (2025/138), Lat. 40.96556667, Long. 24.9095 (2025/139), Lat. 40.96178056, Long. 24.93472222 (2025/151), Lat. 40.99215, Long. 24.83043611 (2025/152), Lat. 40.990675, Long. 24.82167778 (2025/153), Lat. 40.93966944, Long. 24.87886389 (2025/165), Lat. 40.98928333, Long. 24.77680556 (2025/166), Lat. 40.950008, Long. 24.817541 (2025/176), Lat. 40.956202, Long. 24.784566 (2025/177), Lat. 40.9339, Long. 24.837438 (2025/178), Lat. 40.96318, Long. 24.812155 (2025/179), Lat. 40.95993, Long, 24.934561 (2025/180), Lat. 40.94878, Long. 24.89205 (2025/181), Lat. 40.94525, Long. 24.950172 (2025/182), Lat. 41.02525278, Long. 24.91927778 (2025/183),Lat. 40.980056, Long, 24.967289 (2025/184), Lat. 40.93934722, Long. 24.94205278 (2025/195), Lat. 41.001836, Long. 24.86944 (2025/204), Lat. 40.94748056, Long. 24.86959167 (2025/209), Lat. 41.042347, Long. 24.854008 (2025/210), Lat. 41.01641, Long. 24.89005 (2025/219), Lat. 40.99797, Long. 24.79668 (2025/220), Lat. 40.92859, Long. 24.88322 (2025/221), Lat. 40.94748, Long. 24.89024 (2025/222), Lat. 40.98469, Long. 24.94486 (2025/223), Lat. 40.96229, Long. 24.90589 (2025/224), Lat. 40.98139, Long. 24.84509 (2025/225), Lat. 40.9802, Long. 24.84051 (2025/226), Lat. 41.11868, Long. 24.95574 (2025/228), Lat. 41.00244, Long. 25.00836 (2025/237), Lat. 40.92675, Long. 24.83386 (2025/238), Long. 41.03354, Lat. 24.93621 (2025/249), Long. 40.98524, Lat. 24.93988 (2025/250), Long. 40.99613, Lat. 24.79702 (2025/251), Long. 38.41361, Lat. 21.89861 (2025/254), Long. 41.058486, Lat. 24.954978 (2025/255), Long. 40.984936, Lat. 24.784575 (2025/256), Long. 40.971103, Lat. 24.931775 (2025/257), Long. 40.915533, Lat. (2025/258), Lat. 40.98793611, Long. 24.83078056 (2025/264), Lat. 40.956883, Long. 24.786581 (2025/299), Lat. 40.967108, Long. 24.815525 (2025/300), Lat. 40.925822, Long. 24.8287 (2025/301), Lat. 41.03041, Long. 24.86334 (2025/309), Lat. 40.970889, Long. 24.79435 (2025/325), Lat. 41.023147, Long. 24.897725 (2025/326), Lat. 41.033328, Long. 24.805542 (2025/327), Lat. 41.033675, Long. 24.935781 (2025/345), Lat. 40.948125, Long. 24.968808 (2025/353), Lat. 41.035872, Long. 24.850331 (2025/354), Lat. 40.967503, Long. 24.793678 (2025/355), Lat. 41.077656, Long. 24.883311 (2025/356), Lat. 41.074514, Long. 24.941714 (2025/370), Lat. 40.991764, Long. 24.828736 (2025/371), Lat. 41.020433, Long. 24.857022 (2025/372). 22.9.2025-1.10.2025
Regional unit of MagnesiaGR-CAPRIPOX-2025-00095GR-CAPRIPOX-2025-00123GR-CAPRIPOX-2025-00131GR-CAPRIPOX-2025-00132GR-CAPRIPOX-2025-00134GR-CAPRIPOX-2025-00140GR-CAPRIPOX-2025-00141GR-CAPRIPOX-2025-00147GR-CAPRIPOX-2025-00160GR-CAPRIPOX-2025-00161GR-CAPRIPOX-2025-00162GR-CAPRIPOX-2025-00163GR-CAPRIPOX-2025-00172GR-CAPRIPOX-2025-00173GR-CAPRIPOX-2025-00174GR-CAPRIPOX-2025-00175GR-CAPRIPOX-2025-00193GR-CAPRIPOX-2025-00194GR-CAPRIPOX-2025-00198GR-CAPRIPOX-2025-00199 GR-CAPRIPOX-2025-00200GR-CAPRIPOX-2025-00211GR-CAPRIPOX-2025-00212GR-CAPRIPOX-2025-00227GR-CAPRIPOX-2025-00242GR-CAPRIPOX-2025-00243GR-CAPRIPOX-2025-00244GR-CAPRIPOX-2025-00245GR-CAPRIPOX-2025-00246GR-CAPRIPOX-2025-00263GR-CAPRIPOX-2025-00278GR-CAPRIPOX-2025-00279GR-CAPRIPOX-2025-00280GR-CAPRIPOX-2025-00281GR-CAPRIPOX-2025-00283GR-CAPRIPOX-2025-00296GR-CAPRIPOX-2025-00297GR-CAPRIPOX-2025-00298GR-CAPRIPOX-2025-00314GR-CAPRIPOX-2025-00315GR-CAPRIPOX-2025-00318GR-CAPRIPOX-2025-00319GR-CAPRIPOX-2025-00320GR-CAPRIPOX-2025-00350GR-CAPRIPOX-2025-00351GR-CAPRIPOX-2025-00352GR-CAPRIPOX-2025-00358GR-CAPRIPOX-2025-00359GR-CAPRIPOX-2025-00373GR-CAPRIPOX-2025-00374GR-CAPRIPOX-2025-00375GR-CAPRIPOX-2025-00376GR-CAPRIPOX-2025-00377 Protection zone:Those parts of the regional unit of Magnesia and Larisa contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.467052, Long. 22.86536 (2025/95), Lat. 39.496834, Long. 22.871568 (2025/123), Lat. 39.477993, Long. 22.873483 (2025/131), Lat. 39.467493, Long. 22.898677 (2025/132), Lat. 39.471405, Long. 22.8563 (2025/134), Lat. 39.46141, Long. 22.87519 (2025/140), Lat. 39.464448, Long. 22.854603 (2025/141), Lat. 39.49867035, Long. 22.86911413 (2025/160), Lat. 39.4593182, Long. 22.87580615 (2025/161), Lat. 39.50201691, Long. 22.86278904 (2025/162), Lat. 39.43476024, Long. 22.77322376 (2025/163), Lat. 39.334604, Long. 22.920183 (2025/172), Lat. 39.504071, Long. 22.861532 (2025/173), Lat. 39.494902, Long. 22.894167 (2025/174), Lat. 39.4256983, Long. 22.7372429 (2025/175), Lat. 39.368794, Long. 22.741523 (2025/193), Lat. 39.3945734, Long. 22.7667939 (2025/194), Lat. 39.423517, Lat. 22.78069 (2025/198), Lat. 39.3945734, Long, 22.9223459 (2025/199), Lat. 39.52227, Long. 22.817713 (2025/200), Lat. 39.3810771, Long. 22.9145345 (2025/211), Lat. 39.436546, Long. 22.769483 (2025/212), Lat. 39.42227, Long. 22.75349 (2025/227), Lat. 39.4315, Long. 22.75119 (2025/242), Lat. 39.42071, Long. 22.77005 (2025/243), Lat. 39.44432, Long. 22.74879 (2025/244), Lat. 39.48778, Long. 22.89325 (2025/245), Lat. 39.46722, Long. 22.72725 (2025/246), Lat. 39.339966 Long. 23.0400641 (2025/263), Lat. 39.39606526 Long. 22.7968304 (2025/278), Lat. 39.3245953, Long. 22.762568 (2025/279), Lat. 39.195883 Long. 22.768289 (2025/280), Lat. 39.480785 Long. 22.757451 (2025/281), Lat. 39.157619, Long. 22.767124 (2025/283), Lat. 39.49915, Long. 22.891876 (2025/296), Lat. 39.1859584, Long. 22.7102493 (2025/297), Lat. 39.4332262, Long. 22.8887738 (2025/298), Lat. 39.18003634, Long. 22.77596204 (2025/314), Lat. 39.44921, Long. 22.82138 (2025/315), Lat. 39.43631, Long. 22.805354 (2025/318), Lat. 39.388472, Long. 22.911592 (2025/319), Lat. 39.385731, Long. 22.751972 (2025/320), Lat. 39.19191948, Long. 22.79757791 (2025/350), Lat. 39.31323369, Long. 22.91200103 (2025/351), Lat. 39.385731, Long. 22.751972 (2025/320), Lat. 39.431662, Long. 22.749835 (2025/352), Lat. 39.382651, Long. 22.947526 (2025/358), Lat. 39.40998706, Long. 22.66004221 (2025/359), Lat. 39.40997, Long. 22.66004 (2025/373), Lat. 39.36875771, Long. 22.89508114 (2025/374), Lat. 39.36922072, Long. 22.78372022 (2025/375), Lat. 39.468, Long. 22.76436 (2025/376), Lat. 39.42277085, Long. 22.79517004 (2025/377). 20.9.2025
Surveillance zone:Those parts of the regional units of Magnesia, Phthiotis and Larisa contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.467052, Long. 22.86536 (2025/95), Lat. 39.496834, Long. 22.871568 (2025/123), Lat. 39.477993, Long. 22.873483 (2025/131), Lat. 39.467493, Long. 22.898677 (2025/132), Lat. 39.471405, Long. 22.8563 (2025/134), Lat. 39.46141, Long. 22.87519 (2025/140), Lat. 39.464448, Long. 22.854603 (2025/141), Lat. 39.49867035, Long. 22.86911413 (2025/160), Lat. 39.4593182, Long. 22.87580615 (2025/161), Lat. 39.50201691, Long. 22.86278904 (2025/162), Lat. 39.43476024, Long. 22.77322376 (2025/163), Lat. 39.334604, Long. 22.920183 (2025/172), Lat. 39.504071, Long. 22.861532 (2025/173), Lat. 39.494902, Long. 22.894167 (2025/174), Lat. 39.4256983, Long. 22.7372429 (2025/175), Lat. 39.368794, Long.22.741523 (2025/193), Lat. 39.3945734, Long. 22.7667939 (2025/194), Lat. 39.423517, Lat. 22.78069 (2025/198), Lat. 39.3945734, Long, 22.9223459 (2025/199), Lat. 39.52227, Long. 22.817713 (2025/200), Lat. 39.3810771, Long. 22.9145345 (2025/211), Lat. 39.436546, Long. 22.769483 (2025/212), Lat. 39.42227, Long. 22.75349 (2025/227), Lat. 39.4315, Long. 22.75119 (2025/242), Lat. 39.42071, Long. 22.77005 (2025/243), Lat. 39.44432, Long. 22.74879 (2025/244), Lat. 39.48778, Long. 22.89325 (2025/245), Lat. 39.46722, Long. 22.72725 (2025/246), Lat. 39.339966 Long. 23.0400641 (2025/263), Lat. 39.39606526 Long. 22.7968304 (2025/278), Lat. 39.3245953, Long. 22.762568 (2025/279), Lat. 39.195883 Long. 22.768289 (2025/280), Lat. 39.480785 Long. 22.757451 (2025/281), Lat. 39.157619, Long. 22.767124 (2025/283), Lat. 39.49915, Long. 22.891876 (2025/296), Lat. 39.1859584, Long. 22.7102493 (2025/297), Lat. 39.4332262, Long. 22.8887738 (2025/298), Lat. 39.18003634, Long. 22.77596204 (2025/314), Lat. 39.44921, Long. 22.82138 (2025/315), Lat. 39.43631, Long. 22.805354 (2025/318), Lat. 39.388472, Long. 22.911592 (2025/319), Lat. 39.385731, Long. 22.751972 (2025/320) Lat. 39.19191948, Long. 22.79757791 (2025/350), Lat. 39.31323369, Long. 22.91200103 (2025/351), Lat. 39.385731, Long. 22.751972 (2025/320), Lat. 39.431662, Long. 22.749835 (2025/352), Lat. 39.382651, Long. 22.947526 (2025/358), Lat. 39.40998706, Long. 22.66004221 (2025/359), Lat. 39.40997, Long. 22.66004 (2025/373), Lat. 39.36875771, Long. 22.89508114 (2025/374), Lat. 39.36922072, Long. 22.78372022 (2025/375), Lat. 39.468, Long. 22.76436 (2025/376), Lat. 39.42277085, Long. 22.79517004 (2025/377) excluding the areas contained in any protection zone 30.9.2025
Surveillance zone:Those parts of the regional unit of Magnesia and Larisa contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.467052, Long. 22.86536 (2025/95), Lat. 39.496834, Long. 22.871568 (2025/123), Lat. 39.477993, Long. 22.873483 (2025/131), Lat. 39.467493, Long. 22.898677 (2025/132), Lat. 39.471405, Long. 22.8563 (2025/134), Lat. 39.46141, Long. 22.87519 (2025/140), Lat. 39.464448, Long. 22.854603 (2025/141), Lat. 39.49867035, Long. 22.86911413 (2025/160), Lat. 39.4593182, Long. 22.87580615 (2025/161), Lat. 39.50201691, Long. 22.86278904 (2025/162), Lat. 39.43476024, Long. 22.77322376 (2025/163), Lat. 39.334604, Long. 22.920183 (2025/172), Lat. 39.504071, Long. 22.861532 (2025/173), Lat. 39.494902, Long. 22.894167 (2025/174), Lat. 39.4256983, Long. 22.7372429 (2025/175), Lat. 39.368794, Long.22.741523 (2025/193), Lat. 39.3945734, Long. 22.7667939 (2025/194), Lat. 39.423517, Lat. 22.78069 (2025/198), Lat. 39.3945734, Long, 22.9223459 (2025/199), Lat. 39.52227, Long. 22.817713 (2025/200), Lat. 39.3810771, Long. 22.9145345 (2025/211), Lat. 39.436546, Long. 22.769483 (2025/212), Lat. 39.42227, Long. 22.75349 (2025/227), Lat. 39.4315, Long. 22.75119 (2025/242), Lat. 39.42071, Long. 22.77005 (2025/243), Lat. 39.44432, Long. 22.74879 (2025/244), Lat. 39.48778, Long. 22.89325 (2025/245), Lat. 39.46722, Long. 22.72725 (2025/246), Lat. 39.339966, Long. 23.0400641 (2025/263), Lat. 39.39606526, Long. 22.7968304 (2025/278), Lat. 39.3245953, Long. 22.762568 (2025/279), Lat. 39.195883, Long. 22.768289 (2025/280), Lat. 39.480785, Long. 22.757451 (2025/281), Lat. 39.157619, Long. 22.767124 (2025/283), Lat. 39.49915, Long. 22.891876 (2025/296), Lat. 39.1859584, Long. 22.7102493 (2025/297), Lat. 39.4332262, Long. 22.8887738 (2025/298), Lat. 39.18003634, Long. 22.77596204 (2025/314), Lat. 39.44921, Long. 22.82138 (2025/315), Lat. 39.43631, Long. 22.805354 (2025/318), Lat. 39.388472, Long. 22.911592 (2025/319), Lat. 39.385731, Long. 22.751972 (2025/320) Lat. 39.19191948, Long. 22.79757791 (2025/350), Lat. 39.31323369, Long. 22.91200103 (2025/351), Lat. 39.385731, Long. 22.751972 (2025/320), Lat. 39.431662, Long. 22.749835 (2025/352), Lat. 39.382651, Long. 22.947526 (2025/358), Lat. 39.40998706, Long. 22.66004221 (2025/359), Lat. 39.40997, Long. 22.66004 (2025/373), Lat. 39.36875771, Long. 22.89508114 (2025/374), Lat. 39.36922072, Long. 22.78372022 (2025/375), Lat. 39.468, Long. 22.76436 (2025/376), Lat. 39.42277085, Long. 22.79517004 (2025/377). 21.9.2025-30.9.2025
Regional unit of LarisaGR-CAPRIPOX-2025-00121GR-CAPRIPOX-2025-00142GR-CAPRIPOX-2025-00143GR-CAPRIPOX-2025-00144GR-CAPRIPOX-2025-00149 GR-CAPRIPOX-2025-00150GR-CAPRIPOX-2025-00170GR-CAPRIPOX-2025-00171GR-CAPRIPOX-2025-00185GR-CAPRIPOX-2025-00186GR-CAPRIPOX-2025-00191GR-CAPRIPOX-2025-00192GR-CAPRIPOX-2025-00201GR-CAPRIPOX-2025-00202GR-CAPRIPOX-2025-00203GR-CAPRIPOX-2025-00213GR-CAPRIPOX-2025-00214GR-CAPRIPOX-2025-00215GR-CAPRIPOX-2025-00216GR-CAPRIPOX-2025-00217GR-CAPRIPOX-2025-00218GR-CAPRIPOX-2025-00229GR-CAPRIPOX-2025-00230GR-CAPRIPOX-2025-00231GR-CAPRIPOX-2025-00232GR-CAPRIPOX-2025-00233GR-CAPRIPOX-2025-00234GR-CAPRIPOX-2025-00235GR-CAPRIPOX-2025-00236GR-CAPRIPOX-2025-00247GR-CAPRIPOX-2025-00248GR-CAPRIPOX-2025-00261GR-CAPRIPOX-2025-00262GR-CAPRIPOX-2025-00259GR-CAPRIPOX-2025-00259GR-CAPRIPOX-2025-00260GR-CAPRIPOX-2025-00261GR-CAPRIPOX-2025-00262GR-CAPRIPOX-2025-00265GR-CAPRIPOX-2025-00266GR-CAPRIPOX-2025-00267GR-CAPRIPOX-2025-00268GR-CAPRIPOX-2025-00269GR-CAPRIPOX-2025-00270GR-CAPRIPOX-2025-00271GR-CAPRIPOX-2025-00275GR-CAPRIPOX-2025-00276GR-CAPRIPOX-2025-00284GR-CAPRIPOX-2025-00285GR-CAPRIPOX-2025-00286GR-CAPRIPOX-2025-00290GR-CAPRIPOX-2025-00291GR-CAPRIPOX-2025-00292GR-CAPRIPOX-2025-00293GR-CAPRIPOX-2025-00294GR-CAPRIPOX-2025-00295GR-CAPRIPOX-2025-00302GR-CAPRIPOX-2025-00303GR-CAPRIPOX-2025-00308GR-CAPRIPOX-2025-00316GR-CAPRIPOX-2025-00328GR-CAPRIPOX-2025-00329GR-CAPRIPOX-2025-00330GR-CAPRIPOX-2025-00331GR-CAPRIPOX-2025-00332GR-CAPRIPOX-2025-00333GR-CAPRIPOX-2025-00334GR-CAPRIPOX-2025-00335GR-CAPRIPOX-2025-00336GR-CAPRIPOX-2025-00337GR-CAPRIPOX-2025-00338GR-CAPRIPOX-2025-00339GR-CAPRIPOX-2025-00340GR-CAPRIPOX-2025-00341GR-CAPRIPOX-2025-00342GR-CAPRIPOX-2025-00346GR-CAPRIPOX-2025-00347GR-CAPRIPOX-2025-00348GR-CAPRIPOX-2025-00357GR-CAPRIPOX-2025-00360GR-CAPRIPOX-2025-00361GR-CAPRIPOX-2025-00362GR-CAPRIPOX-2025-00363GR-CAPRIPOX-2025-00364GR-CAPRIPOX-2025-00365GR-CAPRIPOX-2025-00366GR-CAPRIPOX-2025-00367GR-CAPRIPOX-2025-00379GR-CAPRIPOX-2025-00380GR-CAPRIPOX-2025-00381GR-CAPRIPOX-2025-00388 Protection zone:Those parts of the regional units of Larisa, Magnesia, Trikala and Pieria contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.89476741, Long. 22.6311429 (2025/121), Lat. 39.91227499, Long. 22.61617251 (2025/142), Lat. 39.6774732, Long. 22.52254213 (2025/143), Lat. 39.57401593, Long. 22.73756419 (2025/144), Lat. 39.92010431, Long. 22.60924625 (2025/149), Lat. 39.91150253, Long. 22.61584129 (2025/150), Lat. 39.6087452, Long. 22.5329685 (2025/170), Lat. 39.592199, Lat. 22.7054 (2025/171), Lat. 39.51886715, Long. 22.68980287 (2025/185), Lat. 39.62186561, Long. 22.62454656 (2025/186), Lat. 39.59839938, Long. 22.70331904 (2025/191), Lat. 39.56463, Long. 22.550243 (2025/192), Lat. 39.572848, Long. 22.738176 (2025/201), Lat. 39.89698879, Long. 22.63020736 (2025/202), Lat. 39.679681, Long. 22.628016 (2025/203), Lat, 39.575026, Long. 22.742632 (2025/213), Lat. 39.53379, Long. 22.67786 (2025/214); Lat. 39.69157, Long, 22.579129 (2025/215), Long 39.55262, Lat. 22.6197(2025/216), Lat. 39.59805, Long. 22.70762 (2015/217), Long. 39.52721, Lat. 22.70306 (2015/218), Lat. 39.59198, Long. 22.70984 ( 2015/229), Lat. 39.89118, Long. 22.66363 (2025/230), Lat. 39.61441886, Long. 22.51768336 (2025/231), Lat. 39.55983, Long. 22.75526, (2025/232), Lat. 39.62413, Long. 22.62314 (2025/233), Lat. 39.62342, Long. 22.68567(2025/234), Lat. 39.61334, Long. 22.57854(2025/235), Lat. 39.59416, Long. 22.58534 (2025/236), Long. 39.61767, Lat. 22.61817 (2025/247) Lat. 39.71837 Long. 22.59385 (2025/248), Lat. 39.6465, Long. 22.328 (2025/259), Lat. 39.556716, Long. 22.651089 (2025/260), Lat. 39.624138, Long. 22.62676 (2025/261), Lat. 39.676118, Long. 22.498195 (2025/262), Lat. 39.534093 Long. 22.505619 (2025/265), Lat. 39.6879039, Long. 22.468641 (2025/266), Lat. 39.3007 Long. 22.5378 (2025/267), Lat. 39.626759 Long. 22.679439 (2025/268), Lat. 39.595981 Long. 22.707803 (2025/269), Lat. 39.595981 Long. 22.707803 (2025/270), Lat. 39.573212 Long. 22.739291 (2025/271), Lat. 39.7167234 Long. 22.4884135 (2025/275), Lat. 39.887 Long. 22.6666 (2025/276), Lat. 39.560071, Long. 22.647354 (2025/284), Lat. 39.593018, Long. 22.586056 (2025/285), Lat. 39.562067 Long. 22.584275 (2025/286), Lat. 39.588418 Long. 22.716484 (2025/290), Lat. 39.575097 Long. 22.833635 (2025/291), Lat. 39.5488537 Long. 22.6594409 (2025/292), Lat. 39.588346 Long. 22.719174 (2025/293), Lat. 39.912948 Long. 22.64367 (2025/294), Lat. 39.5609101 Long. 22.731537 (2025/295), Lat. 39.283168 Long. 22.554176 (2025/302), Lat. 39.924532 Long. 22.606098 (2025/303), Lat. 39.691185 Long. 22.589602 (2025/308), Lat. 39.4843587 Long 22.6030612 (2025/316), Lat. 39.629827 Long. 22.684235 (2025/328), Lat. 39.672253 Long. 22.560922 (2025/329), Lat. 39.705579 Long. 22.415402 (2025/330), Lat. 39.72092 Long. 22.5951278 (2025/331), Lat. 39.912034 Long. 22.612334 (2025/332), Lat. 39.698745 Long. 22.420811 (2025/333), Lat. 39.65035 Long. 22.2234102 (2025/334), Lat. 39.550231 Long. 22.639774 (2025/335), Lat. 39.917506 Long. 22.69245 (2025/336), Lat. 39.898187 Long. 22.641883 (2025/337), Lat. 39.599661 Long. 22.708941 (2025/338), Lat. 39.4797352 Long. 22.750258 (2025/339), Lat. 39.562067 Long. 22.6956564 (2025/340), Lat. 39.6342711 Long. 22.5600637 (2025/341), Lat. 39.652391 Long. 22.330526 (2025/342), Lat. 39.6373828 Long. 22.5524513 (2025/346), Lat. 39.561417 Long. 22.643048 (2025/347), Lat. 39.660889 Long. 22.315177 (2025/348), Lat. 39.691723 Long. 22.429688 (2025/357), Lat. 39.6298061 Long. 22.5303609 (2025/360), Lat. 39.6589464 Long. 22.7827164 (2025/361), Lat. 39.652391 Long. 22.330526 (2025/342), Lat. 39.558758 Long. 22.638562 (2025/362), Lat. 39.6365071 Long. 22.5509049 (2025/363), Lat. 39.617565 Long. 22.579664 (2025/364), Lat. 39.7050478 Long. 22.54867156 (2025/365), Lat. 39.6469329 Long. 22.5443594 (2025/366), Lat. 39.5852205 Long. 22.5643767 (2025/367), Lat. 39.9074 Long. 22.6698 (2025/379), Lat. 39.88973215 Long. 22.66612361 (2025/380), Lat. 39.68492 Long. 22.330526 (2025/381), Lat. 39.5740239, Long. 22.549824 (2025/388). 22.9.2025
Surveillance zone:Those parts of the regional units of Larisa, Pieria, Trikala, Karditsa and Magnesia contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.89476741, Long. 22.6311429 (2025/121), Lat. 39.91227499, Long. 22.61617251 (2025/142), Lat. 39.6774732, Long. 22.52254213 (2025/143), Lat. 39.57401593, Long. 22.73756419 (2025/144), Lat. 39.92010431, Long. 22.60924625 (2025/149), Lat. 39.91150253, Long. 22.61584129 (2025/150), Lat. 39.6087452, Long. 22.5329685 (2025/170), Lat. 39.592199, Lat. 22.7054 (2025/171), lat. 39.51886715, Long. 22.68980287 (2025/185), Lat.39.62186561, Long. 22.62454656 (2025/186), Lat. 39.59839938, Long. 22.70331904 (2025/191), Lat. 39.56463, Long. 22.550243 (2025/192), Lat. 39.572848, Long. 22.738176 (2025/201), Lat. 39.89698879, Long. 22.63020736 (2025/202), Lat. 39.679681, Long. 22.628016 (2025/203), Lat. 39.575026, Long 22.742632 (2025/213), Lat. 39.53379, Long. 22.67786(2025/214), Lat. 39.69157, Long. 22.579129(2025/215), Long. 39.55262, Lat. 22.6197(2025/216), Lat. 39.59805, Long. 22.70762 (2015/217), Long. 39.52721, Lat. 22.70306 (2015/218), Lat. 39.59198, Long. 22.70984( 2015/229), Lat. 39.89118, Long. 22.66363 (2025/230), Lat. 39.61441886, Long. 22.51768336 (2025/231), Lat. 39.55983, Long. 22.75526, (2025/232), Lat. 39.62413, Long. 22.62314(2025/233), Lat. 39.62342, Long. 22.68567(2025/234), Lat. 39.61334, Long. 22.57854(2025/235), Lat. 39.59416, Long. 22.58534 (2025/236), Long. 39.61767, Lat. 22.61817 (2025/247) Lat. 39.71837 Long. 22.59385 (2025/248), Lat. 39.6465 , Long. 22.328 (2025/259), Lat. 39.556716, Long. 22.651089 (2025/260), Lat. 39.624138, Long. 22.62676 (2025/261), Lat. 39.676118, Long. 22.498195 (2025/262), Lat. 39.534093 Long. 22.505619 (2025/265), Lat. 39.6879039, Long. 22.468641 (2025/266), Lat. 39.3007 Long. 22.5378 (2025/267), Lat. 39.626759 Long 22.679439 (2025/268), Lat. 39.595981 Long. 22.707803 (2025/269), Lat. 39.595981 Long. 22.707803 (2025/270), Lat. 39.573212 Long. 22.739291 (2025/271), Lat. 39.7167234 Long. 22.4884135 (2025/275), Lat. 39.887 Long. 22.6666 (2025/276), Lat. 39.560071, Long. 22.647354 (2025/284), Lat. 39.593018, Long. 22.586056 (2025/285), Lat. 39.562067 Long. 22.584275 (2025/286), Lat. 39.588418 Long. 22.716484 (2025/290), Lat. 39.575097 Long. 22.833635 (2025/291), Lat. 39.5488537 Long. 22.6594409 (2025/292), Lat. 39.588346 Long. 22.719174 (2025/293), Lat. 39.912948 Long. 22.64367 (2025/294), Lat. 39.5609101 Long. 22.731537 (2025/295), Lat. 39.283168 Long. 22.554176 (2025/302), Lat. 39.924532 Long. 22.606098 (2025/303), Lat. 39.691185 Long. 22.589602 (2025/308), Lat. 39.4843587 Long. 22.6030612 (2025/316), Lat. 39.629827 Long. 22.684235 (2025/328), Lat. 39.672253 Long. 22.560922 (2025/329), Lat. 39.705579 Long. 22.415402 (2025/330), Lat. 39.72092 Long. 22.5951278 (2025/331), Lat. 39.912034 Long. 22.612334 (2025/332), Lat. 39.698745 Long. 22.420811 (2025/333), Lat. 39.65035 Long. 22.2234102 (2025/334), Lat. 39.550231 Long. 22.639774 (2025/335), Lat. 39.917506 Long. 22.69245 (2025/336), Lat. 39.898187 Long. 22.641883 (2025/337), Lat. 39.599661 Long. 22.708941 (2025/338), Lat. 39.4797352 Long. 22.750258 (2025/339), Lat. 39.562067 Long. 22.6956564 (2025/340), Lat. 39.6342711 Long. 22.5600637 (2025/341), Lat. 39.652391 Long. 22.330526 (2025/342), Lat. 39.6373828 Long. 22.5524513 (2025/346), Lat. 39.561417 Long. 22.643048 (2025/347), Lat. 39.660889 Long. 22.315177 (2025/348), Lat. 39.691723 Long. 22.429688 (2025/357), Lat. 39.6298061 Long. 22.5303609 (2025/360), Lat. 39.6589464 Long. 22.7827164 (2025/361), Lat. 39.652391 Long. 22.330526 (2025/342), Lat. 39.558758 Long. 22.638562 (2025/362), Lat. 39.6365071 Long. 22.5509049 (2025/363), Lat. 39.617565 Long. 22.579664 (2025/364), Lat. 39.7050478 Long. 22.54867156 (2025/365), Lat. 39.6469329 Long. 22.5443594 (2025/366), Lat. 39.5852205 Long. 22.5643767 (2025/367), Lat. 39.9074 Long. 22.6698 (2025/379), Lat. 39.88973215 Long. 22.66612361 (2025/380), Lat. 39.68492 Long. 22.330526 (2025/381), Lat. 39.5740239, Long. 22.549824 (2025/388) excluding the areas contained in any protection zone. 2.10.2025
Surveillance zone:Those parts of the regional units of Larisa, Magnesia, Trikala and Pieria contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.89476741, Long. 22.6311429 (2025/121), Lat. 39.91227499, Long. 22.61617251 (2025/142), Lat. 39.6774732, Long. 22.52254213 (2025/143), Lat. 39.57401593, Long. 22.73756419 (2025/144), Lat. 39.92010431, Long. 22.60924625 (2025/149), Lat. 39.91150253, Long. 22.61584129 (2025/150), Lat. 39.6087452, Long. 22.5329685 (2025/170), Lat. 39.592199, Lat. 22.7054 (2025/171), Lat. 39.51886715, Long. 22.68980287 (2025/185), Lat. 39.62186561, Long. 22.62454656 (2025/186), Lat. 39.59839938, Long. 22.70331904 (2025/191), Lat. 39.56463, Long. 22.550243 (2025/192), Lat. 39.572848, Long. 22.738176 (2025/201), Lat. 39.89698879, Long. 22.63020736 (2025/202), Lat. 39.679681, Long. 22.628016 (2025/203), Lat, 39.575026, Long. 22.742632 (2025/213), Lat. 39.53379, Long. 22.67786(2025/214); Lat. 39.69157, Long. 22.579129(2025/215), Long. 39.55262, Lat. 22.6197(2025/216), Lat. 39.59805, Long. 22.70762 (2015/217), Long. 39.52721, Lat. 22.70306 (2015/218), Lat. 39.59198, Long. 22.70984( 2015/229), Lat. 39.89118, Long. 22.66363 (2025/230), Lat. 39.61441886, Long. 22.51768336 (2025/231), Lat. 39.55983, Long. 22.75526, (2025/232), Lat. 39.62413, Long. 22.62314(2025/233), Lat. 39.62342, Long. 22.68567(2025/234), Lat. 39.61334, Long. 22.57854(2025/235), Lat. 39.59416, Long. 22.58534 (2025/236), Long. 39.61767, Lat. 22.61817 (2025/247) Lat. 39.71837 Long. 22.59385 (2025/248), Lat. 39.6465, Long. 22.328 (2025/259), Lat. 39.556716, Long. 22.651089 (2025/260), Lat. 39.624138, Long. 22.62676 (2025/261), Lat. 39.676118, Long. 22.498195 (2025/262), Lat. 39.534093 Long. 22.505619 (2025/265), Lat. 39.6879039, Long. 22.468641 (2025/266), Lat. 39.3007 Long. 22.5378 (2025/267), Lat. 39.626759 Long. 22.679439 (2025/268), Lat. 39.595981 Long. 22.707803 (2025/269), Lat. 39.595981 Long. 22.707803 (2025/270), Lat. 39.573212 Long. 22.739291 (2025/271), Lat. 39.7167234 Long. 22.4884135 (2025/275), Lat. 39.887 Long. 22.6666 (2025/276), Lat. 39.560071, Long. 22.647354 (2025/284), Lat. 39.593018, Long. 22.586056 (2025/285), Lat. 39.562067 Long. 22.584275 (2025/286), Lat. 39.588418 Long. 22.716484 (2025/290), Lat. 39.575097 Long. 22.833635 (2025/291), Lat. 39.5488537 Long. 22.6594409 (2025/292), Lat. 39.588346 Long. 22.719174 (2025/293), Lat. 39.912948 Long. 22.64367 (2025/294), Lat. 39.5609101 Long. 22.731537 (2025/295), Lat. 39.283168 Long. 22.554176 (2025/302), Lat. 39.924532 Long. 22.606098 (2025/303), Lat. 39.691185 Long. 22.589602 (2025/308), Lat. 39.4843587 Long. 22.6030612 (2025/316), Lat. 39.629827 Long. 22.684235 (2025/328), Lat. 39.672253 Long. 22.560922 (2025/329), Lat. 39.705579 Long. 22.415402 (2025/330), Lat. 39.72092 Long. 22.5951278 (2025/331), Lat. 39.912034 Long. 22.612334 (2025/332), Lat. 39.698745 Long. 22.420811 (2025/333), Lat. 39.65035 Long. 22.2234102 (2025/334), Lat. 39.550231 Long. 22.639774 (2025/335), Lat. 39.917506 Long. 22.69245 (2025/336), Lat. 39.898187 Long. 22.641883 (2025/337), Lat. 39.599661 Long. 22.708941 (2025/338), Lat. 39.4797352 Long. 22.750258 (2025/339), Lat. 39.562067 Long. 22.6956564 (2025/340), Lat. 39.6342711 Long. 22.5600637 (2025/341), Lat. 39.652391 Long. 22.330526 (2025/342), Lat. 39.6373828 Long. 22.5524513 (2025/346), Lat. 39.561417 Long. 22.643048 (2025/347), Lat. 39.660889 Long. 22.315177 (2025/348), Lat. 39.691723 Long. 22.429688 (2025/357), Lat. 39.6298061 Long. 22.5303609 (2025/360), Lat. 39.6589464 Long. 22.7827164 (2025/361), Lat. 39.652391 Long. 22.330526 (2025/342), Lat. 39.558758 Long. 22.638562 (2025/362), Lat. 39.6365071 Long. 22.5509049 (2025/363), Lat. 39.617565 Long. 22.579664 (2025/364), Lat. 39.7050478 Long. 22.54867156 (2025/365), Lat. 39.6469329 Long. 22.5443594 (2025/366), Lat. 39.5852205 Long. 22.5643767 (2025/367), Lat. 39.9074 Long. 22.6698 (2025/379), Lat. 39.88973215 Long. 22.66612361 (2025/380), Lat. 39.68492 Long. 22.330526 (2025/381),Lat. 39.5740239, Long. 22.549824 (2025/388). 23.9.2025-2.10.2025
Regional unit of FlorinaGR-CAPRIPOX-2025-00277 Protection zone:Those parts of the regional units of Florina contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Long. 40.844167, Long. 21.401694 (2025/277). 31.8.2025
Surveillance zone:Those parts of the regional units of Florina and Kastoria contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Long.40.844167, Long. 21.401694 (2025/277), excluding the areas contained in any protection zone. 10.9.2025
Surveillance zone:Those parts of the regional units of Florina contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Long. 40.844167, Long. 21.401694 (2025/277). 1.10.2025-10.10.2025
Regional unit of RhodopiGR-CAPRIPOX-2025-00 287GR-CAPRIPOX-2025-00288GR-CAPRIPOX-2025-00311GR-CAPRIPOX-2025-00317GR-CAPRIPOX-2025-00323GR-CAPRIPOX-2025-00324GR-CAPRIPOX-2025-00384GR-CAPRIPOX-2025-00385 Protection zone:Those parts of the regional unit of Rhodopi contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 41.129527, Long. 25.35025 (2025/287), Lat. 41.095416, Long. 25.193305 (2025/288), Lat. 41.01114, Long. 25.35151 (2025/311), Lat. 41.105193, Long. 25.210017 (2025/317), Lat. 41.0987222, Long. 25.7034722 (2025/323), Lat. 41.0786111, Long. 25.2804444 (2025/324), Lat. 41.0727265, Long. 25.391142 (2025/384), Lat. 41.1238337, Long. 25.4966383 (2025/385). 20.9.2025
Surveillance zone:Those parts of the regional unit of Rhodopi, Xanthi and Evros, contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 41.129527, Long. 25.35025 (2025/287), Lat. 41.095416, Long. 25.193305 (2025/288), Lat. 41.01114, Long. 25.35151 (2025/311), Lat. 41.105193, Long. 25.210017 (2025/317), Lat. 41.0987222, Long. 25.7034722 (2025/323), Lat. 41.0786111, Long. 25.2804444 (2025/324), Lat. 41.0727265, Long. 25.391142 (2025/384), Lat. 41.1238337, Long. 25.4966383 (2025/385) excluding the areas contained in any protection zone. 30.9.2025
Surveillance zone:Those parts of the regional units of Rhodopi contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 41.129527, Long. 25.35025 (2025/287), Lat. 41.095416, Long. 25.193305 (2025/288), Lat. 41.01114, Long. 25.35151 (2025/311), Lat. 41.105193, Long. 25.210017 (2025/317), Lat. 41.0987222, Long. 25.7034722 (2025/323), Lat. 41.0786111, Long. 25.2804444 (2025/324), Lat. 41.0727265, Long. 25.391142 (2025/384), Lat. 41.1238337, Long. 25.4966383 (2025/385). 21.9.2025-30.9.2025
Regional unit of SerresGR-CAPRIPOX-2025-00307GR-CAPRIPOX-2025-00321 Protection zone:Those parts of the regional units of Serres contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 40.797854, Long. 23.831196 (2025/307), Lat. 41.044124, Long. 23.573853 (2025/321). 13.9.2025
Surveillance zone:Those parts of the regional units of Serres and Thessaloniki contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 40.797854, Long. 23.831196 (2025/307), Lat. 41.044124, Long. 23.573853 (2025/321), excluding the areas contained in any protection zone. 23.9.2025
Surveillance zone:Those parts of the regional units of Serres contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 40.797854, Long. 23.831196 (2025/307), Lat. 41.044124, Long. 23.573853 (2025/321). 14.9.2025-23.9.2025
Regional unit of TrikalaGR-CAPRIPOX-2025-00305GR-CAPRIPOX-2025-00310GR-CAPRIPOX-2025-00387 Protection zone:Those parts of the regional units of Trikala and Karditsa contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.590161, Long. 22.044607 (2025/305), Lat. 39.58, Long. 22.07516 (2025/310), Lat. 39.583725, Long. 22.0624183 (2025/387). 21.9.2025
Surveillance zone:Those parts of the regional units of Trikala, Karditsa and Larisa contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.590161, Long. 22.044607 (2025/305), Lat. 39.58, Long. 22.07516 (2025/310), Lat. 39.583725, Long. 22.0624183 (2025/387), excluding the areas contained in any protection zone. 1.10.2025
Surveillance zone:Those parts of the regional units of Trikala and Karditsa contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.590161, Long. 22.044607 (2025/305), Lat. 39.58, Long. 22.07516 (2025/310), Lat. 39.583725, Long. 22.0624183 (2025/387). 22.9.2025-1.10.2025
Regional unit of KarditsaGR-CAPRIPOX-2025-00378 Protection zone:Those parts of the regional units of Karditsa and Trikala contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.50222, Long. 22.04318 (2025/378). 20.9.2025
Surveillance zone:Those parts of the regional units of Karditsa, Larisa and Trikala contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.50222, Long. 22.04318 (2025/378), excluding the areas contained in any protection zone. 30.9.2025
Surveillance zone:Those parts of the regional units of Karditsa contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.50222, Long. 22.04318 (2025/378). 21.9.2025-30.9.2025
Regional unit of PieriaGR-CAPRIPOX-2025-00382 Protection zone:Those parts of the regional units of Pieria and Larisa contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.968737, Long. 22.64962 (2025/382) 21.9.2025
Surveillance zone:Those parts of the regional units of Pieria and Larisa contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Long. 39.590161, Long. 22.044607 (2025/305), Long. 39.58, Long. 22.07516 (2025/310), excluding the areas contained in any protection zone. 1.10.2025
Surveillance zone:Those parts of the regional units of Pieria and Larisa contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Long. 39.590161, Long. 22.044607 (2025/305), Long. 39.58, Long. 22.07516 (2025/310). 22.9.2025-1.10.2025
Further restricted zone Regional unit Areas included in the further restricted zones established in Greece as referred to in Article 2 Date until applicable
Further restricted zone No 1 Regional unit of Evros The regional unit of Evros excluding the municipality of Samothrace and the areas included in any protection or surveillance zone 30.9.2025
The regional unit of Evros excluding the municipality of Samothrace 1.10.2025-30.10.2025
Further restricted zone No 2 Regional unit of Rhodopi The regional unit of Rhodopi excluding the areas included in any protection or surveillance zone. 30.9.2025
The regional unit of Rhodopi 1.10.2025-30.10.2025
Further restricted zone No 3 Regional unit of Kavala The regional unit of Kavala including the municipality of Thasos, excluding the areas included in any protection or surveillance zone 1.10.2025
The regional unit of Kavala including the municipality of Thasos 2.10.2025- 31.10.2025
Regional unit of Drama The municipality of Doxato 31.10.2025
Regional unit of Xanthi The regional unit of Xanthi excluding the areas included in any protection or surveillance zone 1.10.2025
The regional unit of Xanthi 2.10.2025- 31.10.2025
Further restricted zone No 4 Regional unit of Chalkidiki The regional unit of Chalkidiki and the monastic community of Mount Athos, excluding the areas included in any protection or surveillance zone. 18.8.2025
The regional unit of Chalkidiki and the monastic commnunity of Mount Athos. 19.8.2025-17.9.2025
Further restricted zone No 8 Regional unit of Magnesia The regional unit of Magnesia, excluding the Sporades islands and the areas the areas included in any protection or surveillance zone. 30.9.2025
The regional unit of Magnesia, excluding the Sporades islands. 1.10.2025-30.10.2025
Regional unit of Phthiotis The municipality of Stylida excluding the areas included in any protection or surveillance zone. 30.9.2025
The municipality of Stylida 1.10.2025-30.10.2025
Further restricted zone No 9 Regional unit of Phocis The municipality of Dorida excluding the areas included in any protection or surveillance zone 25.9.2025
The municipality of Dorida 26.9.2025- 25.10.2025
Regional unit of Aetolia-Acarnania The municipalities of Nafpaktia and Messolonghi, excluding the areas included in any protection or surveillance zone 25.9.2025
The municipalities of Nafpaktia and Messolonghi 26.9.2025- 25.10.2025
Further restricted zone No 9A Regional unit of Aetolia-Acarnania The municipalities of Agrinio Thermo and Xiromero, excluding the areas included in any protection or surveillance zone 25.9.2025
The municipalities of Agrinio Thermo and Xiromero 26.9.2025- 25.10.2025
Further restricted zone no 16 Municipality of Samothrace in the regional unit of Evros Municipality of Samothrace, excluding the areas included in any protection or surveillance zone. 30.9.2025
The municipality of Samothrace 1.10.2025-30.10.2025
Further restricted zone no 5 Regional unit of Larisa The regional unit of Larisa excluding the areas included in any protection or surveillance zone. 2.10.2025
The regional unit of Larisa 3.10.2025-1.11.2025
Regional unit of Pieria The municipality of Dion-Olympos excluding the areas included in any protection or surveillance zone. 1.10.2025
The municipality of Dion-Olympos 2.10.2025- 31.10.2025
Further restricted zone no 5A Regional unit of Trikala The regional unit of Trikala excluding the areas included in any protection or surveillance zone. 1.10.2025
The regional unit of Trikala 2.10.2025-31.10.2025
Further restricted zone no 6 Regional unit of Florina The regional unit of Florina excluding the areas included in any protection or surveillance zone. 10.9.2025
The regional unit of Florina. 11.9.2025-10.10.2025
Further restricted zone no 7 Regional unit of Serres The regional unit of Serres excluding the areas included in any protection or surveillance zone. 23.9.2025
The regional unit of Serres. 24.9.2025-24.10.2025
Further restricted zone no10 Regional unit of Karditsa The regional unit of Karditsa excluding the areas included in any protection or surveillance zone. 30.9.2025
The regional unit of Karditsa. 1.10.2025-30.10.2025
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) 2016/429 of the European Parliament and of the Council of 9 March 2016 on transmissible animal diseases and amending and repealing certain acts in the area of animal health (‘Animal Health Law’) (1), and in particular Article 259(1) thereof,
Whereas:
(1) Sheep pox and goat pox is an infectious viral disease affecting caprine and ovine animals and it can have a severe impact on the concerned animal populations and the profitability of farming causing disturbance to movements of consignments of those animals and products thereof within the Union and exports to third countries.
(2) In the event of an outbreak of sheep pox and goat pox in caprine or ovine animals, there is a serious risk of the spread of that disease to other establishments of caprine or ovine animals.
(3) Commission Delegated Regulation (EU) 2020/687 (2) supplements the rules for the control of the listed diseases referred to in Article 9(1), points (a), (b) and (c), of Regulation (EU) 2016/429, and defined as category A, B and C diseases in Commission Implementing Regulation (EU) 2018/1882 (3). In particular, Articles 21 and 22 of Delegated Regulation (EU) 2020/687 provide for the establishment of a restricted zone in the event of an outbreak of a category A disease, including sheep pox and goat pox, and for certain measures to be applied therein. Article 21(1) of that Delegated Regulation provides that the restricted zone is to comprise a protection zone, a surveillance zone, and, if necessary, further restricted zones around or adjacent to the protection and surveillance zones.
(4) In order to address outbreaks of sheep pox and goat pox in Greece, notified in August 2024, the Commission adopted Commission Implementing Decision (EU) 2024/2207 (4), which lays down certain emergency measures relating to that disease in Greece. In particular, it provides that the protection, surveillance, and further restricted zones to be established by that Member State, in accordance with Delegated Regulation (EU) 2020/687, are to comprise at least the areas listed in the Annex to that Implementing Decision.
(5) Since the last amendment of Implementing Decision (EU) 2024/2207, Greece has notified the Commission of two hundred and thirty eight new confirmed outbreaks of sheep pox and goat pox, which were reported between 12 June and 4 August 2025, in establishments where ovine and caprine animals were kept, in the regional units of Chalkidiki, Aetolia-Acarnania, Phocis, Evros, Florina, Karditsa, Xanthi, Magnesia, Pieria, Rhodopi, Serres, Trikala and Larisa,. The majority of these outbreaks were confirmed in areas where restrictions in relation to sheep pox and goat pox were already in place indicating localised spread of the disease within the affected areas, with the exception of the outbreaks reported in the newly affected regional units of Florina, Karditsa, Pieria, Rhodopi, Serres and Trikala.
(6) In light of the current epidemiological situation, there is a high risk of the continuous persistence and further spread of the disease as outbreaks continue to be confirmed in regional units such as Chalkidiki, Aetolia-Acarnania, Phocis, Xanthi, Larisa and Magnesia, while new outbreaks have also been confirmed in previously unaffected regional units such as Florina, Karditsa, Pieria, Rhodopi, Serres and Trikala. This fact suggests that the disease continues to circulate and spread despite the measures already put in place in accordance with Delegated Regulation (EU) 2020/687.
(7) Article 3 of Implementing Decision (EU) 2024/2207 provides for additional emergency measures to be applied in the restricted zones, set out in the Annex to that Implementing Decision. In view of the very long duration of the ongoing epidemic, and the prolonged animal movement prohibitions in the restricted zones, it is necessary to provide for alternative conditions as regards movements of goats and sheep within a restricted zone , in addition to those already in place, to allow movements of those animals for slaughter, in an economically viable manner for operators, that at the same time pose a minimum risk for the spread of the disease. Accordingly, Article 3, point (b)(ii), of that Implementing Decision (EU) 2024/2207 should be amended accordingly.
(8) Furthermore, Article 3, point (e), of Implementing Decision (EU) 2024/2207 prohibits movements of sheep and goats from the territory of Greece to a destination located outside Greece until 31 October 2025. However, in view of the occurrence of the two hundred and thirty eight new outbreaks of sheep pox and goat pox in Greece, since the last amendment of Implementing Decision (EU) 2024/2207, it is also necessary to prolong that prohibition, in order to avoid the spread of the disease to the rest of the Union or to third countries, as well as any unjustified barriers to trade being imposed by third countries. Therefore, Article 3, point (e), of that Implementing Decision should be amended accordingly.
(9) In addition, taking into account the new outbreaks in Greece, the areas listed as protection, surveillance, and further restricted zones for Greece in the Annex to Implementing Decision (EU) 2024/2207, as well as the duration of the measures applicable therein, should be adjusted in order to prevent the further spread of the disease in Greece or to the rest of the Union as well as unjustified barriers to trade being imposed by third countries. Accordingly, it is necessary to amend the list of restricted zones, and the duration of the measures to be applied therein, set out in the Annex to that Implementing Decision.
(10) The size of the protection, surveillance, and further restricted zones, and the duration of the measures to be applied therein, are based on the criteria laid down in Article 64(1) of Regulation (EU) 2016/429, as well as the rules laid down in Delegated Regulation (EU) 2020/687. The criteria applied for the choice of the size of the protection, surveillance, and further restricted zones, as well as of the duration of the measures to be applied therein, include a consideration of not only the epidemiological situation as regards sheep pox and goat pox in the areas affected by that disease, but also of the overall epidemiological situation of sheep pox and goat pox in the entire territory of the Member State concerned by that disease, as well as the level of risk for the further spread of the disease. The chosen duration of the measures has also taken into account the international standards of the Terrestrial Animal Health Code of the World Organisation for Animal Health (5).
(11) The measures provided for in this Decision are in accordance with the opinion of the Standing Committee on Plants, Animals, Food and Feed,
HAS ADOPTED THIS DECISION:

Amendments to Implementing Decision (EU) 2024/2207

Implementing Decision (EU) 2024/2207 is amended as follows:

(1) in Article 3, point (b)(ii) is replaced by the following:
‘(ii) a number of randomly selected animals, either:
—
within the same lot to be moved, and sufficient to detect 10 % disease prevalence with 95 % level of confidence, have been sampled and subjected to a PCR test of saliva samples, collected within 48 hours before the time of movement, with negative results,
or
—
at the establishment of origin, and sufficient to detect 10 % disease prevalence with 95 % level of confidence, have been sampled and subjected to a PCR test of saliva samples, collected no earlier than 21 days prior to the date of movement and no later than 48 hours before the time of movement, with negative results;’;
(2) in Article 3, point (e), the date ‘31 October 2025’ is replaced by ‘31 December 2025’;
(3) the Annex is replaced by the text set out in the Annex to this Decision.

Addressee

This Decision is addressed to the Hellenic Republic.

A.   Protection and surveillance zones established around the confirmed outbreaks

Regional unit and ADIS reference number of the outbreaks
Areas established as protection and surveillance zones, part of the restricted zone in Greece referred to in Article 2
Date until applicable
Regional unit of Phocis
GR-CAPRIPOX-2025-00058
GR-CAPRIPOX-2025-00059
GR-CAPRIPOX-2025-00060
GR-CAPRIPOX-2025-00061
GR-CAPRIPOX-2025-00069
GR-CAPRIPOX-2025-00070
GR-CAPRIPOX-2025-00071
GR-CAPRIPOX-2025-00072
GR-CAPRIPOX-2025-00073
GR-CAPRIPOX-2025-00074
GR-CAPRIPOX-2025-00075
GR-CAPRIPOX-2025-00077
GR-CAPRIPOX-2025-00082
GR-CAPRIPOX-2025-00083
GR-CAPRIPOX-2025-00084
GR-CAPRIPOX-2025-00085
GR-CAPRIPOX-2025-00086
GR-CAPRIPOX-2025-00103
GR-CAPRIPOX-2025-00104
GR-CAPRIPOX-2025-00105
GR-CAPRIPOX-2025-00106
GR-CAPRIPOX-2025-00107
GR-CAPRIPOX-2025-00108
GR-CAPRIPOX-2025-00109
GR-CAPRIPOX-2025-00128
GR-CAPRIPOX-2025-00129
GR-CAPRIPOX-2025-00130
GR-CAPRIPOX-2025-00133
GR-CAPRIPOX-2025-00135
GR-CAPRIPOX-2025-00136
GR-CAPRIPOX-2025-00154
GR-CAPRIPOX-2025-00155
GR-CAPRIPOX-2025-00156
GR-CAPRIPOX-2025-00157
GR-CAPRIPOX-2025-00159
GR-CAPRIPOX-2025-00164
GR-CAPRIPOX-2025-00167
GR-CAPRIPOX-2025-00168
GR-CAPRIPOX-2025-00187
GR-CAPRIPOX-2025-00188
GR-CAPRIPOX-2025-00189
GR-CAPRIPOX-2025-00196
GR-CAPRIPOX-2025-00197
GR-CAPRIPOX-2025-00205
GR-CAPRIPOX-2025-00206
GR-CAPRIPOX-2025-00207
GR-CAPRIPOX-2025-00208
GR-CAPRIPOX-2025-00239
GR-CAPRIPOX-2025-00240
GR-CAPRIPOX-2025-00252
GR-CAPRIPOX-2025-00253
GR-CAPRIPOX-2025-00282
GR-CAPRIPOX-2025-00272
GR-CAPRIPOX-2025-00273
GR-CAPRIPOX-2025-00274
GR-CAPRIPOX-2025-00312
GR-CAPRIPOX-2025-00313
GR-CAPRIPOX-2025-00349
Protection zone:
Those parts of the regional units of Phocis and Aetolia-Acarnania contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 38.39722222, Long. 21.88472222 (2025/00058), Lat. 38.37944444, Long. 21.88916667 (2025/59), Lat. 38.39194444, Long. 21.88555556 (2025/60), Lat. 38.37861111, Long. 21.87972222 (2025/61), Lat. 38.38805556, Long. 21.86638889 (2025/69), Lat. 38.39 Long. 21.88361111 (2025/70), Lat. 38.38333333, Long. 21.87333333 (2025/71), Lat. 38.39305556, Long. 21.88305556 (2025/72), Lat. 38.39323882, Long. 21.86530682 (2025/73), Lat. 38.391111, Long. 21.872222 (2025/74), Lat. 38.381944, Long. 21.888611 (2025/75), Lat. 38.39583333, Long. 21.90666667 (2025/77), Lat. 38.37388889, Long. 21.8825 (2025/83), Lat. 38.3918889, Long. 21.8969(2025/84), Lat. 38.39444444, Long. 21.89472222 (2025/85), Lat. 38.38444444, Long. 21.88055556 (2025/86), Lat. 38.41972222, Long. 21.91277778 (2025/103), Lat. 38.39583333, Long. 21.90666667 (2025/104), Lat. 38.38611111, Long. 21.90305556 (2025/105), Lat. 38.415, Long. 21.90333333 (2025/106), Lat. 38.41527778, Long. 21.91305556 (2025/107), Lat. 38.39305556, Long. 21.895 (2025/108), Lat. 38.385, Long. 21.87583333 (2025/109), Lat. 38.39555556, Long. 21.87111111 (2025/128), Lat. 38.38166667, Long. 21.90277778 (2025/129), Lat. 38.38972222, Long. 21.87944444 (2025/130), Lat. 38.395, Long. 21.87527778 (2025/133), Lat. 38.39222222, Long. 21.87361111 (2025/135), Lat. 38.40888889, Long. 21.89777778 (2025/136), Lat. 38.38694444. Long. 21.88611111 (2025/154), Lat. 38.38333333 Long. 21.88805556 (2025/155), Long. 38.38694444, Lat. 21.88666667 (2025/156), Lat. 38.39583333, Long. 21.87055556 (2025/157), Lat. 38.40833333, Long. 21.89694444 (2025/159), Lat. 38.42527778, Lat. 21.90722222 (2025/164), Lat. 38.42722222, Long. 21.9(2025/167), Lat. 38.4038889, Long. 21.89638889 (2025/168), Lat. 38.38861111, Long. 21.89083333 (2025/187), Lat. 38.41972222, Long. 21.92055556 (2025/188), Lat. 38.38555556, Long. 21.87166007 (2025/189), Lat. 38.40722222, Long. 21.90138889 (2025/196), Lat. 38.43527778, Long. 21.89333333 (2025/197), Lat. 38.38111111, Long. 21.85694444 (2025/205), Lat. 38.41194444, Long. 21.8875 (2025/206), Lat. 38.41277778, Long. 21.88861111 (2025/207), Lat. 38.39444444, Long. 21.86638889 (2025/208), Lat. 38.40083, Long. 21.87972 (2025/239), Long. 38.39444, Lat. 21.88778 (2025/240), Long. 38.40667, Lat. 21.89861 (2025/252), Lat. 38.41361, Long 21.89861 (2025/253), Long. 38.379819 Lat. 21.853486 (2025/253), Long. 38.398611, Lat. 21.898333 (2025/272), Long. 38.400556, Lat. 21.878333 (2025/273), Long. 38.400833, Lat. 21.879722 (2025/274), Long. 38.400833 Lat. 38.4175 (2025/312), Long. 38.42528, Lat. 21.91333 (2025/313), Long. 38.40027778, Lat. 21.8775 (2025/349).
15.9.2025
Surveillance zone:
Those parts of the regional units of Phocis and Aetolia-Acarnania contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 38.39722222, Long. 21.88472222 (2025/00058), Lat. 38.37944444, Long. 21.88916667 (2025/59), Lat. 38.39194444, Long. 21.88555556 (2025/60), Lat. 38.37861111, Long. 2 1.87972222 (2025/61), Lat. 38.38805556, Long. 21.86638889 (2025/69), Lat. 38.39, Long. 21.88361111(2025/70), Lat. 38.38333333, Long. 21.87333333 (2025/71), Lat. 38.39305556, Long. 21.88305556 (2025/72), Lat. 38.39323882, Long. 21.86530682 (2025/73), Lat. 38.391111, Long. 21.872222 (2025/74), Lat. 38.381944, Long. 21.888611 (2025/75), Lat. 38.39583333, Long. 21.90666667 (2025/77), Lat. 38.41388, Long. 21.87694 (2025/82), Lat. 38.37388889, Long. 21.8825 (2025/83), Lat. 38.3918889, Long. 21.8969 (2025/84), Lat. 38.39444444, Long. 21.89472222 (2025/85), Lat. 38.38444444, Long. 21.88055556 (2025/86), Lat. 38.41972222, Long. 21.91277778 (2025/103), Lat. 38.39583333, Long. 21.90666667 (2025/104), Lat. 38.38611111, Long. 21.90305556 (2025/105), Lat. 38.415, Long. 21.90333333 (2025/106), Lat. 38.41527778, Long. 21.91305556 (2025/107), Lat. 38.39305556, Long. 21.895 (2025/108), Lat. 38.385, Long. 21.87583333 (2025/109), Lat. 38.39555556, Long. 21.87111111 (2025/128), Lat. 38.38166667, Long. 21.90277778 (2025/129), Lat. 38.38972222, Long. 21.87944444 (2025/130), Lat. 38.395, Long. 21.87527778 (2025/133), Lat. 38.39222222, Long. 21.87361111 (2025/135), Lat. 38.40888889, Long. 21.89777778 (2025/136) Lat. 38.38694444. Long. 21.88611111 (2025/154), Lat. 38.38333333 Long. 21.88805556 (2025/155), Long. 38.38694444, Lat. 21.88666667 (2025/156), Lat. 38.39583333, Long. 21.87055556 (2025/157), Lat. 38.40833333, Long. 21.89694444 (2025/159), Lat. 38.42527778, Lat. 21.90722222 (2025/164), Lat. 38.42722222, Long. 21.9(2025/167), Lat. 38.4038889, Long. 21.89638889 (2025/168), Lat. 38.38861111, Long. 21.89083333 (2025/187), Lat. 38.41972222, Long. 21.92055556 (2025/188), Lat. 38.38555556, Long. 21.87166007 (2025/189), Lat. 38.40722222, Long. 21.90138889 (2025/196), Lat. 38.43527778, Long. 21.89333333 (2025/197), Lat. 38.38111111, Long. 21.85694444 (2025/205), Lat. 38.41194444, Long. 21.8875 (2025/206), Lat. 38.41277778, Long. 21.88861111 (2025/207), Lat. 38.39444444, Long. 21.86638889 (2025/208), Lat 38.40083, Long. 21.87972 (2025/239), Long. 38.39444, Lat. 21.88778 (2025/240), Long. 38.379819, Lat. 21.853486 (2025/253), Long. 38.398611, Lat. 21.898333 (2025/272), Long. 38.400556, Lat. 21.878333 (2025/273), Long. 38.400833, Lat. 21.879722 (2025/274), Long. 38.400833 Lat. 38.4175 (2025/312), Long. 38.42528, Lat. 21.91333 (2025/313), Long. 38.40027778, Lat. 21.8775 (2025/349) excluding the areas contained in any protection zone
25.9.2025
Surveillance zone:
Those parts of the regional units of Phocis and Aetolia-Acarnania contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 38.39722222, Long. 21.88472222 (2025/00058), Lat. 38.37944444, Long. 21.88916667 (2025/59), Lat. 38.39194444, Long. 21.88555556 (2025/60), Lat. 38.37861111, Long. 21.87972222 (2025/61), Lat. 38.38805556, Long. 21.86638889 (2025/69), Lat. 38.39, Long. 21.88361111 (2025/70), Lat. 38.38333333, Long. 21.87333333 (2025/71), Lat. 38.39305556, Long. 21.88305556 (2025/72), Lat. 38.39323882, Long. 21.86530682 (2025/73), Lat. 38.391111, Long. 21.872222 (2025/74), Lat. 38.381944, Long. 21.888611 (2025/75), Lat. 38.39583333, Long. 21.90666667 (2025/77), Lat. 38.41388, Long. 21.87694 (2025/82), Lat. 38.37388889, Long. 21.8825 (2025/83), Lat. 38.3918889, Long. 21.8969 (2025/84), Lat. 38.39444444, Long. 21.89472222 (2025/85), Lat. 38.38444444, Long. 21.88055556 (2025/86), Lat. 38.41972222, Long. 21.91277778 (2025/103), Lat. 38.39583333, Long. 21.90666667 (2025/104), Lat. 38.38611111, Long. 21.90305556 (2025/105), Lat. 38.415, Long. 21.90333333 (2025/106), Lat. 38.41527778, Long. 21.91305556 (2025/107), Lat. 38.39305556, Long. 21.895 (2025/108), Lat. 38.385, Long. 21.87583333 (2025/109), Lat. 38.39555556, Long. 21.87111111 (2025/128), Lat. 38.38166667, Long. 21.90277778 (2025/129), Lat. 38.38972222, Long. 21.87944444 (2025/130), Lat. 38.395, Long. 21.87527778 (2025/133), Lat. 38.39222222, Long. 21.87361111 (2025/135), Lat. 38.40888889, Long. 21.89777778 (2025/136), Lat. 38.38694444. Long. 21.88611111 (2025/154), Lat. 38.38333333 Long. 21.88805556 (2025/155), Long. 38.38694444, Lat. 21.88666667 (2025/156), Lat. 38.39583333, Long. 21.87055556 (2025/157), Lat. 38.40833333, Long. 21.89694444 (2025/159), Lat. 38.42527778, Lat. 21.90722222 (2025/164), Lat. 38.42722222, Long. 21.9(2025/167), Lat. 38.4038889, Long. 21.89638889 (2025/168), Lat. 38.38861111, Long. 21.89083333 (2025/187), Lat. 38.41972222, Long. 21.92055556 (2025/188), Lat. 38.38555556, Long. 21.87166007 (2025/189), Lat. 38.40722222, Long. 21.90138889 (2025/196), Lat. 38.43527778, Long. 21.89333333 (2025/197), Lat. 38.38111111, Long. 21.85694444 (2025/205), Lat. 38.41194444, Long. 21.8875 (2025/206), Lat. 38.41277778, Long. 21.88861111 (2025/207), Lat. 38.39444444, Long. 21.86638889 (2025/208), Lat. 38.40083, Long. 21.87972 (2025/239), Long. 38.39444, Lat. 21.88778 (2025/240), Long. 38.379819, Lat. 21.853486 (2025/253), Long. 38.398611, Lat. 21.898333 (2025/272), Long. 38.400556, Lat. 21.878333 (2025/273), Long. 38.400833, Lat. 21.879722 (2025/274), Long. 38.400833 Lat. 38.4175 (2025/312), Long. 38.42528, Lat. 21.91333 (2025/313), Long. 38.40027778, Lat. 21.8775 (2025/349).
16.9.2025- 25.9.2025
Regional unit of Evros, excluding the municipality of Samothrace
GR-CAPRIPOX-2025-00289
GR-CAPRIPOX-2025-00343
GR-CAPRIPOX-2025-00344
GR-CAPRIPOX-2025-00368
GR-CAPRIPOX-2025-00369
Protection zone:
Those parts of the regional unit of Evros contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 41.62365, Long. 26.418672 (2025/289), Lat. 41.718406, Long. 26.200319 (2025/343), Lat. 41.66125833, Long. 26.41248333 (2025/344), Lat. 41.643906, Long. 26.409917 (2025/368), Lat. 41.643689, Long. 26.409508 (2025/369).
20.9.2025
Surveillance zone:
Those parts of the regional unit of Evros contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 41.62365, Long. 26.418672 (2025/289), Lat. 41.718406, Long. 26.200319 (2025/343), Lat. 41.66125833, Long. 26.41248333 (2025/344), Lat. 41.643906, Long. 26.409917 (2025/368), Lat. 41.643689, Long. 26.409508 (2025/369), excluding the areas contained in any protection zone.
30.9.2025
Surveillance zone:
Those parts of the regional unit of Evros contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 41.62365, Long. 26.418672 (2025/289), Lat. 41.718406, Long. 26.200319 (2025/343), Lat. 41.66125833, Long. 26.41248333 (2025/344), Lat. 41.643906, Long. 26.409917 (2025/368), Lat. 41.643689, Long. 26.409508 (2025/369).
21.9.2025-30.9.2025
Regional unit of Evros,
Municipality of Samothrace
GR-CAPRIPOX-2025-00306
GR-CAPRIPOX-2025-00322
GR-CAPRIPOX-2025-00383
Protection zone:
Those parts of the Municipality of Samothrace contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 40.438273, Long. 25.516617 25.509911 (2025/306), Lat. 40.472744, Long. 25.480941 (2025/322), Lat. 40.463938, Long. 25.662964 (2025/383).
20.9.2025
Surveillance zone:
Those parts of the Municipality of Samothrace contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 40.438273, Long. 25.516617 (2025/306), Lat. 40.472744, Long. 25.480941 (2025/322), Lat. 40.463938, Long. 25.662964 (2025/383) excluding the areas contained in any protection zone.
30.9.2025
Surveillance zone:
Those parts of the Municipality of Samothrace contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Long. 25.516617 (2025/306), Lat. 40.472744, Long. 25.480941 (2025/322), Lat. 40.463938, Long. 25.662964 (2025/383).
21.9.2025-30.9.2025
Regional unit of Aetolia-Acarnania
GR-CAPRIPOX-2025-00045
GR-CAPRIPOX-2025-00053
GR-CAPRIPOX-2025-00055
GR-CAPRIPOX-2025-00056
GR-CAPRIPOX-2025-00067
GR-CAPRIPOX-2025-00078
GR-CAPRIPOX-2025-00079
GR-CAPRIPOX-2025-00080
GR-CAPRIPOX-2025-00087
GR-CAPRIPOX-2025-00088
GR-CAPRIPOX-2025-00093
GR-CAPRIPOX-2025-00097
GR-CAPRIPOX-2025-00098
GR-CAPRIPOX-2025-00099
GR-CAPRIPOX-2025-00117
GR-CAPRIPOX-2025-00146
GR-CAPRIPOX-2025-00158
GR-CAPRIPOX-2025-00190
GR-CAPRIPOX-2025-00241
GR-CAPRIPOX-2025-00282
GR-CAPRIPOX-2025-00304
GR-CAPRIPOX-2025-00386
Protection zone:
Those parts of the regional unit of Aetolia-Acarnania and Phocis contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 38.39148, Long. 21.854 (2025/45), Lat. 38.395, Long. 21.852 (2025/53), Lat. 38.409, Long. 21.855 (2025/55), Lat. 38.425, Long. 21.849 (2025/56), Lat. 38.40511111, Long. 21.84713611 (2025/67), Lat. 38.40842222, Long. 21.86290556 (2025/78), Lat. 38.41496111, Long. 21.86307778 (2025/79), Lat. 38.43037778, Long. 21.85106111 (2025/80), Lat. 38.35896389, Long. 21.721575 (2025/87), Lat. 38.41903056, Long. 21.850975 (2025/88), Lat. 38.41855556, Long. 21.86651111 (2025/93), Lat. 38.41310833, Long. 21.87608333 (2025/97), Lat. 38.39337222, Long. 21.85480278 (2025/98), Lat. 38.39963333, Long. 21.86517778 (2025/99), Lat. 38.40029, Long. 21.85655 (2025/117), Lat. 38.41303611, Long. 21.87314722 (2025/146), Lat. 38.41083333 Long. 21.87388889, (2025/158), Lat. 38.42106667 Long.21.86550833 (2025/190), Lat. 38.3975, Long. 21.8704 (2025/241), Lat. 38.379819, Long. 21.853486 (2025/282), Lat. 38.387911, Long. 21.850506 (2025/304), Lat. 38.381458, Long. 21.852069 (2025/386).
22.8.2025
Surveillance zone:
Those parts of the regional units of Aetolia-Acarnania and Phocis contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 38.391486, Long. 21.854056 (2025/00045), Lat. 38.39565278, Long. 21.85270278 (2025/53), Lat. 38.40945556, Long. 21.85508889 (2025/55), Lat. 38.42558056, Long. 21.84985 (2025/56) Lat. 38.40511111, Long. 21.84713611 (2025/67), Lat. 38.40842222, Long. 21.86290556 (2025/78), Lat. 38.41496111, Long. 21.86307778 (2025/79), Lat. 38.43037778, Long. 21.85106111 (2025/80), Lat. 38.35896389, Long. 21.721575 (2025/87), Lat. 38.41903056, Long. 21.850975 (2025/88), Lat. 38.41855556, Long. 21.86651111 (2025/93), Lat. 38.41310833, Long. 21.87608333 (2025/97), Lat. 38.39337222, Long. 21.85480278 (2025/98), Lat. 38.39963333, Long. 21.86517778 (2025/99), Lat. 38.40029, Long. 21.85655 (2025/117), Lat. 38.41303611, Long. 21.87314722 (2025/146), Lat. 38.41083333 Long. 21.87388889, (2025/158), Lat. 38.42106667 Long.21.86550833(2025/190), Lat. 38.3975, Long. 21.8704(2025/241), Lat. 38.379819, Long. 21.853486 (2025/282), Lat. 38.387911, Long. 21.850506 (2025/304), Lat. 38.381458, Long. 21.852069 (2025/386) excluding the areas contained in any protection zone
1.9.2025
Surveillance zone:
Those parts of the regional units of Aetolia-Acarnania and Phocis contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 38.391486, Long. 21.854056 (2025/00045), Lat. 38.39565278, Long. 21.85270278 (2025/53), Lat. 38.40945556, Long. 21.85508889 (2025/55), Lat. 38.42558056, Long. 21.84985 (2025/56), Lat. 38.40511111, Long. 21.84713611 (2025/67), Lat. 38.40842222, Long. 21.86290556 (2025/78), Lat. 38.41496111, Long. 21.86307778 (2025/79), Lat. 38.43037778, Long. 21.85106111 (2025/80), Lat. 38.35896389, Long. 21.721575 (2025/87), Lat. 38.41903056, Long. 21.850975 (2025/88), Lat. 38.41855556, Long. 21.86651111 (2025/93), Lat. 38.41310833, Long. 21.87608333 (2025/97), Lat. 38.39337222, Long. 21.85480278 (2025/98), Lat. 38.39963333, Long. 21.86517778 (2025/99), Lat. 38.40029, Long. 21.85655 (2025/117), Lat. 38.41303611, Long. 21.87314722 (2025/146), Lat. 38.41083333 Long. 21.87388889, (2025/158), Lat. 38.42106667, Long.21.86550833(2025/190), Lat. 38.3975, Long. 21.8704(2025/241), Lat. 38.379819, Long. 21.853486 (2025/282), Lat. 38.387911, Long. 21.850506 (2025/304), Lat. 38.381458, Long. 21.852069 (2025/386).
23.8.2025 – 1.9.2025
Regional unit of Chalkidiki
GR-CAPRIPOX-2025-00062
GR-CAPRIPOX-2025-00063
GR-CAPRIPOX-2025-00064
GR-CAPRIPOX-2025-00065
GR-CAPRIPOX-2025-00066
GR-CAPRIPOX-2025-00081
GR-CAPRIPOX-2025-00089
GR-CAPRIPOX-2025-00092
GR-CAPRIPOX-2025-00094
GR-CAPRIPOX-2025-00110
GR-CAPRIPOX-2025-00120
GR-CAPRIPOX-2025-00148
GR-CAPRIPOX-2025-00169
Protection zone:
Those parts of the regional unit of Chalkidiki contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 40.124539, Long. 23.378264 (2025/00062), Lat. 40.130724, Long. 23.344954 (2025/00063), Lat. 40.1153, Long. 23.33861 (2025/00064), Lat. 40.121511, Long. 23.347854 (2025/00065), Lat. 40.125054, Long. 23.397489 (2025/00066), Lat. 40.083481, Long. 23.33424 (2025/81), Lat. 40.03813, Long. 23.3899 (2025/89), Lat. 40.165328, Long. 23.34533 (2025/92), Lat. 40.19133, Long. 23.332393 (2025/94), Lat. 40.051, Long. 23.3629 (2025/110), Lat. 40.063233, Long. 23.441135 (2025/120), Lat. 40.377544, Long. 23.904983 (2025/148), Lat.40.053144, Long. 23.405067 (2025/169).
8.8.2025
Surveillance zone:
Those parts of the regional unit of Chalkidiki contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 40.124539, Long. 23.378264 (2025/00062), Lat. 40.130724, Long. 23.344954 (2025/00063), Lat. 40.1153, Long. 23.33861 (2025/00064), Lat. 40.121511, Long. 23.347854 (2025/00065), Lat. 40.125054, Long. 23.397489 (2025/00066), Lat. 40.083481, Long. 23.33424(2025/81), Lat. 40.03813, Long. 23.3899 (2025/89), Lat. 40.165328, Long. 23.34533 (2025/92), Lat. 40.19133, Long. 23.332393 (2025/94), Lat. 40.051, Long. 23.3629 (2025/110), Lat. 40.063233, Long. 23.441135 (2025/120), Lat. 40.377544, Long. 23.904983 (2025/148), Lat. 40.053144, Long. 23.405067 (2025/169) excluding the areas contained in any protection zone
18.8.2025
Surveillance zone:
Those parts of the regional unit of Chalkidiki contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 40.124539, Long. 23.378264 (2025/00062), Lat. 40.130724, Long. 23.344954 (2025/00063), Lat. 40.1153, Long. 23.33861 (2025/00064), Lat. 40.121511, Long. 23.347854 (2025/00065), Lat. 40.125054, Long. 23.397489 (2025/00066), Lat. 40.083481, Long. 23.33424 (2025/81), Lat. 40.03813, Long. 23.3899 (2025/89), Lat. 40.165328, Long. 23.34533 (2025/92), Lat. 40.19133, Long. 23.332393 (2025/94), Lat. 40.051, Long. 23.3629 (2025/110), Lat. 40.063233, Long. 23.441135 (2025/120), Lat. 40.377544, Long. 23.904983 (2025/148), Lat. 40.053144, Long.23.405067 (2025/169)
9.8.2025 – 18.8.2025
Regional unit of Xanthi
GR-CAPRIPOX-2025-00068
GR-CAPRIPOX-2025-00090
GR-CAPRIPOX-2025-00091
GR-CAPRIPOX-2025-00096
GR-CAPRIPOX-2025-00100
GR-CAPRIPOX-2025-00101
GR-CAPRIPOX-2025-00102
GR-CAPRIPOX-2025-00111
GR-CAPRIPOX-2025-00112
GR-CAPRIPOX-2025-00113
GR-CAPRIPOX-2025-00114
GR-CAPRIPOX-2025-00115
GR-CAPRIPOX-2025-00116
GR-CAPRIPOX-2025-00118
GR-CAPRIPOX-2025-00119
GR-CAPRIPOX-2025-00122
GR-CAPRIPOX-2025-00124
GR-CAPRIPOX-2025-00125
GR-CAPRIPOX-2025-00126
GR-CAPRIPOX-2025-00127
GR-CAPRIPOX-2025-00137
GR-CAPRIPOX-2025-00138
GR-CAPRIPOX-2025-00139
GR-CAPRIPOX-2025-00151
GR-CAPRIPOX-2025-00152
GR-CAPRIPOX-2025-00153
GR-CAPRIPOX-2025-00165
GR-CAPRIPOX-2025-00166
GR-CAPRIPOX-2025-00176
GR-CAPRIPOX-2025-00177
GR-CAPRIPOX-2025-00178
GR-CAPRIPOX-2025-00179
GR-CAPRIPOX-2025-00180
GR-CAPRIPOX-2025-00181
GR-CAPRIPOX-2025-00182
GR-CAPRIPOX-2025-00183
GR-CAPRIPOX-2025-00184
GR-CAPRIPOX-2025-00195
GR-CAPRIPOX-2025-00204
GR-CAPRIPOX-2025-00209
GR-CAPRIPOX-2025-00210
GR-CAPRIPOX-2025-00219
GR-CAPRIPOX-2025-00220
GR-CAPRIPOX-2025-00221
GR-CAPRIPOX-2025-00222
GR-CAPRIPOX-2025-00223
GR-CAPRIPOX-2025-00224
GR-CAPRIPOX-2025-00225
GR-CAPRIPOX-2025-00226
GR-CAPRIPOX-2025-00228
GR-CAPRIPOX-2025-00237
GR-CAPRIPOX-2025-00238
GR-CAPRIPOX-2025-00249
GR-CAPRIPOX-2025-00250
GR-CAPRIPOX-2025-00251
GR-CAPRIPOX-2025-00254
GR-CAPRIPOX-2025-00255
GR-CAPRIPOX-2025-00256
GR-CAPRIPOX-2025-00257
GR-CAPRIPOX-2025-00258
GR-CAPRIPOX-2025-00264
GR-CAPRIPOX-2025-00299
GR-CAPRIPOX-2025-00300
GR-CAPRIPOX-2025-00301
GR-CAPRIPOX-2025-00309
GR-CAPRIPOX-2025-00325
GR-CAPRIPOX-2025-00326
GR-CAPRIPOX-2025-00327
GR-CAPRIPOX-2025-00345
GR-CAPRIPOX-2025-00353
GR-CAPRIPOX-2025-00354
GR-CAPRIPOX-2025-00355
GR-CAPRIPOX-2025-00356
GR-CAPRIPOX-2025-00370
GR-CAPRIPOX-2025-00371
GR-CAPRIPOX-2025-00372
Protection zone:
Those parts of the regional units of Xanthi and Kavala contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 40.99623611, Long. 24.83029167 (2025/68), Lat. 40.99545556, Long. 24.83029167 (2025/90), Lat. 40.99517778, Long. 24.84001667 (2025/91), Lat. 41.08872222, Long. 24.80329444 (2025/96), Lat. 40.94198, Long. 24.859461 (2025/100), Lat. 41.02248, Long. 24.79513056 (2025/101), Lat. 41.02248, Long. 24.79513056 (2025/102), Lat. 40.98371667, Long. 24.80023889 (2025/111), Lat. 40.935475, Long. 24.815203 (2025/112), Lat. 40.978975, Long. 24.968347 (2025/113), Lat. 40.97081389, Long. 24.853175 (2025/114), Lat. 40.97081389, Long. 24.853175 (2025/115), Lat. 40.92546111, Long. 24.77911389 (2025/116), Lat. 40.97432, Long. 24.93116 (2025/118), Lat. 40.96386, Long. 24.85581 (2025/119), Lat. 40.901775, Long. 24.853047 (2025/122), Lat. 41.00742222, Long 24.89307778 (2025/124), Lat. 40.95253611, Long. 24.87093056 (2025/125), Lat. 40.94319167, Long. 24.93811389 (2025/126), Lat. 41.04519722, Long. 24.820325 (2025/127), Lat. 41.02537222, Long. 24.86315556 (2025/137), Lat. 40.98996389, Long. 24.82399444 (2025/138), Lat. 40.96556667, Long. 24.9095 (2025/139), Lat. 40.96178056, Long. 24.93472222 (2025/151), Lat. 40.99215, Long. 24.83043611 (2025/152), Lat. 40.990675, Long. 24.82167778 (2025/153), Lat. 40.93966944, Long. 24.87886389 (2025/165), Lat. 40.98928333, Long. 24.77680556 (2025/166), Lat. 40.950008, Long. 24.817541 (2025/176), Lat. 40.956202, Long. 24.784566 (2025/177), Lat. 40.9339, Long. 24.837438 (2025/178), Lat. 40.96318, Long. 24.812155 (2025/179), Lat. 40.95993, Long. 24.934561 (2025/180), Lat. 40.94878, Long. 24.89205 (2025/181), Lat. 40.94525, Long. 24.950172 (2025/182), Lat. 41.02525278, Long. 24.91927778 (2025/183), Lat. 40.980056, Long. 24.967289 (2025/184), Lat. 40.93934722, Long. 24.94205278 (2025/195), Lat. 41.001836, Long. 24.86944 (2025/204), Lat. 40.94748056, Long. 24.86959167 (2025/209), Lat. 41.042347, Long. 24.854008 (2025/210), Lat. 41.01641, Long. 24.89005 (2025/219), Lat. 40.99797, Long. 24.79668 (2025/220), Lat. 40.92859, Long. 24.88322 (2025/221), Lat. 40.94748, Long. 24.89024 (2025/222), Lat. 40.98469, Long 24.94486 (2025/223), Lat. 40.96229, Long. 24.90589 (2025/224), Lat. 40.98139, Long. 24.84509 (2025/225), Lat. 40.9802, Long 24.84051 (2025/226), Lat. 41.11868, Long. 24.95574 (2025/228), Lat. 41.00244, Long. 25.00836 (2025/237), Lat. 40.92675, Long. 24.83386 (2025/238), Long. 41.03354, Lat. 24.93621 (2025/249), Long. 40.98524, Lat. 24.93988 (2025/250), Long. 40.99613 Lat. 24.79702 (2025/251), Long. 38.41361 Lat. 21.89861 (2025/254), Long. 41.058486 Lat. 24.954978 (2025/255), Long. 40.984936 Lat. 24.784575 (2025/256), Long. 40.971103 Lat. 24.931775 (2025/257), Long. 40.915533 Lat. (2025/258), Lat. 40.98793611, Long. 24.83078056 (2025/264), Lat. 40.956883, Long. 24.786581 (2025/299), Lat. 40.967108, Long. 24.815525 (2025/300), Lat. 40.925822, Long. 24.8287 (2025/301), Lat. 41.03041, Long. 24.86334 (2025/309), Lat. 40.970889, Long. 24.79435 (2025/325), Lat. 41.023147, Long. 24.897725 (2025/326), Lat. 41.033328, Long. 24.805542 (2025/327), Lat. 41.033675, Long. 24.935781 (2025/345), Lat. 40.948125, Long. 24.968808 (2025/353), Lat. 41.035872, Long. 24.850331 (2025/354), Lat. 40.967503, Long. 24.793678 (2025/355), Lat. 41.077656, Long. 24.883311 (2025/356), Lat. 41.074514, Long. 24.941714 (2025/370), Lat. 40.991764, Long. 24.828736 (2025/371), Lat. 41.020433, Long. 24.857022 (2025/372).
21.9.2025
Surveillance zone:
Those parts of the regional units of Xanthi, Rhodopi and Kavala contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 40.99623611, Long. 24.83029167 (2025/68), Lat. 40.99545556, Long. 24.83029167 (2025/90), Lat. 40.99517778, Long. 24.84001667 (2025/91), Lat. 41.08872222, Long. 24.80329444 (2025/96), Lat. 40.94198, Long. 24.859461 (2025/100), Lat. 41.02248, Long. 24.79513056 (2025/101), Lat. 41.02248, Long. 24.79513056 (2025/102), Lat. 40.98371667, Long. 24.80023889 (2025/111), Lat. 40.935475, Long. 24.815203 (2025/112), Lat. 40.978975, Long. 24.968347 (2025/113), Lat. 40.97081389, Long. 24.853175 (2025/114), Lat. 40.97081389, Long. 24.853175 (2025/115), Lat. 40.92546111, Long. 24.77911389 (2025/116), Lat. 40.97432, Long. 24.93116 (2025/118), Lat. 40.96386, Long. 24.85581 (2025/119), Lat. 40.901775, Long. 24.853047 (2025/122), Lat. 41.00742222, Long. 24.89307778 (2025/124), Lat. 40.95253611, Long. 24.87093056 (2025/125), Lat. 40.94319167, Long. 24.93811389 (2025/126), Lat. 41.04519722, Long. 24.820325 (2025/127), Lat. 41.02537222, Long. 24.86315556 (2025/137), Lat. 40.98996389, Long. 24.82399444 (2025/138), Lat. 40.96556667, Long. 24.9095 (2025/139), Lat. 40.96178056, Long. 24.93472222 (2025/151), Lat. 40.99215, Long. 24.83043611 (2025/152), Lat. 40.990675, Long. 24.82167778 (2025/153), Lat. 40.93966944, Long. 24.87886389 (2025/165), Lat. 40.98928333, Long. 24.77680556 (2025/166), Lat. 40.950008, Long. 24.817541 (2025/176), Lat. 40.956202, Long. 24.784566 (2025/177), Lat. 40.9339, Long. 24.837438 (2025/178), Lat. 40.96318, Long. 24.812155 (2025/179), Lat. 40.95993, Long, 24.934561 (2025/180), Lat. 40.94878, Long. 24.89205 (2025/181), Lat. 40.94525, Long. 24.950172 (2025/182), Lat. 41.02525278, Long. 24.91927778 (2025/183), Lat. 40.980056, Long. 24.967289 (2025/184), Lat. 40.93934722, Long. 24.94205278 (2025/195), Lat. 41.001836, Long. 24.86944 (2025/204), Lat. 40.94748056, Long. 24.86959167 (2025/209), Lat. 41.042347, Long. 24.854008 (2025/210), Lat. 41.01641, Long. 24.89005 (2025/219), Lat. 40.99797, Long 24.79668 (2025/220), Lat. 40.92859, Long. 24.88322 (2025/221), Lat. 40.94748, Long. 24.89024 (2025/222), Lat. 40.98469, Long. 24.94486 (2025/223), Lat. 40.96229, Long. 24.90589 (2025/224), Lat. 40.98139, Long. 24.84509 (2025/225), Lat. 40.9802, Long. 24.84051 (2025/226), Lat. 41.11868, Long. 24.95574 (2025/228), Lat. 41.00244, Long. 25.00836 (2025/237), Lat. 40.92675, Long. 24.83386 (2025/238), Long. 41.03354, Lat. 24.93621 (2025/249), Long. 40.98524, Lat. 24.93988 (2025/250), Long. 40.99613 Lat. 24.79702 (2025/251), Long. 38.41361 Lat. 21.89861 (2025/254), Long. 41.058486 Lat. 24.954978 (2025/255), Long. 40.984936 Lat. 24.784575 (2025/256), Long. 40.971103 Lat. 24.931775 (2025/257), Long. 40.915533, Lat. (2025/258), Lat. 40.98793611, Long. 24.83078056 (2025/264) Lat. 40.956883, Long. 24.786581 (2025/299), Lat. 40.967108, Long. 24.815525 (2025/300), Lat. 40.925822, Long. 24.8287 (2025/301), Lat. 41.03041, Long. 24.86334 (2025/309), Lat. 40.970889, Long. 24.79435 (2025/325), Lat. 41.023147, Long. 24.897725 (2025/326), Lat. 41.033328, Long. 24.805542 (2025/327), Lat. 41.033675, Long. 24.935781 (2025/345), Lat. 40.948125, Long. 24.968808 (2025/353), Lat. 41.035872, Long. 24.850331 (2025/354), Lat. 40.967503, Long. 24.793678 (2025/355), Lat. 41.077656, Long. 24.883311 (2025/356), Lat. 41.074514, Long. 24.941714 (2025/370), Lat. 40.991764, Long. 24.828736 (2025/371), Lat. 41.020433, Long. 24.857022 (2025/372), excluding the areas contained in any protection zone.
1.10.2025
Surveillance zone:
Those parts of the regional units of Xanthi and Kavala contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 40.99623611, Long. 24.83029167 (2025/68), Lat. 40.99545556, Long. 24.83029167 (2025/90), Lat. 40.99517778, Long. 24.84001667 (2025/91), Lat. 41.08872222, Long. 24.80329444 (2025/96), Lat. 40.94198, Long. 24.859461 (2025/100), Lat. 41.02248, Long 24.79513056 (2025/101), Lat. 41.02248, Long. 24.79513056 (2025/102), Lat. 40.98371667, Long. 24.80023889 (2025/111), Lat. 40.935475, Long. 24.815203 (2025/112), Lat. 40.978975, Long. 24.968347 (2025/113), Lat. 40.97081389, Long. 24.853175 (2025/114), Lat. 40.97081389, Long. 24.853175 (2025/115), Lat. 40.92546111, Long. 24.77911389 (2025/116), Lat. 40.97432, Long. 24.93116 (2025/118), Lat. 40.96386, Long. 24.85581 (2025/119), Lat. 40.901775, Long. 24.853047 (2025/122), Lat. 41.00742222, Long. 24.89307778 (2025/124), Lat. 40.95253611, Long. 24.87093056 (2025/125), Lat. 40.94319167, Long. 24.93811389 (2025/126), Lat. 41.04519722, Long. 24.820325 (2025/127), Lat. 41.02537222, Long. 24.86315556 (2025/137), Lat. 40.98996389, Long. 24.82399444 (2025/138), Lat. 40.96556667, Long. 24.9095 (2025/139), Lat. 40.96178056, Long. 24.93472222 (2025/151), Lat. 40.99215, Long. 24.83043611 (2025/152), Lat. 40.990675, Long. 24.82167778 (2025/153), Lat. 40.93966944, Long. 24.87886389 (2025/165), Lat. 40.98928333, Long. 24.77680556 (2025/166), Lat. 40.950008, Long. 24.817541 (2025/176), Lat. 40.956202, Long. 24.784566 (2025/177), Lat. 40.9339, Long. 24.837438 (2025/178), Lat. 40.96318, Long. 24.812155 (2025/179), Lat. 40.95993, Long, 24.934561 (2025/180), Lat. 40.94878, Long. 24.89205 (2025/181), Lat. 40.94525, Long. 24.950172 (2025/182), Lat. 41.02525278, Long. 24.91927778 (2025/183),Lat. 40.980056, Long, 24.967289 (2025/184), Lat. 40.93934722, Long. 24.94205278 (2025/195), Lat. 41.001836, Long. 24.86944 (2025/204), Lat. 40.94748056, Long. 24.86959167 (2025/209), Lat. 41.042347, Long. 24.854008 (2025/210), Lat. 41.01641, Long. 24.89005 (2025/219), Lat. 40.99797, Long. 24.79668 (2025/220), Lat. 40.92859, Long. 24.88322 (2025/221), Lat. 40.94748, Long. 24.89024 (2025/222), Lat. 40.98469, Long. 24.94486 (2025/223), Lat. 40.96229, Long. 24.90589 (2025/224), Lat. 40.98139, Long. 24.84509 (2025/225), Lat. 40.9802, Long. 24.84051 (2025/226), Lat. 41.11868, Long. 24.95574 (2025/228), Lat. 41.00244, Long. 25.00836 (2025/237), Lat. 40.92675, Long. 24.83386 (2025/238), Long. 41.03354, Lat. 24.93621 (2025/249), Long. 40.98524, Lat. 24.93988 (2025/250), Long. 40.99613, Lat. 24.79702 (2025/251), Long. 38.41361, Lat. 21.89861 (2025/254), Long. 41.058486, Lat. 24.954978 (2025/255), Long. 40.984936, Lat. 24.784575 (2025/256), Long. 40.971103, Lat. 24.931775 (2025/257), Long. 40.915533, Lat. (2025/258), Lat. 40.98793611, Long. 24.83078056 (2025/264), Lat. 40.956883, Long. 24.786581 (2025/299), Lat. 40.967108, Long. 24.815525 (2025/300), Lat. 40.925822, Long. 24.8287 (2025/301), Lat. 41.03041, Long. 24.86334 (2025/309), Lat. 40.970889, Long. 24.79435 (2025/325), Lat. 41.023147, Long. 24.897725 (2025/326), Lat. 41.033328, Long. 24.805542 (2025/327), Lat. 41.033675, Long. 24.935781 (2025/345), Lat. 40.948125, Long. 24.968808 (2025/353), Lat. 41.035872, Long. 24.850331 (2025/354), Lat. 40.967503, Long. 24.793678 (2025/355), Lat. 41.077656, Long. 24.883311 (2025/356), Lat. 41.074514, Long. 24.941714 (2025/370), Lat. 40.991764, Long. 24.828736 (2025/371), Lat. 41.020433, Long. 24.857022 (2025/372).
22.9.2025-1.10.2025
Regional unit of Magnesia
GR-CAPRIPOX-2025-00095
GR-CAPRIPOX-2025-00123
GR-CAPRIPOX-2025-00131
GR-CAPRIPOX-2025-00132
GR-CAPRIPOX-2025-00134
GR-CAPRIPOX-2025-00140
GR-CAPRIPOX-2025-00141
GR-CAPRIPOX-2025-00147
GR-CAPRIPOX-2025-00160
GR-CAPRIPOX-2025-00161
GR-CAPRIPOX-2025-00162
GR-CAPRIPOX-2025-00163
GR-CAPRIPOX-2025-00172
GR-CAPRIPOX-2025-00173
GR-CAPRIPOX-2025-00174
GR-CAPRIPOX-2025-00175
GR-CAPRIPOX-2025-00193
GR-CAPRIPOX-2025-00194
GR-CAPRIPOX-2025-00198
GR-CAPRIPOX-2025-00199 GR-CAPRIPOX-2025-00200
GR-CAPRIPOX-2025-00211
GR-CAPRIPOX-2025-00212
GR-CAPRIPOX-2025-00227
GR-CAPRIPOX-2025-00242
GR-CAPRIPOX-2025-00243
GR-CAPRIPOX-2025-00244
GR-CAPRIPOX-2025-00245
GR-CAPRIPOX-2025-00246
GR-CAPRIPOX-2025-00263
GR-CAPRIPOX-2025-00278
GR-CAPRIPOX-2025-00279
GR-CAPRIPOX-2025-00280
GR-CAPRIPOX-2025-00281
GR-CAPRIPOX-2025-00283
GR-CAPRIPOX-2025-00296
GR-CAPRIPOX-2025-00297
GR-CAPRIPOX-2025-00298
GR-CAPRIPOX-2025-00314
GR-CAPRIPOX-2025-00315
GR-CAPRIPOX-2025-00318
GR-CAPRIPOX-2025-00319
GR-CAPRIPOX-2025-00320
GR-CAPRIPOX-2025-00350
GR-CAPRIPOX-2025-00351
GR-CAPRIPOX-2025-00352
GR-CAPRIPOX-2025-00358
GR-CAPRIPOX-2025-00359
GR-CAPRIPOX-2025-00373
GR-CAPRIPOX-2025-00374
GR-CAPRIPOX-2025-00375
GR-CAPRIPOX-2025-00376
GR-CAPRIPOX-2025-00377
Protection zone:
Those parts of the regional unit of Magnesia and Larisa contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.467052, Long. 22.86536 (2025/95), Lat. 39.496834, Long. 22.871568 (2025/123), Lat. 39.477993, Long. 22.873483 (2025/131), Lat. 39.467493, Long. 22.898677 (2025/132), Lat. 39.471405, Long. 22.8563 (2025/134), Lat. 39.46141, Long. 22.87519 (2025/140), Lat. 39.464448, Long. 22.854603 (2025/141), Lat. 39.49867035, Long. 22.86911413 (2025/160), Lat. 39.4593182, Long. 22.87580615 (2025/161), Lat. 39.50201691, Long. 22.86278904 (2025/162), Lat. 39.43476024, Long. 22.77322376 (2025/163), Lat. 39.334604, Long. 22.920183 (2025/172), Lat. 39.504071, Long. 22.861532 (2025/173), Lat. 39.494902, Long. 22.894167 (2025/174), Lat. 39.4256983, Long. 22.7372429 (2025/175), Lat. 39.368794, Long. 22.741523 (2025/193), Lat. 39.3945734, Long. 22.7667939 (2025/194), Lat. 39.423517, Lat. 22.78069 (2025/198), Lat. 39.3945734, Long, 22.9223459 (2025/199), Lat. 39.52227, Long. 22.817713 (2025/200), Lat. 39.3810771, Long. 22.9145345 (2025/211), Lat. 39.436546, Long. 22.769483 (2025/212), Lat. 39.42227, Long. 22.75349 (2025/227), Lat. 39.4315, Long. 22.75119 (2025/242), Lat. 39.42071, Long. 22.77005 (2025/243), Lat. 39.44432, Long. 22.74879 (2025/244), Lat. 39.48778, Long. 22.89325 (2025/245), Lat. 39.46722, Long. 22.72725 (2025/246), Lat. 39.339966 Long. 23.0400641 (2025/263), Lat. 39.39606526 Long. 22.7968304 (2025/278), Lat. 39.3245953, Long. 22.762568 (2025/279), Lat. 39.195883 Long. 22.768289 (2025/280), Lat. 39.480785 Long. 22.757451 (2025/281), Lat. 39.157619, Long. 22.767124 (2025/283), Lat. 39.49915, Long. 22.891876 (2025/296), Lat. 39.1859584, Long. 22.7102493 (2025/297), Lat. 39.4332262, Long. 22.8887738 (2025/298), Lat. 39.18003634, Long. 22.77596204 (2025/314), Lat. 39.44921, Long. 22.82138 (2025/315), Lat. 39.43631, Long. 22.805354 (2025/318), Lat. 39.388472, Long. 22.911592 (2025/319), Lat. 39.385731, Long. 22.751972 (2025/320), Lat. 39.19191948, Long. 22.79757791 (2025/350), Lat. 39.31323369, Long. 22.91200103 (2025/351), Lat. 39.385731, Long. 22.751972 (2025/320), Lat. 39.431662, Long. 22.749835 (2025/352), Lat. 39.382651, Long. 22.947526 (2025/358), Lat. 39.40998706, Long. 22.66004221 (2025/359), Lat. 39.40997, Long. 22.66004 (2025/373), Lat. 39.36875771, Long. 22.89508114 (2025/374), Lat. 39.36922072, Long. 22.78372022 (2025/375), Lat. 39.468, Long. 22.76436 (2025/376), Lat. 39.42277085, Long. 22.79517004 (2025/377).
20.9.2025
Surveillance zone:
Those parts of the regional units of Magnesia, Phthiotis and Larisa contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.467052, Long. 22.86536 (2025/95), Lat. 39.496834, Long. 22.871568 (2025/123), Lat. 39.477993, Long. 22.873483 (2025/131), Lat. 39.467493, Long. 22.898677 (2025/132), Lat. 39.471405, Long. 22.8563 (2025/134), Lat. 39.46141, Long. 22.87519 (2025/140), Lat. 39.464448, Long. 22.854603 (2025/141), Lat. 39.49867035, Long. 22.86911413 (2025/160), Lat. 39.4593182, Long. 22.87580615 (2025/161), Lat. 39.50201691, Long. 22.86278904 (2025/162), Lat. 39.43476024, Long. 22.77322376 (2025/163), Lat. 39.334604, Long. 22.920183 (2025/172), Lat. 39.504071, Long. 22.861532 (2025/173), Lat. 39.494902, Long. 22.894167 (2025/174), Lat. 39.4256983, Long. 22.7372429 (2025/175), Lat. 39.368794, Long.22.741523 (2025/193), Lat. 39.3945734, Long. 22.7667939 (2025/194), Lat. 39.423517, Lat. 22.78069 (2025/198), Lat. 39.3945734, Long, 22.9223459 (2025/199), Lat. 39.52227, Long. 22.817713 (2025/200), Lat. 39.3810771, Long. 22.9145345 (2025/211), Lat. 39.436546, Long. 22.769483 (2025/212), Lat. 39.42227, Long. 22.75349 (2025/227), Lat. 39.4315, Long. 22.75119 (2025/242), Lat. 39.42071, Long. 22.77005 (2025/243), Lat. 39.44432, Long. 22.74879 (2025/244), Lat. 39.48778, Long. 22.89325 (2025/245), Lat. 39.46722, Long. 22.72725 (2025/246), Lat. 39.339966 Long. 23.0400641 (2025/263), Lat. 39.39606526 Long. 22.7968304 (2025/278), Lat. 39.3245953, Long. 22.762568 (2025/279), Lat. 39.195883 Long. 22.768289 (2025/280), Lat. 39.480785 Long. 22.757451 (2025/281), Lat. 39.157619, Long. 22.767124 (2025/283), Lat. 39.49915, Long. 22.891876 (2025/296), Lat. 39.1859584, Long. 22.7102493 (2025/297), Lat. 39.4332262, Long. 22.8887738 (2025/298), Lat. 39.18003634, Long. 22.77596204 (2025/314), Lat. 39.44921, Long. 22.82138 (2025/315), Lat. 39.43631, Long. 22.805354 (2025/318), Lat. 39.388472, Long. 22.911592 (2025/319), Lat. 39.385731, Long. 22.751972 (2025/320) Lat. 39.19191948, Long. 22.79757791 (2025/350), Lat. 39.31323369, Long. 22.91200103 (2025/351), Lat. 39.385731, Long. 22.751972 (2025/320), Lat. 39.431662, Long. 22.749835 (2025/352), Lat. 39.382651, Long. 22.947526 (2025/358), Lat. 39.40998706, Long. 22.66004221 (2025/359), Lat. 39.40997, Long. 22.66004 (2025/373), Lat. 39.36875771, Long. 22.89508114 (2025/374), Lat. 39.36922072, Long. 22.78372022 (2025/375), Lat. 39.468, Long. 22.76436 (2025/376), Lat. 39.42277085, Long. 22.79517004 (2025/377) excluding the areas contained in any protection zone
30.9.2025
Surveillance zone:
Those parts of the regional unit of Magnesia and Larisa contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.467052, Long. 22.86536 (2025/95), Lat. 39.496834, Long. 22.871568 (2025/123), Lat. 39.477993, Long. 22.873483 (2025/131), Lat. 39.467493, Long. 22.898677 (2025/132), Lat. 39.471405, Long. 22.8563 (2025/134), Lat. 39.46141, Long. 22.87519 (2025/140), Lat. 39.464448, Long. 22.854603 (2025/141), Lat. 39.49867035, Long. 22.86911413 (2025/160), Lat. 39.4593182, Long. 22.87580615 (2025/161), Lat. 39.50201691, Long. 22.86278904 (2025/162), Lat. 39.43476024, Long. 22.77322376 (2025/163), Lat. 39.334604, Long. 22.920183 (2025/172), Lat. 39.504071, Long. 22.861532 (2025/173), Lat. 39.494902, Long. 22.894167 (2025/174), Lat. 39.4256983, Long. 22.7372429 (2025/175), Lat. 39.368794, Long.22.741523 (2025/193), Lat. 39.3945734, Long. 22.7667939 (2025/194), Lat. 39.423517, Lat. 22.78069 (2025/198), Lat. 39.3945734, Long, 22.9223459 (2025/199), Lat. 39.52227, Long. 22.817713 (2025/200), Lat. 39.3810771, Long. 22.9145345 (2025/211), Lat. 39.436546, Long. 22.769483 (2025/212), Lat. 39.42227, Long. 22.75349 (2025/227), Lat. 39.4315, Long. 22.75119 (2025/242), Lat. 39.42071, Long. 22.77005 (2025/243), Lat. 39.44432, Long. 22.74879 (2025/244), Lat. 39.48778, Long. 22.89325 (2025/245), Lat. 39.46722, Long. 22.72725 (2025/246), Lat. 39.339966, Long. 23.0400641 (2025/263), Lat. 39.39606526, Long. 22.7968304 (2025/278), Lat. 39.3245953, Long. 22.762568 (2025/279), Lat. 39.195883, Long. 22.768289 (2025/280), Lat. 39.480785, Long. 22.757451 (2025/281), Lat. 39.157619, Long. 22.767124 (2025/283), Lat. 39.49915, Long. 22.891876 (2025/296), Lat. 39.1859584, Long. 22.7102493 (2025/297), Lat. 39.4332262, Long. 22.8887738 (2025/298), Lat. 39.18003634, Long. 22.77596204 (2025/314), Lat. 39.44921, Long. 22.82138 (2025/315), Lat. 39.43631, Long. 22.805354 (2025/318), Lat. 39.388472, Long. 22.911592 (2025/319), Lat. 39.385731, Long. 22.751972 (2025/320) Lat. 39.19191948, Long. 22.79757791 (2025/350), Lat. 39.31323369, Long. 22.91200103 (2025/351), Lat. 39.385731, Long. 22.751972 (2025/320), Lat. 39.431662, Long. 22.749835 (2025/352), Lat. 39.382651, Long. 22.947526 (2025/358), Lat. 39.40998706, Long. 22.66004221 (2025/359), Lat. 39.40997, Long. 22.66004 (2025/373), Lat. 39.36875771, Long. 22.89508114 (2025/374), Lat. 39.36922072, Long. 22.78372022 (2025/375), Lat. 39.468, Long. 22.76436 (2025/376), Lat. 39.42277085, Long. 22.79517004 (2025/377).
21.9.2025-30.9.2025
Regional unit of Larisa
GR-CAPRIPOX-2025-00121
GR-CAPRIPOX-2025-00142
GR-CAPRIPOX-2025-00143
GR-CAPRIPOX-2025-00144
GR-CAPRIPOX-2025-00149 GR-CAPRIPOX-2025-00150
GR-CAPRIPOX-2025-00170
GR-CAPRIPOX-2025-00171
GR-CAPRIPOX-2025-00185
GR-CAPRIPOX-2025-00186
GR-CAPRIPOX-2025-00191
GR-CAPRIPOX-2025-00192
GR-CAPRIPOX-2025-00201
GR-CAPRIPOX-2025-00202
GR-CAPRIPOX-2025-00203
GR-CAPRIPOX-2025-00213
GR-CAPRIPOX-2025-00214
GR-CAPRIPOX-2025-00215
GR-CAPRIPOX-2025-00216
GR-CAPRIPOX-2025-00217
GR-CAPRIPOX-2025-00218
GR-CAPRIPOX-2025-00229
GR-CAPRIPOX-2025-00230
GR-CAPRIPOX-2025-00231
GR-CAPRIPOX-2025-00232
GR-CAPRIPOX-2025-00233
GR-CAPRIPOX-2025-00234
GR-CAPRIPOX-2025-00235
GR-CAPRIPOX-2025-00236
GR-CAPRIPOX-2025-00247
GR-CAPRIPOX-2025-00248
GR-CAPRIPOX-2025-00261
GR-CAPRIPOX-2025-00262
GR-CAPRIPOX-2025-00259
GR-CAPRIPOX-2025-00259
GR-CAPRIPOX-2025-00260
GR-CAPRIPOX-2025-00261
GR-CAPRIPOX-2025-00262
GR-CAPRIPOX-2025-00265
GR-CAPRIPOX-2025-00266
GR-CAPRIPOX-2025-00267
GR-CAPRIPOX-2025-00268
GR-CAPRIPOX-2025-00269
GR-CAPRIPOX-2025-00270
GR-CAPRIPOX-2025-00271
GR-CAPRIPOX-2025-00275
GR-CAPRIPOX-2025-00276
GR-CAPRIPOX-2025-00284
GR-CAPRIPOX-2025-00285
GR-CAPRIPOX-2025-00286
GR-CAPRIPOX-2025-00290
GR-CAPRIPOX-2025-00291
GR-CAPRIPOX-2025-00292
GR-CAPRIPOX-2025-00293
GR-CAPRIPOX-2025-00294
GR-CAPRIPOX-2025-00295
GR-CAPRIPOX-2025-00302
GR-CAPRIPOX-2025-00303
GR-CAPRIPOX-2025-00308
GR-CAPRIPOX-2025-00316
GR-CAPRIPOX-2025-00328
GR-CAPRIPOX-2025-00329
GR-CAPRIPOX-2025-00330
GR-CAPRIPOX-2025-00331
GR-CAPRIPOX-2025-00332
GR-CAPRIPOX-2025-00333
GR-CAPRIPOX-2025-00334
GR-CAPRIPOX-2025-00335
GR-CAPRIPOX-2025-00336
GR-CAPRIPOX-2025-00337
GR-CAPRIPOX-2025-00338
GR-CAPRIPOX-2025-00339
GR-CAPRIPOX-2025-00340
GR-CAPRIPOX-2025-00341
GR-CAPRIPOX-2025-00342
GR-CAPRIPOX-2025-00346
GR-CAPRIPOX-2025-00347
GR-CAPRIPOX-2025-00348
GR-CAPRIPOX-2025-00357
GR-CAPRIPOX-2025-00360
GR-CAPRIPOX-2025-00361
GR-CAPRIPOX-2025-00362
GR-CAPRIPOX-2025-00363
GR-CAPRIPOX-2025-00364
GR-CAPRIPOX-2025-00365
GR-CAPRIPOX-2025-00366
GR-CAPRIPOX-2025-00367
GR-CAPRIPOX-2025-00379
GR-CAPRIPOX-2025-00380
GR-CAPRIPOX-2025-00381
GR-CAPRIPOX-2025-00388
Protection zone:
Those parts of the regional units of Larisa, Magnesia, Trikala and Pieria contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.89476741, Long. 22.6311429 (2025/121), Lat. 39.91227499, Long. 22.61617251 (2025/142), Lat. 39.6774732, Long. 22.52254213 (2025/143), Lat. 39.57401593, Long. 22.73756419 (2025/144), Lat. 39.92010431, Long. 22.60924625 (2025/149), Lat. 39.91150253, Long. 22.61584129 (2025/150), Lat. 39.6087452, Long. 22.5329685 (2025/170), Lat. 39.592199, Lat. 22.7054 (2025/171), Lat. 39.51886715, Long. 22.68980287 (2025/185), Lat. 39.62186561, Long. 22.62454656 (2025/186), Lat. 39.59839938, Long. 22.70331904 (2025/191), Lat. 39.56463, Long. 22.550243 (2025/192), Lat. 39.572848, Long. 22.738176 (2025/201), Lat. 39.89698879, Long. 22.63020736 (2025/202), Lat. 39.679681, Long. 22.628016 (2025/203), Lat, 39.575026, Long. 22.742632 (2025/213), Lat. 39.53379, Long. 22.67786 (2025/214); Lat. 39.69157, Long, 22.579129 (2025/215), Long 39.55262, Lat. 22.6197(2025/216), Lat. 39.59805, Long. 22.70762 (2015/217), Long. 39.52721, Lat. 22.70306 (2015/218), Lat. 39.59198, Long. 22.70984 ( 2015/229), Lat. 39.89118, Long. 22.66363 (2025/230), Lat. 39.61441886, Long. 22.51768336 (2025/231), Lat. 39.55983, Long. 22.75526, (2025/232), Lat. 39.62413, Long. 22.62314 (2025/233), Lat. 39.62342, Long. 22.68567(2025/234), Lat. 39.61334, Long. 22.57854(2025/235), Lat. 39.59416, Long. 22.58534 (2025/236), Long. 39.61767, Lat. 22.61817 (2025/247) Lat. 39.71837 Long. 22.59385 (2025/248), Lat. 39.6465, Long. 22.328 (2025/259), Lat. 39.556716, Long. 22.651089 (2025/260), Lat. 39.624138, Long. 22.62676 (2025/261), Lat. 39.676118, Long. 22.498195 (2025/262), Lat. 39.534093 Long. 22.505619 (2025/265), Lat. 39.6879039, Long. 22.468641 (2025/266), Lat. 39.3007 Long. 22.5378 (2025/267), Lat. 39.626759 Long. 22.679439 (2025/268), Lat. 39.595981 Long. 22.707803 (2025/269), Lat. 39.595981 Long. 22.707803 (2025/270), Lat. 39.573212 Long. 22.739291 (2025/271), Lat. 39.7167234 Long. 22.4884135 (2025/275), Lat. 39.887 Long. 22.6666 (2025/276), Lat. 39.560071, Long. 22.647354 (2025/284), Lat. 39.593018, Long. 22.586056 (2025/285), Lat. 39.562067 Long. 22.584275 (2025/286), Lat. 39.588418 Long. 22.716484 (2025/290), Lat. 39.575097 Long. 22.833635 (2025/291), Lat. 39.5488537 Long. 22.6594409 (2025/292), Lat. 39.588346 Long. 22.719174 (2025/293), Lat. 39.912948 Long. 22.64367 (2025/294), Lat. 39.5609101 Long. 22.731537 (2025/295), Lat. 39.283168 Long. 22.554176 (2025/302), Lat. 39.924532 Long. 22.606098 (2025/303), Lat. 39.691185 Long. 22.589602 (2025/308), Lat. 39.4843587 Long 22.6030612 (2025/316), Lat. 39.629827 Long. 22.684235 (2025/328), Lat. 39.672253 Long. 22.560922 (2025/329), Lat. 39.705579 Long. 22.415402 (2025/330), Lat. 39.72092 Long. 22.5951278 (2025/331), Lat. 39.912034 Long. 22.612334 (2025/332), Lat. 39.698745 Long. 22.420811 (2025/333), Lat. 39.65035 Long. 22.2234102 (2025/334), Lat. 39.550231 Long. 22.639774 (2025/335), Lat. 39.917506 Long. 22.69245 (2025/336), Lat. 39.898187 Long. 22.641883 (2025/337), Lat. 39.599661 Long. 22.708941 (2025/338), Lat. 39.4797352 Long. 22.750258 (2025/339), Lat. 39.562067 Long. 22.6956564 (2025/340), Lat. 39.6342711 Long. 22.5600637 (2025/341), Lat. 39.652391 Long. 22.330526 (2025/342), Lat. 39.6373828 Long. 22.5524513 (2025/346), Lat. 39.561417 Long. 22.643048 (2025/347), Lat. 39.660889 Long. 22.315177 (2025/348), Lat. 39.691723 Long. 22.429688 (2025/357), Lat. 39.6298061 Long. 22.5303609 (2025/360), Lat. 39.6589464 Long. 22.7827164 (2025/361), Lat. 39.652391 Long. 22.330526 (2025/342), Lat. 39.558758 Long. 22.638562 (2025/362), Lat. 39.6365071 Long. 22.5509049 (2025/363), Lat. 39.617565 Long. 22.579664 (2025/364), Lat. 39.7050478 Long. 22.54867156 (2025/365), Lat. 39.6469329 Long. 22.5443594 (2025/366), Lat. 39.5852205 Long. 22.5643767 (2025/367), Lat. 39.9074 Long. 22.6698 (2025/379), Lat. 39.88973215 Long. 22.66612361 (2025/380), Lat. 39.68492 Long. 22.330526 (2025/381), Lat. 39.5740239, Long. 22.549824 (2025/388).
22.9.2025
Surveillance zone:
Those parts of the regional units of Larisa, Pieria, Trikala, Karditsa and Magnesia contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.89476741, Long. 22.6311429 (2025/121), Lat. 39.91227499, Long. 22.61617251 (2025/142), Lat. 39.6774732, Long. 22.52254213 (2025/143), Lat. 39.57401593, Long. 22.73756419 (2025/144), Lat. 39.92010431, Long. 22.60924625 (2025/149), Lat. 39.91150253, Long. 22.61584129 (2025/150), Lat. 39.6087452, Long. 22.5329685 (2025/170), Lat. 39.592199, Lat. 22.7054 (2025/171), lat. 39.51886715, Long. 22.68980287 (2025/185), Lat.39.62186561, Long. 22.62454656 (2025/186), Lat. 39.59839938, Long. 22.70331904 (2025/191), Lat. 39.56463, Long. 22.550243 (2025/192), Lat. 39.572848, Long. 22.738176 (2025/201), Lat. 39.89698879, Long. 22.63020736 (2025/202), Lat. 39.679681, Long. 22.628016 (2025/203), Lat. 39.575026, Long 22.742632 (2025/213), Lat. 39.53379, Long. 22.67786(2025/214), Lat. 39.69157, Long. 22.579129(2025/215), Long. 39.55262, Lat. 22.6197(2025/216), Lat. 39.59805, Long. 22.70762 (2015/217), Long. 39.52721, Lat. 22.70306 (2015/218), Lat. 39.59198, Long. 22.70984( 2015/229), Lat. 39.89118, Long. 22.66363 (2025/230), Lat. 39.61441886, Long. 22.51768336 (2025/231), Lat. 39.55983, Long. 22.75526, (2025/232), Lat. 39.62413, Long. 22.62314(2025/233), Lat. 39.62342, Long. 22.68567(2025/234), Lat. 39.61334, Long. 22.57854(2025/235), Lat. 39.59416, Long. 22.58534 (2025/236), Long. 39.61767, Lat. 22.61817 (2025/247) Lat. 39.71837 Long. 22.59385 (2025/248), Lat. 39.6465 , Long. 22.328 (2025/259), Lat. 39.556716, Long. 22.651089 (2025/260), Lat. 39.624138, Long. 22.62676 (2025/261), Lat. 39.676118, Long. 22.498195 (2025/262), Lat. 39.534093 Long. 22.505619 (2025/265), Lat. 39.6879039, Long. 22.468641 (2025/266), Lat. 39.3007 Long. 22.5378 (2025/267), Lat. 39.626759 Long 22.679439 (2025/268), Lat. 39.595981 Long. 22.707803 (2025/269), Lat. 39.595981 Long. 22.707803 (2025/270), Lat. 39.573212 Long. 22.739291 (2025/271), Lat. 39.7167234 Long. 22.4884135 (2025/275), Lat. 39.887 Long. 22.6666 (2025/276), Lat. 39.560071, Long. 22.647354 (2025/284), Lat. 39.593018, Long. 22.586056 (2025/285), Lat. 39.562067 Long. 22.584275 (2025/286), Lat. 39.588418 Long. 22.716484 (2025/290), Lat. 39.575097 Long. 22.833635 (2025/291), Lat. 39.5488537 Long. 22.6594409 (2025/292), Lat. 39.588346 Long. 22.719174 (2025/293), Lat. 39.912948 Long. 22.64367 (2025/294), Lat. 39.5609101 Long. 22.731537 (2025/295), Lat. 39.283168 Long. 22.554176 (2025/302), Lat. 39.924532 Long. 22.606098 (2025/303), Lat. 39.691185 Long. 22.589602 (2025/308), Lat. 39.4843587 Long. 22.6030612 (2025/316), Lat. 39.629827 Long. 22.684235 (2025/328), Lat. 39.672253 Long. 22.560922 (2025/329), Lat. 39.705579 Long. 22.415402 (2025/330), Lat. 39.72092 Long. 22.5951278 (2025/331), Lat. 39.912034 Long. 22.612334 (2025/332), Lat. 39.698745 Long. 22.420811 (2025/333), Lat. 39.65035 Long. 22.2234102 (2025/334), Lat. 39.550231 Long. 22.639774 (2025/335), Lat. 39.917506 Long. 22.69245 (2025/336), Lat. 39.898187 Long. 22.641883 (2025/337), Lat. 39.599661 Long. 22.708941 (2025/338), Lat. 39.4797352 Long. 22.750258 (2025/339), Lat. 39.562067 Long. 22.6956564 (2025/340), Lat. 39.6342711 Long. 22.5600637 (2025/341), Lat. 39.652391 Long. 22.330526 (2025/342), Lat. 39.6373828 Long. 22.5524513 (2025/346), Lat. 39.561417 Long. 22.643048 (2025/347), Lat. 39.660889 Long. 22.315177 (2025/348), Lat. 39.691723 Long. 22.429688 (2025/357), Lat. 39.6298061 Long. 22.5303609 (2025/360), Lat. 39.6589464 Long. 22.7827164 (2025/361), Lat. 39.652391 Long. 22.330526 (2025/342), Lat. 39.558758 Long. 22.638562 (2025/362), Lat. 39.6365071 Long. 22.5509049 (2025/363), Lat. 39.617565 Long. 22.579664 (2025/364), Lat. 39.7050478 Long. 22.54867156 (2025/365), Lat. 39.6469329 Long. 22.5443594 (2025/366), Lat. 39.5852205 Long. 22.5643767 (2025/367), Lat. 39.9074 Long. 22.6698 (2025/379), Lat. 39.88973215 Long. 22.66612361 (2025/380), Lat. 39.68492 Long. 22.330526 (2025/381), Lat. 39.5740239, Long. 22.549824 (2025/388) excluding the areas contained in any protection zone.
2.10.2025
Surveillance zone:
Those parts of the regional units of Larisa, Magnesia, Trikala and Pieria contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.89476741, Long. 22.6311429 (2025/121), Lat. 39.91227499, Long. 22.61617251 (2025/142), Lat. 39.6774732, Long. 22.52254213 (2025/143), Lat. 39.57401593, Long. 22.73756419 (2025/144), Lat. 39.92010431, Long. 22.60924625 (2025/149), Lat. 39.91150253, Long. 22.61584129 (2025/150), Lat. 39.6087452, Long. 22.5329685 (2025/170), Lat. 39.592199, Lat. 22.7054 (2025/171), Lat. 39.51886715, Long. 22.68980287 (2025/185), Lat. 39.62186561, Long. 22.62454656 (2025/186), Lat. 39.59839938, Long. 22.70331904 (2025/191), Lat. 39.56463, Long. 22.550243 (2025/192), Lat. 39.572848, Long. 22.738176 (2025/201), Lat. 39.89698879, Long. 22.63020736 (2025/202), Lat. 39.679681, Long. 22.628016 (2025/203), Lat, 39.575026, Long. 22.742632 (2025/213), Lat. 39.53379, Long. 22.67786(2025/214); Lat. 39.69157, Long. 22.579129(2025/215), Long. 39.55262, Lat. 22.6197(2025/216), Lat. 39.59805, Long. 22.70762 (2015/217), Long. 39.52721, Lat. 22.70306 (2015/218), Lat. 39.59198, Long. 22.70984( 2015/229), Lat. 39.89118, Long. 22.66363 (2025/230), Lat. 39.61441886, Long. 22.51768336 (2025/231), Lat. 39.55983, Long. 22.75526, (2025/232), Lat. 39.62413, Long. 22.62314(2025/233), Lat. 39.62342, Long. 22.68567(2025/234), Lat. 39.61334, Long. 22.57854(2025/235), Lat. 39.59416, Long. 22.58534 (2025/236), Long. 39.61767, Lat. 22.61817 (2025/247) Lat. 39.71837 Long. 22.59385 (2025/248), Lat. 39.6465, Long. 22.328 (2025/259), Lat. 39.556716, Long. 22.651089 (2025/260), Lat. 39.624138, Long. 22.62676 (2025/261), Lat. 39.676118, Long. 22.498195 (2025/262), Lat. 39.534093 Long. 22.505619 (2025/265), Lat. 39.6879039, Long. 22.468641 (2025/266), Lat. 39.3007 Long. 22.5378 (2025/267), Lat. 39.626759 Long. 22.679439 (2025/268), Lat. 39.595981 Long. 22.707803 (2025/269), Lat. 39.595981 Long. 22.707803 (2025/270), Lat. 39.573212 Long. 22.739291 (2025/271), Lat. 39.7167234 Long. 22.4884135 (2025/275), Lat. 39.887 Long. 22.6666 (2025/276), Lat. 39.560071, Long. 22.647354 (2025/284), Lat. 39.593018, Long. 22.586056 (2025/285), Lat. 39.562067 Long. 22.584275 (2025/286), Lat. 39.588418 Long. 22.716484 (2025/290), Lat. 39.575097 Long. 22.833635 (2025/291), Lat. 39.5488537 Long. 22.6594409 (2025/292), Lat. 39.588346 Long. 22.719174 (2025/293), Lat. 39.912948 Long. 22.64367 (2025/294), Lat. 39.5609101 Long. 22.731537 (2025/295), Lat. 39.283168 Long. 22.554176 (2025/302), Lat. 39.924532 Long. 22.606098 (2025/303), Lat. 39.691185 Long. 22.589602 (2025/308), Lat. 39.4843587 Long. 22.6030612 (2025/316), Lat. 39.629827 Long. 22.684235 (2025/328), Lat. 39.672253 Long. 22.560922 (2025/329), Lat. 39.705579 Long. 22.415402 (2025/330), Lat. 39.72092 Long. 22.5951278 (2025/331), Lat. 39.912034 Long. 22.612334 (2025/332), Lat. 39.698745 Long. 22.420811 (2025/333), Lat. 39.65035 Long. 22.2234102 (2025/334), Lat. 39.550231 Long. 22.639774 (2025/335), Lat. 39.917506 Long. 22.69245 (2025/336), Lat. 39.898187 Long. 22.641883 (2025/337), Lat. 39.599661 Long. 22.708941 (2025/338), Lat. 39.4797352 Long. 22.750258 (2025/339), Lat. 39.562067 Long. 22.6956564 (2025/340), Lat. 39.6342711 Long. 22.5600637 (2025/341), Lat. 39.652391 Long. 22.330526 (2025/342), Lat. 39.6373828 Long. 22.5524513 (2025/346), Lat. 39.561417 Long. 22.643048 (2025/347), Lat. 39.660889 Long. 22.315177 (2025/348), Lat. 39.691723 Long. 22.429688 (2025/357), Lat. 39.6298061 Long. 22.5303609 (2025/360), Lat. 39.6589464 Long. 22.7827164 (2025/361), Lat. 39.652391 Long. 22.330526 (2025/342), Lat. 39.558758 Long. 22.638562 (2025/362), Lat. 39.6365071 Long. 22.5509049 (2025/363), Lat. 39.617565 Long. 22.579664 (2025/364), Lat. 39.7050478 Long. 22.54867156 (2025/365), Lat. 39.6469329 Long. 22.5443594 (2025/366), Lat. 39.5852205 Long. 22.5643767 (2025/367), Lat. 39.9074 Long. 22.6698 (2025/379), Lat. 39.88973215 Long. 22.66612361 (2025/380), Lat. 39.68492 Long. 22.330526 (2025/381),Lat. 39.5740239, Long. 22.549824 (2025/388).
23.9.2025-2.10.2025
Regional unit of Florina
GR-CAPRIPOX-2025-00277
Protection zone:
Those parts of the regional units of Florina contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Long. 40.844167, Long. 21.401694 (2025/277).
31.8.2025
Surveillance zone:
Those parts of the regional units of Florina and Kastoria contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Long.40.844167, Long. 21.401694 (2025/277), excluding the areas contained in any protection zone.
10.9.2025
Surveillance zone:
Those parts of the regional units of Florina contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Long. 40.844167, Long. 21.401694 (2025/277).
1.10.2025-10.10.2025
Regional unit of Rhodopi
GR-CAPRIPOX-2025-00 287
GR-CAPRIPOX-2025-00288
GR-CAPRIPOX-2025-00311
GR-CAPRIPOX-2025-00317
GR-CAPRIPOX-2025-00323
GR-CAPRIPOX-2025-00324
GR-CAPRIPOX-2025-00384
GR-CAPRIPOX-2025-00385
Protection zone:
Those parts of the regional unit of Rhodopi contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 41.129527, Long. 25.35025 (2025/287), Lat. 41.095416, Long. 25.193305 (2025/288), Lat. 41.01114, Long. 25.35151 (2025/311), Lat. 41.105193, Long. 25.210017 (2025/317), Lat. 41.0987222, Long. 25.7034722 (2025/323), Lat. 41.0786111, Long. 25.2804444 (2025/324), Lat. 41.0727265, Long. 25.391142 (2025/384), Lat. 41.1238337, Long. 25.4966383 (2025/385).
20.9.2025
Surveillance zone:
Those parts of the regional unit of Rhodopi, Xanthi and Evros, contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 41.129527, Long. 25.35025 (2025/287), Lat. 41.095416, Long. 25.193305 (2025/288), Lat. 41.01114, Long. 25.35151 (2025/311), Lat. 41.105193, Long. 25.210017 (2025/317), Lat. 41.0987222, Long. 25.7034722 (2025/323), Lat. 41.0786111, Long. 25.2804444 (2025/324), Lat. 41.0727265, Long. 25.391142 (2025/384), Lat. 41.1238337, Long. 25.4966383 (2025/385) excluding the areas contained in any protection zone.
30.9.2025
Surveillance zone:
Those parts of the regional units of Rhodopi contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 41.129527, Long. 25.35025 (2025/287), Lat. 41.095416, Long. 25.193305 (2025/288), Lat. 41.01114, Long. 25.35151 (2025/311), Lat. 41.105193, Long. 25.210017 (2025/317), Lat. 41.0987222, Long. 25.7034722 (2025/323), Lat. 41.0786111, Long. 25.2804444 (2025/324), Lat. 41.0727265, Long. 25.391142 (2025/384), Lat. 41.1238337, Long. 25.4966383 (2025/385).
21.9.2025-30.9.2025
Regional unit of Serres
GR-CAPRIPOX-2025-00307
GR-CAPRIPOX-2025-00321
Protection zone:
Those parts of the regional units of Serres contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 40.797854, Long. 23.831196 (2025/307), Lat. 41.044124, Long. 23.573853 (2025/321).
13.9.2025
Surveillance zone:
Those parts of the regional units of Serres and Thessaloniki contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 40.797854, Long. 23.831196 (2025/307), Lat. 41.044124, Long. 23.573853 (2025/321), excluding the areas contained in any protection zone.
23.9.2025
Surveillance zone:
Those parts of the regional units of Serres contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 40.797854, Long. 23.831196 (2025/307), Lat. 41.044124, Long. 23.573853 (2025/321).
14.9.2025-23.9.2025
Regional unit of Trikala
GR-CAPRIPOX-2025-00305
GR-CAPRIPOX-2025-00310
GR-CAPRIPOX-2025-00387
Protection zone:
Those parts of the regional units of Trikala and Karditsa contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.590161, Long. 22.044607 (2025/305), Lat. 39.58, Long. 22.07516 (2025/310), Lat. 39.583725, Long. 22.0624183 (2025/387).
21.9.2025
Surveillance zone:
Those parts of the regional units of Trikala, Karditsa and Larisa contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.590161, Long. 22.044607 (2025/305), Lat. 39.58, Long. 22.07516 (2025/310), Lat. 39.583725, Long. 22.0624183 (2025/387), excluding the areas contained in any protection zone.
1.10.2025
Surveillance zone:
Those parts of the regional units of Trikala and Karditsa contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.590161, Long. 22.044607 (2025/305), Lat. 39.58, Long. 22.07516 (2025/310), Lat. 39.583725, Long. 22.0624183 (2025/387).
22.9.2025-1.10.2025
Regional unit of Karditsa
GR-CAPRIPOX-2025-00378
Protection zone:
Those parts of the regional units of Karditsa and Trikala contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.50222, Long. 22.04318 (2025/378).
20.9.2025
Surveillance zone:
Those parts of the regional units of Karditsa, Larisa and Trikala contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.50222, Long. 22.04318 (2025/378), excluding the areas contained in any protection zone.
30.9.2025
Surveillance zone:
Those parts of the regional units of Karditsa contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.50222, Long. 22.04318 (2025/378).
21.9.2025-30.9.2025
Regional unit of Pieria
GR-CAPRIPOX-2025-00382
Protection zone:
Those parts of the regional units of Pieria and Larisa contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Lat. 39.968737, Long. 22.64962 (2025/382)
21.9.2025
Surveillance zone:
Those parts of the regional units of Pieria and Larisa contained within a circle of a radius of 20 kilometres, centred on UTM 30, ETRS89 coordinates Long. 39.590161, Long. 22.044607 (2025/305), Long. 39.58, Long. 22.07516 (2025/310), excluding the areas contained in any protection zone.
1.10.2025
Surveillance zone:
Those parts of the regional units of Pieria and Larisa contained within a circle of a radius of 5 kilometres, centred on UTM 30, ETRS89 coordinates Long. 39.590161, Long. 22.044607 (2025/305), Long. 39.58, Long. 22.07516 (2025/310).
22.9.2025-1.10.2025

B. Further restricted zones

Further restricted zone
Regional unit
Areas included in the further restricted zones established in Greece as referred to in Article 2
Date until applicable
Further restricted zone No 1
Regional unit of Evros
The regional unit of Evros excluding the municipality of Samothrace and the areas included in any protection or surveillance zone
30.9.2025
The regional unit of Evros excluding the municipality of Samothrace
1.10.2025-30.10.2025
Further restricted zone No 2
Regional unit of Rhodopi
The regional unit of Rhodopi excluding the areas included in any protection or surveillance zone.
30.9.2025
The regional unit of Rhodopi
1.10.2025-30.10.2025
Further restricted zone No 3
Regional unit of Kavala
The regional unit of Kavala including the municipality of Thasos, excluding the areas included in any protection or surveillance zone
1.10.2025
The regional unit of Kavala including the municipality of Thasos
2.10.2025- 31.10.2025
Regional unit of Drama
The municipality of Doxato
31.10.2025
Regional unit of Xanthi
The regional unit of Xanthi excluding the areas included in any protection or surveillance zone
1.10.2025
The regional unit of Xanthi
2.10.2025- 31.10.2025
Further restricted zone No 4
Regional unit of Chalkidiki
The regional unit of Chalkidiki and the monastic community of Mount Athos, excluding the areas included in any protection or surveillance zone.
18.8.2025
The regional unit of Chalkidiki and the monastic commnunity of Mount Athos.
19.8.2025-17.9.2025
Further restricted zone No 8
Regional unit of Magnesia
The regional unit of Magnesia, excluding the Sporades islands and the areas the areas included in any protection or surveillance zone.
30.9.2025
The regional unit of Magnesia, excluding the Sporades islands.
1.10.2025-30.10.2025
Regional unit of Phthiotis
The municipality of Stylida excluding the areas included in any protection or surveillance zone.
30.9.2025
The municipality of Stylida
1.10.2025-30.10.2025
Further restricted zone No 9
Regional unit of Phocis
The municipality of Dorida excluding the areas included in any protection or surveillance zone
25.9.2025
The municipality of Dorida
26.9.2025- 25.10.2025
Regional unit of Aetolia-Acarnania
The municipalities of Nafpaktia and Messolonghi, excluding the areas included in any protection or surveillance zone
25.9.2025
The municipalities of Nafpaktia and Messolonghi
26.9.2025- 25.10.2025
Further restricted zone No 9A
Regional unit of Aetolia-Acarnania
The municipalities of Agrinio Thermo and Xiromero, excluding the areas included in any protection or surveillance zone
25.9.2025
The municipalities of Agrinio Thermo and Xiromero
26.9.2025- 25.10.2025
Further restricted zone no 16
Municipality of Samothrace in the regional unit of Evros
Municipality of Samothrace, excluding the areas included in any protection or surveillance zone.
30.9.2025
The municipality of Samothrace
1.10.2025-30.10.2025
Further restricted zone no 5
Regional unit of Larisa
The regional unit of Larisa excluding the areas included in any protection or surveillance zone.
2.10.2025
The regional unit of Larisa
3.10.2025-1.11.2025
Regional unit of Pieria
The municipality of Dion-Olympos excluding the areas included in any protection or surveillance zone.
1.10.2025
The municipality of Dion-Olympos
2.10.2025- 31.10.2025
Further restricted zone no 5A
Regional unit of Trikala
The regional unit of Trikala excluding the areas included in any protection or surveillance zone.
1.10.2025
The regional unit of Trikala
2.10.2025-31.10.2025
Further restricted zone no 6
Regional unit of Florina
The regional unit of Florina excluding the areas included in any protection or surveillance zone.
10.9.2025
The regional unit of Florina.
11.9.2025-10.10.2025
Further restricted zone no 7
Regional unit of Serres
The regional unit of Serres excluding the areas included in any protection or surveillance zone.
23.9.2025
The regional unit of Serres.
24.9.2025-24.10.2025
Further restricted zone no10
Regional unit of Karditsa
The regional unit of Karditsa excluding the areas included in any protection or surveillance zone.
30.9.2025
The regional unit of Karditsa.
1.10.2025-30.10.2025

Commission Implementing Decision (EU) 2025/1750 of 12 August 2025 amending the Annex to Implementing Decision (EU) 2023/2447 concerning emergency measures in relation to outbreaks of highly pathogenic avian influenza in certain Member States (notified under document C(2025) 5686)

Official Journalof the European Union ENL series
2025/1750 18.8.2025
(1) Highly pathogenic avian influenza (HPAI) is an infectious viral disease in birds and can have a severe impact on the profitability of poultry farming causing disturbance to trade within the Union and exports to third countries. HPAI viruses can infect migratory birds, which can then spread these viruses over long distances during their autumn and spring migrations. Therefore, the presence of HPAI viruses in wild birds poses a continuous threat for the direct and indirect introduction of these viruses into holdings where poultry or captive birds are kept. In the event of an outbreak of HPAI, there is a risk that the disease agent may spread to other holdings where poultry or captive birds are kept.
(2) Regulation (EU) 2016/429 establishes the legislative framework for the prevention and control of diseases that are transmissible to animals or humans. HPAI falls within the definition of a listed disease in that Regulation, and it is subject to the disease prevention and control rules laid down therein. In addition, Commission Delegated Regulation (EU) 2020/687(2)supplements Regulation (EU) 2016/429 as regards the rules for the prevention and control of certain listed diseases, including disease control measures for HPAI.
(3) On 24 October 2023, the Commission adopted Commission Implementing Decision (EU) 2023/2447(3)on the basis of Regulation (EU) 2016/429, and it lays down emergency measures at Union level in relation to outbreaks of HPAI.
(4) In particular, Implementing Decision (EU) 2023/2447 provides that the protection, surveillance and further restricted zones, to be established by the concerned Member States following outbreaks of HPAI, in accordance with Delegated Regulation (EU) 2020/687, must comprise at least the areas listed as protection, surveillance and further restricted zones in the Annex to that Implementing Decision. It also provides that the measures to be applied in those zones, in accordance with that Delegated Regulation, must be maintained until at least the dates set out in that Annex.
(5) The Annex to Implementing Decision (EU) 2023/2447 was recently amended by Commission Implementing Decision (EU) 2025/1712(4)following outbreaks of HPAI in Spain in establishments where poultry were kept, which needed to be reflected in that Annex.
(6) Since the date of adoption of Implementing Decision (EU) 2025/1712, Spain and Portugal notified the Commission of outbreaks of HPAI in establishments where captive birds were kept, located in the Bizkaia province in Spain and the district of Setúbal in Portugal.
(7) Following those outbreaks, Spain and Portugal have taken the disease control measures required in accordance with Delegated Regulation (EU) 2020/687, including the establishment of protection and surveillance zones around those outbreaks.
(8) The Commission has examined the disease control measures taken by Spain and Portugal and it is satisfied that the boundaries of the protection and surveillances zones established by those Member States are at a sufficient distance from the establishments where the outbreaks of HPAI have been confirmed.
(9) In the Annex to Implementing Decision (EU) 2023/2447, there are currently no areas listed as protection and surveillance zones for Portugal.
(10) In order to prevent any unnecessary disturbance to trade within the Union and to avoid unjustified barriers to trade being imposed by third countries, it is necessary to rapidly lay down at Union level, in collaboration with Spain and Portugal, the protection and surveillance zones established by those Member States, in accordance with Delegated Regulation (EU) 2020/687.
(11) Therefore, the areas listed as protection and surveillance zones for Spain in the Annex to Implementing Decision (EU) 2023/2447 should be updated.
(12) In addition, the protection and surveillance zones for Portugal should be listed in the Annex to Implementing Decision (EU) 2023/2447.
(13) Accordingly, the Annex to Implementing Decision (EU) 2023/2447 should be amended to update regionalisation at Union level in order to take account of the protection and surveillance zones established by Spain and Portugal, in accordance with Delegated Regulation (EU) 2020/687, as well as to set out the duration of the measures applicable therein.
(14) Implementing Decision (EU) 2023/2447 should therefore be amended accordingly.
(15) Given the urgency of the epidemiological situation in the Union as regards the spread of HPAI, it is important that the amendments to be made to Implementing Decision (EU) 2023/2447 by this Decision take effect as soon as possible.
(16) The measures provided for in this Decision are in accordance with the opinion of the Standing Committee on Plants, Animals, Food and Feed,
ADIS reference number of the outbreak Area comprising: Date until applicable in accordance with Article 39 of Delegated Regulation (EU) 2020/687
ES-HPAI(P)-2025-00001 Those parts in the province of Badajoz of the comarca of Azuaga contained within a circle of a radius of 3 kilometres, centered on UTM 30, ETRS89 coordinates long -5,858931247 , lat 38,260806792 19.8.2025
ES-HPAI(P)-2025-00002 Those parts in the province of Toledo of the comarcas of Oropesa and Belvís de la Jara contained within a circle of a radius of 3 kilometres, centered on UTM 30, ETRS89 coordinates long -5,1395444 , lat 39,8054028 23.8.2025
ES-HPAI(NON-P)-2025-00009 Those parts in the province of Vizcaya contained within a circle of a radius of 3 kilometres, centered on UTM 30, ETRS89 coordinates long -2,9450083 , lat 43,4246139 27.8.2025
ADIS reference number of the outbreak Area comprising: Date until applicable in accordance with Article 39 of Delegated Regulation (EU) 2020/687
PT.HPAI(NON-P)-2025-00014 The parts from the county of Alcácer do Sal from the district of Setúbal and the county of Viana do Alentejo from the district of Évora, that are contained within circle of 3 kilometers radius, centered on GPS coordinates 38.403607N, -8.316925W 27.8.2025
ADIS reference number of the outbreak Area comprising: Date until applicable in accordance with Article 55 of Delegated Regulation (EU) 2020/687
ES-HPAI(P)-2025-00001 Those parts in the province of Badajoz of the comarca of Azuaga beyond the area described in the protection zone and contained within a circle of a radius of 10 kilometres, centered on UTM 30, ETRS89 coordinates long -5,858931247 , lat 38,260806792 28.8.2025
Those parts in the province of Badajoz of the comarca of Azuaga contained within a circle of a radius of 3 kilometres, centered on UTM 30, ETRS89 coordinates long -5,858931247 , lat 38,260806792 20.8.2025 – 28.8.2025
ES-HPAI(P)-2025-00002 Those parts in the province of Toledo of the comarcas of Oropesa, Talavera de la Reina and Belvís de la Jara, and in the province of Cáceres of the comarca of Navalmoral de la Mata beyond the area described in the protection zone and contained within a circle of a radius of 10 kilometres, centered on UTM 30, ETRS89 coordinates long -5,1395444 , lat 39,8054028 1.9.2025
Those parts in the province of Toledo of the comarcas of Oropesa end Belvis de la Jara contained within a circle of a radius of 3 kilometres, centered on UTM 30, ETRS89 coordinates long -5,1395444 , lat 39,8054028 24.8.2025 – 1.9.2025
ES-HPAI(NON-P)-2025-00009 Those parts in the province of Vizcaya contained within a circle of a radius of 10 kilometres, centered on UTM 30, ETRS89 coordinates long -2,9450083 , lat 43,4246139 5.9.2025
Those parts in the province of Vizcaya contained within a circle of a radius of 3 kilometres, centered on UTM 30, ETRS89 coordinates long -2,9450083 , lat 43,4246139 28.8.2025 – 5.9.2025
ADIS reference number of the outbreak Area comprising: Date until applicable in accordance with Article 55 of Delegated Regulation (EU) 2020/687
PT.HPAI(NON-P)-2025-00014 The parts from the county of Alcácer do Sal from the district of Setúbal, the county of Viana do Alentejo and the county of Montemor-o-Novo both from the district of Évora, that are contained within the circle of 10 kilometers radius, centered on GPS coordinates 38.403607N, -8.316925W 5.9.2025
The parts from the county of Alcácer do Sal from the district of Setúbal and the county of Viana do Alentejo from the district of Évora, that are contained within circle of 3 kilometers radius, centered on GPS coordinates 38.403607N, -8.316925W 28.8.2025 – 5.9.2025
Area comprising: Date until measures are to remain applicable in accordance with Article 4
* In accordance with the Agreement on the withdrawal of the United Kingdom of Great Britain and Northern Ireland from the European Union and the European Atomic Energy Community, and in particular Article 5(4) of the Windsor Framework (see Joint Declaration No 1/2023 of the Union and the United Kingdom in the Joint Committee established by the Agreement on the withdrawal of the United Kingdom of Great Britain and Northern Ireland from the European Union and the European Atomic Energy Community of 24 March 2023,OJ L 102, 17.4.2023, p. 87) in conjunction with Annex 2 to that Framework, for the purposes of this Annex, references to Member State include the United Kingdom in respect of Northern Ireland.
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) 2016/429 of the European Parliament and of the Council of 9 March 2016 on transmissible animal diseases and amending and repealing certain acts in the area of animal health (‘Animal Health Law’) (1), and in particular Article 259(1), point (c), thereof,
Whereas:
(1) Highly pathogenic avian influenza (HPAI) is an infectious viral disease in birds and can have a severe impact on the profitability of poultry farming causing disturbance to trade within the Union and exports to third countries. HPAI viruses can infect migratory birds, which can then spread these viruses over long distances during their autumn and spring migrations. Therefore, the presence of HPAI viruses in wild birds poses a continuous threat for the direct and indirect introduction of these viruses into holdings where poultry or captive birds are kept. In the event of an outbreak of HPAI, there is a risk that the disease agent may spread to other holdings where poultry or captive birds are kept.
(2) Regulation (EU) 2016/429 establishes the legislative framework for the prevention and control of diseases that are transmissible to animals or humans. HPAI falls within the definition of a listed disease in that Regulation, and it is subject to the disease prevention and control rules laid down therein. In addition, Commission Delegated Regulation (EU) 2020/687 (2) supplements Regulation (EU) 2016/429 as regards the rules for the prevention and control of certain listed diseases, including disease control measures for HPAI.
(3) On 24 October 2023, the Commission adopted Commission Implementing Decision (EU) 2023/2447 (3) on the basis of Regulation (EU) 2016/429, and it lays down emergency measures at Union level in relation to outbreaks of HPAI.
(4) In particular, Implementing Decision (EU) 2023/2447 provides that the protection, surveillance and further restricted zones, to be established by the concerned Member States following outbreaks of HPAI, in accordance with Delegated Regulation (EU) 2020/687, must comprise at least the areas listed as protection, surveillance and further restricted zones in the Annex to that Implementing Decision. It also provides that the measures to be applied in those zones, in accordance with that Delegated Regulation, must be maintained until at least the dates set out in that Annex.
(5) The Annex to Implementing Decision (EU) 2023/2447 was recently amended by Commission Implementing Decision (EU) 2025/1712 (4) following outbreaks of HPAI in Spain in establishments where poultry were kept, which needed to be reflected in that Annex.
(6) Since the date of adoption of Implementing Decision (EU) 2025/1712, Spain and Portugal notified the Commission of outbreaks of HPAI in establishments where captive birds were kept, located in the Bizkaia province in Spain and the district of Setúbal in Portugal.
(7) Following those outbreaks, Spain and Portugal have taken the disease control measures required in accordance with Delegated Regulation (EU) 2020/687, including the establishment of protection and surveillance zones around those outbreaks.
(8) The Commission has examined the disease control measures taken by Spain and Portugal and it is satisfied that the boundaries of the protection and surveillances zones established by those Member States are at a sufficient distance from the establishments where the outbreaks of HPAI have been confirmed.
(9) In the Annex to Implementing Decision (EU) 2023/2447, there are currently no areas listed as protection and surveillance zones for Portugal.
(10) In order to prevent any unnecessary disturbance to trade within the Union and to avoid unjustified barriers to trade being imposed by third countries, it is necessary to rapidly lay down at Union level, in collaboration with Spain and Portugal, the protection and surveillance zones established by those Member States, in accordance with Delegated Regulation (EU) 2020/687.
(11) Therefore, the areas listed as protection and surveillance zones for Spain in the Annex to Implementing Decision (EU) 2023/2447 should be updated.
(12) In addition, the protection and surveillance zones for Portugal should be listed in the Annex to Implementing Decision (EU) 2023/2447.
(13) Accordingly, the Annex to Implementing Decision (EU) 2023/2447 should be amended to update regionalisation at Union level in order to take account of the protection and surveillance zones established by Spain and Portugal, in accordance with Delegated Regulation (EU) 2020/687, as well as to set out the duration of the measures applicable therein.
(14) Implementing Decision (EU) 2023/2447 should therefore be amended accordingly.
(15) Given the urgency of the epidemiological situation in the Union as regards the spread of HPAI, it is important that the amendments to be made to Implementing Decision (EU) 2023/2447 by this Decision take effect as soon as possible.
(16) The measures provided for in this Decision are in accordance with the opinion of the Standing Committee on Plants, Animals, Food and Feed,
HAS ADOPTED THIS DECISION:
The Annex to Implementing Decision (EU) 2023/2447 is replaced by the text set out in the Annex to this Decision.
This Decision is addressed to the Member States.

Part A

Protection zones in the concerned Member States* as referred to in Article 1, point (a), and Article 2:

Member State: Spain

ADIS reference number of the outbreak
Area comprising:
Date until applicable in accordance with Article 39 of Delegated Regulation (EU) 2020/687
ES-HPAI(P)-2025-00001
Those parts in the province of Badajoz of the comarca of Azuaga contained within a circle of a radius of 3 kilometres, centered on UTM 30, ETRS89 coordinates long -5,858931247 , lat 38,260806792
19.8.2025
ES-HPAI(P)-2025-00002
Those parts in the province of Toledo of the comarcas of Oropesa and Belvís de la Jara contained within a circle of a radius of 3 kilometres, centered on UTM 30, ETRS89 coordinates long -5,1395444 , lat 39,8054028
23.8.2025
ES-HPAI(NON-P)-2025-00009
Those parts in the province of Vizcaya contained within a circle of a radius of 3 kilometres, centered on UTM 30, ETRS89 coordinates long -2,9450083 , lat 43,4246139
27.8.2025

Member State: Portugal

ADIS reference number of the outbreak
Area comprising:
Date until applicable in accordance with Article 39 of Delegated Regulation (EU) 2020/687
PT.HPAI(NON-P)-2025-00014
The parts from the county of Alcácer do Sal from the district of Setúbal and the county of Viana do Alentejo from the district of Évora, that are contained within circle of 3 kilometers radius, centered on GPS coordinates 38.403607N, -8.316925W
27.8.2025

Part B

Surveillance zones in the concerned Member States* as referred to in Article 1, point (a), and Article 3:

Member State: Spain

ADIS reference number of the outbreak
Area comprising:
Date until applicable in accordance with Article 55 of Delegated Regulation (EU) 2020/687
ES-HPAI(P)-2025-00001
Those parts in the province of Badajoz of the comarca of Azuaga beyond the area described in the protection zone and contained within a circle of a radius of 10 kilometres, centered on UTM 30, ETRS89 coordinates long -5,858931247 , lat 38,260806792
28.8.2025
Those parts in the province of Badajoz of the comarca of Azuaga contained within a circle of a radius of 3 kilometres, centered on UTM 30, ETRS89 coordinates long -5,858931247 , lat 38,260806792
20.8.2025 – 28.8.2025
ES-HPAI(P)-2025-00002
Those parts in the province of Toledo of the comarcas of Oropesa, Talavera de la Reina and Belvís de la Jara, and in the province of Cáceres of the comarca of Navalmoral de la Mata beyond the area described in the protection zone and contained within a circle of a radius of 10 kilometres, centered on UTM 30, ETRS89 coordinates long -5,1395444 , lat 39,8054028
1.9.2025
Those parts in the province of Toledo of the comarcas of Oropesa end Belvis de la Jara contained within a circle of a radius of 3 kilometres, centered on UTM 30, ETRS89 coordinates long -5,1395444 , lat 39,8054028
24.8.2025 – 1.9.2025
ES-HPAI(NON-P)-2025-00009
Those parts in the province of Vizcaya contained within a circle of a radius of 10 kilometres, centered on UTM 30, ETRS89 coordinates long -2,9450083 , lat 43,4246139
5.9.2025
Those parts in the province of Vizcaya contained within a circle of a radius of 3 kilometres, centered on UTM 30, ETRS89 coordinates long -2,9450083 , lat 43,4246139
28.8.2025 – 5.9.2025

Member State: Portugal

ADIS reference number of the outbreak
Area comprising:
Date until applicable in accordance with Article 55 of Delegated Regulation (EU) 2020/687
PT.HPAI(NON-P)-2025-00014
The parts from the county of Alcácer do Sal from the district of Setúbal, the county of Viana do Alentejo and the county of Montemor-o-Novo both from the district of Évora, that are contained within the circle of 10 kilometers radius, centered on GPS coordinates 38.403607N, -8.316925W
5.9.2025
The parts from the county of Alcácer do Sal from the district of Setúbal and the county of Viana do Alentejo from the district of Évora, that are contained within circle of 3 kilometers radius, centered on GPS coordinates 38.403607N, -8.316925W
28.8.2025 – 5.9.2025

Part C

Further restricted zones in the concerned Member States* as referred to in Article 1, point (b), and Article 4:

Member State: None

Area comprising:
Date until measures are to remain applicable in accordance with Article 4

*
In accordance with the Agreement on the withdrawal of the United Kingdom of Great Britain and Northern Ireland from the European Union and the European Atomic Energy Community, and in particular Article 5(4) of the Windsor Framework (see Joint Declaration No 1/2023 of the Union and the United Kingdom in the Joint Committee established by the Agreement on the withdrawal of the United Kingdom of Great Britain and Northern Ireland from the European Union and the European Atomic Energy Community of 24 March 2023, OJ L 102, 17.4.2023, p. 87) in conjunction with Annex 2 to that Framework, for the purposes of this Annex, references to Member State include the United Kingdom in respect of Northern Ireland.

Commission Implementing Decision (EU) 2025/1741 of 13 August 2025 amending Implementing Decision (EU) 2022/2191 as regards harmonised standards for wireless digital video links, satellite earth stations and systems, base stations and short range devices

Official Journalof the European Union ENL series
2025/1741 14.8.2025
(1) In accordance with Article 16 of Directive 2014/53/EU of the European Parliament and of the Council(2), radio equipment which is in conformity with harmonised standards or parts thereof, the references of which have been published in theOfficial Journal of the European Union, is to be presumed to be in conformity with the essential requirements set out in Article 3 of that Directive where they are covered by those standards or parts thereof.
(2) By Commission Implementing Decision C(2015) 5376(3), the Commission made a request to the European Committee for Electrotechnical Standardisation (Cenelec) and the European Telecommunications Standards Institute (ETSI) for the drafting and the revision of harmonised standards, for radio equipment and in support of the essential requirements that are set out in Directive 2014/53/EU and covered by Annex II to that Decision (‘the request’).
(3) On the basis of the request, ETSI drafted harmonised standard EN 301 489-28 V2.1.1 on electromagnetic compatibility for wireless digital video links.
(4) On the basis of the request, ETSI revised harmonised standards EN 300 487 V2.1.2, EN 301 908-14 V15.1.1, EN 301 908-18 V15.1.1 and EN 303 978 V2.1.2, the references of which are published in theOfficial Journal of the European Unionby Commission Implementing Decision (EU) 2022/2191(4). This resulted in the adoption of harmonised standards EN 300 487 V2.2.1, EN 301 908-14 V17.1.1, EN 301 908-18 V17.1.1 and EN 303 978 V2.2.1. Furthermore, ETSI drafted more specific standards in replacement of the generic harmonised standards EN 302 065-3 V2.1.1 and EN 302 065-4 V1.1.1, the references of which are published in theOfficial Journal of the European Unionby Implementing Decision (EU) 2022/2191. This resulted in the adoption of harmonised standards EN 302 065-3-1 V3.2.1 and EN 302 065-4-1 V2.2.1.
(5) The Commission, together with ETSI, has assessed whether those harmonised standards comply with the request.
(6) Harmonised standards EN 300 487 V2.2.1, EN 301 908-14 V17.1.1, EN 301 908-18 V17.1.1, EN 302 065-3-1 V3.2.1, EN 302 065-4-1 V2.2.1 and EN 303 978 V2.2.1 satisfy the essential requirements which they aim to cover and which are set out in Article 3 of Directive 2014/53/EU. It is therefore appropriate to publish the references of those harmonised standards in theOfficial Journal of the European Union.
(7) Harmonised standard EN 301 489-28 V2.1.1 does not address emissions requirements in the frequency band below 9 kHz. Additionally, in its clause 6, it lays down performance-based criteria on a subjective basis, lacking objectively verifiable criteria and specified limits. Consequently, EN 301 489-28 V2.1.1 should not provide a presumption of conformity as regards the emission requirements in frequency bands below 9 kHz and also as regards its clause 6, if that clause is applied with such performance-based criteria. The reference of that harmonised standard should therefore be published in theOfficial Journal of the European Unionwith restrictions.
(8) Annex I to Implementing Decision (EU) 2022/2191 provides the references of harmonised standards conferring a presumption of conformity with Directive 2014/53/EU. In order to ensure that the references of harmonised standards drafted in support of Directive 2014/53/EU are listed in one act, the references of the following harmonised standards should be included in that Annex: EN 300 487 V2.2.1, EN 301 908-14 V17.1.1, EN 301 908-18 V17.1.1, EN 302 065-3-1 V3.2.1, EN 302 065-4-1 V2.2.1 and EN 303 978 V2.2.1. Furthermore, the reference of harmonised standard EN 301 489-28 V2.1.1 should be included in that Annex with restrictions.
(9) It is therefore necessary to withdraw from theOfficial Journal of the European Unionthe references of the revised harmonised standards EN 300 487 V2.1.2, EN 301 908-14 V15.1.1, EN 301 908-18 V15.1.1, EN 302 065-3 V2.1.1, EN 302 065-4 V1.1.1 and EN 303 978 V2.1.2.
(10) In order to allow manufacturers sufficient time to carry out any adaptations in relation to their radio equipment that is covered by the revised harmonised standard EN 300 487 V2.1.2, EN 301 908-14 V15.1.1, EN 301 908-18 V15.1.1, EN 302 065-3 V2.1.1, EN 302 065-4 V1.1.1 or EN 303 978 V2.1.2, it is necessary to defer the withdrawal of the references of those harmonised standards.
(11) Implementing Decision (EU) 2022/2191 should therefore be amended accordingly.
(12) Compliance with a harmonised standard confers a presumption of conformity with the corresponding essential requirements set out in Union harmonisation legislation from the date of publication of the reference of such standard in theOfficial Journal of the European Union. This Decision should therefore enter into force on the day of its publication,
(1) rows 25, 71, 73, 87, 88 and 159 are deleted;
(2) the following rows are inserted in sequential order:‘25a.EN 300 487 V2.2.1Satellite Earth Stations and Systems (SES); Receive-Only Mobile Earth Stations (ROMES) providing data communications operating in the 1,5 GHz frequency band; Harmonised Standard for access to radio spectrum’‘71a.EN 301 908-14 V17.1.1IMT cellular networks; Harmonised Standard for access to radio spectrum; Part 14: Evolved Universal Terrestrial Radio Access (E-UTRA); Base Stations (BS); Release 17’‘73a.EN 301 908-18 V17.1.1IMT cellular networks; Harmonised Standard for access to radio spectrum; Part 18: NR, E-UTRA, UTRA and GSM/EDGE Multi-Standard Radio (MSR); Base Station (BS); Release 17’‘87a.EN 302 065-3-1 V3.2.1Short Range Devices (SRD) using Ultra Wide Band technology (UWB); Harmonised standard for access to radio spectrum; Part 3: UWB devices installed in motor and railway vehicles; Sub-part 1:Requirements for UWB devices for vehicular access systems within 3,8 GHz to 4,2 GHz or 6 GHz to 8,5 GHz’‘88a.EN 302 065-4-1 V2.2.1Short Range Devices (SRD) using Ultra Wide Band technology (UWB); Harmonised Standard for access to radio spectrum; Part 4: Material Sensing devices; Sub-part 1: Building material analysis operating within 30 MHz to 10,6 GHz’‘159a.EN 303 978 V2.2.1Satellite Earth Stations and Systems (SES); Earth Stations on Mobile Platforms (ESOMP) communicating with satellites in geostationary orbit, operating in the 27,5 GHz to 30,0 GHz and 17,3 GHz to 20,2 GHz frequency bands; Harmonised Standard for access to radio spectrum’ ‘25a. EN 300 487 V2.2.1Satellite Earth Stations and Systems (SES); Receive-Only Mobile Earth Stations (ROMES) providing data communications operating in the 1,5 GHz frequency band; Harmonised Standard for access to radio spectrum’ ‘71a. EN 301 908-14 V17.1.1IMT cellular networks; Harmonised Standard for access to radio spectrum; Part 14: Evolved Universal Terrestrial Radio Access (E-UTRA); Base Stations (BS); Release 17’ ‘73a. EN 301 908-18 V17.1.1IMT cellular networks; Harmonised Standard for access to radio spectrum; Part 18: NR, E-UTRA, UTRA and GSM/EDGE Multi-Standard Radio (MSR); Base Station (BS); Release 17’ ‘87a. EN 302 065-3-1 V3.2.1Short Range Devices (SRD) using Ultra Wide Band technology (UWB); Harmonised standard for access to radio spectrum; Part 3: UWB devices installed in motor and railway vehicles; Sub-part 1:Requirements for UWB devices for vehicular access systems within 3,8 GHz to 4,2 GHz or 6 GHz to 8,5 GHz’ ‘88a. EN 302 065-4-1 V2.2.1Short Range Devices (SRD) using Ultra Wide Band technology (UWB); Harmonised Standard for access to radio spectrum; Part 4: Material Sensing devices; Sub-part 1: Building material analysis operating within 30 MHz to 10,6 GHz’ ‘159a. EN 303 978 V2.2.1Satellite Earth Stations and Systems (SES); Earth Stations on Mobile Platforms (ESOMP) communicating with satellites in geostationary orbit, operating in the 27,5 GHz to 30,0 GHz and 17,3 GHz to 20,2 GHz frequency bands; Harmonised Standard for access to radio spectrum’
‘25a. EN 300 487 V2.2.1Satellite Earth Stations and Systems (SES); Receive-Only Mobile Earth Stations (ROMES) providing data communications operating in the 1,5 GHz frequency band; Harmonised Standard for access to radio spectrum’
‘71a. EN 301 908-14 V17.1.1IMT cellular networks; Harmonised Standard for access to radio spectrum; Part 14: Evolved Universal Terrestrial Radio Access (E-UTRA); Base Stations (BS); Release 17’
‘73a. EN 301 908-18 V17.1.1IMT cellular networks; Harmonised Standard for access to radio spectrum; Part 18: NR, E-UTRA, UTRA and GSM/EDGE Multi-Standard Radio (MSR); Base Station (BS); Release 17’
‘87a. EN 302 065-3-1 V3.2.1Short Range Devices (SRD) using Ultra Wide Band technology (UWB); Harmonised standard for access to radio spectrum; Part 3: UWB devices installed in motor and railway vehicles; Sub-part 1:Requirements for UWB devices for vehicular access systems within 3,8 GHz to 4,2 GHz or 6 GHz to 8,5 GHz’
‘88a. EN 302 065-4-1 V2.2.1Short Range Devices (SRD) using Ultra Wide Band technology (UWB); Harmonised Standard for access to radio spectrum; Part 4: Material Sensing devices; Sub-part 1: Building material analysis operating within 30 MHz to 10,6 GHz’
‘159a. EN 303 978 V2.2.1Satellite Earth Stations and Systems (SES); Earth Stations on Mobile Platforms (ESOMP) communicating with satellites in geostationary orbit, operating in the 27,5 GHz to 30,0 GHz and 17,3 GHz to 20,2 GHz frequency bands; Harmonised Standard for access to radio spectrum’
‘25a. EN 300 487 V2.2.1Satellite Earth Stations and Systems (SES); Receive-Only Mobile Earth Stations (ROMES) providing data communications operating in the 1,5 GHz frequency band; Harmonised Standard for access to radio spectrum’
‘71a. EN 301 908-14 V17.1.1IMT cellular networks; Harmonised Standard for access to radio spectrum; Part 14: Evolved Universal Terrestrial Radio Access (E-UTRA); Base Stations (BS); Release 17’
‘73a. EN 301 908-18 V17.1.1IMT cellular networks; Harmonised Standard for access to radio spectrum; Part 18: NR, E-UTRA, UTRA and GSM/EDGE Multi-Standard Radio (MSR); Base Station (BS); Release 17’
‘87a. EN 302 065-3-1 V3.2.1Short Range Devices (SRD) using Ultra Wide Band technology (UWB); Harmonised standard for access to radio spectrum; Part 3: UWB devices installed in motor and railway vehicles; Sub-part 1:Requirements for UWB devices for vehicular access systems within 3,8 GHz to 4,2 GHz or 6 GHz to 8,5 GHz’
‘88a. EN 302 065-4-1 V2.2.1Short Range Devices (SRD) using Ultra Wide Band technology (UWB); Harmonised Standard for access to radio spectrum; Part 4: Material Sensing devices; Sub-part 1: Building material analysis operating within 30 MHz to 10,6 GHz’
‘159a. EN 303 978 V2.2.1Satellite Earth Stations and Systems (SES); Earth Stations on Mobile Platforms (ESOMP) communicating with satellites in geostationary orbit, operating in the 27,5 GHz to 30,0 GHz and 17,3 GHz to 20,2 GHz frequency bands; Harmonised Standard for access to radio spectrum’
(3) the following row is added:‘181.EN 301 489-28 V2.1.1ElectroMagnetic Compatibility (EMC) standard for radio equipment and services; Part 28: Specific conditions for wireless digital video links; Harmonised Standard for ElectroMagnetic CompatibilityNotice 1: This harmonised standard does not address emission requirements in frequency bands below 9 kHz and does not therefore confer a presumption of conformity as regards this parameter in this band.Notice 2: This harmonised standard does not confer a presumption of conformity to the essential requirement set out in Article 3(1), point (b), of Directive 2014/53/EU, if its clause 6 is applied.’ ‘181. EN 301 489-28 V2.1.1ElectroMagnetic Compatibility (EMC) standard for radio equipment and services; Part 28: Specific conditions for wireless digital video links; Harmonised Standard for ElectroMagnetic CompatibilityNotice 1: This harmonised standard does not address emission requirements in frequency bands below 9 kHz and does not therefore confer a presumption of conformity as regards this parameter in this band.Notice 2: This harmonised standard does not confer a presumption of conformity to the essential requirement set out in Article 3(1), point (b), of Directive 2014/53/EU, if its clause 6 is applied.’
‘181. EN 301 489-28 V2.1.1ElectroMagnetic Compatibility (EMC) standard for radio equipment and services; Part 28: Specific conditions for wireless digital video links; Harmonised Standard for ElectroMagnetic CompatibilityNotice 1: This harmonised standard does not address emission requirements in frequency bands below 9 kHz and does not therefore confer a presumption of conformity as regards this parameter in this band.Notice 2: This harmonised standard does not confer a presumption of conformity to the essential requirement set out in Article 3(1), point (b), of Directive 2014/53/EU, if its clause 6 is applied.’
‘181. EN 301 489-28 V2.1.1ElectroMagnetic Compatibility (EMC) standard for radio equipment and services; Part 28: Specific conditions for wireless digital video links; Harmonised Standard for ElectroMagnetic CompatibilityNotice 1: This harmonised standard does not address emission requirements in frequency bands below 9 kHz and does not therefore confer a presumption of conformity as regards this parameter in this band.Notice 2: This harmonised standard does not confer a presumption of conformity to the essential requirement set out in Article 3(1), point (b), of Directive 2014/53/EU, if its clause 6 is applied.’
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) No 1025/2012 of the European Parliament and of the Council of 25 October 2012 on European standardisation, amending Council Directives 89/686/EEC and 93/15/EEC and Directives 94/9/EC, 94/25/EC, 95/16/EC, 97/23/EC, 98/34/EC, 2004/22/EC, 2007/23/EC, 2009/23/EC and 2009/105/EC of the European Parliament and of the Council and repealing Council Decision 87/95/EEC and Decision No 1673/2006/EC of the European Parliament and of the Council (1), and in particular Article 10(6) thereof,
Whereas:
(1) In accordance with Article 16 of Directive 2014/53/EU of the European Parliament and of the Council (2), radio equipment which is in conformity with harmonised standards or parts thereof, the references of which have been published in the Official Journal of the European Union, is to be presumed to be in conformity with the essential requirements set out in Article 3 of that Directive where they are covered by those standards or parts thereof.
(2) By Commission Implementing Decision C(2015) 5376 (3), the Commission made a request to the European Committee for Electrotechnical Standardisation (Cenelec) and the European Telecommunications Standards Institute (ETSI) for the drafting and the revision of harmonised standards, for radio equipment and in support of the essential requirements that are set out in Directive 2014/53/EU and covered by Annex II to that Decision (‘the request’).
(3) On the basis of the request, ETSI drafted harmonised standard EN 301 489-28 V2.1.1 on electromagnetic compatibility for wireless digital video links.
(4) On the basis of the request, ETSI revised harmonised standards EN 300 487 V2.1.2, EN 301 908-14 V15.1.1, EN 301 908-18 V15.1.1 and EN 303 978 V2.1.2, the references of which are published in the Official Journal of the European Union by Commission Implementing Decision (EU) 2022/2191 (4). This resulted in the adoption of harmonised standards EN 300 487 V2.2.1, EN 301 908-14 V17.1.1, EN 301 908-18 V17.1.1 and EN 303 978 V2.2.1. Furthermore, ETSI drafted more specific standards in replacement of the generic harmonised standards EN 302 065-3 V2.1.1 and EN 302 065-4 V1.1.1, the references of which are published in the Official Journal of the European Union by Implementing Decision (EU) 2022/2191. This resulted in the adoption of harmonised standards EN 302 065-3-1 V3.2.1 and EN 302 065-4-1 V2.2.1.
(5) The Commission, together with ETSI, has assessed whether those harmonised standards comply with the request.
(6) Harmonised standards EN 300 487 V2.2.1, EN 301 908-14 V17.1.1, EN 301 908-18 V17.1.1, EN 302 065-3-1 V3.2.1, EN 302 065-4-1 V2.2.1 and EN 303 978 V2.2.1 satisfy the essential requirements which they aim to cover and which are set out in Article 3 of Directive 2014/53/EU. It is therefore appropriate to publish the references of those harmonised standards in the Official Journal of the European Union.
(7) Harmonised standard EN 301 489-28 V2.1.1 does not address emissions requirements in the frequency band below 9 kHz. Additionally, in its clause 6, it lays down performance-based criteria on a subjective basis, lacking objectively verifiable criteria and specified limits. Consequently, EN 301 489-28 V2.1.1 should not provide a presumption of conformity as regards the emission requirements in frequency bands below 9 kHz and also as regards its clause 6, if that clause is applied with such performance-based criteria. The reference of that harmonised standard should therefore be published in the Official Journal of the European Union with restrictions.
(8) Annex I to Implementing Decision (EU) 2022/2191 provides the references of harmonised standards conferring a presumption of conformity with Directive 2014/53/EU. In order to ensure that the references of harmonised standards drafted in support of Directive 2014/53/EU are listed in one act, the references of the following harmonised standards should be included in that Annex: EN 300 487 V2.2.1, EN 301 908-14 V17.1.1, EN 301 908-18 V17.1.1, EN 302 065-3-1 V3.2.1, EN 302 065-4-1 V2.2.1 and EN 303 978 V2.2.1. Furthermore, the reference of harmonised standard EN 301 489-28 V2.1.1 should be included in that Annex with restrictions.
(9) It is therefore necessary to withdraw from the Official Journal of the European Union the references of the revised harmonised standards EN 300 487 V2.1.2, EN 301 908-14 V15.1.1, EN 301 908-18 V15.1.1, EN 302 065-3 V2.1.1, EN 302 065-4 V1.1.1 and EN 303 978 V2.1.2.
(10) In order to allow manufacturers sufficient time to carry out any adaptations in relation to their radio equipment that is covered by the revised harmonised standard EN 300 487 V2.1.2, EN 301 908-14 V15.1.1, EN 301 908-18 V15.1.1, EN 302 065-3 V2.1.1, EN 302 065-4 V1.1.1 or EN 303 978 V2.1.2, it is necessary to defer the withdrawal of the references of those harmonised standards.
(11) Implementing Decision (EU) 2022/2191 should therefore be amended accordingly.
(12) Compliance with a harmonised standard confers a presumption of conformity with the corresponding essential requirements set out in Union harmonisation legislation from the date of publication of the reference of such standard in the Official Journal of the European Union. This Decision should therefore enter into force on the day of its publication,
HAS ADOPTED THIS DECISION:
Annex I to Implementing Decision (EU) 2022/2191 is amended in accordance with the Annex to this Decision.
This Decision shall enter into force on the day of its publication in the Official Journal of the European Union.
Point (1) of the Annex shall apply from 14 February 2027.

Annex I to Implementing Decision (EU) 2022/2191 is amended as follows:

(1) rows 25, 71, 73, 87, 88 and 159 are deleted;

(2) the following rows are inserted in sequential order:
‘25a.
EN 300 487 V2.2.1
Satellite Earth Stations and Systems (SES); Receive-Only Mobile Earth Stations (ROMES) providing data communications operating in the 1,5 GHz frequency band; Harmonised Standard for access to radio spectrum’
‘71a.
EN 301 908-14 V17.1.1
IMT cellular networks; Harmonised Standard for access to radio spectrum; Part 14: Evolved Universal Terrestrial Radio Access (E-UTRA); Base Stations (BS); Release 17’
‘73a.
EN 301 908-18 V17.1.1
IMT cellular networks; Harmonised Standard for access to radio spectrum; Part 18: NR, E-UTRA, UTRA and GSM/EDGE Multi-Standard Radio (MSR); Base Station (BS); Release 17’
‘87a.
EN 302 065-3-1 V3.2.1
Short Range Devices (SRD) using Ultra Wide Band technology (UWB); Harmonised standard for access to radio spectrum; Part 3: UWB devices installed in motor and railway vehicles; Sub-part 1:Requirements for UWB devices for vehicular access systems within 3,8 GHz to 4,2 GHz or 6 GHz to 8,5 GHz’
‘88a.
EN 302 065-4-1 V2.2.1
Short Range Devices (SRD) using Ultra Wide Band technology (UWB); Harmonised Standard for access to radio spectrum; Part 4: Material Sensing devices; Sub-part 1: Building material analysis operating within 30 MHz to 10,6 GHz’
‘159a.
EN 303 978 V2.2.1
Satellite Earth Stations and Systems (SES); Earth Stations on Mobile Platforms (ESOMP) communicating with satellites in geostationary orbit, operating in the 27,5 GHz to 30,0 GHz and 17,3 GHz to 20,2 GHz frequency bands; Harmonised Standard for access to radio spectrum’

(3) the following row is added:
‘181. EN 301 489-28 V2.1.1
ElectroMagnetic Compatibility (EMC) standard for radio equipment and services; Part 28: Specific conditions for wireless digital video links; Harmonised Standard for ElectroMagnetic Compatibility
Notice 1: This harmonised standard does not address emission requirements in frequency bands below 9 kHz and does not therefore confer a presumption of conformity as regards this parameter in this band.
Notice 2: This harmonised standard does not confer a presumption of conformity to the essential requirement set out in Article 3(1), point (b), of Directive 2014/53/EU, if its clause 6 is applied.’

Commission Implementing Decision (EU) 2025/1740 of 13 August 2025 amending Implementing Decision (EU) 2023/1586 as regards harmonised standards for lifts, firefighting and rescue service vehicles, application equipment for coating materials, cranes, hoists, aircraft ground support equipment, supply and circulation equipment for liquid coating materials, power operated doors and gates, garden equipment, food processing equipment and welding equipment

Official Journalof the European Union ENL series
2025/1740 14.8.2025
(1) In accordance with Article 7 of Directive 2006/42/EC, machinery manufactured in conformity with harmonised standards, or parts thereof, the reference to which have been published in theOfficial Journal of the European Union, are to be presumed to comply with the essential health and safety requirements set out in Annex I to that Directive covered by those standards or parts thereof.
(2) By letter M/396 of 19 December 2006, the Commission made a request to the European Committee for Standardization (CEN) and the European Committee for Electrotechnical Standardization (Cenelec) (‘the Request’) for the drafting, the revision and the completion of the work on harmonised standards in support of Directive 2006/42/EC to take account of changes introduced by that Directive in comparison with Directive 98/37/EC of the European Parliament and of the Council(3).
(3) On the basis of the Request, CEN and Cenelec drafted the following new harmonised standards: EN 81-44:2024 with safety rules for the construction and installation of lifts in wind turbines, EN 17677:2024 with safety and hygiene requirements for food processing equipment, EN 17942:2024 with safety requirements for welding equipment, EN 50059:2025 with safety requirements for hand-held electrostatic coating material application equipment and EN 50176:2025 with safety requirements for automatic electrostatic liquid coating material application equipment.
(4) On the basis of the Request, CEN revised the following harmonised standards, the references of which are published in theOfficial Journal of the European Unionby Commission Implementing Decision (EU) 2023/1586(4): EN 81-31:2010, EN 81-41:2010, EN 1846-2:2009+A1:2013, EN 1953:2013, EN 12077-2:1998+A1:2008, EN 12159:2012, EN 12312-4:2014, EN 12621:2006+A1:2010 and EN 12978:2003+A1:2009. This resulted in the adoption of the following revising harmonised standards: EN 81-31:2024, EN 81-41:2024, EN 1846-2:2024, EN 1953:2025, EN 12077-2:2024, EN 12159:2024, EN 12312-4:2024, EN 12621:2025 and EN 12978:2024.
(5) Furthermore, on the basis of the Request, CEN amended the following harmonised standards, the references of which are published inthe Official Journal of the European Unionby Implementing Decision (EU) 2023/1586: EN 12312-5:2021 and EN 13684:2018. This resulted in the adoption of the consolidated harmonised standards EN 12312-5:2021+A1:2025 and EN 13684:2018+A1:2024.
(6) The Commission, together with CEN and Cenelec, has assessed whether those harmonised standards comply with the Request.
(7) The following harmonised standards satisfy the safety objectives which they aim to cover and which are set out in Directive 2006/42/EC: EN 81-31:2024, EN 81-41:2024, EN 81-44:2024, EN 1846-2:2024, EN 1953:2025, EN 12077-2:2024, EN 12159:2024, EN 12312-4:2024, EN 12312-5:2021+A1:2025, EN 12621:2025, EN 12978:2024, EN 13684:2018+A1:2024, EN 17677:2024, EN 17942:2024, EN 50059:2025 and EN 50176:2025. It is therefore appropriate to publish the references of those standards and amendments thereto in theOfficial Journal of the European Union.
(8) Annex I to Implementing Decision (EU) 2023/1586 lists the references of harmonised standards conferring a presumption of conformity with Directive 2006/42/EC. In order to ensure that the references of harmonised standards drafted in support of Directive 2006/42/EC are listed in one act, the references of harmonised standards EN 81-31:2024, EN 81-41:2024, EN 81-44:2024, EN 1846-2:2024, EN 1953:2025, EN 12077-2:2024, EN 12159:2024, EN 12312-4:2024, EN 12312-5:2021+A1:2025, EN 12621:2025, EN 12978:2024, EN 13684:2018+A1:2024, EN 17677:2024, EN 17942:2024, EN 50059:2025 and EN 50176:2025 should be included in that Annex.
(9) It is necessary to withdraw the references of harmonised standards EN 81-31:2010, EN 81-41:2010, EN 1846-2:2009+A1:2013, EN 1953:2013, EN 12077-2:1998+A1:2008, EN 12159:2012, EN 12312-4:2014, EN 12312-5:2021, EN 12621:2006+A1:2010, EN 12978:2003+A1:2009 and EN 13684:2018, given that they have been revised or amended, fromthe Official Journal of the European Union.It is therefore appropriate to delete those references from Annex I to Implementing Decision (EU) 2023/1586.
(10) In order to give manufacturers sufficient time to adapt their machinery that is covered by harmonised standard EN 81-31:2010, EN 81-41:2010, EN 1846-2:2009+A1:2013, EN 1953:2013, EN 12077-2:1998+A1:2008, EN 12159:2012, EN 12312-4:2014, EN 12312-5:2021, EN 12621:2006+A1:2010, EN 12978:2003+A1:2009 or EN 13684:2018, it is necessary to defer the withdrawal of the references of those harmonised standards.
(11) Implementing Decision (EU) 2023/1586 should therefore be amended accordingly.
(12) Compliance with a harmonised standard confers a presumption of conformity with the corresponding essential requirements set out in Union harmonisation legislation from the date of publication of the reference of such standard in theOfficial Journal of the European Union. This Decision should therefore enter into force on the date of its publication,
(1) rows 2, 4, 157, 177, 277, 282, 291, 292, 330, 366 and 433 are deleted;
(2) the following rows are inserted in sequential order:‘2a.EN 81-31:2024Safety rules for the construction and installation of lifts – Lifts for the transport of goods only – Part 31: Accessible goods only lifts’;‘4a.EN 81-41:2024Safety rules for the construction and installation of lifts – Special lifts for the transport of persons and goods – Part 41: Vertical lifting platforms intended for use by persons with impaired mobility’;‘5a.EN 81-44:2024Safety rules for the construction and installation of lifts – Special lifts for the transport of persons and goods – Part 44: Lifting appliances in wind turbines’;‘157a.EN 1846-2:2024Firefighting and rescue service vehicles – Part 2: Common requirements – Safety and performance’;‘177a.EN 1953:2025Application equipment for coating materials – Safety requirements’;‘277a.EN 12077-2:2024Cranes safety – Requirements for health and safety – Part 2: Limiting and indicating devices’;‘282a.EN 12159:2024Builders hoists for persons and materials with vertically guided cages’;‘291a.EN 12312-4:2024Aircraft ground support equipment – Specific requirements – Part 4: Passenger boarding bridges’;‘292a.EN 12312-5:2021+A1:2025Aircraft ground support equipment – Specific requirements – Part 5: Aircraft fuelling equipment’;‘330a.EN 12621:2025Machinery for supply and circulation of liquid coating materials – Safety requirements’;‘366a.EN 12978:2024Industrial, commercial and garage doors and gates and pedestrian doorsets – Protective devices for power operated doors and gates – Requirements and test methods’;‘433a.EN 13684:2018+A1:2024Garden equipment – Pedestrian controlled lawn aerators and scarifiers – Safety’;‘572a.EN 17677:2024Food processing machinery – Craft bakery and pastry depositors – Safety and hygiene requirements’;‘573a.EN 17942:2024Welding and allied processes – Gas welding equipment – Safety requirements for thermoprocess equipment with open firing oxy-fuel gas welding equipment’;‘619a.EN 50059:2025Hand-held electrostatic application equipment for non-ignitable liquid coating materials – Safety requirements’;‘619b.EN 50176:2025Automatic electrostatic application systems for ignitable liquid coating materials – Safety requirements’. ‘2a. EN 81-31:2024Safety rules for the construction and installation of lifts – Lifts for the transport of goods only – Part 31: Accessible goods only lifts’; ‘4a. EN 81-41:2024Safety rules for the construction and installation of lifts – Special lifts for the transport of persons and goods – Part 41: Vertical lifting platforms intended for use by persons with impaired mobility’; ‘5a. EN 81-44:2024Safety rules for the construction and installation of lifts – Special lifts for the transport of persons and goods – Part 44: Lifting appliances in wind turbines’; ‘157a. EN 1846-2:2024Firefighting and rescue service vehicles – Part 2: Common requirements – Safety and performance’; ‘177a. EN 1953:2025Application equipment for coating materials – Safety requirements’; ‘277a. EN 12077-2:2024Cranes safety – Requirements for health and safety – Part 2: Limiting and indicating devices’; ‘282a. EN 12159:2024Builders hoists for persons and materials with vertically guided cages’; ‘291a. EN 12312-4:2024Aircraft ground support equipment – Specific requirements – Part 4: Passenger boarding bridges’; ‘292a. EN 12312-5:2021+A1:2025Aircraft ground support equipment – Specific requirements – Part 5: Aircraft fuelling equipment’; ‘330a. EN 12621:2025Machinery for supply and circulation of liquid coating materials – Safety requirements’; ‘366a. EN 12978:2024Industrial, commercial and garage doors and gates and pedestrian doorsets – Protective devices for power operated doors and gates – Requirements and test methods’; ‘433a. EN 13684:2018+A1:2024Garden equipment – Pedestrian controlled lawn aerators and scarifiers – Safety’; ‘572a. EN 17677:2024Food processing machinery – Craft bakery and pastry depositors – Safety and hygiene requirements’; ‘573a. EN 17942:2024Welding and allied processes – Gas welding equipment – Safety requirements for thermoprocess equipment with open firing oxy-fuel gas welding equipment’; ‘619a. EN 50059:2025Hand-held electrostatic application equipment for non-ignitable liquid coating materials – Safety requirements’; ‘619b. EN 50176:2025Automatic electrostatic application systems for ignitable liquid coating materials – Safety requirements’.
‘2a. EN 81-31:2024Safety rules for the construction and installation of lifts – Lifts for the transport of goods only – Part 31: Accessible goods only lifts’;
‘4a. EN 81-41:2024Safety rules for the construction and installation of lifts – Special lifts for the transport of persons and goods – Part 41: Vertical lifting platforms intended for use by persons with impaired mobility’;
‘5a. EN 81-44:2024Safety rules for the construction and installation of lifts – Special lifts for the transport of persons and goods – Part 44: Lifting appliances in wind turbines’;
‘157a. EN 1846-2:2024Firefighting and rescue service vehicles – Part 2: Common requirements – Safety and performance’;
‘177a. EN 1953:2025Application equipment for coating materials – Safety requirements’;
‘277a. EN 12077-2:2024Cranes safety – Requirements for health and safety – Part 2: Limiting and indicating devices’;
‘282a. EN 12159:2024Builders hoists for persons and materials with vertically guided cages’;
‘291a. EN 12312-4:2024Aircraft ground support equipment – Specific requirements – Part 4: Passenger boarding bridges’;
‘292a. EN 12312-5:2021+A1:2025Aircraft ground support equipment – Specific requirements – Part 5: Aircraft fuelling equipment’;
‘330a. EN 12621:2025Machinery for supply and circulation of liquid coating materials – Safety requirements’;
‘366a. EN 12978:2024Industrial, commercial and garage doors and gates and pedestrian doorsets – Protective devices for power operated doors and gates – Requirements and test methods’;
‘433a. EN 13684:2018+A1:2024Garden equipment – Pedestrian controlled lawn aerators and scarifiers – Safety’;
‘572a. EN 17677:2024Food processing machinery – Craft bakery and pastry depositors – Safety and hygiene requirements’;
‘573a. EN 17942:2024Welding and allied processes – Gas welding equipment – Safety requirements for thermoprocess equipment with open firing oxy-fuel gas welding equipment’;
‘619a. EN 50059:2025Hand-held electrostatic application equipment for non-ignitable liquid coating materials – Safety requirements’;
‘619b. EN 50176:2025Automatic electrostatic application systems for ignitable liquid coating materials – Safety requirements’.
‘2a. EN 81-31:2024Safety rules for the construction and installation of lifts – Lifts for the transport of goods only – Part 31: Accessible goods only lifts’;
‘4a. EN 81-41:2024Safety rules for the construction and installation of lifts – Special lifts for the transport of persons and goods – Part 41: Vertical lifting platforms intended for use by persons with impaired mobility’;
‘5a. EN 81-44:2024Safety rules for the construction and installation of lifts – Special lifts for the transport of persons and goods – Part 44: Lifting appliances in wind turbines’;
‘157a. EN 1846-2:2024Firefighting and rescue service vehicles – Part 2: Common requirements – Safety and performance’;
‘177a. EN 1953:2025Application equipment for coating materials – Safety requirements’;
‘277a. EN 12077-2:2024Cranes safety – Requirements for health and safety – Part 2: Limiting and indicating devices’;
‘282a. EN 12159:2024Builders hoists for persons and materials with vertically guided cages’;
‘291a. EN 12312-4:2024Aircraft ground support equipment – Specific requirements – Part 4: Passenger boarding bridges’;
‘292a. EN 12312-5:2021+A1:2025Aircraft ground support equipment – Specific requirements – Part 5: Aircraft fuelling equipment’;
‘330a. EN 12621:2025Machinery for supply and circulation of liquid coating materials – Safety requirements’;
‘366a. EN 12978:2024Industrial, commercial and garage doors and gates and pedestrian doorsets – Protective devices for power operated doors and gates – Requirements and test methods’;
‘433a. EN 13684:2018+A1:2024Garden equipment – Pedestrian controlled lawn aerators and scarifiers – Safety’;
‘572a. EN 17677:2024Food processing machinery – Craft bakery and pastry depositors – Safety and hygiene requirements’;
‘573a. EN 17942:2024Welding and allied processes – Gas welding equipment – Safety requirements for thermoprocess equipment with open firing oxy-fuel gas welding equipment’;
‘619a. EN 50059:2025Hand-held electrostatic application equipment for non-ignitable liquid coating materials – Safety requirements’;
‘619b. EN 50176:2025Automatic electrostatic application systems for ignitable liquid coating materials – Safety requirements’.
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) No 1025/2012 of the European Parliament and of the Council of 25 October 2012 on European Standardisation, amending Council Directives 89/686/EEC and 93/15/EEC and Directives 94/9/EC, 94/25/EC, 95/16/EC, 97/23/EC, 98/34/ EC, 2004/22/EC, 2007/23/EC, 2009/23/EC and 2009/105/EC of the European Parliament and of the Council and repealing Council Decision 87/95/EEC and Decision No 1673/2006/EC of the European Parliament and of the Council (1), and in particular Article 10(6) thereof,
Having regard to Directive 2006/42/EC of the European Parliament and of the Council of 17 May 2006 on machinery, and amending Directive 95/16/EC (2), and in particular Article 7(3) thereof,
Whereas:
(1) In accordance with Article 7 of Directive 2006/42/EC, machinery manufactured in conformity with harmonised standards, or parts thereof, the reference to which have been published in the Official Journal of the European Union, are to be presumed to comply with the essential health and safety requirements set out in Annex I to that Directive covered by those standards or parts thereof.
(2) By letter M/396 of 19 December 2006, the Commission made a request to the European Committee for Standardization (CEN) and the European Committee for Electrotechnical Standardization (Cenelec) (‘the Request’) for the drafting, the revision and the completion of the work on harmonised standards in support of Directive 2006/42/EC to take account of changes introduced by that Directive in comparison with Directive 98/37/EC of the European Parliament and of the Council (3).
(3) On the basis of the Request, CEN and Cenelec drafted the following new harmonised standards: EN 81-44:2024 with safety rules for the construction and installation of lifts in wind turbines, EN 17677:2024 with safety and hygiene requirements for food processing equipment, EN 17942:2024 with safety requirements for welding equipment, EN 50059:2025 with safety requirements for hand-held electrostatic coating material application equipment and EN 50176:2025 with safety requirements for automatic electrostatic liquid coating material application equipment.
(4) On the basis of the Request, CEN revised the following harmonised standards, the references of which are published in the Official Journal of the European Union by Commission Implementing Decision (EU) 2023/1586 (4): EN 81-31:2010, EN 81-41:2010, EN 1846-2:2009+A1:2013, EN 1953:2013, EN 12077-2:1998+A1:2008, EN 12159:2012, EN 12312-4:2014, EN 12621:2006+A1:2010 and EN 12978:2003+A1:2009. This resulted in the adoption of the following revising harmonised standards: EN 81-31:2024, EN 81-41:2024, EN 1846-2:2024, EN 1953:2025, EN 12077-2:2024, EN 12159:2024, EN 12312-4:2024, EN 12621:2025 and EN 12978:2024.
(5) Furthermore, on the basis of the Request, CEN amended the following harmonised standards, the references of which are published in the Official Journal of the European Union by Implementing Decision (EU) 2023/1586: EN 12312-5:2021 and EN 13684:2018. This resulted in the adoption of the consolidated harmonised standards EN 12312-5:2021+A1:2025 and EN 13684:2018+A1:2024.
(6) The Commission, together with CEN and Cenelec, has assessed whether those harmonised standards comply with the Request.
(7) The following harmonised standards satisfy the safety objectives which they aim to cover and which are set out in Directive 2006/42/EC: EN 81-31:2024, EN 81-41:2024, EN 81-44:2024, EN 1846-2:2024, EN 1953:2025, EN 12077-2:2024, EN 12159:2024, EN 12312-4:2024, EN 12312-5:2021+A1:2025, EN 12621:2025, EN 12978:2024, EN 13684:2018+A1:2024, EN 17677:2024, EN 17942:2024, EN 50059:2025 and EN 50176:2025. It is therefore appropriate to publish the references of those standards and amendments thereto in the Official Journal of the European Union.
(8) Annex I to Implementing Decision (EU) 2023/1586 lists the references of harmonised standards conferring a presumption of conformity with Directive 2006/42/EC. In order to ensure that the references of harmonised standards drafted in support of Directive 2006/42/EC are listed in one act, the references of harmonised standards EN 81-31:2024, EN 81-41:2024, EN 81-44:2024, EN 1846-2:2024, EN 1953:2025, EN 12077-2:2024, EN 12159:2024, EN 12312-4:2024, EN 12312-5:2021+A1:2025, EN 12621:2025, EN 12978:2024, EN 13684:2018+A1:2024, EN 17677:2024, EN 17942:2024, EN 50059:2025 and EN 50176:2025 should be included in that Annex.
(9) It is necessary to withdraw the references of harmonised standards EN 81-31:2010, EN 81-41:2010, EN 1846-2:2009+A1:2013, EN 1953:2013, EN 12077-2:1998+A1:2008, EN 12159:2012, EN 12312-4:2014, EN 12312-5:2021, EN 12621:2006+A1:2010, EN 12978:2003+A1:2009 and EN 13684:2018, given that they have been revised or amended, from the Official Journal of the European Union. It is therefore appropriate to delete those references from Annex I to Implementing Decision (EU) 2023/1586.
(10) In order to give manufacturers sufficient time to adapt their machinery that is covered by harmonised standard EN 81-31:2010, EN 81-41:2010, EN 1846-2:2009+A1:2013, EN 1953:2013, EN 12077-2:1998+A1:2008, EN 12159:2012, EN 12312-4:2014, EN 12312-5:2021, EN 12621:2006+A1:2010, EN 12978:2003+A1:2009 or EN 13684:2018, it is necessary to defer the withdrawal of the references of those harmonised standards.
(11) Implementing Decision (EU) 2023/1586 should therefore be amended accordingly.
(12) Compliance with a harmonised standard confers a presumption of conformity with the corresponding essential requirements set out in Union harmonisation legislation from the date of publication of the reference of such standard in the Official Journal of the European Union. This Decision should therefore enter into force on the date of its publication,
HAS ADOPTED THIS DECISION:
Annex I to Implementing Decision (EU) 2023/1586 is amended in accordance with the Annex to this Decision.
This Decision shall enter into force on the day of its publication in the Official Journal of the European Union.
Point (1) of the Annex shall apply from 20 January 2027.

In Part Three of Annex I to Implementing Decision (EU) 2023/1586, point 2 is amended as follows:

(1) rows 2, 4, 157, 177, 277, 282, 291, 292, 330, 366 and 433 are deleted;

(2) the following rows are inserted in sequential order:
‘2a.
EN 81-31:2024
Safety rules for the construction and installation of lifts – Lifts for the transport of goods only – Part 31: Accessible goods only lifts’;
‘4a.
EN 81-41:2024
Safety rules for the construction and installation of lifts – Special lifts for the transport of persons and goods – Part 41: Vertical lifting platforms intended for use by persons with impaired mobility’;
‘5a.
EN 81-44:2024
Safety rules for the construction and installation of lifts – Special lifts for the transport of persons and goods – Part 44: Lifting appliances in wind turbines’;
‘157a.
EN 1846-2:2024
Firefighting and rescue service vehicles – Part 2: Common requirements – Safety and performance’;
‘177a.
EN 1953:2025
Application equipment for coating materials – Safety requirements’;
‘277a.
EN 12077-2:2024
Cranes safety – Requirements for health and safety – Part 2: Limiting and indicating devices’;
‘282a.
EN 12159:2024
Builders hoists for persons and materials with vertically guided cages’;
‘291a.
EN 12312-4:2024
Aircraft ground support equipment – Specific requirements – Part 4: Passenger boarding bridges’;
‘292a.
EN 12312-5:2021+A1:2025
Aircraft ground support equipment – Specific requirements – Part 5: Aircraft fuelling equipment’;
‘330a.
EN 12621:2025
Machinery for supply and circulation of liquid coating materials – Safety requirements’;
‘366a.
EN 12978:2024
Industrial, commercial and garage doors and gates and pedestrian doorsets – Protective devices for power operated doors and gates – Requirements and test methods’;
‘433a.
EN 13684:2018+A1:2024
Garden equipment – Pedestrian controlled lawn aerators and scarifiers – Safety’;
‘572a.
EN 17677:2024
Food processing machinery – Craft bakery and pastry depositors – Safety and hygiene requirements’;
‘573a.
EN 17942:2024
Welding and allied processes – Gas welding equipment – Safety requirements for thermoprocess equipment with open firing oxy-fuel gas welding equipment’;
‘619a.
EN 50059:2025
Hand-held electrostatic application equipment for non-ignitable liquid coating materials – Safety requirements’;
‘619b.
EN 50176:2025
Automatic electrostatic application systems for ignitable liquid coating materials – Safety requirements’.

Council Decision (EU) 2025/1736 of 25 July 2025 on the position to be adopted on behalf of the European Union within the Association Council established by the Association Agreement between the European Union and the European Atomic Energy Community and their Member States, of the one part, and the Republic of Moldova, of the other part, as regards the further market opening with respect to the sector of roaming on public mobile communications networks and amending Annex XXVIII-B (Rules applicable to telecommunication services) to that Association Agreement

Official Journalof the European Union ENL series
2025/1736 14.8.2025
(1) The Association Agreement between the European Union and the European Atomic Energy Community and their Member States, of the one part, and the Republic of Moldova, of the other part(1)(the ‘Agreement’) entered into force on 1 July 2016.
(2) Pursuant to Article 452(2) of the Agreement, if the Parties agree that the necessary measures have been implemented and are being enforced, the Association Council established under the Agreement is to agree on further market opening with respect to the sector concerned by regulatory approximation.
(3) Article 436(3) of the Agreement provides that the Association Council is to have the power to update or amend the Annexes to the Agreement.
(4) In the course of 2025, the Association Council is to adopt a Decision on the Union and the Republic of Moldova (‘Moldova’) granting each other further market opening with respect to the sector of roaming on public mobile communications networks and on amending Annex XXVIII-B to the Agreement.
(5) Article 1(2), point (g), of the Agreement provides that the aim of the Agreement is, inter alia, to establish conditions for enhanced economic and trade relations leading towards the Republic of Moldova’s gradual integration in the Union internal market, including by setting up a Deep and Comprehensive Free Trade Area, which will provide for far-reaching regulatory approximation and market access liberalisation, in compliance with the rights and obligations arising out of World Trade Organization membership and the transparent application of those rights and obligations.
(6) As stated in the preamble to the Agreement and in accordance with Article 448 of the Agreement, the Parties to the Agreement recognise the importance of the approximation of Moldova’s existing legislation to Union law, meaning that Moldova is to ensure that its existing and future legislation be made compatible with the Unionacquis.
(7) Moldova has requested further integration with regard to the roaming sector in the Union, in particular through further market opening for the purpose of roaming services.
(8) Decision No 1/2023 of the EU-Republic of Moldova Association Committee in Trade configuration(2)complemented Annex XXVIII-B (Rules applicable to telecommunication services) to the Agreement with the relevant Union acts relating to roaming on public mobile communications networks.
(9) Pursuant to Article 407(3) of the Agreement, on 9 May 2025, Moldova informed the Union that it considered it had completed the regulatory approximation with respect to the Unionacquisin the sector of roaming on public mobile communications networks. On 3 and 20 June 2025, Moldova supplemented its initial notification after adopting the remaining transposition measures.
(10) Pursuant to Articles 409 and 451 of the Agreement, the Union carried out an assessment and determined, on the basis of that assessment, that Moldova had completed the regulatory approximation with the Unionacquisregarding roaming.
(11) On this basis, it is appropriate for the Association Council to decide pursuant to Article 452(2) of the Agreement on the reciprocal granting of further market opening with respect to the sector of roaming on public mobile communications networks between the Union and Moldova.
(12) To ensure legal certainty as regards the scope of the Unionacquisregarding roaming, it should be specified in Annex XXVIII-B to the Agreement which provisions are relevant for that purpose.
(13) It is therefore appropriate to establish the position to be adopted on the Union’s behalf within the Association Council, as the Decision of the Association Council on the reciprocal granting of further market opening with respect to the sector of roaming on public mobile communications networks and on amending Annex XXVIII-B will be binding upon the Union,
(1) The Association Agreement between the European Union and the European Atomic Energy Community and their Member States, of the one part, and the Republic of Moldova, of the other part (the ‘Agreement’) entered into force on 1 July 2016.
(2) Article 1(2), point (g), of the Agreement provides that the aim of the Agreement is, inter alia, to establish conditions for enhanced economic and trade relations leading towards the Republic of Moldova’s (‘Moldova’) gradual integration in the internal market of the European Union (the ‘Union’), including by setting up a Deep and Comprehensive Free Trade Area, which will provide for far-reaching regulatory approximation and market access liberalisation, in compliance with the rights and obligations arising out of World Trade Organization membership and the transparent application of those rights and obligations.
(3) Articles 102 and 240 of the Agreement provide that Moldova is to carry out approximation of its legislation to the Unionacquisset out in Annex XXVIII-B to the Agreement, according to the provisions of that Annex, and Moldova reaffirms its obligations under those Articles.
(4) Moldova has requested further integration in the Union internal market with regard to roaming on public mobile communications networks in the Union. As a first step toward further integration in this sector, Annex XXVIII-B to the Agreement was amended by Decision No 1/2023 of the EU-Republic of Moldova Association Committee in Trade Configuration(2)to include the relevant Unionacquisregarding roaming.
(5) In accordance with Article 407(3) of the Agreement, Moldova informed the Union on 9 May 2025 that it considered it had completed the regulatory approximation with respect to the Unionacquisin the sector of roaming on public mobile communications networks (‘Unionacquisregarding roaming’). On 3 and 20 June 2025, Moldova supplemented its initial notification after adopting the remaining transposition measures.
(6) The Union carried out an assessment in accordance with Article 409 of the Agreement. In accordance with Article 452(1) of the Agreement, that assessment was discussed in the Association Committee in Trade Configuration (the ‘Trade Committee’).
(7) On this basis, the Parties agree that necessary measures have been implemented and are being enforced and it is, therefore, appropriate for the Association Council to agree pursuant to Article 452(2) of the Agreement on further market opening with respect to the sector of roaming on public mobile communications networks between the Union and Moldova, as well as the conditions that will govern it.
(8) Certain provisions of Directive (EU) 2018/1972 of the European Parliament and of the Council(3), Regulation (EU) 2022/612 of the European Parliament and of the Council(4), Regulation (EU) 2018/1971 of the European Parliament and of the Council(5), Commission Implementing Regulation (EU) 2016/2286(6)and Commission Delegated Regulation (EU) 2021/654(7)are not relevant for Moldova’s obligation to carry out regulatory approximation to the Unionacquisregarding roaming. To ensure legal certainty, it is appropriate to specify in Annex XXVIII-B to the Agreement which provisions are relevant in this regard. This is done without prejudice to Moldova’s obligation to implement Directive (EU) 2018/1972 fully and completely in accordance with its obligation under Articles 102 and 240 of the Agreement and in view of pursuing the objective of further integration in the Union internal market.
(9) Once the Union and Moldova grant each other market opening with respect to the sector of roaming on public mobile communications networks, the regulated charges set out in the Unionacquisregarding roaming, especially the average wholesale roaming charges laid down in Regulation (EU) 2022/612 and termination rates laid down in Delegated Regulation (EU) 2021/654, may be subject to amendments. To ensure reciprocity with respect to the level of the regulated charges applicable between undertakings during the period necessary for Moldova to transpose and implement any amendments into its legal order, it is necessary to provide specific rules for the date of applicability of the rules for the amended regulated charges.
(10) To allow undertakings providing roaming on public communications networks in the Union and in Moldova the necessary time to implement all technical and legal requirements resulting from this Decisions, an application date should be set,
(a) an act corresponding to a Union Regulation or Decision shall as such be made part of the internal legal order of Moldova;
(b) an act corresponding to a Union Directive shall leave to the authorities of Moldova the choice of form and method of implementation.
(a) the preambles of the acts constituting the Unionacquisregarding roaming are not adapted for the purposes of the Agreement and this Decision. They are relevant to the extent necessary for the proper interpretation and application, within the framework of the Agreement and this Decision, of the provisions contained in such legal acts;
(b) the following terms used by the acts constituting the Unionacquisregarding roaming shall read as follows:(i)the term ‘Community’ or ‘European Union’ shall read ‘EU-Moldova’;(ii)the terms ‘Community or European Union law’, ‘Community or European Union legislation’, ‘Community or European Union instruments’ and ‘EC Treaty’ or ‘Treaty on the Functioning of the EU’ shall read ‘EU-Moldova Free Trade Agreement’;(iii)the term ‘Official Journal of the European Communities’ or ‘Official Journal of the European Union’ shall read ‘Official Journals of the Parties’; (i) the term ‘Community’ or ‘European Union’ shall read ‘EU-Moldova’; (ii) the terms ‘Community or European Union law’, ‘Community or European Union legislation’, ‘Community or European Union instruments’ and ‘EC Treaty’ or ‘Treaty on the Functioning of the EU’ shall read ‘EU-Moldova Free Trade Agreement’; (iii) the term ‘Official Journal of the European Communities’ or ‘Official Journal of the European Union’ shall read ‘Official Journals of the Parties’;
(i) the term ‘Community’ or ‘European Union’ shall read ‘EU-Moldova’;
(ii) the terms ‘Community or European Union law’, ‘Community or European Union legislation’, ‘Community or European Union instruments’ and ‘EC Treaty’ or ‘Treaty on the Functioning of the EU’ shall read ‘EU-Moldova Free Trade Agreement’;
(iii) the term ‘Official Journal of the European Communities’ or ‘Official Journal of the European Union’ shall read ‘Official Journals of the Parties’;
(i) the term ‘Community’ or ‘European Union’ shall read ‘EU-Moldova’;
(ii) the terms ‘Community or European Union law’, ‘Community or European Union legislation’, ‘Community or European Union instruments’ and ‘EC Treaty’ or ‘Treaty on the Functioning of the EU’ shall read ‘EU-Moldova Free Trade Agreement’;
(iii) the term ‘Official Journal of the European Communities’ or ‘Official Journal of the European Union’ shall read ‘Official Journals of the Parties’;
(c) without prejudice to point (e), whenever provisions of the Unionacquisregarding roaming contain references to ‘Member State(s)’, the references shall be understood to include, apart from the Member States of the Union, also Moldova;
(d) whenever the provisions of the Unionacquisregarding roaming contain references to the territory of the ‘Community’, ‘European Union’ or of the ‘common market’ the references shall for the purposes of the Agreement and this Decision be understood to be references to the territories of the Parties as defined in paragraphs 1 and 2 of Article 462 of the Agreement;
(e) whenever the provisions of the Unionacquisregarding roaming contain references to Union institutions, committees or other bodies, it is understood that Moldova will not become a member of such institutions, committees or bodies;
(f) rights conferred and obligations imposed upon the Member States of the Union or their public entities, undertakings or individuals in relation to each other, shall be understood to be conferred or imposed upon the Parties, the latter also being understood, as the case may be, as their competent authorities, public entities, undertakings or individuals;
(g) provisions on the entry into force or implementation of the applicable provisions referred to in the acts which constitute the Unionacquisregarding roaming are not relevant for the purposes of this Decision. The time limits and dates for Moldova to enact the applicable provisions and to ensure their complete and full implementation are set out in the arrangements specified in Annex XXVIII-B to the Agreement and this Decision.
(a) a Union Regulation or Decision shall be implemented and enforced as soon as practicable and at the latest 3 months after the entry into force date provided for in that Regulation or that Decision, unless otherwise decided by the Trade Committee;
(b) a Union Directive shall be implemented and enforced as soon as practicable and at the latest 3 months after the transposition period provided for in that Directive has expired, unless otherwise decided by the Trade Committee.
— Article 1 – Subject matter, scope and aims
— Article 2 – Definitions, points (1) and (2), (4) to (11), (13) to (16), (22), (27) to (34), (36), and (38) to (40)
— Article 3 – General objectives
— Article 5 – National regulatory and other competent authorities
— Article 6 – Independence of national regulatory and other competent authorities
— Article 7 – Appointment and dismissal of members of national regulatory authorities
— Article 8 – Political independence and accountability of the national regulatory authorities
— Article 9 – Regulatory capacity of national regulatory authorities
— Article 10 – Participation of national regulatory authorities in BEREC
— Article 11 – Cooperation with national authorities
— Article 12 – General authorisation of electronic communications networks and services
— Article 13 – Conditions attached to the general authorisation and to the rights of use for radio spectrum and for numbering resources, and specific obligations, except all mentions to the rights of use for radio spectrum and numbering resources and the cross references to Article 45, Article 51, Article 62, Article 68, Article 83, and Article 94
— Article 14 – Declarations to facilitate the exercise of rights to install facilities and rights of interconnection
— Article 15 – Minimum list of rights derived from the general authorisation
— Article 16 – Administrative charges
— Article 17 – Accounting separation and financial reports
— Article 18 – Amendment of rights and obligations, except all mentions to the rights of use for radio spectrum, numbering resources and to install facilities
— Article 19 – Restriction or withdrawal of rights, except all mentions to the rights of use for radio spectrum, numbering resources and to install facilities
— Article 20 – Information request to undertakings
— Article 21 – Information required with regard to the general authorisation, rights of use and specific obligations, except all mentions to rights of use and specific obligations and the cross references to Article 13(2), Article 22, and Annex I, parts D and E
— Article 23 – Consultation and transparency mechanism, except paragraph (2) and the cross references to Article 32(10), and Article 45(4) and (5)
— Article 24 – Consultation of interested parties
— Article 25 – Out-of-court dispute resolution
— Article 26 – Dispute resolution between undertakings
— Article 27 – Resolution of cross-border disputes, paragraphs (1) and (2), and paragraphs (4) to (6)
— Article 29 – Penalties, paragraph (1)
— Article 30 – Compliance with the conditions of the general authorisation or of rights of use for radio spectrum and for numbering resources and compliance with specific obligations, except all mentions to the rights of use for radio spectrum and numbering resources and the cross references to Article 4, Article 13(2), Article 45(1), Article 47, Article 67, and Article 69
— Article 31 – Right of appeal
— Article 59 – General framework for access and interconnection
— Article 60 – Rights and obligations of undertakings, paragraphs (1) and (2)
— Article 61 – Powers and responsibilities of the national regulatory and other competent authorities with regard to access and interconnection, paragraph (1), paragraph (2), points (a) to (c), paragraphs (3), (5) and (6)
— Article 75 – Termination rates, paragraphs (2) and (3)
— Article 93 – Numbering resources, the first subparagraph of paragraph (5)
— Article 97 – Access to numbers and services
— Article 99 – Non-discrimination
— Article 100 – Fundamental rights safeguard
— Article 108 – Availability of services
— Article 111 – Equivalent access and choice for end-users with disabilities
— Article 120 – Publication of information
— Article 122 – Review procedures, the second and third subparagraphs of paragraph (1)
— Annex I – List of conditions which may be attached to general authorisations, rights of use for radio spectrum and rights of use for numbering resources, parts A to C
— Annex III – Criteria for the determination of wholesale voice termination rates.
Timetable: the provisions of Directive (EU) 2018/1972 shall be implemented within 1 year after the date of entry into force of this Decision.
— Article 1 – Subject matter and scope, paragraph (5)
— Article 3 – Wholesale roaming access, paragraph (8)
— Article 4 – Provision of regulated retail roaming services, paragraph (3)
— Article 7 – Implementation of fair use policy and of sustainability mechanism, paragraphs (1) to (3) and (5). The exception regarding Article 7(1) to (3) is without prejudice to Moldova’s obligation to implement the implementing acts on the application of fair use policies, the methodology for assessing sustainability of the provision of retail roaming services at domestic prices and the application to be submitted by a roaming provider for the purpose of the assessment of the sustainability
— Article 8 – Exceptional application of retail surcharges for the consumption of regulated retail roaming services and provision of alternative tariffs, paragraph (6)
— The first and third subparagraphs of Article 16 – Databases of numbering ranges for value-added services and means of access to emergency services
— Article 20 – Committee procedure
— Article 21 – Review
— Article 23 – Repeal.
Timetable: the provisions of Regulation (EU) 2022/612 shall be implemented within 2 years after the date of entry into force of this Decision.
— Article 12 – Review.
Timetable: the provisions of Commission Implementing Regulation (EU) 2016/2286 shall be implemented within 2 years after the date of entry into force of this Decision.
— Article 1(2)
— Article 4(2) to (5)
— Article 5(2).
Timetable: the provisions of Commission Delegated Regulation (EU) 2021/654 shall be implemented before the Roaming Regulation and shall be implemented within 2 years after the date of entry into force of this Decision.
— Article 3 – Objectives of BEREC, paragraph (5)
— Article 4 – Regulatory tasks of BEREC, paragraph (4)
— Article 7 – Composition of the Board of Regulators, paragraphs (1) to (3)
— Article 8 – Independence of the Board of Regulators
— Article 11 – Meetings of the Board of Regulators, paragraph (5)
— Article 12 – Voting rules of the Board of Regulators, paragraph (2)
— Article 15 – Composition of the Management Board, paragraphs (1) to (3)
— Article 18 – Meetings of the Management Board, paragraph (5)
— Article 38 – Confidentiality, paragraph (2)
— Article 40 – Exchange of information, paragraphs (1), (2), (4), and (5)
— Article 42 – Declarations of interests, paragraphs (1) and (2).
Timetable: the provisions of Regulation (EU) 2018/1971 shall be implemented within 1 year after the date of entry into force of this Decision.’.
THE COUNCIL OF THE EUROPEAN UNION,
Having regard to the Treaty on the Functioning of the European Union, and in particular Article 207(4), first subparagraph, in conjunction with Article 218(9) thereof,
Having regard to the proposal from the European Commission,
Whereas:
(1) The Association Agreement between the European Union and the European Atomic Energy Community and their Member States, of the one part, and the Republic of Moldova, of the other part (1) (the ‘Agreement’) entered into force on 1 July 2016.
(2) Pursuant to Article 452(2) of the Agreement, if the Parties agree that the necessary measures have been implemented and are being enforced, the Association Council established under the Agreement is to agree on further market opening with respect to the sector concerned by regulatory approximation.
(3) Article 436(3) of the Agreement provides that the Association Council is to have the power to update or amend the Annexes to the Agreement.
(4) In the course of 2025, the Association Council is to adopt a Decision on the Union and the Republic of Moldova (‘Moldova’) granting each other further market opening with respect to the sector of roaming on public mobile communications networks and on amending Annex XXVIII-B to the Agreement.
(5) Article 1(2), point (g), of the Agreement provides that the aim of the Agreement is, inter alia, to establish conditions for enhanced economic and trade relations leading towards the Republic of Moldova’s gradual integration in the Union internal market, including by setting up a Deep and Comprehensive Free Trade Area, which will provide for far-reaching regulatory approximation and market access liberalisation, in compliance with the rights and obligations arising out of World Trade Organization membership and the transparent application of those rights and obligations.
(6) As stated in the preamble to the Agreement and in accordance with Article 448 of the Agreement, the Parties to the Agreement recognise the importance of the approximation of Moldova’s existing legislation to Union law, meaning that Moldova is to ensure that its existing and future legislation be made compatible with the Union acquis.
(7) Moldova has requested further integration with regard to the roaming sector in the Union, in particular through further market opening for the purpose of roaming services.
(8) Decision No 1/2023 of the EU-Republic of Moldova Association Committee in Trade configuration (2) complemented Annex XXVIII-B (Rules applicable to telecommunication services) to the Agreement with the relevant Union acts relating to roaming on public mobile communications networks.
(9) Pursuant to Article 407(3) of the Agreement, on 9 May 2025, Moldova informed the Union that it considered it had completed the regulatory approximation with respect to the Union acquis in the sector of roaming on public mobile communications networks. On 3 and 20 June 2025, Moldova supplemented its initial notification after adopting the remaining transposition measures.
(10) Pursuant to Articles 409 and 451 of the Agreement, the Union carried out an assessment and determined, on the basis of that assessment, that Moldova had completed the regulatory approximation with the Union acquis regarding roaming.
(11) On this basis, it is appropriate for the Association Council to decide pursuant to Article 452(2) of the Agreement on the reciprocal granting of further market opening with respect to the sector of roaming on public mobile communications networks between the Union and Moldova.
(12) To ensure legal certainty as regards the scope of the Union acquis regarding roaming, it should be specified in Annex XXVIII-B to the Agreement which provisions are relevant for that purpose.
(13) It is therefore appropriate to establish the position to be adopted on the Union’s behalf within the Association Council, as the Decision of the Association Council on the reciprocal granting of further market opening with respect to the sector of roaming on public mobile communications networks and on amending Annex XXVIII-B will be binding upon the Union,
HAS ADOPTED THIS DECISION:
The position to be adopted on the Union’s behalf in the course of 2025 within the Association Council established by the Association Agreement between the European Union and the European Atomic Energy Community and their Member States, of the one part, and the Republic of Moldova, of the other part, as regards the further market opening with respect to the sector of roaming on public mobile communications networks and amending Annex XXVIII-B (Rules applicable to telecommunication services) to that Association Agreement shall be based on the draft Decision of the Association Council attached to this Decision.
This Decision shall enter into force on the date of its adoption.
Further market opening with respect to the sector of roaming on public mobile communications networks between the Union and Moldova is hereby granted, in accordance with the conditions set out in the Association Agreement between the European Union and the European Atomic Energy Community and their Member States, of the one part, and the Republic of Moldova, of the other part (‘the Agreement’) and in this Decision.
1. Moldova reaffirms its obligations under Articles 102 and 240 of the Agreement to approximate its legislation to the Union acquis as set out in Annex XXVIII-B of the Agreement.

2. The applicable provisions of the acts constituting the Union acquis in the sector of roaming on public mobile communications networks (‘Union acquis regarding roaming’) shall be binding upon the Union and Moldova (‘the Parties’), in accordance with the horizontal adaptations laid out in Article 3(1) of this Decision and with the specific arrangements provided in Annex XXVIII-B to the Agreement. The Parties shall ensure full and complete implementation of those provisions.
For the purposes of the first subparagraph, it shall be understood that the Union acquis applies in its entirety, including with the exceptions granted to the Union Member States during their accession process.

3. Acts constituting the Union acquis regarding roaming, as specified in Annex XXVIII-B to the Agreement, shall be binding upon the Parties and be, or be made, part of their internal legal order and in particular:
(a) an act corresponding to a Union Regulation or Decision shall as such be made part of the internal legal order of Moldova;
(b) an act corresponding to a Union Directive shall leave to the authorities of Moldova the choice of form and method of implementation.

4. In the event of discrepancies between the text of Union acquis and any act incorporating it into the internal legal order of Moldova, the text of the Union act shall prevail.

5. Pursuant to the principle of sincere cooperation, the Parties shall, in full mutual respect, assist each other in carrying out the tasks set out in this Decision. The Parties shall take any appropriate measure to ensure fulfilment of the obligations arising out of this Decision or resulting from the acts of the institutions of the Union.

1. For the purpose of giving effect to this Decision, unless otherwise provided in the Agreement, the provisions of the Union acquis regarding roaming, shall be applicable in accordance the following horizontal adaptations:
(a) the preambles of the acts constituting the Union acquis regarding roaming are not adapted for the purposes of the Agreement and this Decision. They are relevant to the extent necessary for the proper interpretation and application, within the framework of the Agreement and this Decision, of the provisions contained in such legal acts;
(b) the following terms used by the acts constituting the Union acquis regarding roaming shall read as follows:
(i) the term ‘Community’ or ‘European Union’ shall read ‘EU-Moldova’;
(ii) the terms ‘Community or European Union law’, ‘Community or European Union legislation’, ‘Community or European Union instruments’ and ‘EC Treaty’ or ‘Treaty on the Functioning of the EU’ shall read ‘EU-Moldova Free Trade Agreement’;
(iii) the term ‘Official Journal of the European Communities’ or ‘Official Journal of the European Union’ shall read ‘Official Journals of the Parties’;
(c) without prejudice to point (e), whenever provisions of the Union acquis regarding roaming contain references to ‘Member State(s)’, the references shall be understood to include, apart from the Member States of the Union, also Moldova;
(d) whenever the provisions of the Union acquis regarding roaming contain references to the territory of the ‘Community’, ‘European Union’ or of the ‘common market’ the references shall for the purposes of the Agreement and this Decision be understood to be references to the territories of the Parties as defined in paragraphs 1 and 2 of Article 462 of the Agreement;
(e) whenever the provisions of the Union acquis regarding roaming contain references to Union institutions, committees or other bodies, it is understood that Moldova will not become a member of such institutions, committees or bodies;
(f) rights conferred and obligations imposed upon the Member States of the Union or their public entities, undertakings or individuals in relation to each other, shall be understood to be conferred or imposed upon the Parties, the latter also being understood, as the case may be, as their competent authorities, public entities, undertakings or individuals;
(g) provisions on the entry into force or implementation of the applicable provisions referred to in the acts which constitute the Union acquis regarding roaming are not relevant for the purposes of this Decision. The time limits and dates for Moldova to enact the applicable provisions and to ensure their complete and full implementation are set out in the arrangements specified in Annex XXVIII-B to the Agreement and this Decision.

2. The Parties shall be entitled to use, in the procedures established in this Decision, any official language of the institutions of the Union or of Moldova. If a language which is not an official language of the institutions of the Union is used in an official document, a translation into an official language of the institutions of the Union shall be simultaneously submitted.

3. To facilitate the exercise of the relevant powers of the competent authorities of the Parties, such authorities shall upon request mutually exchange all information necessary for the proper functioning of this Decision.

1. The Union shall maintain its right to adopt new legal acts or amend existing acts in the sector of roaming on public mobile communications networks. The Union shall notify Moldova and the Trade Committee in writing, in a timely manner, of any new legally binding act in the sector of roaming on public mobile communications networks once it has been adopted by the Union.

2. The Trade Committee shall decide within three months to add a particular new or amended Union act to Annex XXVIII-B of the Agreement.

3. Once a new or amended Union act has been added to Annex XXVIII-B to the Agreement, Moldova shall transpose and implement the act into its domestic legal system. The applicable provisions of the acts referred to in Annex XXVIII-B to the Agreement shall be made part of Moldova’s internal legal order in accordance with Article 2(3) and in line within the following deadlines:
(a) a Union Regulation or Decision shall be implemented and enforced as soon as practicable and at the latest 3 months after the entry into force date provided for in that Regulation or that Decision, unless otherwise decided by the Trade Committee;
(b) a Union Directive shall be implemented and enforced as soon as practicable and at the latest 3 months after the transposition period provided for in that Directive has expired, unless otherwise decided by the Trade Committee.
Moldova shall ensure that at the end of the relevant time period, its legal order is fully compliant with the Union legal act to be implemented.

4. An assessment of the implementation shall be carried out by the Union in cooperation with Moldova according to the principles set out in Article 409 of the Agreement.

5. In case Moldova expects to face particular difficulties in transposing a new or amended Union act into its domestic legislation, it shall inform the Union and the Trade Committee immediately thereof. The Trade Committee may decide whether Moldova can under exceptional circumstances temporarily and partly be exempted from its transposition obligations under paragraph 3 as far as new or amended Union legal acts are concerned. Should the Trade Committee grant such derogation, Moldova shall report regularly on the progress reached to transpose the relevant Union legislation.

6. If notwithstanding the application of paragraph 5, Moldova does not approximate its domestic law to take account of changes to Annex XXVIII-B to the Agreement, or if an assessment pursuant to Article 410(6) of the Agreement shows that the legislation of Moldova is no longer approximated to the Union law, or if the Association Council established by Article 434 of the Agreement fails to take a decision to update Annex XXVIII-B to the Agreement in accordance with developments in Union law, the Union may suspend benefits granted under this Decision in accordance with Article 410(7) and (8) of the Agreement. The suspension shall be promptly lifted, if the Trade Committee subsequently resolves the matter.

7. When Moldova wishes to adopt new legislation or amend its existing legislation in the sector of roaming on public mobile communications networks, the reporting and assessment requirements set out in Article 407(3) and Article 409 of the Agreement shall apply.

Insofar as the provisions of the Agreement, this Decision, or the applicable provisions specified in Annex XXVIII-B to the Agreement are identical in substance to corresponding rules of the Treaty on the Functioning of the European Union and to acts adopted pursuant thereto, those provisions shall, in their implementation and application, be interpreted in accordance with the case law of the Court of Justice of the European Union given before or after the adoption of this Decision.
1. If serious economic, societal or environmental difficulties of a sectoral or regional nature liable to persist have arisen or threaten to arise in either Party in relation to the treatment granted pursuant to Article 1, the Party concerned may take appropriate safeguard measures with respect to the treatment granted pursuant to Article 1 under the conditions and procedures laid down in Article 7(1) to (6).

2. Such safeguard measures shall be restricted with regard to their scope and duration to what is strictly necessary in order to remedy the situation in the sector or region concerned. Priority shall be given to such measures as will least disturb the functioning of the Agreement.

1. If a Party is considering taking safeguard measures, it shall notify the other Party of its intention through the Trade Committee and shall provide all relevant information.

2. The Parties shall immediately enter into consultations in the Trade Committee with a view to finding a mutually acceptable solution. A Party shall abstain from taking safeguard measures until attempts have been made to find a mutually acceptable solution.

3. The Party concerned may not take safeguard measures until one month has elapsed after the date of notification under paragraph 1, unless the consultation procedure under paragraph 2 has been concluded before the expiration of the said time limit. By derogation from this requirement, when exceptional circumstances requiring urgent action exclude prior examination, a Party may immediately apply the protective measures strictly necessary to remedy the situation.

4. The Party concerned shall without delay notify the Trade Committee of the safeguard measures taken and shall provide all relevant information.

5. Any safeguard measure shall be discontinued once the factors leading to the adoption of that measure cease to exist.

6. The safeguard measures taken shall be the subject of continuous consultations in the Trade Committee with a view to their abolition or to the limitation of their scope of application.

7. If, notwithstanding the application of paragraph 6, no mutually acceptable solution can be found within 6 months and the safeguard measure creates an imbalance between the rights and obligations of the Parties in the sector concerned, the Party concerned may take such proportionate rebalancing measures as strictly necessary to remedy the imbalance. Priority shall be given to such measures as will least disturb the functioning of Chapter 6 (Establishment, Trade in Services and Electronic Commerce) of Title V (Trade and Trade-related Matters) of the Agreement and this Decision.

8. The Party concerned shall without delay notify the Trade Committee of the rebalancing measures taken and shall provide all relevant information. Any such rebalancing measure shall be discontinued immediately once the factors leading to the adoption of that measure cease to exist.

9. Any rebalancing measure taken shall be the subject of continuous consultations in the Trade Committee with a view of their abolition or to the limitation of their scope of application.

In case the regulated charges set out in the Union acquis regarding roaming are amended after the entry into force of this Decision, their compulsory application for the purposes of this Decision starts on the same date for both Parties. This is either the date of entry into force of the relevant amendments to the Union acquis regarding roaming or the date of entry into force of Moldova’s fully compliant legislation implementing the relevant amendments to the Union acquis regarding roaming, following its confirmation by the assessment pursuant to Article 409 of the Agreement, whichever date is last, or other date of entry into force agreed by both Parties to avoid the retroactive application effect. Until that date, the previously regulated charges remain applicable for the purposes of this Decision.
Annex XXVIII-B (Rules applicable to telecommunication services) to the Association Agreement between the European Union and the European Atomic Energy Community and their Member States, of the one part, and the Republic of Moldova, of the other part, is hereby modified as set out in the Annex to this Decision.
This Decision has been drawn up in the Bulgarian, Croatian, Czech, Danish, Dutch, English, Estonian, Finnish, French, German, Greek, Hungarian, Irish, Italian, Latvian, Lithuanian, Maltese, Polish, Portuguese, Romanian, Slovak, Slovenian, Spanish and Swedish languages, each text being equally authentic.
This Decision shall enter into force on the date of its adoption.
It shall apply from 1 January 2026.

Annex XXVIII-B (Rules applicable to telecommunication services) to the Agreement shall be amended by replacing the text starting with the paragraph concerning Directive (EU) 2018/1972 and ending with the paragraph concerning Regulation (EU) 2018/1971 with the following text:

‘Directive (EU) 2018/1972 of the European Parliament and of the Council of 11 December 2018 establishing the European Electronic Communications Code (recast) (“EECC”).
Without prejudice to Moldova’s obligation to implement Directive (EU) 2018/1972 fully and completely for the purpose of an eventual decision by the Association Council to grant further market opening for telecommunication services pursuant to Article 452(2), for the purpose of an eventual decision by the Association Council to grant further market opening for roaming pursuant to Article 452(2) the following provisions of Directive (EU) 2018/1972 need to be implemented:

—
Article 1 – Subject matter, scope and aims

—
Article 2 – Definitions, points (1) and (2), (4) to (11), (13) to (16), (22), (27) to (34), (36), and (38) to (40)

—
Article 3 – General objectives

—
Article 5 – National regulatory and other competent authorities

—
Article 6 – Independence of national regulatory and other competent authorities

—
Article 7 – Appointment and dismissal of members of national regulatory authorities

—
Article 8 – Political independence and accountability of the national regulatory authorities

—
Article 9 – Regulatory capacity of national regulatory authorities

—
Article 10 – Participation of national regulatory authorities in BEREC

—
Article 11 – Cooperation with national authorities

—
Article 12 – General authorisation of electronic communications networks and services

—
Article 13 – Conditions attached to the general authorisation and to the rights of use for radio spectrum and for numbering resources, and specific obligations, except all mentions to the rights of use for radio spectrum and numbering resources and the cross references to Article 45, Article 51, Article 62, Article 68, Article 83, and Article 94

—
Article 14 – Declarations to facilitate the exercise of rights to install facilities and rights of interconnection

—
Article 15 – Minimum list of rights derived from the general authorisation

—
Article 16 – Administrative charges

—
Article 17 – Accounting separation and financial reports

—
Article 18 – Amendment of rights and obligations, except all mentions to the rights of use for radio spectrum, numbering resources and to install facilities

—
Article 19 – Restriction or withdrawal of rights, except all mentions to the rights of use for radio spectrum, numbering resources and to install facilities

—
Article 20 – Information request to undertakings

—
Article 21 – Information required with regard to the general authorisation, rights of use and specific obligations, except all mentions to rights of use and specific obligations and the cross references to Article 13(2), Article 22, and Annex I, parts D and E

—
Article 23 – Consultation and transparency mechanism, except paragraph (2) and the cross references to Article 32(10), and Article 45(4) and (5)

—
Article 24 – Consultation of interested parties

—
Article 25 – Out-of-court dispute resolution

—
Article 26 – Dispute resolution between undertakings

—
Article 27 – Resolution of cross-border disputes, paragraphs (1) and (2), and paragraphs (4) to (6)

—
Article 29 – Penalties, paragraph (1)

—
Article 30 – Compliance with the conditions of the general authorisation or of rights of use for radio spectrum and for numbering resources and compliance with specific obligations, except all mentions to the rights of use for radio spectrum and numbering resources and the cross references to Article 4, Article 13(2), Article 45(1), Article 47, Article 67, and Article 69

—
Article 31 – Right of appeal

—
Article 59 – General framework for access and interconnection

—
Article 60 – Rights and obligations of undertakings, paragraphs (1) and (2)

—
Article 61 – Powers and responsibilities of the national regulatory and other competent authorities with regard to access and interconnection, paragraph (1), paragraph (2), points (a) to (c), paragraphs (3), (5) and (6)

—
Article 75 – Termination rates, paragraphs (2) and (3)

—
Article 93 – Numbering resources, the first subparagraph of paragraph (5)

—
Article 97 – Access to numbers and services

—
Article 99 – Non-discrimination

—
Article 100 – Fundamental rights safeguard

—
Article 108 – Availability of services

—
Article 111 – Equivalent access and choice for end-users with disabilities

—
Article 120 – Publication of information

—
Article 122 – Review procedures, the second and third subparagraphs of paragraph (1)

—
Annex I – List of conditions which may be attached to general authorisations, rights of use for radio spectrum and rights of use for numbering resources, parts A to C

—
Annex III – Criteria for the determination of wholesale voice termination rates.

Timetable: the provisions of Directive (EU) 2018/1972 shall be implemented within 1 year after the date of entry into force of this Decision.

Regulation (EU) 2022/612 of the European Parliament and of the Council of 6 April 2022 on roaming on public mobile communications networks within the Union (recast).
The provisions of Regulation (EU) 2022/612 shall, for the purposes of this Agreement, be read with the following adaptation: Article 1(4) refers to reference exchange rates published by the European Central Bank in the Official Journal of the European Union. For as long as the European Central Bank does not publish exchange rates for the Moldovan leu, exchange rates between the euro and the Moldovan leu published by the National Bank of Moldova should be used for the purposes of applying Article 1(4). The reference periods and conditions laid down in Article 1(4) remain unchanged.
Implement all provisions with the exception of:

—
Article 1 – Subject matter and scope, paragraph (5)

—
Article 3 – Wholesale roaming access, paragraph (8)

—
Article 4 – Provision of regulated retail roaming services, paragraph (3)

—
Article 7 – Implementation of fair use policy and of sustainability mechanism, paragraphs (1) to (3) and (5). The exception regarding Article 7(1) to (3) is without prejudice to Moldova’s obligation to implement the implementing acts on the application of fair use policies, the methodology for assessing sustainability of the provision of retail roaming services at domestic prices and the application to be submitted by a roaming provider for the purpose of the assessment of the sustainability

—
Article 8 – Exceptional application of retail surcharges for the consumption of regulated retail roaming services and provision of alternative tariffs, paragraph (6)

—
The first and third subparagraphs of Article 16 – Databases of numbering ranges for value-added services and means of access to emergency services

—
Article 20 – Committee procedure

—
Article 21 – Review

—
Article 23 – Repeal.

Timetable: the provisions of Regulation (EU) 2022/612 shall be implemented within 2 years after the date of entry into force of this Decision.

Commission Implementing Regulation (EU) 2016/2286 of 15 December 2016 laying down detailed rules on the application of fair use policy and on the methodology for assessing the sustainability of the abolition of retail roaming surcharges and on the application to be submitted by a roaming provider for the purposes of that assessment.
Implement all provisions with the exception of:

—
Article 12 – Review.

Timetable: the provisions of Commission Implementing Regulation (EU) 2016/2286 shall be implemented within 2 years after the date of entry into force of this Decision.

Commission Delegated Regulation (EU) 2021/654 of 18 December 2020 supplementing Directive (EU) 2018/1972 of the European Parliament and of the Council by setting a single maximum Union-wide mobile voice termination rate and a single maximum Union-wide fixed voice termination rate.
The provisions of Commission Delegated Regulation (EU) 2021/654 shall, for the purposes of this Agreement, be read with the following adaptation: Article 3(2) and 3(3) refers to reference exchange rates published by the European Central Bank in the Official Journal of the European Union. For as long as the European Central Bank does not publish exchange rates for the Moldovan leu, exchange rates between the euro and the Moldovan leu published by the National Bank of Moldova should be used for the purposes of applying Article 3(2) and 3(3). The reference period laid down in Article 3(2) is adapted to the latest relevant quarter for which information is available. The reference periods and conditions laid down in Article 3(3) remain unchanged.
Moldova shall implement Article 1(1), Article 3(1), Article 4(1) and Article 5(1) by mandating its operators not to exceed the single maximum European Union-wide mobile voice termination rate and the single maximum European Union-wide fixed voice termination rate, respectively.
Implement all provisions with the exception of:

—
Article 1(2)

—
Article 4(2) to (5)

—
Article 5(2).

Timetable: the provisions of Commission Delegated Regulation (EU) 2021/654 shall be implemented before the Roaming Regulation and shall be implemented within 2 years after the date of entry into force of this Decision.

Regulation (EU) 2018/1971 of the European Parliament and of the Council of 11 December 2018 establishing the Body of European Regulators for Electronic Communications (BEREC) and the Agency for Support for BEREC (BEREC Office), amending Regulation (EU) 2015/2120 and repealing Regulation (EC) No 1211/2009.
Implement the following provisions:

—
Article 3 – Objectives of BEREC, paragraph (5)

—
Article 4 – Regulatory tasks of BEREC, paragraph (4)

—
Article 7 – Composition of the Board of Regulators, paragraphs (1) to (3)

—
Article 8 – Independence of the Board of Regulators

—
Article 11 – Meetings of the Board of Regulators, paragraph (5)

—
Article 12 – Voting rules of the Board of Regulators, paragraph (2)

—
Article 15 – Composition of the Management Board, paragraphs (1) to (3)

—
Article 18 – Meetings of the Management Board, paragraph (5)

—
Article 38 – Confidentiality, paragraph (2)

—
Article 40 – Exchange of information, paragraphs (1), (2), (4), and (5)

—
Article 42 – Declarations of interests, paragraphs (1) and (2).

The national regulatory authority of Moldova with primary responsibility for overseeing the day-to-day operation of the markets for electronic communications networks and services shall participate fully in the work of the Board of Regulators of BEREC, the working groups of BEREC and the Management Board of the BEREC Office. The national regulatory authority of Moldova shall have the same rights and obligations as the national regulatory authorities of the Member States of the Union, except for the right to vote and for the Chairmanship of the Board of Regulators and of the Management Board.
In light thereof, the national regulatory authority of Moldova shall be represented at an appropriate level in accordance with the provisions of Regulation (EU) 2018/1971. In accordance with the relevant rules of the Regulation (EU) 2018/1971, BEREC and the BEREC Office shall, as the case may be, assist the national regulatory authority of Moldova in the performance of its tasks.
The national regulatory authority of Moldova shall take the utmost account of any guideline, opinion, recommendation, common position and best practices adopted by BEREC with the aim of ensuring the consistent implementation of the regulatory framework for electronic communications. For the purpose of market opening for roaming pursuant to Article 452(2), the national regulatory authority of Moldova shall take the utmost account of any guideline adopted by BEREC with the aim of ensuring the consistent implementation of the regulatory framework on roaming and shall provide reasons when deviating from such a guideline.

Timetable: the provisions of Regulation (EU) 2018/1971 shall be implemented within 1 year after the date of entry into force of this Decision.’.

Decision (EU) 2025/1734 of the European Central Bank of 31 July 2025 on safeguards in relation to access by central counterparties to Eurosystem overnight credit in TARGET (ECB/2025/29)

Official Journalof the European Union ENL series
2025/1734 13.8.2025
(1) Under Guideline (EU) 2022/912 of the European Central Bank (ECB/2022/8)(1), national central banks of Member States whose currency is the euro (hereinafter ‘euro area NCBs’) may provide overnight credit through a dedicated crisis facility to central counterparties (CCPs) (hereinafter the ‘CCP credit facility’). Such CCPs must be established in the euro area and meet the requirements set out in Guideline (EU) 2022/912 (ECB/2022/8) (hereinafter ‘eligible CCPs’). In cases where eligible CCPs have not reimbursed intraday credit at the end of a day, they may access the CCP credit facility by automatically rolling over the outstanding intraday credit without the need to request the prior approval of the Governing Council.
(2) With respect to the euro as a currency, the Eurosystem central banks collectively exercise the central bank of issue function in relation to CCPs. In view of this function, requirements relating to safeguards on financial soundness and sound liquidity risk management that need to be complied with by eligible CCPs as well as the method of assessment of compliance with these requirements are put in place.
(3) Safeguards in relation to the CCP credit facility are necessary to ensure that only eligible CCPs that are financially sound and have in place sound liquidity risk management may access the CCP credit facility. Sound liquidity risk management ensures that eligible CCPs have adequate liquidity risk controls in place, including for crisis scenarios under which eligible CCPs are not expected to resort to the CCP credit facility, or – where such access is available to CCPs authorised as credit institutions under Regulation (EU) No 575/2013 of the European Parliament and of the Council(2)– to Eurosystem monetary policy operations. Safeguards on financial soundness and sound liquidity risk management should apply to all eligible CCPs, including those that are authorised as credit institutions under Regulation (EU) No 575/2013.
(4) Eligible CCPs’ compliance with the requirements relating to the safeguards on financial soundness and sound liquidity risk management should be assessed by Eurosystem central banks in a forward-looking manner. Therefore, eligible CCPs need to comply – on a continuous basis and without any doubt as regards their ongoing and future compliance – with these requirements. Compliance with the regulatory requirements established under Regulation (EU) No 648/2012 of the European Parliament and of the Council(3)in relation to capital, margin, default fund, other financial resources and liquidity risk controls constitutes a necessary but not sufficient condition for assessing financial soundness and sound liquidity risk management by Eurosystem central banks in relation to granting access to the CCP credit facility.
(5) For the purpose of ensuring compliance with the provisions set out in this Decision, it is necessary to specify the Governing Council’s powers to decide on discretionary measures in cases where an eligible CCP does not comply with the requirements relating to the safeguards on financial soundness and sound liquidity risk management. It is also necessary to specify the penalties applicable for cases where a CCP’s access to the CCP credit facility has been limited and the CCP exceeds the restricted level of access, or resorts to the CCP credit facility in breach of relevant requirements relating to liquidity risk controls. With respect to the penalties, there should be sufficient communication between the operators of TARGET component systems and the central bank of issue function of the Eurosystem central banks to ensure compliance with the principle ofne bis in idem.
(6) Where relevant, the requirements relating to the safeguards on financial soundness and sound liquidity risk management, including the related discretionary measures and applicable penalties, should be reflected in the contractual arrangements concluded between the eligible CCPs and the euro area NCBs in relation to the CCP credit facility.
(7) For legal certainty, the date of application of this Decision should be aligned with the date of application of the amendments to Guideline (EU) 2022/912 (ECB/2022/8) relating to the CCP credit facility, which is 6 October 2025,
(1) ‘central counterparty’ or ‘CCP’ means a central counterparty that is authorised under Regulation (EU) No 648/2012;
(2) ‘eligible CCP’ means an eligible CCP as defined in Article 2, point (26a), of Guideline (EU) 2022/912 (ECB/2022/8);
(3) ‘CCP credit facility’ means the CCP credit facility as defined in Article 2, point (18a), of Guideline (EU) 2022/912 (ECB/2022/8);
(4) ‘euro area NCB’ means euro area NCB as defined in Article 2, point (27), of Guideline (EU) 2022/912 (ECB/2022/8);
(5) ‘Eurosystem central bank’ means the European Central Bank (ECB) or a euro area NCB;
(6) ‘private funding arrangement’ means a funding arrangement other than a borrowing facility that may be accessible through a euro area NCB;
(7) ‘private liquidity provider’ means a liquidity provider other than a euro area NCB.
(a) the capital requirements pursuant to Article 16 of Regulation (EU) No 648/2012;
(b) the margin requirements pursuant to Article 41 of Regulation (EU) No 648/2012;
(c) the requirements in relation to pre-funded financial resources pursuant to Articles 42 and 43 of Regulation (EU) No 648/2012.
(a) the CCP shall have sufficient pre-funded financial resources, including the margins posted by the defaulted clearing member and the pre-funded financial resources, as set out in Articles 42 and 43 of Regulation (EU) No 648/2012, to cover credit losses incurred as a result of the default management process;
(b) on the basis of the assessment conducted in accordance with Article 4, the Eurosystem central banks may decide to temporarily waive the requirement set out in paragraph 1, point (c), where the CCP presents a plan to replenish pre-funded financial resources as set out in Articles 42 and 43 of Regulation (EU) No 648/2012 in a credible and timely manner.
(a) have liquidity risk controls in place to ensure that access to the CCP credit facility or – where such access is available to CCPs authorised as credit institutions under Regulation (EU) No 575/2013 – to Eurosystem monetary policy operations, shall:(i)be a last resort;(ii)be limited to scenarios which due to their severity may present considerable challenges for the liquidity management of the CCP (‘crisis scenarios’);(iii)constitute a temporary funding source on the basis of a credible plan to reimburse the amount used under the CCP credit facility or – where such access is available to CCPs authorised as credit institutions under Regulation (EU) No 575/2013 – under Eurosystem monetary policy operations as soon as possible;(iv)not be for the purpose of meeting payment obligations in relation to currencies other than the euro; (i) be a last resort; (ii) be limited to scenarios which due to their severity may present considerable challenges for the liquidity management of the CCP (‘crisis scenarios’); (iii) constitute a temporary funding source on the basis of a credible plan to reimburse the amount used under the CCP credit facility or – where such access is available to CCPs authorised as credit institutions under Regulation (EU) No 575/2013 – under Eurosystem monetary policy operations as soon as possible; (iv) not be for the purpose of meeting payment obligations in relation to currencies other than the euro;
(i) be a last resort;
(ii) be limited to scenarios which due to their severity may present considerable challenges for the liquidity management of the CCP (‘crisis scenarios’);
(iii) constitute a temporary funding source on the basis of a credible plan to reimburse the amount used under the CCP credit facility or – where such access is available to CCPs authorised as credit institutions under Regulation (EU) No 575/2013 – under Eurosystem monetary policy operations as soon as possible;
(iv) not be for the purpose of meeting payment obligations in relation to currencies other than the euro;
(i) be a last resort;
(ii) be limited to scenarios which due to their severity may present considerable challenges for the liquidity management of the CCP (‘crisis scenarios’);
(iii) constitute a temporary funding source on the basis of a credible plan to reimburse the amount used under the CCP credit facility or – where such access is available to CCPs authorised as credit institutions under Regulation (EU) No 575/2013 – under Eurosystem monetary policy operations as soon as possible;
(iv) not be for the purpose of meeting payment obligations in relation to currencies other than the euro;
(b) meet the requirements in relation to liquidity risk controls in accordance with Article 44 of Regulation (EU) No 648/2012.
(a) with respect to the requirement set out in paragraph 1, point (a), the assessment conducted in accordance with Article 4 may be conducted after the CCP has completed the default management process;
(b) on the basis of the assessment conducted in accordance with Article 4, the Eurosystem central banks may decide to temporarily waive the requirement set out in paragraph 1, point (b), where the CCP presents a plan to replenish the liquid resources as referred to in Article 44 of Regulation (EU) No 648/2012 in a credible and timely manner.
(a) the liquidity risk due to overreliance on a single type of private funding arrangement;
(b) the liquidity risk due to overreliance on too few private liquidity providers;
(c) the liquidity risk due to the low number of private liquidity providers of the CCP that have access to the Eurosystem’s monetary policy operations.
(a) the scope and degree of the due diligence to which private funding arrangements are subjected by the CCP;
(b) the comprehensiveness and frequency of the testing of access to private funding arrangements, and the methodology and stress scenario context utilised for this purpose;
(c) the validation of the test results, in particular in relation to the estimated amounts of liquidity provision on the basis of the private funding arrangements.
(a) quantitative information on capital, margin, default fund, other financial resources and liquidity risk controls reported within the context of Regulation (EU) No 648/2012;
(b) any additional information on capital, margin, default fund, other financial resources and liquidity risk controls;
(c) information on elements listed in Article 3(1), point (a), with respect to a CCP’s liquidity risk controls regarding stress situations;
(d) any other information that is considered relevant, in particular if it raises substantial concerns about a CCP’s financial soundness, sound liquidity risk management, general risk management framework and governance.
(a) rejecting, limiting the use of or applying supplementary valuation haircuts to the assets mobilised as collateral for the purposes of the CCP credit facility;
(b) limiting, suspending or terminating access to the CCP credit facility as further specified in paragraphs 3 to 7.
(a) in the case set out in paragraph 3, the relevant eligible CCP’s non-compliance with the requirements set out in Articles 2 and 3;
(b) in the case set out in paragraph 4, the incompleteness or unavailability of information necessary for the purpose of the assessments provided for under Article 4.
(a) where a CCP’s access to the CCP credit facility is limited in accordance with Article 5 and the CCP exceeds the restricted level of access; or
(b) where a CCP resorts to the CCP credit facility in breach of Article 3(1), point (a).
(a) Annex I, Part II, Article 12a(3), point (a), to Guideline (EU) 2022/912 (ECB/2022/8), if the case set out in paragraph 1, point (a) or point (b), occurs for the first time within any 12-month period;
(b) Annex I, Part II, Article 12a(3), point (b), to Guideline (EU) 2022/912 (ECB/2022/8), if the case set out in paragraph 1, point (a) or point (b), occurs for at least the second time within the same 12-month period.
(a) in the case set out in paragraph 1, point (a), the amount used under the CCP credit facility in excess of the restricted level of access set as a permitted limit; or
(b) in the case set out in paragraph 1, point (b), the full amount used under the CCP credit facility.
THE GOVERNING COUNCIL OF THE EUROPEAN CENTRAL BANK,
Having regard to the Treaty on the Functioning of the European Union, and in particular Article 127(2), the first and fourth indents, and Article 127(5) thereof,
Having regard to the Statute of the European System of Central Banks and of the European Central Bank, and in particular Article 3.1 and Articles 17, 18 and 22 thereof,
Whereas:
(1) Under Guideline (EU) 2022/912 of the European Central Bank (ECB/2022/8) (1), national central banks of Member States whose currency is the euro (hereinafter ‘euro area NCBs’) may provide overnight credit through a dedicated crisis facility to central counterparties (CCPs) (hereinafter the ‘CCP credit facility’). Such CCPs must be established in the euro area and meet the requirements set out in Guideline (EU) 2022/912 (ECB/2022/8) (hereinafter ‘eligible CCPs’). In cases where eligible CCPs have not reimbursed intraday credit at the end of a day, they may access the CCP credit facility by automatically rolling over the outstanding intraday credit without the need to request the prior approval of the Governing Council.
(2) With respect to the euro as a currency, the Eurosystem central banks collectively exercise the central bank of issue function in relation to CCPs. In view of this function, requirements relating to safeguards on financial soundness and sound liquidity risk management that need to be complied with by eligible CCPs as well as the method of assessment of compliance with these requirements are put in place.
(3) Safeguards in relation to the CCP credit facility are necessary to ensure that only eligible CCPs that are financially sound and have in place sound liquidity risk management may access the CCP credit facility. Sound liquidity risk management ensures that eligible CCPs have adequate liquidity risk controls in place, including for crisis scenarios under which eligible CCPs are not expected to resort to the CCP credit facility, or – where such access is available to CCPs authorised as credit institutions under Regulation (EU) No 575/2013 of the European Parliament and of the Council (2) – to Eurosystem monetary policy operations. Safeguards on financial soundness and sound liquidity risk management should apply to all eligible CCPs, including those that are authorised as credit institutions under Regulation (EU) No 575/2013.
(4) Eligible CCPs’ compliance with the requirements relating to the safeguards on financial soundness and sound liquidity risk management should be assessed by Eurosystem central banks in a forward-looking manner. Therefore, eligible CCPs need to comply – on a continuous basis and without any doubt as regards their ongoing and future compliance – with these requirements. Compliance with the regulatory requirements established under Regulation (EU) No 648/2012 of the European Parliament and of the Council (3) in relation to capital, margin, default fund, other financial resources and liquidity risk controls constitutes a necessary but not sufficient condition for assessing financial soundness and sound liquidity risk management by Eurosystem central banks in relation to granting access to the CCP credit facility.
(5) For the purpose of ensuring compliance with the provisions set out in this Decision, it is necessary to specify the Governing Council’s powers to decide on discretionary measures in cases where an eligible CCP does not comply with the requirements relating to the safeguards on financial soundness and sound liquidity risk management. It is also necessary to specify the penalties applicable for cases where a CCP’s access to the CCP credit facility has been limited and the CCP exceeds the restricted level of access, or resorts to the CCP credit facility in breach of relevant requirements relating to liquidity risk controls. With respect to the penalties, there should be sufficient communication between the operators of TARGET component systems and the central bank of issue function of the Eurosystem central banks to ensure compliance with the principle of ne bis in idem.
(6) Where relevant, the requirements relating to the safeguards on financial soundness and sound liquidity risk management, including the related discretionary measures and applicable penalties, should be reflected in the contractual arrangements concluded between the eligible CCPs and the euro area NCBs in relation to the CCP credit facility.
(7) For legal certainty, the date of application of this Decision should be aligned with the date of application of the amendments to Guideline (EU) 2022/912 (ECB/2022/8) relating to the CCP credit facility, which is 6 October 2025,
HAS ADOPTED THIS DECISION:

Definitions

For the purposes of this Decision, the following definitions apply:

(1) ‘central counterparty’ or ‘CCP’ means a central counterparty that is authorised under Regulation (EU) No 648/2012;
(2) ‘eligible CCP’ means an eligible CCP as defined in Article 2, point (26a), of Guideline (EU) 2022/912 (ECB/2022/8);
(3) ‘CCP credit facility’ means the CCP credit facility as defined in Article 2, point (18a), of Guideline (EU) 2022/912 (ECB/2022/8);
(4) ‘euro area NCB’ means euro area NCB as defined in Article 2, point (27), of Guideline (EU) 2022/912 (ECB/2022/8);
(5) ‘Eurosystem central bank’ means the European Central Bank (ECB) or a euro area NCB;
(6) ‘private funding arrangement’ means a funding arrangement other than a borrowing facility that may be accessible through a euro area NCB;
(7) ‘private liquidity provider’ means a liquidity provider other than a euro area NCB.

Requirements relating to safeguards on financial soundness

1. In order to safeguard their financial soundness, eligible CCPs shall meet the following requirements on an ongoing basis:
(a) the capital requirements pursuant to Article 16 of Regulation (EU) No 648/2012;
(b) the margin requirements pursuant to Article 41 of Regulation (EU) No 648/2012;
(c) the requirements in relation to pre-funded financial resources pursuant to Articles 42 and 43 of Regulation (EU) No 648/2012.
2. In the event of a default of a clearing member of a CCP where the CCP conducts its default management process in accordance with Articles 45 and 48 of Regulation (EU) No 648/2012 and as a result uses the margins posted by the defaulted clearing member and the pre-funded financial resources referred to in Articles 42 and 43 of Regulation (EU) No 648/2012, the following shall apply:
(a) the CCP shall have sufficient pre-funded financial resources, including the margins posted by the defaulted clearing member and the pre-funded financial resources, as set out in Articles 42 and 43 of Regulation (EU) No 648/2012, to cover credit losses incurred as a result of the default management process;
(b) on the basis of the assessment conducted in accordance with Article 4, the Eurosystem central banks may decide to temporarily waive the requirement set out in paragraph 1, point (c), where the CCP presents a plan to replenish pre-funded financial resources as set out in Articles 42 and 43 of Regulation (EU) No 648/2012 in a credible and timely manner.

3. No CCP deemed to be failing or likely to fail as determined under Article 22 of Regulation (EU) 2021/23 of the European Parliament and of the Council (4) shall be considered financially sound.

Requirements relating to safeguards on sound liquidity risk management

1. In order to safeguard their sound liquidity risk management with respect to the euro, eligible CCPs shall meet the following requirements on an ongoing basis:
(a) have liquidity risk controls in place to ensure that access to the CCP credit facility or – where such access is available to CCPs authorised as credit institutions under Regulation (EU) No 575/2013 – to Eurosystem monetary policy operations, shall:
(i) be a last resort;
(ii) be limited to scenarios which due to their severity may present considerable challenges for the liquidity management of the CCP (‘crisis scenarios’);
(iii) constitute a temporary funding source on the basis of a credible plan to reimburse the amount used under the CCP credit facility or – where such access is available to CCPs authorised as credit institutions under Regulation (EU) No 575/2013 – under Eurosystem monetary policy operations as soon as possible;
(iv) not be for the purpose of meeting payment obligations in relation to currencies other than the euro;
(b) meet the requirements in relation to liquidity risk controls in accordance with Article 44 of Regulation (EU) No 648/2012.
2. In the event of the default of a clearing member where the CCP conducts its default management process in accordance with Articles 45 and 48 of Regulation (EU) No 648/2012 and as a result uses the liquid resources referred to in Article 44 of Regulation (EU) No 648/2012, the following shall apply:
(a) with respect to the requirement set out in paragraph 1, point (a), the assessment conducted in accordance with Article 4 may be conducted after the CCP has completed the default management process;
(b) on the basis of the assessment conducted in accordance with Article 4, the Eurosystem central banks may decide to temporarily waive the requirement set out in paragraph 1, point (b), where the CCP presents a plan to replenish the liquid resources as referred to in Article 44 of Regulation (EU) No 648/2012 in a credible and timely manner.

3. For the purpose of assessing a CCP’s compliance with paragraph 1, point (a), the following may be taken into account:
(a) the liquidity risk due to overreliance on a single type of private funding arrangement;
(b) the liquidity risk due to overreliance on too few private liquidity providers;
(c) the liquidity risk due to the low number of private liquidity providers of the CCP that have access to the Eurosystem’s monetary policy operations.

4. With respect to paragraph 1, point (b), the Eurosystem central banks may take the following into account for the purpose of assessing the extent to which the private funding arrangements are pre-arranged and highly reliable, including under stressed market conditions:
(a) the scope and degree of the due diligence to which private funding arrangements are subjected by the CCP;
(b) the comprehensiveness and frequency of the testing of access to private funding arrangements, and the methodology and stress scenario context utilised for this purpose;
(c) the validation of the test results, in particular in relation to the estimated amounts of liquidity provision on the basis of the private funding arrangements.

Assessment of safeguards

1. The Eurosystem central banks shall carry out assessments of compliance by eligible CCPs with the requirements relating to safeguards on financial soundness and sound liquidity risk management provided for in Articles 2 and 3 on a quarterly basis and in a forward-looking manner.

2. If an event occurs between the quarterly assessments provided for in paragraph 1 that could raise concerns in relation to an eligible CCP’s financial soundness and liquidity risk management, the Eurosystem central banks shall also carry out occasional assessments of the compliance by an eligible CCP with the requirements on financial soundness and sound liquidity risk management provided for in Articles 2 and 3, including by way of ad hoc intensified monitoring and in a forward-looking manner.

3. For the purpose of the assessments provided for in paragraphs 1 and 2, the following information may be taken into account:
(a) quantitative information on capital, margin, default fund, other financial resources and liquidity risk controls reported within the context of Regulation (EU) No 648/2012;
(b) any additional information on capital, margin, default fund, other financial resources and liquidity risk controls;
(c) information on elements listed in Article 3(1), point (a), with respect to a CCP’s liquidity risk controls regarding stress situations;
(d) any other information that is considered relevant, in particular if it raises substantial concerns about a CCP’s financial soundness, sound liquidity risk management, general risk management framework and governance.

4. The eligible CCP shall provide the information referred to in paragraph 3, if requested to do so by the relevant euro area NCB.

Discretionary measures

1. The Governing Council may decide to adopt, revise or remove discretionary measures with respect to the CCP credit facility on the grounds of prudence. These measures shall be applied by the respective euro area NCB and shall include:
(a) rejecting, limiting the use of or applying supplementary valuation haircuts to the assets mobilised as collateral for the purposes of the CCP credit facility;
(b) limiting, suspending or terminating access to the CCP credit facility as further specified in paragraphs 3 to 7.
2. The Governing Council shall ensure that the measures referred to in paragraph 1 are taken in a proportionate and non-discriminatory manner and are duly justified.

3. Unless decided otherwise by the Governing Council, a CCP which does not comply with the requirements set out in Articles 2 and 3 shall have its access to the CCP credit facility automatically limited on the grounds of prudence. If compliance has not been restored through adequate and timely measures at the latest within 16 weeks from the date of the determination of non-compliance with the requirements set out in Articles 2 and 3 on the basis of the assessments provided for in Article 4, the CCP’s access to the CCP credit facility shall be suspended on the grounds of prudence. Such measures shall be applied by the respective euro area NCB.

4. Without prejudice to the measures referred to under paragraph 3, access to the CCP credit facility may be limited or suspended on the grounds of prudence for an eligible CCP for which information necessary for the purpose of the assessments provided for under Article 4 is incomplete or is not made available to the Eurosystem central banks. Access shall be restored once the relevant information becomes available to the Eurosystem central banks and the CCP has been assessed as meeting the requirements of Articles 2 and 3.
5. Upon the limitation of access to the CCP credit facility provided for in this Article, the relevant eligible CCP may maintain a restricted level of access to the CCP credit facility. Unless decided otherwise by the Governing Council, that restricted level of access shall correspond to the level of the usage of the CCP credit facility at the time when the Eurosystem central banks become aware of:
(a) in the case set out in paragraph 3, the relevant eligible CCP’s non-compliance with the requirements set out in Articles 2 and 3;
(b) in the case set out in paragraph 4, the incompleteness or unavailability of information necessary for the purpose of the assessments provided for under Article 4.
6. In the event of a suspension of access to the CCP credit facility provided for in this Article, any outstanding credit shall immediately become repayable in full.

7. In the event of a termination of access to the CCP credit facility provided for in this Article, any outstanding credit shall immediately become repayable in full and the CCP subject to such termination shall immediately cease to be eligible for access to the CCP credit facility.

Penalties in relation to safeguards and discretionary measures

1. Unless decided otherwise by the Governing Council, the respective euro area NCB shall apply penalties in the following cases:
(a) where a CCP’s access to the CCP credit facility is limited in accordance with Article 5 and the CCP exceeds the restricted level of access; or
(b) where a CCP resorts to the CCP credit facility in breach of Article 3(1), point (a).

2. The penalties referred to in paragraph 1 shall take the form of penalty interest rates, which shall be calculated in line with:
(a) Annex I, Part II, Article 12a(3), point (a), to Guideline (EU) 2022/912 (ECB/2022/8), if the case set out in paragraph 1, point (a) or point (b), occurs for the first time within any 12-month period;
(b) Annex I, Part II, Article 12a(3), point (b), to Guideline (EU) 2022/912 (ECB/2022/8), if the case set out in paragraph 1, point (a) or point (b), occurs for at least the second time within the same 12-month period.

3. The penalty interest rates referred to in paragraph 2 shall be applied to:
(a) in the case set out in paragraph 1, point (a), the amount used under the CCP credit facility in excess of the restricted level of access set as a permitted limit; or
(b) in the case set out in paragraph 1, point (b), the full amount used under the CCP credit facility.

Implementation through contractual arrangements

Euro area NCBs shall take the necessary measures to implement Articles 2 to 6 through contractual arrangements with eligible CCPs where relevant, by the date referred to in Article 8(2).

Entry into force

1. This Decision shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.

2. It shall apply from 6 October 2025.

Commission Implementing Decision (EU) 2025/1715 of 30 July 2025 laying down detailed rules for the application of Regulation (EU) 2024/1679 of the European Parliament and of the Council as regards the implementation of the Lyon-Turin cross-border project on the Mediterranean European Transport Corridor (notified under document C(2025) 5111)

Official Journalof the European Union ENL series
2025/1715 1.8.2025
(1) As underlined by the Work Plans for the Mediterranean Corridor, the cross-border project Lyon-Turin (the ‘project’) plays a crucial role in ensuring the functioning of the corridor with an interoperable and efficient connection across the Alpes, between France and Italy, for the transport of goods and passengers by rail.
(2) Decarbonising transport through creating the conditions for an ambitious modal shift of long-distance transport of goods and passenger to energy-efficient transport modes, is a key policy objective of the Union and in line with the Union’s objectives towards fighting climate change.
(3) In this context, fostering railway transport of goods and passengers is a clear priority of the Union transport policy, as outlined by the Smart and Sustainable Mobility Strategy(2)and a long-standing priority of in the development of the TEN-T network.
(4) Through the completion of the Lyon-Turin railway, the Mediterranean European Transport Corridor and its transalpine cross-border section will be equipped with modern, safe and energy efficient railway transport infrastructure contributing to modal shift.
(5) The Lyon-Turin cross border link is listed as a pre-identified cross border link on the Mediterranean European Transport Corridor eligible for Union funding under the Connecting Europe Facility in Part III of the Annex to Regulation (EU) 2021/1153 of the European Parliament and of the Council(3).
(6) Three bilateral treaties and one additional protocol between France and Italy(4)regulate and plan the project within the agreed political, legal and financial framework. A further bilateral agreement for cross-border transfers of material for the construction of the project was signed on 4 August 2023.
(7) The Work Plan for the Mediterranean Corridor emphasises the need to ensure completion of the project in its entirety, which includes the cross-border base tunnel as well as access lines between the pre-identified urban nodes of Lyon and Turin.
(8) All sections of the project are essential for a good functioning of the Mediterranean European Transport Corridor. They will be planned in line with standards set out in Article 16 and 18 of Regulation (EU) 2024/1679.
(9) The project is a complex cross-border long-term investment involving France, Italy and their respective neighbouring regions of Auvergne Rhône Alpes and Piedmont. It also benefits other Member States, which rely on a modern connection between France and Italy across the Alpes.
(10) The project implies the creation of new infrastructure and the improvement of the existing one. In order to support the coordinated and timely implementation of the project, it is necessary to adopt provisions laying down a description of actions and a timetable for their implementation. The project is a long-term commitment requiring planning of investments across several budgetary cycles both at national and Union level. It will help achieving the cross-border objectives of the Work Plan for the Mediterranean European Transport Corridor, including the construction of access lines that will ensure the transit of 24 million tons of goods per year and 1,5 million passengers per year.
(11) France and Italy have already carried out significant actions such as studies and infrastructure works. Those actions include the ongoing construction of the base tunnel in both countries (as of 31 October 2024), where 38,6 km of galleries have been excavated, out of which 14,7 km of the base tunnel), the planning of access lines on the Italian territory, the planning of the modernisation of the conventional rail line Ambérieu – Saint-Jean-de-Maurienne as from 2027 with a dedicated budget of EUR 700 million, and the ongoing modernisation of the conventional rail line between Bussoleno-Avigliana. Regarding the French new railway lines, a decree of 13 August 2013(5)declared the works to be in the public interest, the detailed railway alignment was approved. The avant-projet détaillé (APD) studies, co-financed by the Commission, France and the French regional authorities will be launched in 2025.
(12) The clear identification of the necessary actions to complete the project and the timetable for their implementation are also important to plan and fully optimise the availability of Union, national, and regional funding. Union co-financing has an essential leverage effect on national and regional decision-making for the implementation of the actions. Therefore, it is important to identify the remaining actions necessary for the full completion of the project, so that Union resources can be exploited at the maximum level, in line with the respective planning and the applicable co-financing rates, together with the available financial resources at national and regional level. Pursuant to Regulation (EU) 2021/1153, all of the sections of the project are eligible for Union funding (up to a maximum of 55 % for the base tunnel and 50 % for access lines). The remaining actions must demonstrate a high degree of integration in the planning and implementation of the actions and be in line with the award criteria set out in Article 14 of Regulation (EU) 2021/1153. Financial resources should therefore be fully optimised with the maximum efforts of all parties involved.
(13) The Agreement between the Government of the French Republic and the Government of the Italian Republic for the construction and operation of a new Lyon-Turin railway line(6)and the additional protocol specify the certified cost of the cross-border base tunnel and, after subtracting the contribution of the Union and the part financed by tolls, the cost allocation key of 57,9 % for Italy and 42,1 % for France. Any additional costs will be equally allocated between Italy and France. The additional protocol also provides for the possibility of monetary revaluation and evolution of the costs of the production factors of the works.
(14) The Franco-Italian company Tunnel Euralpin Lyon Turin, as a bi-national entity, is responsible for managing and constructing the cross-border section of the project. The national infrastructure managers of France and Italy respectively are responsible for constructing the access routes.
(15) In order to monitor the progress of the project’s implementation, France and Italy should provide the Commission with regular reports on the matter concerning the sections situated in their respective territories, and notify any delays encountered.
(16) Pursuant to Article 6(1) of Regulation (EU) 2024/1679, Member States are to take appropriate measures to develop the core network by 31 December 2030. This obligation, however, is subject to the conditions set out in Article 8(5) of that Regulation, emphasising that the execution of projects of common interest is contingent upon factors such as their degree of maturity, compliance with both Union and national legal procedures, and the availability of financial resources, without prejudging the financial commitment of a Member State or of the Union.
(17) The implementation timetable should be without prejudice to the fulfilment of the requirements set out in international law and Union law, including provisions to protect the environment and human health. The timetable should allow Member States to plan and fully optimise the availability of funding, without prejudging the financial commitment of a Member State or of the Union. It should, under no circumstances, compromise the Union’s and Member State’s standards for environmental protection and public participation.
(18) Without prejudice to Article 54(3) of Regulation (EU) 2024/1679], it is appropriate to start the review of this decision by the end of 2026, to reflect accurately the state of planning and construction of actions listed in Article 2.
(19) France and Italy have approved the measures provided for in this Decision.
(20) The measures provided for in this Decision are in accordance with the opinion of the Committee established by Article 61(1) of Regulation (EU) 2024/1679,
(a) the cross-border section of the tunnel together with the connecting stations of Saint Jean de Maurienne and Susa.
(b) access lines on the Italian territory, composed of:(i)upgrading of the existing conventional line – Bussoleno-Avigliana section:—Lot 1: Realization of new technological installations for the management of the traffic on the Bussoleno – Avigliana section;—Lot 2: Elimination of two level crossings at Borgone Susa;—Lot 3: Implementation of the Technical Specifications for Interoperability for Persons with Reduced Mobility in the stations of Sant’Ambrogio, Borgone and Bruzolo;—Lot 4: Construction of two priority tracks with 750 m long modules, one in Condove and one Bruzolo;—Lot 5: Adaptation of the line power supply system through the construction of two new electrical substations,one in Avigliana and one in Borgone;—Lot 6: Demolition of 281 piles of the primary electric line 66 kV;—Lot 7: Acoustic mitigation;—Lot 8: involves the complete replacement of the current electric traction line, the Rete Ferroviaria Italiana standard one, between the Bussoleno and Avigliana stations with a 540 sq mm section and the addition of a 230 sq mm reinforcement feeder, necessary for the correct operation of the line according to the planned future train traffic;(ii)construction of the new line Avigliana-Orbassano section;(iii)rearrangement of the Orbassano marshalling yard including south junction;(iv)connectivity within the Turin railway urban node:—completion of the Turin railway bypass, Porta Susa – Stura section;—upgrading of the high-speed line between Porta Susa and Porta Nuova, new 4,5 km long independent double-track line, and construction of a number of new stops in the Turin railway system;—speeding up the Turin-Genoa line;—infrastructural and technological upgrading of the Turin railway urban node and related lines, and renewal of the centralized circulation management systems or insertion of new centralized circulatio management systems;—new railway bypass from Orbassano to Settimo Torinese – phase 1b “Gronda Merci”. (i) upgrading of the existing conventional line – Bussoleno-Avigliana section:—Lot 1: Realization of new technological installations for the management of the traffic on the Bussoleno – Avigliana section;—Lot 2: Elimination of two level crossings at Borgone Susa;—Lot 3: Implementation of the Technical Specifications for Interoperability for Persons with Reduced Mobility in the stations of Sant’Ambrogio, Borgone and Bruzolo;—Lot 4: Construction of two priority tracks with 750 m long modules, one in Condove and one Bruzolo;—Lot 5: Adaptation of the line power supply system through the construction of two new electrical substations,one in Avigliana and one in Borgone;—Lot 6: Demolition of 281 piles of the primary electric line 66 kV;—Lot 7: Acoustic mitigation;—Lot 8: involves the complete replacement of the current electric traction line, the Rete Ferroviaria Italiana standard one, between the Bussoleno and Avigliana stations with a 540 sq mm section and the addition of a 230 sq mm reinforcement feeder, necessary for the correct operation of the line according to the planned future train traffic; — Lot 1: Realization of new technological installations for the management of the traffic on the Bussoleno – Avigliana section; — Lot 2: Elimination of two level crossings at Borgone Susa; — Lot 3: Implementation of the Technical Specifications for Interoperability for Persons with Reduced Mobility in the stations of Sant’Ambrogio, Borgone and Bruzolo; — Lot 4: Construction of two priority tracks with 750 m long modules, one in Condove and one Bruzolo; — Lot 5: Adaptation of the line power supply system through the construction of two new electrical substations,one in Avigliana and one in Borgone; — Lot 6: Demolition of 281 piles of the primary electric line 66 kV; — Lot 7: Acoustic mitigation; — Lot 8: involves the complete replacement of the current electric traction line, the Rete Ferroviaria Italiana standard one, between the Bussoleno and Avigliana stations with a 540 sq mm section and the addition of a 230 sq mm reinforcement feeder, necessary for the correct operation of the line according to the planned future train traffic; (ii) construction of the new line Avigliana-Orbassano section; (iii) rearrangement of the Orbassano marshalling yard including south junction; (iv) connectivity within the Turin railway urban node:—completion of the Turin railway bypass, Porta Susa – Stura section;—upgrading of the high-speed line between Porta Susa and Porta Nuova, new 4,5 km long independent double-track line, and construction of a number of new stops in the Turin railway system;—speeding up the Turin-Genoa line;—infrastructural and technological upgrading of the Turin railway urban node and related lines, and renewal of the centralized circulation management systems or insertion of new centralized circulatio management systems;—new railway bypass from Orbassano to Settimo Torinese – phase 1b “Gronda Merci”. — completion of the Turin railway bypass, Porta Susa – Stura section; — upgrading of the high-speed line between Porta Susa and Porta Nuova, new 4,5 km long independent double-track line, and construction of a number of new stops in the Turin railway system; — speeding up the Turin-Genoa line; — infrastructural and technological upgrading of the Turin railway urban node and related lines, and renewal of the centralized circulation management systems or insertion of new centralized circulatio management systems; — new railway bypass from Orbassano to Settimo Torinese – phase 1b “Gronda Merci”.
(i) upgrading of the existing conventional line – Bussoleno-Avigliana section:—Lot 1: Realization of new technological installations for the management of the traffic on the Bussoleno – Avigliana section;—Lot 2: Elimination of two level crossings at Borgone Susa;—Lot 3: Implementation of the Technical Specifications for Interoperability for Persons with Reduced Mobility in the stations of Sant’Ambrogio, Borgone and Bruzolo;—Lot 4: Construction of two priority tracks with 750 m long modules, one in Condove and one Bruzolo;—Lot 5: Adaptation of the line power supply system through the construction of two new electrical substations,one in Avigliana and one in Borgone;—Lot 6: Demolition of 281 piles of the primary electric line 66 kV;—Lot 7: Acoustic mitigation;—Lot 8: involves the complete replacement of the current electric traction line, the Rete Ferroviaria Italiana standard one, between the Bussoleno and Avigliana stations with a 540 sq mm section and the addition of a 230 sq mm reinforcement feeder, necessary for the correct operation of the line according to the planned future train traffic; — Lot 1: Realization of new technological installations for the management of the traffic on the Bussoleno – Avigliana section; — Lot 2: Elimination of two level crossings at Borgone Susa; — Lot 3: Implementation of the Technical Specifications for Interoperability for Persons with Reduced Mobility in the stations of Sant’Ambrogio, Borgone and Bruzolo; — Lot 4: Construction of two priority tracks with 750 m long modules, one in Condove and one Bruzolo; — Lot 5: Adaptation of the line power supply system through the construction of two new electrical substations,one in Avigliana and one in Borgone; — Lot 6: Demolition of 281 piles of the primary electric line 66 kV; — Lot 7: Acoustic mitigation; — Lot 8: involves the complete replacement of the current electric traction line, the Rete Ferroviaria Italiana standard one, between the Bussoleno and Avigliana stations with a 540 sq mm section and the addition of a 230 sq mm reinforcement feeder, necessary for the correct operation of the line according to the planned future train traffic;
— Lot 1: Realization of new technological installations for the management of the traffic on the Bussoleno – Avigliana section;
— Lot 2: Elimination of two level crossings at Borgone Susa;
— Lot 3: Implementation of the Technical Specifications for Interoperability for Persons with Reduced Mobility in the stations of Sant’Ambrogio, Borgone and Bruzolo;
— Lot 4: Construction of two priority tracks with 750 m long modules, one in Condove and one Bruzolo;
— Lot 5: Adaptation of the line power supply system through the construction of two new electrical substations,one in Avigliana and one in Borgone;
— Lot 6: Demolition of 281 piles of the primary electric line 66 kV;
— Lot 7: Acoustic mitigation;
— Lot 8: involves the complete replacement of the current electric traction line, the Rete Ferroviaria Italiana standard one, between the Bussoleno and Avigliana stations with a 540 sq mm section and the addition of a 230 sq mm reinforcement feeder, necessary for the correct operation of the line according to the planned future train traffic;
(ii) construction of the new line Avigliana-Orbassano section;
(iii) rearrangement of the Orbassano marshalling yard including south junction;
(iv) connectivity within the Turin railway urban node:—completion of the Turin railway bypass, Porta Susa – Stura section;—upgrading of the high-speed line between Porta Susa and Porta Nuova, new 4,5 km long independent double-track line, and construction of a number of new stops in the Turin railway system;—speeding up the Turin-Genoa line;—infrastructural and technological upgrading of the Turin railway urban node and related lines, and renewal of the centralized circulation management systems or insertion of new centralized circulatio management systems;—new railway bypass from Orbassano to Settimo Torinese – phase 1b “Gronda Merci”. — completion of the Turin railway bypass, Porta Susa – Stura section; — upgrading of the high-speed line between Porta Susa and Porta Nuova, new 4,5 km long independent double-track line, and construction of a number of new stops in the Turin railway system; — speeding up the Turin-Genoa line; — infrastructural and technological upgrading of the Turin railway urban node and related lines, and renewal of the centralized circulation management systems or insertion of new centralized circulatio management systems; — new railway bypass from Orbassano to Settimo Torinese – phase 1b “Gronda Merci”.
— completion of the Turin railway bypass, Porta Susa – Stura section;
— upgrading of the high-speed line between Porta Susa and Porta Nuova, new 4,5 km long independent double-track line, and construction of a number of new stops in the Turin railway system;
— speeding up the Turin-Genoa line;
— infrastructural and technological upgrading of the Turin railway urban node and related lines, and renewal of the centralized circulation management systems or insertion of new centralized circulatio management systems;
— new railway bypass from Orbassano to Settimo Torinese – phase 1b “Gronda Merci”.
(i) upgrading of the existing conventional line – Bussoleno-Avigliana section:—Lot 1: Realization of new technological installations for the management of the traffic on the Bussoleno – Avigliana section;—Lot 2: Elimination of two level crossings at Borgone Susa;—Lot 3: Implementation of the Technical Specifications for Interoperability for Persons with Reduced Mobility in the stations of Sant’Ambrogio, Borgone and Bruzolo;—Lot 4: Construction of two priority tracks with 750 m long modules, one in Condove and one Bruzolo;—Lot 5: Adaptation of the line power supply system through the construction of two new electrical substations,one in Avigliana and one in Borgone;—Lot 6: Demolition of 281 piles of the primary electric line 66 kV;—Lot 7: Acoustic mitigation;—Lot 8: involves the complete replacement of the current electric traction line, the Rete Ferroviaria Italiana standard one, between the Bussoleno and Avigliana stations with a 540 sq mm section and the addition of a 230 sq mm reinforcement feeder, necessary for the correct operation of the line according to the planned future train traffic; — Lot 1: Realization of new technological installations for the management of the traffic on the Bussoleno – Avigliana section; — Lot 2: Elimination of two level crossings at Borgone Susa; — Lot 3: Implementation of the Technical Specifications for Interoperability for Persons with Reduced Mobility in the stations of Sant’Ambrogio, Borgone and Bruzolo; — Lot 4: Construction of two priority tracks with 750 m long modules, one in Condove and one Bruzolo; — Lot 5: Adaptation of the line power supply system through the construction of two new electrical substations,one in Avigliana and one in Borgone; — Lot 6: Demolition of 281 piles of the primary electric line 66 kV; — Lot 7: Acoustic mitigation; — Lot 8: involves the complete replacement of the current electric traction line, the Rete Ferroviaria Italiana standard one, between the Bussoleno and Avigliana stations with a 540 sq mm section and the addition of a 230 sq mm reinforcement feeder, necessary for the correct operation of the line according to the planned future train traffic;
— Lot 1: Realization of new technological installations for the management of the traffic on the Bussoleno – Avigliana section;
— Lot 2: Elimination of two level crossings at Borgone Susa;
— Lot 3: Implementation of the Technical Specifications for Interoperability for Persons with Reduced Mobility in the stations of Sant’Ambrogio, Borgone and Bruzolo;
— Lot 4: Construction of two priority tracks with 750 m long modules, one in Condove and one Bruzolo;
— Lot 5: Adaptation of the line power supply system through the construction of two new electrical substations,one in Avigliana and one in Borgone;
— Lot 6: Demolition of 281 piles of the primary electric line 66 kV;
— Lot 7: Acoustic mitigation;
— Lot 8: involves the complete replacement of the current electric traction line, the Rete Ferroviaria Italiana standard one, between the Bussoleno and Avigliana stations with a 540 sq mm section and the addition of a 230 sq mm reinforcement feeder, necessary for the correct operation of the line according to the planned future train traffic;
— Lot 1: Realization of new technological installations for the management of the traffic on the Bussoleno – Avigliana section;
— Lot 2: Elimination of two level crossings at Borgone Susa;
— Lot 3: Implementation of the Technical Specifications for Interoperability for Persons with Reduced Mobility in the stations of Sant’Ambrogio, Borgone and Bruzolo;
— Lot 4: Construction of two priority tracks with 750 m long modules, one in Condove and one Bruzolo;
— Lot 5: Adaptation of the line power supply system through the construction of two new electrical substations,one in Avigliana and one in Borgone;
— Lot 6: Demolition of 281 piles of the primary electric line 66 kV;
— Lot 7: Acoustic mitigation;
— Lot 8: involves the complete replacement of the current electric traction line, the Rete Ferroviaria Italiana standard one, between the Bussoleno and Avigliana stations with a 540 sq mm section and the addition of a 230 sq mm reinforcement feeder, necessary for the correct operation of the line according to the planned future train traffic;
(ii) construction of the new line Avigliana-Orbassano section;
(iii) rearrangement of the Orbassano marshalling yard including south junction;
(iv) connectivity within the Turin railway urban node:—completion of the Turin railway bypass, Porta Susa – Stura section;—upgrading of the high-speed line between Porta Susa and Porta Nuova, new 4,5 km long independent double-track line, and construction of a number of new stops in the Turin railway system;—speeding up the Turin-Genoa line;—infrastructural and technological upgrading of the Turin railway urban node and related lines, and renewal of the centralized circulation management systems or insertion of new centralized circulatio management systems;—new railway bypass from Orbassano to Settimo Torinese – phase 1b “Gronda Merci”. — completion of the Turin railway bypass, Porta Susa – Stura section; — upgrading of the high-speed line between Porta Susa and Porta Nuova, new 4,5 km long independent double-track line, and construction of a number of new stops in the Turin railway system; — speeding up the Turin-Genoa line; — infrastructural and technological upgrading of the Turin railway urban node and related lines, and renewal of the centralized circulation management systems or insertion of new centralized circulatio management systems; — new railway bypass from Orbassano to Settimo Torinese – phase 1b “Gronda Merci”.
— completion of the Turin railway bypass, Porta Susa – Stura section;
— upgrading of the high-speed line between Porta Susa and Porta Nuova, new 4,5 km long independent double-track line, and construction of a number of new stops in the Turin railway system;
— speeding up the Turin-Genoa line;
— infrastructural and technological upgrading of the Turin railway urban node and related lines, and renewal of the centralized circulation management systems or insertion of new centralized circulatio management systems;
— new railway bypass from Orbassano to Settimo Torinese – phase 1b “Gronda Merci”.
— completion of the Turin railway bypass, Porta Susa – Stura section;
— upgrading of the high-speed line between Porta Susa and Porta Nuova, new 4,5 km long independent double-track line, and construction of a number of new stops in the Turin railway system;
— speeding up the Turin-Genoa line;
— infrastructural and technological upgrading of the Turin railway urban node and related lines, and renewal of the centralized circulation management systems or insertion of new centralized circulatio management systems;
— new railway bypass from Orbassano to Settimo Torinese – phase 1b “Gronda Merci”.
(c) access lines on the French territory composed of:(i)upgrading of the existing conventional line Ambérieu – Saint-Jean-de-Maurienne;(ii)connectivity within the Lyon agglomeration – Lyon railway bypass between Saint-Pierre-de-Chandieu and Dagneux;(iii)construction of the new line between Lyon and Saint-Jean-de-Maurienne:—mixed passenger and freight railway line between Grenay and Avressieux;—new freight railway line between Avressieux and Montmélian;—new freight railway line between Montmélian and Saint-Jean-de-Maurienne. (i) upgrading of the existing conventional line Ambérieu – Saint-Jean-de-Maurienne; (ii) connectivity within the Lyon agglomeration – Lyon railway bypass between Saint-Pierre-de-Chandieu and Dagneux; (iii) construction of the new line between Lyon and Saint-Jean-de-Maurienne:—mixed passenger and freight railway line between Grenay and Avressieux;—new freight railway line between Avressieux and Montmélian;—new freight railway line between Montmélian and Saint-Jean-de-Maurienne. — mixed passenger and freight railway line between Grenay and Avressieux; — new freight railway line between Avressieux and Montmélian; — new freight railway line between Montmélian and Saint-Jean-de-Maurienne.
(i) upgrading of the existing conventional line Ambérieu – Saint-Jean-de-Maurienne;
(ii) connectivity within the Lyon agglomeration – Lyon railway bypass between Saint-Pierre-de-Chandieu and Dagneux;
(iii) construction of the new line between Lyon and Saint-Jean-de-Maurienne:—mixed passenger and freight railway line between Grenay and Avressieux;—new freight railway line between Avressieux and Montmélian;—new freight railway line between Montmélian and Saint-Jean-de-Maurienne. — mixed passenger and freight railway line between Grenay and Avressieux; — new freight railway line between Avressieux and Montmélian; — new freight railway line between Montmélian and Saint-Jean-de-Maurienne.
— mixed passenger and freight railway line between Grenay and Avressieux;
— new freight railway line between Avressieux and Montmélian;
— new freight railway line between Montmélian and Saint-Jean-de-Maurienne.
(i) upgrading of the existing conventional line Ambérieu – Saint-Jean-de-Maurienne;
(ii) connectivity within the Lyon agglomeration – Lyon railway bypass between Saint-Pierre-de-Chandieu and Dagneux;
(iii) construction of the new line between Lyon and Saint-Jean-de-Maurienne:—mixed passenger and freight railway line between Grenay and Avressieux;—new freight railway line between Avressieux and Montmélian;—new freight railway line between Montmélian and Saint-Jean-de-Maurienne. — mixed passenger and freight railway line between Grenay and Avressieux; — new freight railway line between Avressieux and Montmélian; — new freight railway line between Montmélian and Saint-Jean-de-Maurienne.
— mixed passenger and freight railway line between Grenay and Avressieux;
— new freight railway line between Avressieux and Montmélian;
— new freight railway line between Montmélian and Saint-Jean-de-Maurienne.
— mixed passenger and freight railway line between Grenay and Avressieux;
— new freight railway line between Avressieux and Montmélian;
— new freight railway line between Montmélian and Saint-Jean-de-Maurienne.
(a) In 2025: start of mechanized excavation of the first French lot of the base tunnel (operational construction site 7) – France.
(b) by the end of 2026/early 2027: start of mechanized excavation of the other lots of the base tunnel (operational construction sites 3-4-5-6) – France and Italy.
(c) by 2028: end of civil works at the entrance section – Saint Martin La Porte (operational construction site 8) – France.
(d) by 2027: contract award proposal of railway and non-railway installations (operational construction site 12) – France and Italy.
(e) by 2028: start of the interconnection tunnel excavation with traditional method in Bussoleno (operational construction site 1) – Italy.
(f) by 2029: start of civil works at Susa international station (operational construction site 2) –Italy.
(g) by 2030: end of civil works of the multimodal exchange hub at Saint-Jean-de-Maurienne international station (operational construction site 9) – France.
(h) by 2031: completion of the base tunnel excavation on the French and Italian sides (operational construction sites 3-4-5-6-7-8) – France and Italy.
(i) by 2031: completion of the Saint-Jean-de Maurienne international station with related ancillary infrastructure; starting of the construction of the Susa international station equipment (operational construction sites 9 and 2) – France and Italy.
(j) By 31 December 2032: completion of the railway infrastructure for mixed traffic, in compliance with the TEN-T parameters set out in Regulation (EU) 2024/1679 – France and Italy.
(k) By 2033: operational installation ERTMS Level 2 – France and Italy.
(a) upgrading the existing conventional line Bussoleno-Avigliana section: end of works between 2026-2032.
(b) construction of the new line Avigliana-Orbassano:(i)environmental assessment and permits obtained between 2024-2025;(ii)start of works by 2026;(iii)end of works by 2033. (i) environmental assessment and permits obtained between 2024-2025; (ii) start of works by 2026; (iii) end of works by 2033.
(i) environmental assessment and permits obtained between 2024-2025;
(ii) start of works by 2026;
(iii) end of works by 2033.
(i) environmental assessment and permits obtained between 2024-2025;
(ii) start of works by 2026;
(iii) end of works by 2033.
(c) rearrangement of the Orbassano marshalling yard including South Junction, first phase, Turin side, by 2026.
(d) connectivity within the Turin railway urban node:i)Porta Susa – Stura section: concluded at 98 % (completion expected by 2025)(ii)Porta Susa- Porta Nuova section: completion by 2028;(iii)Turin-Genoa line: by 2027 (first phase):—completion of the technological adaptation of the systems of the CCS Subsystem of the Trofarello-Alessandria section with the construction of the ACCM-SCCM in sub-phases;—completion of the ACC of the Villafranca station;—completion of the new ACC of Asti. i) Porta Susa – Stura section: concluded at 98 % (completion expected by 2025) (ii) Porta Susa- Porta Nuova section: completion by 2028; (iii) Turin-Genoa line: by 2027 (first phase):—completion of the technological adaptation of the systems of the CCS Subsystem of the Trofarello-Alessandria section with the construction of the ACCM-SCCM in sub-phases;—completion of the ACC of the Villafranca station;—completion of the new ACC of Asti. — completion of the technological adaptation of the systems of the CCS Subsystem of the Trofarello-Alessandria section with the construction of the ACCM-SCCM in sub-phases; — completion of the ACC of the Villafranca station; — completion of the new ACC of Asti.
i) Porta Susa – Stura section: concluded at 98 % (completion expected by 2025)
(ii) Porta Susa- Porta Nuova section: completion by 2028;
(iii) Turin-Genoa line: by 2027 (first phase):—completion of the technological adaptation of the systems of the CCS Subsystem of the Trofarello-Alessandria section with the construction of the ACCM-SCCM in sub-phases;—completion of the ACC of the Villafranca station;—completion of the new ACC of Asti. — completion of the technological adaptation of the systems of the CCS Subsystem of the Trofarello-Alessandria section with the construction of the ACCM-SCCM in sub-phases; — completion of the ACC of the Villafranca station; — completion of the new ACC of Asti.
— completion of the technological adaptation of the systems of the CCS Subsystem of the Trofarello-Alessandria section with the construction of the ACCM-SCCM in sub-phases;
— completion of the ACC of the Villafranca station;
— completion of the new ACC of Asti.
i) Porta Susa – Stura section: concluded at 98 % (completion expected by 2025)
(ii) Porta Susa- Porta Nuova section: completion by 2028;
(iii) Turin-Genoa line: by 2027 (first phase):—completion of the technological adaptation of the systems of the CCS Subsystem of the Trofarello-Alessandria section with the construction of the ACCM-SCCM in sub-phases;—completion of the ACC of the Villafranca station;—completion of the new ACC of Asti. — completion of the technological adaptation of the systems of the CCS Subsystem of the Trofarello-Alessandria section with the construction of the ACCM-SCCM in sub-phases; — completion of the ACC of the Villafranca station; — completion of the new ACC of Asti.
— completion of the technological adaptation of the systems of the CCS Subsystem of the Trofarello-Alessandria section with the construction of the ACCM-SCCM in sub-phases;
— completion of the ACC of the Villafranca station;
— completion of the new ACC of Asti.
— completion of the technological adaptation of the systems of the CCS Subsystem of the Trofarello-Alessandria section with the construction of the ACCM-SCCM in sub-phases;
— completion of the ACC of the Villafranca station;
— completion of the new ACC of Asti.
(a) upgrading the existing conventional line Ambérieu – Saint-Jean-de-Maurienne:(i)preliminary studies, including a socio-economic analysis by the middle of 2025;(ii)start of works on first operations by 2027;(iii)design studies by the end of 2028;(iv)administrative procedures for land acquisition by the end of 2028;(v)environmental assessment by the end of 2028;(vi)final studies by the end of 2029;(vii)end of works by 2033:—modification of access to the Aiton platform—capacity improvements at Aix-les-Bains—capacity improvements at Chambéry—grade separation in Montmélian—securing the Lac du Bourget—securing level crossings—reinforcement of fixed Installations for Electric Traction. (i) preliminary studies, including a socio-economic analysis by the middle of 2025; (ii) start of works on first operations by 2027; (iii) design studies by the end of 2028; (iv) administrative procedures for land acquisition by the end of 2028; (v) environmental assessment by the end of 2028; (vi) final studies by the end of 2029; (vii) end of works by 2033:—modification of access to the Aiton platform—capacity improvements at Aix-les-Bains—capacity improvements at Chambéry—grade separation in Montmélian—securing the Lac du Bourget—securing level crossings—reinforcement of fixed Installations for Electric Traction. — modification of access to the Aiton platform — capacity improvements at Aix-les-Bains — capacity improvements at Chambéry — grade separation in Montmélian — securing the Lac du Bourget — securing level crossings — reinforcement of fixed Installations for Electric Traction.
(i) preliminary studies, including a socio-economic analysis by the middle of 2025;
(ii) start of works on first operations by 2027;
(iii) design studies by the end of 2028;
(iv) administrative procedures for land acquisition by the end of 2028;
(v) environmental assessment by the end of 2028;
(vi) final studies by the end of 2029;
(vii) end of works by 2033:—modification of access to the Aiton platform—capacity improvements at Aix-les-Bains—capacity improvements at Chambéry—grade separation in Montmélian—securing the Lac du Bourget—securing level crossings—reinforcement of fixed Installations for Electric Traction. — modification of access to the Aiton platform — capacity improvements at Aix-les-Bains — capacity improvements at Chambéry — grade separation in Montmélian — securing the Lac du Bourget — securing level crossings — reinforcement of fixed Installations for Electric Traction.
— modification of access to the Aiton platform
— capacity improvements at Aix-les-Bains
— capacity improvements at Chambéry
— grade separation in Montmélian
— securing the Lac du Bourget
— securing level crossings
— reinforcement of fixed Installations for Electric Traction.
(i) preliminary studies, including a socio-economic analysis by the middle of 2025;
(ii) start of works on first operations by 2027;
(iii) design studies by the end of 2028;
(iv) administrative procedures for land acquisition by the end of 2028;
(v) environmental assessment by the end of 2028;
(vi) final studies by the end of 2029;
(vii) end of works by 2033:—modification of access to the Aiton platform—capacity improvements at Aix-les-Bains—capacity improvements at Chambéry—grade separation in Montmélian—securing the Lac du Bourget—securing level crossings—reinforcement of fixed Installations for Electric Traction. — modification of access to the Aiton platform — capacity improvements at Aix-les-Bains — capacity improvements at Chambéry — grade separation in Montmélian — securing the Lac du Bourget — securing level crossings — reinforcement of fixed Installations for Electric Traction.
— modification of access to the Aiton platform
— capacity improvements at Aix-les-Bains
— capacity improvements at Chambéry
— grade separation in Montmélian
— securing the Lac du Bourget
— securing level crossings
— reinforcement of fixed Installations for Electric Traction.
— modification of access to the Aiton platform
— capacity improvements at Aix-les-Bains
— capacity improvements at Chambéry
— grade separation in Montmélian
— securing the Lac du Bourget
— securing level crossings
— reinforcement of fixed Installations for Electric Traction.
(b) connectivity within the Lyon agglomeration – Lyon railway bypass between Saint-Pierre-de-Chandieu and Dagneux:(i)detailed design studies by the end of 2027(ii)environmental assessment(iii)final studies(iv)land acquisition in line with study and construction schedule(v)works (i) detailed design studies by the end of 2027 (ii) environmental assessment (iii) final studies (iv) land acquisition in line with study and construction schedule (v) works
(i) detailed design studies by the end of 2027
(ii) environmental assessment
(iii) final studies
(iv) land acquisition in line with study and construction schedule
(v) works
(i) detailed design studies by the end of 2027
(ii) environmental assessment
(iii) final studies
(iv) land acquisition in line with study and construction schedule
(v) works
(c) construction of the new lines between Lyon and Saint-Jean-de-Maurienne in line with parameters of the ‘grand gabarit’ as the main scenario explored at this stage:(i)detailed design studies on the following operations, including a socio-economic analysis and studies related to reconnaissance works by mid-2028 (French accesses to the Lyon-Torino rail tunnel – detailed studies – APD):—mixed line between Grenay and Avressieux;—improvements at Ambérieu station;—new freight railway line between Avressieux and Montmélian including a single-track freight tunnel under the Chartreuse massif, for which detailed design studies will be carried out in parallel with the construction of the reconnaissance structures;—doubling the connection at Montmélian station;—new freight railway line between Montmélian and Saint-Jean-de-Maurienne including single-track freight tunnels under the Belledonne massif and the Glandon massif, for which detailed design studies will be carried out in parallel with the construction of the reconnaissance structures;(ii)Environmental assessment(iii)Construction of reconnaissance structures(iv)Final studies(v)Land acquisition in line with study and construction schedule(vi)Works. (i) detailed design studies on the following operations, including a socio-economic analysis and studies related to reconnaissance works by mid-2028 (French accesses to the Lyon-Torino rail tunnel – detailed studies – APD):—mixed line between Grenay and Avressieux;—improvements at Ambérieu station;—new freight railway line between Avressieux and Montmélian including a single-track freight tunnel under the Chartreuse massif, for which detailed design studies will be carried out in parallel with the construction of the reconnaissance structures;—doubling the connection at Montmélian station;—new freight railway line between Montmélian and Saint-Jean-de-Maurienne including single-track freight tunnels under the Belledonne massif and the Glandon massif, for which detailed design studies will be carried out in parallel with the construction of the reconnaissance structures; — mixed line between Grenay and Avressieux; — improvements at Ambérieu station; — new freight railway line between Avressieux and Montmélian including a single-track freight tunnel under the Chartreuse massif, for which detailed design studies will be carried out in parallel with the construction of the reconnaissance structures; — doubling the connection at Montmélian station; — new freight railway line between Montmélian and Saint-Jean-de-Maurienne including single-track freight tunnels under the Belledonne massif and the Glandon massif, for which detailed design studies will be carried out in parallel with the construction of the reconnaissance structures; (ii) Environmental assessment (iii) Construction of reconnaissance structures (iv) Final studies (v) Land acquisition in line with study and construction schedule (vi) Works.
(i) detailed design studies on the following operations, including a socio-economic analysis and studies related to reconnaissance works by mid-2028 (French accesses to the Lyon-Torino rail tunnel – detailed studies – APD):—mixed line between Grenay and Avressieux;—improvements at Ambérieu station;—new freight railway line between Avressieux and Montmélian including a single-track freight tunnel under the Chartreuse massif, for which detailed design studies will be carried out in parallel with the construction of the reconnaissance structures;—doubling the connection at Montmélian station;—new freight railway line between Montmélian and Saint-Jean-de-Maurienne including single-track freight tunnels under the Belledonne massif and the Glandon massif, for which detailed design studies will be carried out in parallel with the construction of the reconnaissance structures; — mixed line between Grenay and Avressieux; — improvements at Ambérieu station; — new freight railway line between Avressieux and Montmélian including a single-track freight tunnel under the Chartreuse massif, for which detailed design studies will be carried out in parallel with the construction of the reconnaissance structures; — doubling the connection at Montmélian station; — new freight railway line between Montmélian and Saint-Jean-de-Maurienne including single-track freight tunnels under the Belledonne massif and the Glandon massif, for which detailed design studies will be carried out in parallel with the construction of the reconnaissance structures;
— mixed line between Grenay and Avressieux;
— improvements at Ambérieu station;
— new freight railway line between Avressieux and Montmélian including a single-track freight tunnel under the Chartreuse massif, for which detailed design studies will be carried out in parallel with the construction of the reconnaissance structures;
— doubling the connection at Montmélian station;
— new freight railway line between Montmélian and Saint-Jean-de-Maurienne including single-track freight tunnels under the Belledonne massif and the Glandon massif, for which detailed design studies will be carried out in parallel with the construction of the reconnaissance structures;
(ii) Environmental assessment
(iii) Construction of reconnaissance structures
(iv) Final studies
(v) Land acquisition in line with study and construction schedule
(vi) Works.
(i) detailed design studies on the following operations, including a socio-economic analysis and studies related to reconnaissance works by mid-2028 (French accesses to the Lyon-Torino rail tunnel – detailed studies – APD):—mixed line between Grenay and Avressieux;—improvements at Ambérieu station;—new freight railway line between Avressieux and Montmélian including a single-track freight tunnel under the Chartreuse massif, for which detailed design studies will be carried out in parallel with the construction of the reconnaissance structures;—doubling the connection at Montmélian station;—new freight railway line between Montmélian and Saint-Jean-de-Maurienne including single-track freight tunnels under the Belledonne massif and the Glandon massif, for which detailed design studies will be carried out in parallel with the construction of the reconnaissance structures; — mixed line between Grenay and Avressieux; — improvements at Ambérieu station; — new freight railway line between Avressieux and Montmélian including a single-track freight tunnel under the Chartreuse massif, for which detailed design studies will be carried out in parallel with the construction of the reconnaissance structures; — doubling the connection at Montmélian station; — new freight railway line between Montmélian and Saint-Jean-de-Maurienne including single-track freight tunnels under the Belledonne massif and the Glandon massif, for which detailed design studies will be carried out in parallel with the construction of the reconnaissance structures;
— mixed line between Grenay and Avressieux;
— improvements at Ambérieu station;
— new freight railway line between Avressieux and Montmélian including a single-track freight tunnel under the Chartreuse massif, for which detailed design studies will be carried out in parallel with the construction of the reconnaissance structures;
— doubling the connection at Montmélian station;
— new freight railway line between Montmélian and Saint-Jean-de-Maurienne including single-track freight tunnels under the Belledonne massif and the Glandon massif, for which detailed design studies will be carried out in parallel with the construction of the reconnaissance structures;
— mixed line between Grenay and Avressieux;
— improvements at Ambérieu station;
— new freight railway line between Avressieux and Montmélian including a single-track freight tunnel under the Chartreuse massif, for which detailed design studies will be carried out in parallel with the construction of the reconnaissance structures;
— doubling the connection at Montmélian station;
— new freight railway line between Montmélian and Saint-Jean-de-Maurienne including single-track freight tunnels under the Belledonne massif and the Glandon massif, for which detailed design studies will be carried out in parallel with the construction of the reconnaissance structures;
(ii) Environmental assessment
(iii) Construction of reconnaissance structures
(iv) Final studies
(v) Land acquisition in line with study and construction schedule
(vi) Works.
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) 2024/1679 of the European Parliament and of the Council of 13 June 2024 on Union Guidelines for the development of the trans-European transport network, amending Regulation (EU) 2021/1153 and Regulation (EU) No 913/2010 and repealing Regulation (EU) 1315/2013 (1) and in particular Article 55(2) thereof,
Whereas:
(1) As underlined by the Work Plans for the Mediterranean Corridor, the cross-border project Lyon-Turin (the ‘project’) plays a crucial role in ensuring the functioning of the corridor with an interoperable and efficient connection across the Alpes, between France and Italy, for the transport of goods and passengers by rail.
(2) Decarbonising transport through creating the conditions for an ambitious modal shift of long-distance transport of goods and passenger to energy-efficient transport modes, is a key policy objective of the Union and in line with the Union’s objectives towards fighting climate change.
(3) In this context, fostering railway transport of goods and passengers is a clear priority of the Union transport policy, as outlined by the Smart and Sustainable Mobility Strategy (2) and a long-standing priority of in the development of the TEN-T network.
(4) Through the completion of the Lyon-Turin railway, the Mediterranean European Transport Corridor and its transalpine cross-border section will be equipped with modern, safe and energy efficient railway transport infrastructure contributing to modal shift.
(5) The Lyon-Turin cross border link is listed as a pre-identified cross border link on the Mediterranean European Transport Corridor eligible for Union funding under the Connecting Europe Facility in Part III of the Annex to Regulation (EU) 2021/1153 of the European Parliament and of the Council (3).
(6) Three bilateral treaties and one additional protocol between France and Italy (4) regulate and plan the project within the agreed political, legal and financial framework. A further bilateral agreement for cross-border transfers of material for the construction of the project was signed on 4 August 2023.
(7) The Work Plan for the Mediterranean Corridor emphasises the need to ensure completion of the project in its entirety, which includes the cross-border base tunnel as well as access lines between the pre-identified urban nodes of Lyon and Turin.
(8) All sections of the project are essential for a good functioning of the Mediterranean European Transport Corridor. They will be planned in line with standards set out in Article 16 and 18 of Regulation (EU) 2024/1679.
(9) The project is a complex cross-border long-term investment involving France, Italy and their respective neighbouring regions of Auvergne Rhône Alpes and Piedmont. It also benefits other Member States, which rely on a modern connection between France and Italy across the Alpes.
(10) The project implies the creation of new infrastructure and the improvement of the existing one. In order to support the coordinated and timely implementation of the project, it is necessary to adopt provisions laying down a description of actions and a timetable for their implementation. The project is a long-term commitment requiring planning of investments across several budgetary cycles both at national and Union level. It will help achieving the cross-border objectives of the Work Plan for the Mediterranean European Transport Corridor, including the construction of access lines that will ensure the transit of 24 million tons of goods per year and 1,5 million passengers per year.
(11) France and Italy have already carried out significant actions such as studies and infrastructure works. Those actions include the ongoing construction of the base tunnel in both countries (as of 31 October 2024), where 38,6 km of galleries have been excavated, out of which 14,7 km of the base tunnel), the planning of access lines on the Italian territory, the planning of the modernisation of the conventional rail line Ambérieu – Saint-Jean-de-Maurienne as from 2027 with a dedicated budget of EUR 700 million, and the ongoing modernisation of the conventional rail line between Bussoleno-Avigliana. Regarding the French new railway lines, a decree of 13 August 2013 (5) declared the works to be in the public interest, the detailed railway alignment was approved. The avant-projet détaillé (APD) studies, co-financed by the Commission, France and the French regional authorities will be launched in 2025.
(12) The clear identification of the necessary actions to complete the project and the timetable for their implementation are also important to plan and fully optimise the availability of Union, national, and regional funding. Union co-financing has an essential leverage effect on national and regional decision-making for the implementation of the actions. Therefore, it is important to identify the remaining actions necessary for the full completion of the project, so that Union resources can be exploited at the maximum level, in line with the respective planning and the applicable co-financing rates, together with the available financial resources at national and regional level. Pursuant to Regulation (EU) 2021/1153, all of the sections of the project are eligible for Union funding (up to a maximum of 55 % for the base tunnel and 50 % for access lines). The remaining actions must demonstrate a high degree of integration in the planning and implementation of the actions and be in line with the award criteria set out in Article 14 of Regulation (EU) 2021/1153. Financial resources should therefore be fully optimised with the maximum efforts of all parties involved.
(13) The Agreement between the Government of the French Republic and the Government of the Italian Republic for the construction and operation of a new Lyon-Turin railway line (6) and the additional protocol specify the certified cost of the cross-border base tunnel and, after subtracting the contribution of the Union and the part financed by tolls, the cost allocation key of 57,9 % for Italy and 42,1 % for France. Any additional costs will be equally allocated between Italy and France. The additional protocol also provides for the possibility of monetary revaluation and evolution of the costs of the production factors of the works.
(14) The Franco-Italian company Tunnel Euralpin Lyon Turin, as a bi-national entity, is responsible for managing and constructing the cross-border section of the project. The national infrastructure managers of France and Italy respectively are responsible for constructing the access routes.
(15) In order to monitor the progress of the project’s implementation, France and Italy should provide the Commission with regular reports on the matter concerning the sections situated in their respective territories, and notify any delays encountered.
(16) Pursuant to Article 6(1) of Regulation (EU) 2024/1679, Member States are to take appropriate measures to develop the core network by 31 December 2030. This obligation, however, is subject to the conditions set out in Article 8(5) of that Regulation, emphasising that the execution of projects of common interest is contingent upon factors such as their degree of maturity, compliance with both Union and national legal procedures, and the availability of financial resources, without prejudging the financial commitment of a Member State or of the Union.
(17) The implementation timetable should be without prejudice to the fulfilment of the requirements set out in international law and Union law, including provisions to protect the environment and human health. The timetable should allow Member States to plan and fully optimise the availability of funding, without prejudging the financial commitment of a Member State or of the Union. It should, under no circumstances, compromise the Union’s and Member State’s standards for environmental protection and public participation.
(18) Without prejudice to Article 54(3) of Regulation (EU) 2024/1679], it is appropriate to start the review of this decision by the end of 2026, to reflect accurately the state of planning and construction of actions listed in Article 2.
(19) France and Italy have approved the measures provided for in this Decision.
(20) The measures provided for in this Decision are in accordance with the opinion of the Committee established by Article 61(1) of Regulation (EU) 2024/1679,
HAS ADOPTED THIS DECISION:

Subject matter

This Decision lays down the actions and the timetable for the implementation of the cross-border rail project and its related access lines linking the urban nodes of Lyon and Turin (the ‘project’), as well as related governance provisions.

Actions

France and Italy shall ensure the implementation of the following actions in accordance with the timetable set out in Article 3:

(a) the cross-border section of the tunnel together with the connecting stations of Saint Jean de Maurienne and Susa.
(b) access lines on the Italian territory, composed of:
(i) upgrading of the existing conventional line – Bussoleno-Avigliana section:
—
Lot 1: Realization of new technological installations for the management of the traffic on the Bussoleno – Avigliana section;
—
Lot 2: Elimination of two level crossings at Borgone Susa;
—
Lot 3: Implementation of the Technical Specifications for Interoperability for Persons with Reduced Mobility in the stations of Sant’Ambrogio, Borgone and Bruzolo;
—
Lot 4: Construction of two priority tracks with 750 m long modules, one in Condove and one Bruzolo;
—
Lot 5: Adaptation of the line power supply system through the construction of two new electrical substations,one in Avigliana and one in Borgone;
—
Lot 6: Demolition of 281 piles of the primary electric line 66 kV;
—
Lot 7: Acoustic mitigation;
—
Lot 8: involves the complete replacement of the current electric traction line, the Rete Ferroviaria Italiana standard one, between the Bussoleno and Avigliana stations with a 540 sq mm section and the addition of a 230 sq mm reinforcement feeder, necessary for the correct operation of the line according to the planned future train traffic;
(ii) construction of the new line Avigliana-Orbassano section;
(iii) rearrangement of the Orbassano marshalling yard including south junction;
(iv) connectivity within the Turin railway urban node:
—
completion of the Turin railway bypass, Porta Susa – Stura section;
—
upgrading of the high-speed line between Porta Susa and Porta Nuova, new 4,5 km long independent double-track line, and construction of a number of new stops in the Turin railway system;
—
speeding up the Turin-Genoa line;
—
infrastructural and technological upgrading of the Turin railway urban node and related lines, and renewal of the centralized circulation management systems or insertion of new centralized circulatio management systems;
—
new railway bypass from Orbassano to Settimo Torinese – phase 1b “Gronda Merci”.
(c) access lines on the French territory composed of:
(i) upgrading of the existing conventional line Ambérieu – Saint-Jean-de-Maurienne;
(ii) connectivity within the Lyon agglomeration – Lyon railway bypass between Saint-Pierre-de-Chandieu and Dagneux;
(iii) construction of the new line between Lyon and Saint-Jean-de-Maurienne:
—
mixed passenger and freight railway line between Grenay and Avressieux;
—
new freight railway line between Avressieux and Montmélian;
—
new freight railway line between Montmélian and Saint-Jean-de-Maurienne.

Timetable

1. The timetable for the actions referred to in Article 2 point (a), shall be the following:
(a) In 2025: start of mechanized excavation of the first French lot of the base tunnel (operational construction site 7) – France.
(b) by the end of 2026/early 2027: start of mechanized excavation of the other lots of the base tunnel (operational construction sites 3-4-5-6) – France and Italy.
(c) by 2028: end of civil works at the entrance section – Saint Martin La Porte (operational construction site 8) – France.
(d) by 2027: contract award proposal of railway and non-railway installations (operational construction site 12) – France and Italy.
(e) by 2028: start of the interconnection tunnel excavation with traditional method in Bussoleno (operational construction site 1) – Italy.
(f) by 2029: start of civil works at Susa international station (operational construction site 2) –Italy.
(g) by 2030: end of civil works of the multimodal exchange hub at Saint-Jean-de-Maurienne international station (operational construction site 9) – France.
(h) by 2031: completion of the base tunnel excavation on the French and Italian sides (operational construction sites 3-4-5-6-7-8) – France and Italy.
(i) by 2031: completion of the Saint-Jean-de Maurienne international station with related ancillary infrastructure; starting of the construction of the Susa international station equipment (operational construction sites 9 and 2) – France and Italy.
(j) By 31 December 2032: completion of the railway infrastructure for mixed traffic, in compliance with the TEN-T parameters set out in Regulation (EU) 2024/1679 – France and Italy.
(k) By 2033: operational installation ERTMS Level 2 – France and Italy.

2. The timetable for the actions referred to in Article 2, point (b), shall be the following:
(a) upgrading the existing conventional line Bussoleno-Avigliana section: end of works between 2026-2032. (b) construction of the new line Avigliana-Orbassano:
(i) environmental assessment and permits obtained between 2024-2025;
(ii) start of works by 2026;
(iii) end of works by 2033. (c) rearrangement of the Orbassano marshalling yard including South Junction, first phase, Turin side, by 2026. (d) connectivity within the Turin railway urban node: i)
Porta Susa – Stura section: concluded at 98 % (completion expected by 2025)
(ii) Porta Susa- Porta Nuova section: completion by 2028;
(iii) Turin-Genoa line: by 2027 (first phase):
—
completion of the technological adaptation of the systems of the CCS Subsystem of the Trofarello-Alessandria section with the construction of the ACCM-SCCM in sub-phases;
—
completion of the ACC of the Villafranca station;
—
completion of the new ACC of Asti.

3. The timetable for the actions referred to in Article 2, point (c), shall be the following:
(a) upgrading the existing conventional line Ambérieu – Saint-Jean-de-Maurienne:
(i) preliminary studies, including a socio-economic analysis by the middle of 2025;
(ii) start of works on first operations by 2027;
(iii) design studies by the end of 2028;
(iv) administrative procedures for land acquisition by the end of 2028;
(v) environmental assessment by the end of 2028;
(vi) final studies by the end of 2029;
(vii) end of works by 2033:
—
modification of access to the Aiton platform
—
capacity improvements at Aix-les-Bains
—
capacity improvements at Chambéry
—
grade separation in Montmélian
—
securing the Lac du Bourget
—
securing level crossings
—
reinforcement of fixed Installations for Electric Traction.
(b) connectivity within the Lyon agglomeration – Lyon railway bypass between Saint-Pierre-de-Chandieu and Dagneux:
(i) detailed design studies by the end of 2027
(ii) environmental assessment
(iii) final studies
(iv) land acquisition in line with study and construction schedule
(v) works
(c) construction of the new lines between Lyon and Saint-Jean-de-Maurienne in line with parameters of the ‘grand gabarit’ as the main scenario explored at this stage:
(i) detailed design studies on the following operations, including a socio-economic analysis and studies related to reconnaissance works by mid-2028 (French accesses to the Lyon-Torino rail tunnel – detailed studies – APD):
—
mixed line between Grenay and Avressieux;
—
improvements at Ambérieu station;
—
new freight railway line between Avressieux and Montmélian including a single-track freight tunnel under the Chartreuse massif, for which detailed design studies will be carried out in parallel with the construction of the reconnaissance structures;
—
doubling the connection at Montmélian station;
—
new freight railway line between Montmélian and Saint-Jean-de-Maurienne including single-track freight tunnels under the Belledonne massif and the Glandon massif, for which detailed design studies will be carried out in parallel with the construction of the reconnaissance structures;
(ii) Environmental assessment
(iii) Construction of reconnaissance structures
(iv) Final studies
(v) Land acquisition in line with study and construction schedule
(vi) Works.

Governance

The European Coordinator for the Mediterranean European Transport Corridor and a representative of the Commission shall be invited to participate as observers in the meetings of the Board of Directors of the Tunnel Euralpin Lyon Turin as well as the meetings of the Intergovernmental Commission Lyon-Turin (CIG).

Reporting

France and Italy shall report at least once a year to the Commission and to the European Coordinator for the Mediterranean European Transport Corridor on the progress in implementing the actions referred to in Article 2 and shall notify any delay encountered, specifying the causes for the delay and indicating the corrective measures taken. For this purpose, France and Italy may use, when appropriate, the content of the Annual Status Reports to be submitted under the Connecting Europe Facility Grant Agreements.

Review

The Commission shall start a review of the actions and of the timetable referred to in Articles 2 and 3 by the end of 2026.

Addressees

This Decision is addressed to the French Republic and the Italian Republic.

Commission Implementing Decision (EU) 2025/1712 of 30 July 2025 amending the Annex to Implementing Decision (EU) 2023/2447 concerning emergency measures in relation to outbreaks of highly pathogenic avian influenza in certain Member States (notified under document C(2025) 5433)

Official Journalof the European Union ENL series
2025/1712 4.8.2025
(1) Highly pathogenic avian influenza (HPAI) is an infectious viral disease in birds and can have a severe impact on the profitability of poultry farming causing disturbance to trade within the Union and exports to third countries. HPAI viruses can infect migratory birds, which can then spread these viruses over long distances during their autumn and spring migrations. Therefore, the presence of HPAI viruses in wild birds poses a continuous threat for the direct and indirect introduction of these viruses into holdings where poultry or captive birds are kept. In the event of an outbreak of HPAI, there is a risk that the disease agent may spread to other holdings where poultry or captive birds are kept.
(2) Regulation (EU) 2016/429 establishes the legislative framework for the prevention and control of diseases that are transmissible to animals or humans. HPAI falls within the definition of a listed disease in that Regulation, and it is subject to the disease prevention and control rules laid down therein. In addition, Commission Delegated Regulation (EU) 2020/687(2)supplements Regulation (EU) 2016/429 as regards the rules for the prevention and control of certain listed diseases, including disease control measures for HPAI.
(3) On 24 October 2023, the Commission adopted Commission Implementing Decision (EU) 2023/2447(3)on the basis of Regulation (EU) 2016/429, and it lays down emergency measures at Union level in relation to outbreaks of HPAI.
(4) In particular, Implementing Decision (EU) 2023/2447 provides that the protection, surveillance and further restricted zones, to be established by the concerned Member States following outbreaks of HPAI, in accordance with Delegated Regulation (EU) 2020/687, must comprise at least the areas listed as protection, surveillance and further restricted zones in the Annex to that Implementing Decision. It also provides that the measures to be applied in those zones, in accordance with that Delegated Regulation, must be maintained until at least the dates set out in that Annex.
(5) The Annex to Implementing Decision (EU) 2023/2447 was recently amended by Commission Implementing Decision (EU) 2025/1210(4)following new outbreaks of HPAI in Poland in establishments where poultry or captive birds were kept, which needed to be reflected in that Annex.
(6) Since the date of adoption of Implementing Decision (EU) 2025/1210, Spain notified the Commission of two outbreaks of HPAI in establishments where poultry were kept, located in the provinces of Badajoz and Toledo.
(7) Following that outbreak, Spain has taken the disease control measures required in accordance with Delegated Regulation (EU) 2020/687, including the establishment of protection and surveillance zones around the outbreaks.
(8) The Commission has examined the disease control measures taken by Spain and it is satisfied that the boundaries of the protection and surveillances zones established by that Member State are at a sufficient distance from the establishment where the outbreaks of HPAI have been confirmed.
(9) In the Annex to Implementing Decision (EU) 2023/2447, there are currently no areas listed as protection and surveillance zones for Spain.
(10) In order to prevent any unnecessary disturbance to trade within the Union and to avoid unjustified barriers to trade being imposed by third countries, it is necessary to rapidly lay down at Union level, in collaboration with Spain, the protection and surveillance zones established by that Member State, in accordance with Delegated Regulation (EU) 2020/687.
(11) Therefore, protection and surveillance zones for Spain should be listed in the Annex to Implementing Decision (EU) 2023/2447.
(12) Accordingly, the Annex to Implementing Decision (EU) 2023/2447 should be amended to update regionalisation at Union level in order to take account of the protection and surveillance zones established by Spain, in accordance with Delegated Regulation (EU) 2020/687, as well as to set out the duration of the measures applicable therein.
(13) Implementing Decision (EU) 2023/2447 should therefore be amended accordingly.
(14) Given the urgency of the epidemiological situation in the Union as regards the spread of HPAI, it is important that the amendments to be made to Implementing Decision (EU) 2023/2447 by this Decision take effect as soon as possible.
(15) The measures provided for in this Decision are in accordance with the opinion of the Standing Committee on Plants, Animals, Food and Feed,
ADIS reference number of the outbreak Area comprising: Date until applicable in accordance with Article 39 of Delegated Regulation (EU) 2020/687
ES-HPAI(P)-2025-00001 Those parts in the province of Badajoz of the comarca of Azuaga contained within a circle of a radius of 3 kilometres, centered on UTM 30, ETRS89 coordinates long -5,858931247 , lat 38,260806792 15.8.2025
ES-HPAI(P)-2025-00002 Those parts in the province of Toledo of the comarcas of Oropesa and Belvís de la Jara contained within a circle of a radius of 3 kilometres, centered on UTM 30, ETRS89 coordinates long -5,1395444 , lat 39,8054028 23.8.2025
ADIS reference number of the outbreak Area comprising: Date until applicable in accordance with Article 55 of Delegated Regulation (EU) 2020/687
ES-HPAI(P)-2025-00001 Those parts in the province of Badajoz of the comarca of Azuaga beyond the area described in the protection zone and contained within a circle of a radius of 10 kilometres, centered on UTM 30, ETRS89 coordinates long -5,858931247 , lat 38,260806792 24.8.2025
Those parts in the province of Badajoz of the comarca of Azuaga contained within a circle of a radius of 3 kilometres, centered on UTM 30, ETRS89 coordinates long -5,858931247 , lat 38,260806792 16.8.2025 – 24.8.2025
ES-HPAI(P)-2025-00002 Those parts in the province of Toledo of the comarcas of Oropesa, Talavera de la Reina and Belvís de la Jara, and in the province of Cáceres of the comarca of Navalmoral de la Mata beyond the area described in the protection zone and contained within a circle of a radius of 10 kilometres, centered on UTM 30, ETRS89 coordinates long -5,1395444 , lat 39,8054028 1.9.2025
Those parts in the province of Toledo of the comarcas of Oropesa end Belvis de la Jara contained within a circle of a radius of 3 kilometres, centered on UTM 30, ETRS89 coordinates long -5,1395444 , lat 39,8054028 24.8.2025 – 1.9.2025
Area comprising: Date until measures are to remain applicable in accordance with Article 4
* In accordance with the Agreement on the withdrawal of the United Kingdom of Great Britain and Northern Ireland from the European Union and the European Atomic Energy Community, and in particular Article 5(4) of the Windsor Framework (see Joint Declaration No 1/2023 of the Union and the United Kingdom in the Joint Committee established by the Agreement on the withdrawal of the United Kingdom of Great Britain and Northern Ireland from the European Union and the European Atomic Energy Community of 24 March 2023,OJ L 102, 17.4.2023, p. 87) in conjunction with Annex 2 to that Framework, for the purposes of this Annex, references to Member State include the United Kingdom in respect of Northern Ireland.
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) 2016/429 of the European Parliament and of the Council of 9 March 2016 on transmissible animal diseases and amending and repealing certain acts in the area of animal health (‘Animal Health Law’) (1), and in particular Article 259(1), point (c), thereof,
Whereas:
(1) Highly pathogenic avian influenza (HPAI) is an infectious viral disease in birds and can have a severe impact on the profitability of poultry farming causing disturbance to trade within the Union and exports to third countries. HPAI viruses can infect migratory birds, which can then spread these viruses over long distances during their autumn and spring migrations. Therefore, the presence of HPAI viruses in wild birds poses a continuous threat for the direct and indirect introduction of these viruses into holdings where poultry or captive birds are kept. In the event of an outbreak of HPAI, there is a risk that the disease agent may spread to other holdings where poultry or captive birds are kept.
(2) Regulation (EU) 2016/429 establishes the legislative framework for the prevention and control of diseases that are transmissible to animals or humans. HPAI falls within the definition of a listed disease in that Regulation, and it is subject to the disease prevention and control rules laid down therein. In addition, Commission Delegated Regulation (EU) 2020/687 (2) supplements Regulation (EU) 2016/429 as regards the rules for the prevention and control of certain listed diseases, including disease control measures for HPAI.
(3) On 24 October 2023, the Commission adopted Commission Implementing Decision (EU) 2023/2447 (3) on the basis of Regulation (EU) 2016/429, and it lays down emergency measures at Union level in relation to outbreaks of HPAI.
(4) In particular, Implementing Decision (EU) 2023/2447 provides that the protection, surveillance and further restricted zones, to be established by the concerned Member States following outbreaks of HPAI, in accordance with Delegated Regulation (EU) 2020/687, must comprise at least the areas listed as protection, surveillance and further restricted zones in the Annex to that Implementing Decision. It also provides that the measures to be applied in those zones, in accordance with that Delegated Regulation, must be maintained until at least the dates set out in that Annex.
(5) The Annex to Implementing Decision (EU) 2023/2447 was recently amended by Commission Implementing Decision (EU) 2025/1210 (4) following new outbreaks of HPAI in Poland in establishments where poultry or captive birds were kept, which needed to be reflected in that Annex.
(6) Since the date of adoption of Implementing Decision (EU) 2025/1210, Spain notified the Commission of two outbreaks of HPAI in establishments where poultry were kept, located in the provinces of Badajoz and Toledo.
(7) Following that outbreak, Spain has taken the disease control measures required in accordance with Delegated Regulation (EU) 2020/687, including the establishment of protection and surveillance zones around the outbreaks.
(8) The Commission has examined the disease control measures taken by Spain and it is satisfied that the boundaries of the protection and surveillances zones established by that Member State are at a sufficient distance from the establishment where the outbreaks of HPAI have been confirmed.
(9) In the Annex to Implementing Decision (EU) 2023/2447, there are currently no areas listed as protection and surveillance zones for Spain.
(10) In order to prevent any unnecessary disturbance to trade within the Union and to avoid unjustified barriers to trade being imposed by third countries, it is necessary to rapidly lay down at Union level, in collaboration with Spain, the protection and surveillance zones established by that Member State, in accordance with Delegated Regulation (EU) 2020/687.
(11) Therefore, protection and surveillance zones for Spain should be listed in the Annex to Implementing Decision (EU) 2023/2447.
(12) Accordingly, the Annex to Implementing Decision (EU) 2023/2447 should be amended to update regionalisation at Union level in order to take account of the protection and surveillance zones established by Spain, in accordance with Delegated Regulation (EU) 2020/687, as well as to set out the duration of the measures applicable therein.
(13) Implementing Decision (EU) 2023/2447 should therefore be amended accordingly.
(14) Given the urgency of the epidemiological situation in the Union as regards the spread of HPAI, it is important that the amendments to be made to Implementing Decision (EU) 2023/2447 by this Decision take effect as soon as possible.
(15) The measures provided for in this Decision are in accordance with the opinion of the Standing Committee on Plants, Animals, Food and Feed,
HAS ADOPTED THIS DECISION:
The Annex to Implementing Decision (EU) 2023/2447 is replaced by the text set out in the Annex to this Decision.
This Decision is addressed to the Member States.

‘ANNEX
Part A
Protection zones in the concerned Member States* as referred to in Article 1, point (a), and Article 2:
Member State: Spain
ADIS reference number of the outbreak
Area comprising:
Date until applicable in accordance with Article 39 of Delegated Regulation (EU) 2020/687
ES-HPAI(P)-2025-00001
Those parts in the province of Badajoz of the comarca of Azuaga contained within a circle of a radius of 3 kilometres, centered on UTM 30, ETRS89 coordinates long -5,858931247 , lat 38,260806792
15.8.2025
ES-HPAI(P)-2025-00002
Those parts in the province of Toledo of the comarcas of Oropesa and Belvís de la Jara contained within a circle of a radius of 3 kilometres, centered on UTM 30, ETRS89 coordinates long -5,1395444 , lat 39,8054028
23.8.2025
Part B
Surveillance zones in the concerned Member States* as referred to in Article 1, point (a), and Article 3:
Member State: Spain
ADIS reference number of the outbreak
Area comprising:
Date until applicable in accordance with Article 55 of Delegated Regulation (EU) 2020/687
ES-HPAI(P)-2025-00001
Those parts in the province of Badajoz of the comarca of Azuaga beyond the area described in the protection zone and contained within a circle of a radius of 10 kilometres, centered on UTM 30, ETRS89 coordinates long -5,858931247 , lat 38,260806792
24.8.2025
Those parts in the province of Badajoz of the comarca of Azuaga contained within a circle of a radius of 3 kilometres, centered on UTM 30, ETRS89 coordinates long -5,858931247 , lat 38,260806792
16.8.2025 – 24.8.2025
ES-HPAI(P)-2025-00002
Those parts in the province of Toledo of the comarcas of Oropesa, Talavera de la Reina and Belvís de la Jara, and in the province of Cáceres of the comarca of Navalmoral de la Mata beyond the area described in the protection zone and contained within a circle of a radius of 10 kilometres, centered on UTM 30, ETRS89 coordinates long -5,1395444 , lat 39,8054028
1.9.2025
Those parts in the province of Toledo of the comarcas of Oropesa end Belvis de la Jara contained within a circle of a radius of 3 kilometres, centered on UTM 30, ETRS89 coordinates long -5,1395444 , lat 39,8054028
24.8.2025 – 1.9.2025
Part C
Further restricted zones in the concerned Member States* as referred to in Article 1, point (b), and Article 4:
Member State: None
Area comprising:
Date until measures are to remain applicable in accordance with Article 4

*
In accordance with the Agreement on the withdrawal of the United Kingdom of Great Britain and Northern Ireland from the European Union and the European Atomic Energy Community, and in particular Article 5(4) of the Windsor Framework (see Joint Declaration No 1/2023 of the Union and the United Kingdom in the Joint Committee established by the Agreement on the withdrawal of the United Kingdom of Great Britain and Northern Ireland from the European Union and the European Atomic Energy Community of 24 March 2023, OJ L 102, 17.4.2023, p. 87) in conjunction with Annex 2 to that Framework, for the purposes of this Annex, references to Member State include the United Kingdom in respect of Northern Ireland.
’

Commission Implementing Decision (EU, Euratom) 2025/1709 of 29 July 2025 amending Implementing Decision (EU) 2023/1602 as regards to non-competitive auction allocations

Official Journalof the European Union ENL series
2025/1709 1.8.2025
(1) A new type of transaction of non-competitive auction allocation was introduced by Commission Implementing Decision (EU, Euratom) 2025/363(2), which amended Commission Implementing Decision (EU, Euratom) 2023/2825(3). As Implementing Decision (EU, Euratom) 2023/2825 establishes the arrangements for the administration and implementation of the Union borrowing and debt management operations, such a type of transaction should also be reflected in Commission Implementing Decision (EU) 2023/1602(4)which applies to any borrowing and debt management activity carried out by the Commission and which establishes the primary dealer network and lays down the rights and obligations of the members of the primary dealer network.
(2) The amendment of Implementing Decision (EU) 2023/1602 should therefore specify the rights and obligations of primary dealers in relation to the non-competitive auction allocation. Since non-competitive auction allocations are intended to provide an incentive to primary dealers, it should be clarified that such transactions and amounts purchased through them should not be considered in the minimum auction participation requirements applicable to primary dealers.
(3) In order to provide clarity on the functioning of the non-competitive auction allocation to members of the EU primary dealer network, Implementing Decision (EU) 2023/1602 should provide the possibility to set out further detailed rules for the use and functioning of the non-competitive auction allocation in the General terms and conditions for Union primary dealers (GTC).
(4) Implementing Decision (EU) 2023/1602 should therefore be amended accordingly.
(5) The amendments provided in this Decision are a prerequisite for further steps in the non-competitive auction allocation implementation, namely the adoption of the amended GTC’s and the publication and entry into force of the EU and Euratom debt issuance programme amendments. As the non-competitive auction functionality is intended for launch in September 2025, this Decision should enter into force on the day following that of its publication in the Official Journal,
(1) in Article 2, point (10) is added:‘(10)‘non-competitive auction allocation’ means the issuance process whereby amounts of the Union and Euratom debt securities additional to the auctioned amounts are allocated to members of the primary dealer network participating in the auction, at their request, based on a set price, within a set period of time following an auction and by using, as appropriate, an auction platform to carry out the allocation.’; ‘(10) ‘non-competitive auction allocation’ means the issuance process whereby amounts of the Union and Euratom debt securities additional to the auctioned amounts are allocated to members of the primary dealer network participating in the auction, at their request, based on a set price, within a set period of time following an auction and by using, as appropriate, an auction platform to carry out the allocation.’;
‘(10) ‘non-competitive auction allocation’ means the issuance process whereby amounts of the Union and Euratom debt securities additional to the auctioned amounts are allocated to members of the primary dealer network participating in the auction, at their request, based on a set price, within a set period of time following an auction and by using, as appropriate, an auction platform to carry out the allocation.’;
‘(10) ‘non-competitive auction allocation’ means the issuance process whereby amounts of the Union and Euratom debt securities additional to the auctioned amounts are allocated to members of the primary dealer network participating in the auction, at their request, based on a set price, within a set period of time following an auction and by using, as appropriate, an auction platform to carry out the allocation.’;
(2) in Article 3, paragraph (a) is replaced by the following:‘(a)the placement of debt securities on the primary capital markets, in particular through an auction platform and syndicated transactions;’ ‘(a) the placement of debt securities on the primary capital markets, in particular through an auction platform and syndicated transactions;’
‘(a) the placement of debt securities on the primary capital markets, in particular through an auction platform and syndicated transactions;’
‘(a) the placement of debt securities on the primary capital markets, in particular through an auction platform and syndicated transactions;’
(3) in Article 5(1), point (a) is replaced by the following:‘(a)to buy a minimum weighted average of 0,05 % of volumes auctioned by the Union or the Euratom, on a semi-annual basis in accordance with part 1 of the Annex I. The amounts of Union and the Euratom debt securities issued through non-competitive auction allocations shall be excluded when calculating the minimum weighted average of 0,05 % of volumes auctioned by the Union or the Euratom, on a semi-annual basis in accordance with part 1 of the Annex I.’; ‘(a) to buy a minimum weighted average of 0,05 % of volumes auctioned by the Union or the Euratom, on a semi-annual basis in accordance with part 1 of the Annex I. The amounts of Union and the Euratom debt securities issued through non-competitive auction allocations shall be excluded when calculating the minimum weighted average of 0,05 % of volumes auctioned by the Union or the Euratom, on a semi-annual basis in accordance with part 1 of the Annex I.’;
‘(a) to buy a minimum weighted average of 0,05 % of volumes auctioned by the Union or the Euratom, on a semi-annual basis in accordance with part 1 of the Annex I. The amounts of Union and the Euratom debt securities issued through non-competitive auction allocations shall be excluded when calculating the minimum weighted average of 0,05 % of volumes auctioned by the Union or the Euratom, on a semi-annual basis in accordance with part 1 of the Annex I.’;
‘(a) to buy a minimum weighted average of 0,05 % of volumes auctioned by the Union or the Euratom, on a semi-annual basis in accordance with part 1 of the Annex I. The amounts of Union and the Euratom debt securities issued through non-competitive auction allocations shall be excluded when calculating the minimum weighted average of 0,05 % of volumes auctioned by the Union or the Euratom, on a semi-annual basis in accordance with part 1 of the Annex I.’;
(4) in Article 6(2), point (h) is added:‘(h)establish detailed rules for the use and functioning of auctions and non-competitive auction allocations.’; ‘(h) establish detailed rules for the use and functioning of auctions and non-competitive auction allocations.’;
‘(h) establish detailed rules for the use and functioning of auctions and non-competitive auction allocations.’;
‘(h) establish detailed rules for the use and functioning of auctions and non-competitive auction allocations.’;
(5) In Article 7, point (b) is replaced by the following:‘(b)to participate and bid in any auction of debt securities of the Union or Euratom and to participate in non-competitive auction allocations, following participation and purchase of debt securities of the Union or Euratom through the corresponding auction;’; ‘(b) to participate and bid in any auction of debt securities of the Union or Euratom and to participate in non-competitive auction allocations, following participation and purchase of debt securities of the Union or Euratom through the corresponding auction;’;
‘(b) to participate and bid in any auction of debt securities of the Union or Euratom and to participate in non-competitive auction allocations, following participation and purchase of debt securities of the Union or Euratom through the corresponding auction;’;
‘(b) to participate and bid in any auction of debt securities of the Union or Euratom and to participate in non-competitive auction allocations, following participation and purchase of debt securities of the Union or Euratom through the corresponding auction;’;
(6) in Article 8, point (a) is replaced by the following:‘(a)having bought a minimum share of auctioned volumes by the Union and the Euratom on weighted average based on the last auctions on a rolling basis. The amounts issued through non-competitive auction allocations shall be excluded when calculating the minimum share of auctioned volumes by the Union and the Euratom on weighted average based on the last auctions on a rolling basis’; ‘(a) having bought a minimum share of auctioned volumes by the Union and the Euratom on weighted average based on the last auctions on a rolling basis. The amounts issued through non-competitive auction allocations shall be excluded when calculating the minimum share of auctioned volumes by the Union and the Euratom on weighted average based on the last auctions on a rolling basis’;
‘(a) having bought a minimum share of auctioned volumes by the Union and the Euratom on weighted average based on the last auctions on a rolling basis. The amounts issued through non-competitive auction allocations shall be excluded when calculating the minimum share of auctioned volumes by the Union and the Euratom on weighted average based on the last auctions on a rolling basis’;
‘(a) having bought a minimum share of auctioned volumes by the Union and the Euratom on weighted average based on the last auctions on a rolling basis. The amounts issued through non-competitive auction allocations shall be excluded when calculating the minimum share of auctioned volumes by the Union and the Euratom on weighted average based on the last auctions on a rolling basis’;
(7) in Annex I, point 1(g) is replaced by the following:‘(g)The calculations of the volume purchased by primary dealers over the relevant 6-month period, shall be weighted in accordance with the following table:Residual maturity3,5]]3,5 m-1Y]]1Y-4Y]]4Y-8Y]]8Y-12Y]]12Y-17Y]]17Y-23Y]Above 23Coeff.0,512,55,510152025The amounts issued through non-competitive auction allocations shall be excluded from this calculation of volumes purchased’. ‘(g) The calculations of the volume purchased by primary dealers over the relevant 6-month period, shall be weighted in accordance with the following table:Residual maturity3,5]]3,5 m-1Y]]1Y-4Y]]4Y-8Y]]8Y-12Y]]12Y-17Y]]17Y-23Y]Above 23Coeff.0,512,55,510152025 Residual maturity 3,5] ]3,5 m-1Y] ]1Y-4Y] ]4Y-8Y] ]8Y-12Y] ]12Y-17Y] ]17Y-23Y] Above 23 Coeff. 0,5 1 2,5 5,5 10 15 20 25
‘(g) The calculations of the volume purchased by primary dealers over the relevant 6-month period, shall be weighted in accordance with the following table:Residual maturity3,5]]3,5 m-1Y]]1Y-4Y]]4Y-8Y]]8Y-12Y]]12Y-17Y]]17Y-23Y]Above 23Coeff.0,512,55,510152025 Residual maturity 3,5] ]3,5 m-1Y] ]1Y-4Y] ]4Y-8Y] ]8Y-12Y] ]12Y-17Y] ]17Y-23Y] Above 23 Coeff. 0,5 1 2,5 5,5 10 15 20 25
Residual maturity 3,5] ]3,5 m-1Y] ]1Y-4Y] ]4Y-8Y] ]8Y-12Y] ]12Y-17Y] ]17Y-23Y] Above 23
Coeff. 0,5 1 2,5 5,5 10 15 20 25
‘(g) The calculations of the volume purchased by primary dealers over the relevant 6-month period, shall be weighted in accordance with the following table:Residual maturity3,5]]3,5 m-1Y]]1Y-4Y]]4Y-8Y]]8Y-12Y]]12Y-17Y]]17Y-23Y]Above 23Coeff.0,512,55,510152025 Residual maturity 3,5] ]3,5 m-1Y] ]1Y-4Y] ]4Y-8Y] ]8Y-12Y] ]12Y-17Y] ]17Y-23Y] Above 23 Coeff. 0,5 1 2,5 5,5 10 15 20 25
Residual maturity 3,5] ]3,5 m-1Y] ]1Y-4Y] ]4Y-8Y] ]8Y-12Y] ]12Y-17Y] ]17Y-23Y] Above 23
Coeff. 0,5 1 2,5 5,5 10 15 20 25
Residual maturity 3,5] ]3,5 m-1Y] ]1Y-4Y] ]4Y-8Y] ]8Y-12Y] ]12Y-17Y] ]17Y-23Y] Above 23
Coeff. 0,5 1 2,5 5,5 10 15 20 25
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to the Treaty establishing the European Atomic Energy Community,
Having regard to Regulation (EU, Euratom) 2024/2509 of the European Parliament and of the Council of 23 September 2024 on the financial rules applicable to the general budget of the Union (recast) (1) and in particular Article 224(2) thereof,
Whereas:
(1) A new type of transaction of non-competitive auction allocation was introduced by Commission Implementing Decision (EU, Euratom) 2025/363 (2), which amended Commission Implementing Decision (EU, Euratom) 2023/2825 (3). As Implementing Decision (EU, Euratom) 2023/2825 establishes the arrangements for the administration and implementation of the Union borrowing and debt management operations, such a type of transaction should also be reflected in Commission Implementing Decision (EU) 2023/1602 (4) which applies to any borrowing and debt management activity carried out by the Commission and which establishes the primary dealer network and lays down the rights and obligations of the members of the primary dealer network.
(2) The amendment of Implementing Decision (EU) 2023/1602 should therefore specify the rights and obligations of primary dealers in relation to the non-competitive auction allocation. Since non-competitive auction allocations are intended to provide an incentive to primary dealers, it should be clarified that such transactions and amounts purchased through them should not be considered in the minimum auction participation requirements applicable to primary dealers.
(3) In order to provide clarity on the functioning of the non-competitive auction allocation to members of the EU primary dealer network, Implementing Decision (EU) 2023/1602 should provide the possibility to set out further detailed rules for the use and functioning of the non-competitive auction allocation in the General terms and conditions for Union primary dealers (GTC).
(4) Implementing Decision (EU) 2023/1602 should therefore be amended accordingly.
(5) The amendments provided in this Decision are a prerequisite for further steps in the non-competitive auction allocation implementation, namely the adoption of the amended GTC’s and the publication and entry into force of the EU and Euratom debt issuance programme amendments. As the non-competitive auction functionality is intended for launch in September 2025, this Decision should enter into force on the day following that of its publication in the Official Journal,
HAS ADOPTED THIS DECISION:
Implementing Decision (EU) 2023/1602 is amended as follows:

(1) in Article 2, point (10) is added:
‘(10) ‘non-competitive auction allocation’ means the issuance process whereby amounts of the Union and Euratom debt securities additional to the auctioned amounts are allocated to members of the primary dealer network participating in the auction, at their request, based on a set price, within a set period of time following an auction and by using, as appropriate, an auction platform to carry out the allocation.’;
(2) in Article 3, paragraph (a) is replaced by the following:
‘(a) the placement of debt securities on the primary capital markets, in particular through an auction platform and syndicated transactions;’
(3) in Article 5(1), point (a) is replaced by the following:
‘(a) to buy a minimum weighted average of 0,05 % of volumes auctioned by the Union or the Euratom, on a semi-annual basis in accordance with part 1 of the Annex I. The amounts of Union and the Euratom debt securities issued through non-competitive auction allocations shall be excluded when calculating the minimum weighted average of 0,05 % of volumes auctioned by the Union or the Euratom, on a semi-annual basis in accordance with part 1 of the Annex I.’;
(4) in Article 6(2), point (h) is added:
‘(h) establish detailed rules for the use and functioning of auctions and non-competitive auction allocations.’;
(5) In Article 7, point (b) is replaced by the following:
‘(b) to participate and bid in any auction of debt securities of the Union or Euratom and to participate in non-competitive auction allocations, following participation and purchase of debt securities of the Union or Euratom through the corresponding auction;’;
(6) in Article 8, point (a) is replaced by the following:
‘(a) having bought a minimum share of auctioned volumes by the Union and the Euratom on weighted average based on the last auctions on a rolling basis. The amounts issued through non-competitive auction allocations shall be excluded when calculating the minimum share of auctioned volumes by the Union and the Euratom on weighted average based on the last auctions on a rolling basis’;
(7) in Annex I, point 1(g) is replaced by the following:
‘(g) The calculations of the volume purchased by primary dealers over the relevant 6-month period, shall be weighted in accordance with the following table:
Residual maturity
3,5]
]3,5 m-1Y]
]1Y-4Y]
]4Y-8Y]
]8Y-12Y]
]12Y-17Y]
]17Y-23Y]
Above 23
Coeff.
0,5
1
2,5
5,5
10
15
20
25
The amounts issued through non-competitive auction allocations shall be excluded from this calculation of volumes purchased’.

This Decision shall enter into force on the day following that of its publication in the Official Journal of the European Union.

Commission Implementing Decision (EU) 2025/1708 of 29 July 2025 concerning certain emergency measures relating to infection with lumpy skin disease virus in France and repealing Implementing Decision (EU) 2025/1336 (notified under document C(2025) 5363)

Official Journalof the European Union ENL series
2025/1708 5.8.2025
(1) Infection with lumpy skin disease virus is an infectious, vector-borne disease affecting bovine animals. Its occurrence can have a severe impact on the concerned animal population and on the profitability of farming, also causing disturbance to movements of those animals and products thereof within the Union and exports to third countries.
(2) In the event of an outbreak of infection lumpy skin disease virus in bovine animals, there is a serious risk of the spread of that disease to other establishments of bovine animals particularly due its main mode of transmission through vectors.
(3) Commission Delegated Regulation (EU) 2020/687(2)supplements the rules for the control of the listed diseases referred to in Article 9(1), points (a), (b) and (c), of Regulation (EU) 2016/429, and defined as category A, B and C diseases in Commission Implementing Regulation (EU) 2018/1882(3). In particular, Articles 21 and 22 of Delegated Regulation (EU) 2020/687 provide for the establishment of a restricted zone in the event of an outbreak of a category A disease, including infection with lumpy skin disease virus, and for certain measures to be applied therein. In addition, Article 21(1) of that Delegated Regulation provides that the restricted zone is to comprise at least a protection zone, a surveillance zone, and, if necessary, further restricted zones around or adjacent to the protection and surveillance zones.
(4) Commission Implementing Decision (EU) 2025/1336(4)was adopted on the basis of Regulation (EU) 2016/429, and it lays down certain interim emergency measures relating to infection with lumpy skin disease virus in France.
(5) More particularly, Implementing Decision (EU) 2025/1336 requires the establishment of restricted zones in the sense of Delegated Regulation (EU) 2020/687 in that Member State, and determine the areas listed in their respective Annexes as such zones.
(6) Since the adoption of Implementing Decision (EU) 2025/1336, France has notified the Commission of 33 additional outbreaks of infection with lumpy skin disease virus in establishments keeping bovine animals in the communes of Chambéry and Annecy, departments of Savoie and Haute Savoie, region of Auvergne-Rhône-Alpes, which were reported between 4-23 July 2025. In response to these outbreaks, France has established protection and surveillance zones in the departments of Ain, Isere, Savoie, and Haute Savoie, region of Auvergne-Rhône-Alpe, where the disease control measures laid down in accordance with Delegated Regulation (EU) 2020/687 are applied.
(7) The size of the areas indicated as protection and surveillance zones in Annex I to this Decision, as well as the duration of the measures to be applied therein, are based on the criteria laid down in Article 64(1) of Regulation (EU) 2016/429 as well as on the rules laid down in Delegated Regulation (EU) 2020/687. The criteria applied for the choice of the size of the protection zone and the surveillance zone, as well as of the duration of the measures to be applied therein, include the consideration of not only the epidemiological situation as regards infection with lumpy skin disease virus in the areas affected by that disease, but also of other epidemiological factors, including geographical parameters and the risk for the further spread of the disease in view of the presence of insect vectors. The chosen duration of the measures foreseen in this Decision has also taken into account the international standards of the Terrestrial Animal Health Code of the World Organisation for Animal Health(5).
(8) Regulation (EU) 2016/429, in particular Article 69, provides that the competent authority of a Member State may use emergency protective vaccination where necessary for the effective control of a listed disease in kept animals. To that end, the competent authority is to establish vaccination zones and implement an official vaccination plan that meets specific requirements. Commission Delegated Regulation (EU) 2023/361(6), which supplements Regulation (EU) 2016/429 lays down, inter alia, the specific rules to be implemented by Member States when using emergency protective vaccination in bovine animals to prevent or control a listed disease. That Delegated Regulation also contains the conditions under which the movement of vaccinated animals and products thereof may be allowed. Specific conditions for emergency protective vaccination against infection with lumpy skin disease are laid down in Annex IX to that Delegated Regulation.
(9) Commission Implementing Regulation (EU) 2022/140(7)lays down rules for the application of Regulation (EU) 2016/429 with regard to the Union antigen, vaccine and diagnostic reagent banks. In particular, it lays down the procedural and technical requirements under Article 8 for Member States to request emergency access to vaccines, including those for lumpy skin disease, from vaccine banks.
(10) On 1 July 2025, France submitted to the Commission its official vaccination plan for emergency protective vaccination against infection with lumpy skin disease. The plan includes information on the geographical and administrative scope of the vaccination zone, the number of establishments and animals to be vaccinated, and the duration of the vaccination, as required by Article 6(4), point (a), of Delegated Regulation (EU) 2023/361. They also requested sufficient vaccine doses from the Union vaccine bank, in accordance with Article 8 of Implementing Regulation (EU) 2022/140 in order to commence emergency protective vaccination in the territory of the four departments of Ain, Savoie, Haute-Savoie and Isère in the Auvergne-Rhône-Alpes region of France.
(11) The conditions under which France is to apply emergency protective vaccination against infection with lumpy skin disease virus, as well as the risk-mitigating measures that are to be taken for the movement of vaccinated animals and their products are laid down in Annex IX to Delegated Regulation (EU) 2023/361. In line with these conditions, vaccination may be implemented in vaccination zones I or II, depending on the confirmation of infection with lumpy skin disease virus.
(12) The type, size and duration of vaccination zones I and II may need to be adjusted in the light of the evolving epidemiological situation and the progress of the vaccination campaigns, particularly taking into account the evolving level of vaccine coverage achieved. Where appropriate or necessary, a vaccination zone II or part thereof may need to be converted into a vaccination zone I and vice versa, in line with the criteria set out in Delegated Regulation (EU) 2023/361 and based on the information provided by the competent authorities of the affected Member States. Accordingly, it is necessary to indicate, in the Annex to this Decision, the dates for the conversion of one type of vaccination zone to another.
(13) In view of the current epidemiological situation and the risk that infection with lumpy skin disease virus can spread through sub-clinically infected bovine animals, it is necessary to prohibit the movement of such animals from any location within the protection and surveillance zones to destinations outside the external perimeters of those zones in France or outside that Member State until a certain date.
(14) In order to prevent any unnecessary disturbance to trade within the Union, and to avoid unjustified barriers to trade being imposed by third countries, the areas identified as protection and surveillance zones, as well as the vaccination zone, should be set out in the Annex to this Decision, and the duration of those measures fixed, in collaboration with that Member State.
(15) To ensure legal clarity, the restricted zones and vaccination zones should be clearly defined in terms of their geographical scope and their duration to prevent the further spread of the disease within France to other Member States or to third countries. In light of the epidemiological situation, the provisions of this Decision should apply as soon as possible.
(16) Implementing Decision (EU) 2025/1336 should, therefore, be repealed and replaced by this Decision.
(17) The measures provided for in this Decision are in accordance with the opinion of the Standing Committee on Plants, Animals, Food and Feed,
(a) a restricted zone, which comprises the protection and surveillance zones, is established immediately by the competent authorities of that Member State in accordance with Article 21 of Delegated Regulation (EU) 2020/687, and under the conditions laid down in that Article;
(b) a vaccination zone is established immediately by the competent authorities of that Member State in accordance with Part 1 of Annex IX to Delegated Regulation (EU) 2023/361, and under the conditions laid down in that Annex;
(c) the protection and surveillance zones referred to in point (a) as well as the vaccination zone referred to in point (b) comprise at least the areas listed in the Annexes to this Decision;
(d) the measures required to be applied in the protection and surveillance zones as well as the vaccination zone are applied at least until the dates listed in the Annexes to this Decision.
Administrative area and ADIS reference number of the outbreak Areas established as protection and surveillance zones, part of the restricted zone, referred to in Article 1 Date until applicable
Region of Auvergne-Rhône-AlpesFR-LSD-2025-00001FR-LSD-2025-00002FR-LSD-2025-00003FR-LSD-2025-00004FR-LSD-2025-00005FR-LSD-2025-00006FR-LSD-2025-00007FR-LSD-2025-00008FR-LSD-2025-00009FR-LSD-2025-00010FR-LSD-2025-00011FR-LSD-2025-00012FR-LSD-2025-00013FR-LSD-2025-00014FR-LSD-2025-00015FR-LSD-2025-00016FR-LSD-2025-00017FR-LSD-2025-00018FR-LSD-2025-00019FR-LSD-2025-00020FR-LSD-2025-00021FR-LSD-2025-00022FR-LSD-2025-00023FR-LSD-2025-00024FR-LSD-2025-00025FR-LSD-2025-00026FR-LSD-2025-00027FR-LSD-2025-00028FR-LSD-2025-00029FR-LSD-2025-00030FR-LSD-2025-00031FR-LSD-2025-00032FR-LSD-2025-00033FR-LSD-2025-00034 Protection zone:The following municipalities in the following departments from region of Auvergne-Rhône-Alpes:AIN Department—Andert-et-Condon—Anglefort—Arboys en Bugey—Artemare—Belley—Valromey-sur-Séran—Brens—Ceyzérieu—Champagne-en-Valromey—Chazey-Bons—Cheignieu-la-Balme—Contrevoz—Corbonod—Cressin-Rochefort—Culoz-Béon—Cuzieu—Flaxieu—Lavours—Magnieu—Marignieu—Massignieu-de-Rives—Parves et Nattages—Peyrieu—Pollieu—Saint-Germain-les-Paroisses—Saint-Martin-de-Bavel—Seyssel—Talissieu—Virieu-le-Grand—Arvière-en-Valromey—Virignin—VongnesSAVOIE Department—Aillon-le-Jeune—Aillon-le-Vieux—Aime-la-Plagne—Aiton—Aix-les-Bains—Entrelacs—Albertville—Allondaz—Arith—La Balme—La Bâthie—Beaufort—Bellecombe-en-Bauges—Billième—La Biolle—Bonvillard—Bonvillaret—Bourdeau—Le Bourget-du-Lac—Bourgneuf—Bourg-Saint-Maurice—Brison-Saint-Innocent—Césarches—Cevins—Chamousset—Chanaz—La Chapelle-du-Mont-du-Chat—Les Chapelles—La Chapelle-Saint-Martin—Le Châtelard—Chindrieux—Cléry—Cohennoz—La Compôte—Conjux—Crest-Voland—Les Déserts—Doucy-en-Bauges—Drumettaz-Clarafond—École—Esserts-Blay—Flumet—Fréterive—Frontenex—La Giettaz—Gilly-sur-Isère—Grésy-sur-Aix—Grésy-sur-Isère—Grignon—Hauteluce—Jarsy—Jongieux—Lescheraines—Loisieux—Lucey—La Plagne Tarentaise—Marthod—Mercury—Méry—Meyrieux-Trouet—Montailleur—Montcel—Monthion—Montsapey—La Motte-en-Bauges—La Motte-Servolex—Motz—Mouxy—Notre-Dame-de-Bellecombe—La Léchère—Notre-Dame-des-Millières—Le Noyer—Ontex—Pallud—Plancherine—Pugny-Chatenod—Queige—Val-d’Arc—Rognaix—Ruffieux—Saint-François-de-Sales—Sainte-Hélène-sur-Isère—Saint-Jean-de-Chevelu—Saint-Nicolas-la-Chapelle—Saint-Offenge—Saint-Ours—Saint-Paul-sur-Isère—Saint-Paul-sur-Yenne—Saint-Pierre-d’Albigny—Saint-Pierre-de-Curtille—Sainte-Reine—Saint-Vital—Serrières-en-Chautagne—Sonnaz—Thénésol—Tournon—Tours-en-Savoie—Traize—Tresserve—Trévignin—Ugine—Venthon—Verel-Pragondran—Verrens-Arvey—Verthemex—Villard-sur-Doron—Vions—Viviers-du-Lac—Voglans—YenneHAUTE-SAVOIE Department—Alby-sur-Chéran—Alex—Allèves—Annecy—Argonay—La Balme-de-Sillingy—La Balme-de-Thuy—Bassy—Bloye—Bluffy—Le Bouchet-Mont-Charvin—Boussy—Chainaz-les-Frasses—La Chapelle-Saint-Maurice—Chapeiry—Chavanod—Chevaline—Chilly—Choisy—Clermont—Les Clefs—La Clusaz—Combloux—Les Contamines-Montjoie—Cordon—Crempigny-Bonneguête—Cusy—Cuvat—Demi-Quartier—Desingy—Dingy-Saint-Clair—Domancy—Doussard—Droisy—Duingt—Entrevernes—Epagny Metz-Tessy—Étercy—Faverges-Seythenex—Giez—Le Grand-Bornand—Gruffy—Hauteville-sur-Fier—Héry-sur-Alby—Lathuile—Leschaux—Lornay—Lovagny—Manigod—Marcellaz-Albanais—Marigny-Saint-Marcel—Val de Chaise—Massingy—Megève—Menthon-Saint-Bernard—Menthonnex-sous-Clermont—Mésigny—Montagny-les-Lanches—Moye—Mûres—Nonglard—Poisy—Praz-sur-Arly—Quintal—Rumilly—Saint-Eusèbe—Saint-Eustache—Saint-Félix—Saint-Ferréol—Saint-Gervais-les-Bains—Saint-Jean-de-Sixt—Saint-Jorioz—Saint-Sylvestre—Sales—Sallanches—Sallenôves—Serraval—Sevrier—Seyssel—Sillingy—Talloires-Montmin—Thônes—Thusy—Vallières-sur-Fier—Vaulx—Versonnex—Veyrier-du-Lac—Les Villards-sur-Thônes—Viuz-la-Chiésaz AIN Department—Andert-et-Condon—Anglefort—Arboys en Bugey—Artemare—Belley—Valromey-sur-Séran—Brens—Ceyzérieu—Champagne-en-Valromey—Chazey-Bons—Cheignieu-la-Balme—Contrevoz—Corbonod—Cressin-Rochefort—Culoz-Béon—Cuzieu—Flaxieu—Lavours—Magnieu—Marignieu—Massignieu-de-Rives—Parves et Nattages—Peyrieu—Pollieu—Saint-Germain-les-Paroisses—Saint-Martin-de-Bavel—Seyssel—Talissieu—Virieu-le-Grand—Arvière-en-Valromey—Virignin—Vongnes — Andert-et-Condon — Anglefort — Arboys en Bugey — Artemare — Belley — Valromey-sur-Séran — Brens — Ceyzérieu — Champagne-en-Valromey — Chazey-Bons — Cheignieu-la-Balme — Contrevoz — Corbonod — Cressin-Rochefort — Culoz-Béon — Cuzieu — Flaxieu — Lavours — Magnieu — Marignieu — Massignieu-de-Rives — Parves et Nattages — Peyrieu — Pollieu — Saint-Germain-les-Paroisses — Saint-Martin-de-Bavel — Seyssel — Talissieu — Virieu-le-Grand — Arvière-en-Valromey — Virignin — Vongnes SAVOIE Department—Aillon-le-Jeune—Aillon-le-Vieux—Aime-la-Plagne—Aiton—Aix-les-Bains—Entrelacs—Albertville—Allondaz—Arith—La Balme—La Bâthie—Beaufort—Bellecombe-en-Bauges—Billième—La Biolle—Bonvillard—Bonvillaret—Bourdeau—Le Bourget-du-Lac—Bourgneuf—Bourg-Saint-Maurice—Brison-Saint-Innocent—Césarches—Cevins—Chamousset—Chanaz—La Chapelle-du-Mont-du-Chat—Les Chapelles—La Chapelle-Saint-Martin—Le Châtelard—Chindrieux—Cléry—Cohennoz—La Compôte—Conjux—Crest-Voland—Les Déserts—Doucy-en-Bauges—Drumettaz-Clarafond—École—Esserts-Blay—Flumet—Fréterive—Frontenex—La Giettaz—Gilly-sur-Isère—Grésy-sur-Aix—Grésy-sur-Isère—Grignon—Hauteluce—Jarsy—Jongieux—Lescheraines—Loisieux—Lucey—La Plagne Tarentaise—Marthod—Mercury—Méry—Meyrieux-Trouet—Montailleur—Montcel—Monthion—Montsapey—La Motte-en-Bauges—La Motte-Servolex—Motz—Mouxy—Notre-Dame-de-Bellecombe—La Léchère—Notre-Dame-des-Millières—Le Noyer—Ontex—Pallud—Plancherine—Pugny-Chatenod—Queige—Val-d’Arc—Rognaix—Ruffieux—Saint-François-de-Sales—Sainte-Hélène-sur-Isère—Saint-Jean-de-Chevelu—Saint-Nicolas-la-Chapelle—Saint-Offenge—Saint-Ours—Saint-Paul-sur-Isère—Saint-Paul-sur-Yenne—Saint-Pierre-d’Albigny—Saint-Pierre-de-Curtille—Sainte-Reine—Saint-Vital—Serrières-en-Chautagne—Sonnaz—Thénésol—Tournon—Tours-en-Savoie—Traize—Tresserve—Trévignin—Ugine—Venthon—Verel-Pragondran—Verrens-Arvey—Verthemex—Villard-sur-Doron—Vions—Viviers-du-Lac—Voglans—Yenne — Aillon-le-Jeune — Aillon-le-Vieux — Aime-la-Plagne — Aiton — Aix-les-Bains — Entrelacs — Albertville — Allondaz — Arith — La Balme — La Bâthie — Beaufort — Bellecombe-en-Bauges — Billième — La Biolle — Bonvillard — Bonvillaret — Bourdeau — Le Bourget-du-Lac — Bourgneuf — Bourg-Saint-Maurice — Brison-Saint-Innocent — Césarches — Cevins — Chamousset — Chanaz — La Chapelle-du-Mont-du-Chat — Les Chapelles — La Chapelle-Saint-Martin — Le Châtelard — Chindrieux — Cléry — Cohennoz — La Compôte — Conjux — Crest-Voland — Les Déserts — Doucy-en-Bauges — Drumettaz-Clarafond — École — Esserts-Blay — Flumet — Fréterive — Frontenex — La Giettaz — Gilly-sur-Isère — Grésy-sur-Aix — Grésy-sur-Isère — Grignon — Hauteluce — Jarsy — Jongieux — Lescheraines — Loisieux — Lucey — La Plagne Tarentaise — Marthod — Mercury — Méry — Meyrieux-Trouet — Montailleur — Montcel — Monthion — Montsapey — La Motte-en-Bauges — La Motte-Servolex — Motz — Mouxy — Notre-Dame-de-Bellecombe — La Léchère — Notre-Dame-des-Millières — Le Noyer — Ontex — Pallud — Plancherine — Pugny-Chatenod — Queige — Val-d’Arc — Rognaix — Ruffieux — Saint-François-de-Sales — Sainte-Hélène-sur-Isère — Saint-Jean-de-Chevelu — Saint-Nicolas-la-Chapelle — Saint-Offenge — Saint-Ours — Saint-Paul-sur-Isère — Saint-Paul-sur-Yenne — Saint-Pierre-d’Albigny — Saint-Pierre-de-Curtille — Sainte-Reine — Saint-Vital — Serrières-en-Chautagne — Sonnaz — Thénésol — Tournon — Tours-en-Savoie — Traize — Tresserve — Trévignin — Ugine — Venthon — Verel-Pragondran — Verrens-Arvey — Verthemex — Villard-sur-Doron — Vions — Viviers-du-Lac — Voglans — Yenne HAUTE-SAVOIE Department—Alby-sur-Chéran—Alex—Allèves—Annecy—Argonay—La Balme-de-Sillingy—La Balme-de-Thuy—Bassy—Bloye—Bluffy—Le Bouchet-Mont-Charvin—Boussy—Chainaz-les-Frasses—La Chapelle-Saint-Maurice—Chapeiry—Chavanod—Chevaline—Chilly—Choisy—Clermont—Les Clefs—La Clusaz—Combloux—Les Contamines-Montjoie—Cordon—Crempigny-Bonneguête—Cusy—Cuvat—Demi-Quartier—Desingy—Dingy-Saint-Clair—Domancy—Doussard—Droisy—Duingt—Entrevernes—Epagny Metz-Tessy—Étercy—Faverges-Seythenex—Giez—Le Grand-Bornand—Gruffy—Hauteville-sur-Fier—Héry-sur-Alby—Lathuile—Leschaux—Lornay—Lovagny—Manigod—Marcellaz-Albanais—Marigny-Saint-Marcel—Val de Chaise—Massingy—Megève—Menthon-Saint-Bernard—Menthonnex-sous-Clermont—Mésigny—Montagny-les-Lanches—Moye—Mûres—Nonglard—Poisy—Praz-sur-Arly—Quintal—Rumilly—Saint-Eusèbe—Saint-Eustache—Saint-Félix—Saint-Ferréol—Saint-Gervais-les-Bains—Saint-Jean-de-Sixt—Saint-Jorioz—Saint-Sylvestre—Sales—Sallanches—Sallenôves—Serraval—Sevrier—Seyssel—Sillingy—Talloires-Montmin—Thônes—Thusy—Vallières-sur-Fier—Vaulx—Versonnex—Veyrier-du-Lac—Les Villards-sur-Thônes—Viuz-la-Chiésaz — Alby-sur-Chéran — Alex — Allèves — Annecy — Argonay — La Balme-de-Sillingy — La Balme-de-Thuy — Bassy — Bloye — Bluffy — Le Bouchet-Mont-Charvin — Boussy — Chainaz-les-Frasses — La Chapelle-Saint-Maurice — Chapeiry — Chavanod — Chevaline — Chilly — Choisy — Clermont — Les Clefs — La Clusaz — Combloux — Les Contamines-Montjoie — Cordon — Crempigny-Bonneguête — Cusy — Cuvat — Demi-Quartier — Desingy — Dingy-Saint-Clair — Domancy — Doussard — Droisy — Duingt — Entrevernes — Epagny Metz-Tessy — Étercy — Faverges-Seythenex — Giez — Le Grand-Bornand — Gruffy — Hauteville-sur-Fier — Héry-sur-Alby — Lathuile — Leschaux — Lornay — Lovagny — Manigod — Marcellaz-Albanais — Marigny-Saint-Marcel — Val de Chaise — Massingy — Megève — Menthon-Saint-Bernard — Menthonnex-sous-Clermont — Mésigny — Montagny-les-Lanches — Moye — Mûres — Nonglard — Poisy — Praz-sur-Arly — Quintal — Rumilly — Saint-Eusèbe — Saint-Eustache — Saint-Félix — Saint-Ferréol — Saint-Gervais-les-Bains — Saint-Jean-de-Sixt — Saint-Jorioz — Saint-Sylvestre — Sales — Sallanches — Sallenôves — Serraval — Sevrier — Seyssel — Sillingy — Talloires-Montmin — Thônes — Thusy — Vallières-sur-Fier — Vaulx — Versonnex — Veyrier-du-Lac — Les Villards-sur-Thônes — Viuz-la-Chiésaz 24.8.2025
AIN Department—Andert-et-Condon—Anglefort—Arboys en Bugey—Artemare—Belley—Valromey-sur-Séran—Brens—Ceyzérieu—Champagne-en-Valromey—Chazey-Bons—Cheignieu-la-Balme—Contrevoz—Corbonod—Cressin-Rochefort—Culoz-Béon—Cuzieu—Flaxieu—Lavours—Magnieu—Marignieu—Massignieu-de-Rives—Parves et Nattages—Peyrieu—Pollieu—Saint-Germain-les-Paroisses—Saint-Martin-de-Bavel—Seyssel—Talissieu—Virieu-le-Grand—Arvière-en-Valromey—Virignin—Vongnes — Andert-et-Condon — Anglefort — Arboys en Bugey — Artemare — Belley — Valromey-sur-Séran — Brens — Ceyzérieu — Champagne-en-Valromey — Chazey-Bons — Cheignieu-la-Balme — Contrevoz — Corbonod — Cressin-Rochefort — Culoz-Béon — Cuzieu — Flaxieu — Lavours — Magnieu — Marignieu — Massignieu-de-Rives — Parves et Nattages — Peyrieu — Pollieu — Saint-Germain-les-Paroisses — Saint-Martin-de-Bavel — Seyssel — Talissieu — Virieu-le-Grand — Arvière-en-Valromey — Virignin — Vongnes
— Andert-et-Condon
— Anglefort
— Arboys en Bugey
— Artemare
— Belley
— Valromey-sur-Séran
— Brens
— Ceyzérieu
— Champagne-en-Valromey
— Chazey-Bons
— Cheignieu-la-Balme
— Contrevoz
— Corbonod
— Cressin-Rochefort
— Culoz-Béon
— Cuzieu
— Flaxieu
— Lavours
— Magnieu
— Marignieu
— Massignieu-de-Rives
— Parves et Nattages
— Peyrieu
— Pollieu
— Saint-Germain-les-Paroisses
— Saint-Martin-de-Bavel
— Seyssel
— Talissieu
— Virieu-le-Grand
— Arvière-en-Valromey
— Virignin
— Vongnes
SAVOIE Department—Aillon-le-Jeune—Aillon-le-Vieux—Aime-la-Plagne—Aiton—Aix-les-Bains—Entrelacs—Albertville—Allondaz—Arith—La Balme—La Bâthie—Beaufort—Bellecombe-en-Bauges—Billième—La Biolle—Bonvillard—Bonvillaret—Bourdeau—Le Bourget-du-Lac—Bourgneuf—Bourg-Saint-Maurice—Brison-Saint-Innocent—Césarches—Cevins—Chamousset—Chanaz—La Chapelle-du-Mont-du-Chat—Les Chapelles—La Chapelle-Saint-Martin—Le Châtelard—Chindrieux—Cléry—Cohennoz—La Compôte—Conjux—Crest-Voland—Les Déserts—Doucy-en-Bauges—Drumettaz-Clarafond—École—Esserts-Blay—Flumet—Fréterive—Frontenex—La Giettaz—Gilly-sur-Isère—Grésy-sur-Aix—Grésy-sur-Isère—Grignon—Hauteluce—Jarsy—Jongieux—Lescheraines—Loisieux—Lucey—La Plagne Tarentaise—Marthod—Mercury—Méry—Meyrieux-Trouet—Montailleur—Montcel—Monthion—Montsapey—La Motte-en-Bauges—La Motte-Servolex—Motz—Mouxy—Notre-Dame-de-Bellecombe—La Léchère—Notre-Dame-des-Millières—Le Noyer—Ontex—Pallud—Plancherine—Pugny-Chatenod—Queige—Val-d’Arc—Rognaix—Ruffieux—Saint-François-de-Sales—Sainte-Hélène-sur-Isère—Saint-Jean-de-Chevelu—Saint-Nicolas-la-Chapelle—Saint-Offenge—Saint-Ours—Saint-Paul-sur-Isère—Saint-Paul-sur-Yenne—Saint-Pierre-d’Albigny—Saint-Pierre-de-Curtille—Sainte-Reine—Saint-Vital—Serrières-en-Chautagne—Sonnaz—Thénésol—Tournon—Tours-en-Savoie—Traize—Tresserve—Trévignin—Ugine—Venthon—Verel-Pragondran—Verrens-Arvey—Verthemex—Villard-sur-Doron—Vions—Viviers-du-Lac—Voglans—Yenne — Aillon-le-Jeune — Aillon-le-Vieux — Aime-la-Plagne — Aiton — Aix-les-Bains — Entrelacs — Albertville — Allondaz — Arith — La Balme — La Bâthie — Beaufort — Bellecombe-en-Bauges — Billième — La Biolle — Bonvillard — Bonvillaret — Bourdeau — Le Bourget-du-Lac — Bourgneuf — Bourg-Saint-Maurice — Brison-Saint-Innocent — Césarches — Cevins — Chamousset — Chanaz — La Chapelle-du-Mont-du-Chat — Les Chapelles — La Chapelle-Saint-Martin — Le Châtelard — Chindrieux — Cléry — Cohennoz — La Compôte — Conjux — Crest-Voland — Les Déserts — Doucy-en-Bauges — Drumettaz-Clarafond — École — Esserts-Blay — Flumet — Fréterive — Frontenex — La Giettaz — Gilly-sur-Isère — Grésy-sur-Aix — Grésy-sur-Isère — Grignon — Hauteluce — Jarsy — Jongieux — Lescheraines — Loisieux — Lucey — La Plagne Tarentaise — Marthod — Mercury — Méry — Meyrieux-Trouet — Montailleur — Montcel — Monthion — Montsapey — La Motte-en-Bauges — La Motte-Servolex — Motz — Mouxy — Notre-Dame-de-Bellecombe — La Léchère — Notre-Dame-des-Millières — Le Noyer — Ontex — Pallud — Plancherine — Pugny-Chatenod — Queige — Val-d’Arc — Rognaix — Ruffieux — Saint-François-de-Sales — Sainte-Hélène-sur-Isère — Saint-Jean-de-Chevelu — Saint-Nicolas-la-Chapelle — Saint-Offenge — Saint-Ours — Saint-Paul-sur-Isère — Saint-Paul-sur-Yenne — Saint-Pierre-d’Albigny — Saint-Pierre-de-Curtille — Sainte-Reine — Saint-Vital — Serrières-en-Chautagne — Sonnaz — Thénésol — Tournon — Tours-en-Savoie — Traize — Tresserve — Trévignin — Ugine — Venthon — Verel-Pragondran — Verrens-Arvey — Verthemex — Villard-sur-Doron — Vions — Viviers-du-Lac — Voglans — Yenne
— Aillon-le-Jeune
— Aillon-le-Vieux
— Aime-la-Plagne
— Aiton
— Aix-les-Bains
— Entrelacs
— Albertville
— Allondaz
— Arith
— La Balme
— La Bâthie
— Beaufort
— Bellecombe-en-Bauges
— Billième
— La Biolle
— Bonvillard
— Bonvillaret
— Bourdeau
— Le Bourget-du-Lac
— Bourgneuf
— Bourg-Saint-Maurice
— Brison-Saint-Innocent
— Césarches
— Cevins
— Chamousset
— Chanaz
— La Chapelle-du-Mont-du-Chat
— Les Chapelles
— La Chapelle-Saint-Martin
— Le Châtelard
— Chindrieux
— Cléry
— Cohennoz
— La Compôte
— Conjux
— Crest-Voland
— Les Déserts
— Doucy-en-Bauges
— Drumettaz-Clarafond
— École
— Esserts-Blay
— Flumet
— Fréterive
— Frontenex
— La Giettaz
— Gilly-sur-Isère
— Grésy-sur-Aix
— Grésy-sur-Isère
— Grignon
— Hauteluce
— Jarsy
— Jongieux
— Lescheraines
— Loisieux
— Lucey
— La Plagne Tarentaise
— Marthod
— Mercury
— Méry
— Meyrieux-Trouet
— Montailleur
— Montcel
— Monthion
— Montsapey
— La Motte-en-Bauges
— La Motte-Servolex
— Motz
— Mouxy
— Notre-Dame-de-Bellecombe
— La Léchère
— Notre-Dame-des-Millières
— Le Noyer
— Ontex
— Pallud
— Plancherine
— Pugny-Chatenod
— Queige
— Val-d’Arc
— Rognaix
— Ruffieux
— Saint-François-de-Sales
— Sainte-Hélène-sur-Isère
— Saint-Jean-de-Chevelu
— Saint-Nicolas-la-Chapelle
— Saint-Offenge
— Saint-Ours
— Saint-Paul-sur-Isère
— Saint-Paul-sur-Yenne
— Saint-Pierre-d’Albigny
— Saint-Pierre-de-Curtille
— Sainte-Reine
— Saint-Vital
— Serrières-en-Chautagne
— Sonnaz
— Thénésol
— Tournon
— Tours-en-Savoie
— Traize
— Tresserve
— Trévignin
— Ugine
— Venthon
— Verel-Pragondran
— Verrens-Arvey
— Verthemex
— Villard-sur-Doron
— Vions
— Viviers-du-Lac
— Voglans
— Yenne
HAUTE-SAVOIE Department—Alby-sur-Chéran—Alex—Allèves—Annecy—Argonay—La Balme-de-Sillingy—La Balme-de-Thuy—Bassy—Bloye—Bluffy—Le Bouchet-Mont-Charvin—Boussy—Chainaz-les-Frasses—La Chapelle-Saint-Maurice—Chapeiry—Chavanod—Chevaline—Chilly—Choisy—Clermont—Les Clefs—La Clusaz—Combloux—Les Contamines-Montjoie—Cordon—Crempigny-Bonneguête—Cusy—Cuvat—Demi-Quartier—Desingy—Dingy-Saint-Clair—Domancy—Doussard—Droisy—Duingt—Entrevernes—Epagny Metz-Tessy—Étercy—Faverges-Seythenex—Giez—Le Grand-Bornand—Gruffy—Hauteville-sur-Fier—Héry-sur-Alby—Lathuile—Leschaux—Lornay—Lovagny—Manigod—Marcellaz-Albanais—Marigny-Saint-Marcel—Val de Chaise—Massingy—Megève—Menthon-Saint-Bernard—Menthonnex-sous-Clermont—Mésigny—Montagny-les-Lanches—Moye—Mûres—Nonglard—Poisy—Praz-sur-Arly—Quintal—Rumilly—Saint-Eusèbe—Saint-Eustache—Saint-Félix—Saint-Ferréol—Saint-Gervais-les-Bains—Saint-Jean-de-Sixt—Saint-Jorioz—Saint-Sylvestre—Sales—Sallanches—Sallenôves—Serraval—Sevrier—Seyssel—Sillingy—Talloires-Montmin—Thônes—Thusy—Vallières-sur-Fier—Vaulx—Versonnex—Veyrier-du-Lac—Les Villards-sur-Thônes—Viuz-la-Chiésaz — Alby-sur-Chéran — Alex — Allèves — Annecy — Argonay — La Balme-de-Sillingy — La Balme-de-Thuy — Bassy — Bloye — Bluffy — Le Bouchet-Mont-Charvin — Boussy — Chainaz-les-Frasses — La Chapelle-Saint-Maurice — Chapeiry — Chavanod — Chevaline — Chilly — Choisy — Clermont — Les Clefs — La Clusaz — Combloux — Les Contamines-Montjoie — Cordon — Crempigny-Bonneguête — Cusy — Cuvat — Demi-Quartier — Desingy — Dingy-Saint-Clair — Domancy — Doussard — Droisy — Duingt — Entrevernes — Epagny Metz-Tessy — Étercy — Faverges-Seythenex — Giez — Le Grand-Bornand — Gruffy — Hauteville-sur-Fier — Héry-sur-Alby — Lathuile — Leschaux — Lornay — Lovagny — Manigod — Marcellaz-Albanais — Marigny-Saint-Marcel — Val de Chaise — Massingy — Megève — Menthon-Saint-Bernard — Menthonnex-sous-Clermont — Mésigny — Montagny-les-Lanches — Moye — Mûres — Nonglard — Poisy — Praz-sur-Arly — Quintal — Rumilly — Saint-Eusèbe — Saint-Eustache — Saint-Félix — Saint-Ferréol — Saint-Gervais-les-Bains — Saint-Jean-de-Sixt — Saint-Jorioz — Saint-Sylvestre — Sales — Sallanches — Sallenôves — Serraval — Sevrier — Seyssel — Sillingy — Talloires-Montmin — Thônes — Thusy — Vallières-sur-Fier — Vaulx — Versonnex — Veyrier-du-Lac — Les Villards-sur-Thônes — Viuz-la-Chiésaz
— Alby-sur-Chéran
— Alex
— Allèves
— Annecy
— Argonay
— La Balme-de-Sillingy
— La Balme-de-Thuy
— Bassy
— Bloye
— Bluffy
— Le Bouchet-Mont-Charvin
— Boussy
— Chainaz-les-Frasses
— La Chapelle-Saint-Maurice
— Chapeiry
— Chavanod
— Chevaline
— Chilly
— Choisy
— Clermont
— Les Clefs
— La Clusaz
— Combloux
— Les Contamines-Montjoie
— Cordon
— Crempigny-Bonneguête
— Cusy
— Cuvat
— Demi-Quartier
— Desingy
— Dingy-Saint-Clair
— Domancy
— Doussard
— Droisy
— Duingt
— Entrevernes
— Epagny Metz-Tessy
— Étercy
— Faverges-Seythenex
— Giez
— Le Grand-Bornand
— Gruffy
— Hauteville-sur-Fier
— Héry-sur-Alby
— Lathuile
— Leschaux
— Lornay
— Lovagny
— Manigod
— Marcellaz-Albanais
— Marigny-Saint-Marcel
— Val de Chaise
— Massingy
— Megève
— Menthon-Saint-Bernard
— Menthonnex-sous-Clermont
— Mésigny
— Montagny-les-Lanches
— Moye
— Mûres
— Nonglard
— Poisy
— Praz-sur-Arly
— Quintal
— Rumilly
— Saint-Eusèbe
— Saint-Eustache
— Saint-Félix
— Saint-Ferréol
— Saint-Gervais-les-Bains
— Saint-Jean-de-Sixt
— Saint-Jorioz
— Saint-Sylvestre
— Sales
— Sallanches
— Sallenôves
— Serraval
— Sevrier
— Seyssel
— Sillingy
— Talloires-Montmin
— Thônes
— Thusy
— Vallières-sur-Fier
— Vaulx
— Versonnex
— Veyrier-du-Lac
— Les Villards-sur-Thônes
— Viuz-la-Chiésaz
Surveillance zone:The following municipalities in the following departments from region of Auvergne-Rhône-Alpes:AIN DepartmentAIN Department—Andert-et-Condon—Anglefort—Arboys en Bugey—Artemare—Belley—Valromey-sur-Séran—Brens—Ceyzérieu—Champagne-en-Valromey—Chazey-Bons—Cheignieu-la-Balme—Contrevoz—Corbonod—Cressin-Rochefort—Culoz-Béon—Cuzieu—Flaxieu—Lavours—Magnieu—Marignieu—Massignieu-de-Rives—Parves et Nattages—Peyrieu—Pollieu—Saint-Germain-les-Paroisses—Saint-Martin-de-Bavel—Seyssel—Talissieu—Virieu-le-Grand—Arvière-en-Valromey—Virignin—VongnesSAVOIE Department—Aillon-le-Jeune—Aillon-le-Vieux—Aime-la-Plagne—Aiton—Aix-les-Bains—Entrelacs—Albertville—Allondaz—Arith—La Balme—La Bâthie—Beaufort—Bellecombe-en-Bauges—Billième—La Biolle—Bonvillard—Bonvillaret—Bourdeau—Le Bourget-du-Lac—Bourgneuf—Bourg-Saint-Maurice—Brison-Saint-Innocent—Césarches—Cevins—Chamousset—Chanaz—La Chapelle-du-Mont-du-Chat—Les Chapelles—La Chapelle-Saint-Martin—Le Châtelard—Chindrieux—Cléry—Cohennoz—La Compôte—Conjux—Crest-Voland—Les Déserts—Doucy-en-Bauges—Drumettaz-Clarafond—École—Esserts-Blay—Flumet—Fréterive—Frontenex—La Giettaz—Gilly-sur-Isère—Grésy-sur-Aix—Grésy-sur-Isère—Grignon—Hauteluce—Jarsy—Jongieux—Lescheraines—Loisieux—Lucey—La Plagne Tarentaise—Marthod—Mercury—Méry—Meyrieux-Trouet—Montailleur—Montcel—Monthion—Montsapey—La Motte-en-Bauges—La Motte-Servolex—Motz—Mouxy—Notre-Dame-de-Bellecombe—La Léchère—Notre-Dame-des-Millières—Le Noyer—Ontex—Pallud—Plancherine—Pugny-Chatenod—Queige—Val-d’Arc—Rognaix—Ruffieux—Saint-François-de-Sales—Sainte-Hélène-sur-Isère—Saint-Jean-de-Chevelu—Saint-Nicolas-la-Chapelle—Saint-Offenge—Saint-Ours—Saint-Paul-sur-Isère—Saint-Paul-sur-Yenne—Saint-Pierre-d’Albigny—Saint-Pierre-de-Curtille—Sainte-Reine—Saint-Vital—Serrières-en-Chautagne—Sonnaz—Thénésol—Tournon—Tours-en-Savoie—Traize—Tresserve—Trévignin—Ugine—Venthon—Verel-Pragondran—Verrens-Arvey—Verthemex—Villard-sur-Doron—Vions—Viviers-du-Lac—Voglans—YenneHAUTE-SAVOIE Department—Alby-sur-Chéran—Alex—Allèves—Annecy—Argonay—La Balme-de-Sillingy—La Balme-de-Thuy—Bassy—Bloye—Bluffy—Le Bouchet-Mont-Charvin—Boussy—Chainaz-les-Frasses—La Chapelle-Saint-Maurice—Chapeiry—Chavanod—Chevaline—Chilly—Choisy—Clermont—Les Clefs—La Clusaz—Combloux—Les Contamines-Montjoie—Cordon—Crempigny-Bonneguête—Cusy—Cuvat—Demi-Quartier—Desingy—Dingy-Saint-Clair—Domancy—Doussard—Droisy—Duingt—Entrevernes—Epagny Metz-Tessy—Étercy—Faverges-Seythenex—Giez—Le Grand-Bornand—Gruffy—Hauteville-sur-Fier—Héry-sur-Alby—Lathuile—Leschaux—Lornay—Lovagny—Manigod—Marcellaz-Albanais—Marigny-Saint-Marcel—Val de Chaise—Massingy—Megève—Menthon-Saint-Bernard—Menthonnex-sous-Clermont—Mésigny—Montagny-les-Lanches—Moye—Mûres—Nonglard—Poisy—Praz-sur-Arly—Quintal—Rumilly—Saint-Eusèbe—Saint-Eustache—Saint-Félix—Saint-Ferréol—Saint-Gervais-les-Bains—Saint-Jean-de-Sixt—Saint-Jorioz—Saint-Sylvestre—Sales—Sallanches—Sallenôves—Serraval—Sevrier—Seyssel—Sillingy—Talloires-Montmin—Thônes—Thusy—Vallières-sur-Fier—Vaulx—Versonnex—Veyrier-du-Lac—Les Villards-sur-Thônes—Viuz-la-Chiésaz AIN Department AIN Department—Andert-et-Condon—Anglefort—Arboys en Bugey—Artemare—Belley—Valromey-sur-Séran—Brens—Ceyzérieu—Champagne-en-Valromey—Chazey-Bons—Cheignieu-la-Balme—Contrevoz—Corbonod—Cressin-Rochefort—Culoz-Béon—Cuzieu—Flaxieu—Lavours—Magnieu—Marignieu—Massignieu-de-Rives—Parves et Nattages—Peyrieu—Pollieu—Saint-Germain-les-Paroisses—Saint-Martin-de-Bavel—Seyssel—Talissieu—Virieu-le-Grand—Arvière-en-Valromey—Virignin—Vongnes — Andert-et-Condon — Anglefort — Arboys en Bugey — Artemare — Belley — Valromey-sur-Séran — Brens — Ceyzérieu — Champagne-en-Valromey — Chazey-Bons — Cheignieu-la-Balme — Contrevoz — Corbonod — Cressin-Rochefort — Culoz-Béon — Cuzieu — Flaxieu — Lavours — Magnieu — Marignieu — Massignieu-de-Rives — Parves et Nattages — Peyrieu — Pollieu — Saint-Germain-les-Paroisses — Saint-Martin-de-Bavel — Seyssel — Talissieu — Virieu-le-Grand — Arvière-en-Valromey — Virignin — Vongnes SAVOIE Department—Aillon-le-Jeune—Aillon-le-Vieux—Aime-la-Plagne—Aiton—Aix-les-Bains—Entrelacs—Albertville—Allondaz—Arith—La Balme—La Bâthie—Beaufort—Bellecombe-en-Bauges—Billième—La Biolle—Bonvillard—Bonvillaret—Bourdeau—Le Bourget-du-Lac—Bourgneuf—Bourg-Saint-Maurice—Brison-Saint-Innocent—Césarches—Cevins—Chamousset—Chanaz—La Chapelle-du-Mont-du-Chat—Les Chapelles—La Chapelle-Saint-Martin—Le Châtelard—Chindrieux—Cléry—Cohennoz—La Compôte—Conjux—Crest-Voland—Les Déserts—Doucy-en-Bauges—Drumettaz-Clarafond—École—Esserts-Blay—Flumet—Fréterive—Frontenex—La Giettaz—Gilly-sur-Isère—Grésy-sur-Aix—Grésy-sur-Isère—Grignon—Hauteluce—Jarsy—Jongieux—Lescheraines—Loisieux—Lucey—La Plagne Tarentaise—Marthod—Mercury—Méry—Meyrieux-Trouet—Montailleur—Montcel—Monthion—Montsapey—La Motte-en-Bauges—La Motte-Servolex—Motz—Mouxy—Notre-Dame-de-Bellecombe—La Léchère—Notre-Dame-des-Millières—Le Noyer—Ontex—Pallud—Plancherine—Pugny-Chatenod—Queige—Val-d’Arc—Rognaix—Ruffieux—Saint-François-de-Sales—Sainte-Hélène-sur-Isère—Saint-Jean-de-Chevelu—Saint-Nicolas-la-Chapelle—Saint-Offenge—Saint-Ours—Saint-Paul-sur-Isère—Saint-Paul-sur-Yenne—Saint-Pierre-d’Albigny—Saint-Pierre-de-Curtille—Sainte-Reine—Saint-Vital—Serrières-en-Chautagne—Sonnaz—Thénésol—Tournon—Tours-en-Savoie—Traize—Tresserve—Trévignin—Ugine—Venthon—Verel-Pragondran—Verrens-Arvey—Verthemex—Villard-sur-Doron—Vions—Viviers-du-Lac—Voglans—Yenne — Aillon-le-Jeune — Aillon-le-Vieux — Aime-la-Plagne — Aiton — Aix-les-Bains — Entrelacs — Albertville — Allondaz — Arith — La Balme — La Bâthie — Beaufort — Bellecombe-en-Bauges — Billième — La Biolle — Bonvillard — Bonvillaret — Bourdeau — Le Bourget-du-Lac — Bourgneuf — Bourg-Saint-Maurice — Brison-Saint-Innocent — Césarches — Cevins — Chamousset — Chanaz — La Chapelle-du-Mont-du-Chat — Les Chapelles — La Chapelle-Saint-Martin — Le Châtelard — Chindrieux — Cléry — Cohennoz — La Compôte — Conjux — Crest-Voland — Les Déserts — Doucy-en-Bauges — Drumettaz-Clarafond — École — Esserts-Blay — Flumet — Fréterive — Frontenex — La Giettaz — Gilly-sur-Isère — Grésy-sur-Aix — Grésy-sur-Isère — Grignon — Hauteluce — Jarsy — Jongieux — Lescheraines — Loisieux — Lucey — La Plagne Tarentaise — Marthod — Mercury — Méry — Meyrieux-Trouet — Montailleur — Montcel — Monthion — Montsapey — La Motte-en-Bauges — La Motte-Servolex — Motz — Mouxy — Notre-Dame-de-Bellecombe — La Léchère — Notre-Dame-des-Millières — Le Noyer — Ontex — Pallud — Plancherine — Pugny-Chatenod — Queige — Val-d’Arc — Rognaix — Ruffieux — Saint-François-de-Sales — Sainte-Hélène-sur-Isère — Saint-Jean-de-Chevelu — Saint-Nicolas-la-Chapelle — Saint-Offenge — Saint-Ours — Saint-Paul-sur-Isère — Saint-Paul-sur-Yenne — Saint-Pierre-d’Albigny — Saint-Pierre-de-Curtille — Sainte-Reine — Saint-Vital — Serrières-en-Chautagne — Sonnaz — Thénésol — Tournon — Tours-en-Savoie — Traize — Tresserve — Trévignin — Ugine — Venthon — Verel-Pragondran — Verrens-Arvey — Verthemex — Villard-sur-Doron — Vions — Viviers-du-Lac — Voglans — Yenne HAUTE-SAVOIE Department—Alby-sur-Chéran—Alex—Allèves—Annecy—Argonay—La Balme-de-Sillingy—La Balme-de-Thuy—Bassy—Bloye—Bluffy—Le Bouchet-Mont-Charvin—Boussy—Chainaz-les-Frasses—La Chapelle-Saint-Maurice—Chapeiry—Chavanod—Chevaline—Chilly—Choisy—Clermont—Les Clefs—La Clusaz—Combloux—Les Contamines-Montjoie—Cordon—Crempigny-Bonneguête—Cusy—Cuvat—Demi-Quartier—Desingy—Dingy-Saint-Clair—Domancy—Doussard—Droisy—Duingt—Entrevernes—Epagny Metz-Tessy—Étercy—Faverges-Seythenex—Giez—Le Grand-Bornand—Gruffy—Hauteville-sur-Fier—Héry-sur-Alby—Lathuile—Leschaux—Lornay—Lovagny—Manigod—Marcellaz-Albanais—Marigny-Saint-Marcel—Val de Chaise—Massingy—Megève—Menthon-Saint-Bernard—Menthonnex-sous-Clermont—Mésigny—Montagny-les-Lanches—Moye—Mûres—Nonglard—Poisy—Praz-sur-Arly—Quintal—Rumilly—Saint-Eusèbe—Saint-Eustache—Saint-Félix—Saint-Ferréol—Saint-Gervais-les-Bains—Saint-Jean-de-Sixt—Saint-Jorioz—Saint-Sylvestre—Sales—Sallanches—Sallenôves—Serraval—Sevrier—Seyssel—Sillingy—Talloires-Montmin—Thônes—Thusy—Vallières-sur-Fier—Vaulx—Versonnex—Veyrier-du-Lac—Les Villards-sur-Thônes—Viuz-la-Chiésaz — Alby-sur-Chéran — Alex — Allèves — Annecy — Argonay — La Balme-de-Sillingy — La Balme-de-Thuy — Bassy — Bloye — Bluffy — Le Bouchet-Mont-Charvin — Boussy — Chainaz-les-Frasses — La Chapelle-Saint-Maurice — Chapeiry — Chavanod — Chevaline — Chilly — Choisy — Clermont — Les Clefs — La Clusaz — Combloux — Les Contamines-Montjoie — Cordon — Crempigny-Bonneguête — Cusy — Cuvat — Demi-Quartier — Desingy — Dingy-Saint-Clair — Domancy — Doussard — Droisy — Duingt — Entrevernes — Epagny Metz-Tessy — Étercy — Faverges-Seythenex — Giez — Le Grand-Bornand — Gruffy — Hauteville-sur-Fier — Héry-sur-Alby — Lathuile — Leschaux — Lornay — Lovagny — Manigod — Marcellaz-Albanais — Marigny-Saint-Marcel — Val de Chaise — Massingy — Megève — Menthon-Saint-Bernard — Menthonnex-sous-Clermont — Mésigny — Montagny-les-Lanches — Moye — Mûres — Nonglard — Poisy — Praz-sur-Arly — Quintal — Rumilly — Saint-Eusèbe — Saint-Eustache — Saint-Félix — Saint-Ferréol — Saint-Gervais-les-Bains — Saint-Jean-de-Sixt — Saint-Jorioz — Saint-Sylvestre — Sales — Sallanches — Sallenôves — Serraval — Sevrier — Seyssel — Sillingy — Talloires-Montmin — Thônes — Thusy — Vallières-sur-Fier — Vaulx — Versonnex — Veyrier-du-Lac — Les Villards-sur-Thônes — Viuz-la-Chiésaz 25.8.2025 – 10.9.2025
AIN Department
AIN Department—Andert-et-Condon—Anglefort—Arboys en Bugey—Artemare—Belley—Valromey-sur-Séran—Brens—Ceyzérieu—Champagne-en-Valromey—Chazey-Bons—Cheignieu-la-Balme—Contrevoz—Corbonod—Cressin-Rochefort—Culoz-Béon—Cuzieu—Flaxieu—Lavours—Magnieu—Marignieu—Massignieu-de-Rives—Parves et Nattages—Peyrieu—Pollieu—Saint-Germain-les-Paroisses—Saint-Martin-de-Bavel—Seyssel—Talissieu—Virieu-le-Grand—Arvière-en-Valromey—Virignin—Vongnes — Andert-et-Condon — Anglefort — Arboys en Bugey — Artemare — Belley — Valromey-sur-Séran — Brens — Ceyzérieu — Champagne-en-Valromey — Chazey-Bons — Cheignieu-la-Balme — Contrevoz — Corbonod — Cressin-Rochefort — Culoz-Béon — Cuzieu — Flaxieu — Lavours — Magnieu — Marignieu — Massignieu-de-Rives — Parves et Nattages — Peyrieu — Pollieu — Saint-Germain-les-Paroisses — Saint-Martin-de-Bavel — Seyssel — Talissieu — Virieu-le-Grand — Arvière-en-Valromey — Virignin — Vongnes
— Andert-et-Condon
— Anglefort
— Arboys en Bugey
— Artemare
— Belley
— Valromey-sur-Séran
— Brens
— Ceyzérieu
— Champagne-en-Valromey
— Chazey-Bons
— Cheignieu-la-Balme
— Contrevoz
— Corbonod
— Cressin-Rochefort
— Culoz-Béon
— Cuzieu
— Flaxieu
— Lavours
— Magnieu
— Marignieu
— Massignieu-de-Rives
— Parves et Nattages
— Peyrieu
— Pollieu
— Saint-Germain-les-Paroisses
— Saint-Martin-de-Bavel
— Seyssel
— Talissieu
— Virieu-le-Grand
— Arvière-en-Valromey
— Virignin
— Vongnes
SAVOIE Department—Aillon-le-Jeune—Aillon-le-Vieux—Aime-la-Plagne—Aiton—Aix-les-Bains—Entrelacs—Albertville—Allondaz—Arith—La Balme—La Bâthie—Beaufort—Bellecombe-en-Bauges—Billième—La Biolle—Bonvillard—Bonvillaret—Bourdeau—Le Bourget-du-Lac—Bourgneuf—Bourg-Saint-Maurice—Brison-Saint-Innocent—Césarches—Cevins—Chamousset—Chanaz—La Chapelle-du-Mont-du-Chat—Les Chapelles—La Chapelle-Saint-Martin—Le Châtelard—Chindrieux—Cléry—Cohennoz—La Compôte—Conjux—Crest-Voland—Les Déserts—Doucy-en-Bauges—Drumettaz-Clarafond—École—Esserts-Blay—Flumet—Fréterive—Frontenex—La Giettaz—Gilly-sur-Isère—Grésy-sur-Aix—Grésy-sur-Isère—Grignon—Hauteluce—Jarsy—Jongieux—Lescheraines—Loisieux—Lucey—La Plagne Tarentaise—Marthod—Mercury—Méry—Meyrieux-Trouet—Montailleur—Montcel—Monthion—Montsapey—La Motte-en-Bauges—La Motte-Servolex—Motz—Mouxy—Notre-Dame-de-Bellecombe—La Léchère—Notre-Dame-des-Millières—Le Noyer—Ontex—Pallud—Plancherine—Pugny-Chatenod—Queige—Val-d’Arc—Rognaix—Ruffieux—Saint-François-de-Sales—Sainte-Hélène-sur-Isère—Saint-Jean-de-Chevelu—Saint-Nicolas-la-Chapelle—Saint-Offenge—Saint-Ours—Saint-Paul-sur-Isère—Saint-Paul-sur-Yenne—Saint-Pierre-d’Albigny—Saint-Pierre-de-Curtille—Sainte-Reine—Saint-Vital—Serrières-en-Chautagne—Sonnaz—Thénésol—Tournon—Tours-en-Savoie—Traize—Tresserve—Trévignin—Ugine—Venthon—Verel-Pragondran—Verrens-Arvey—Verthemex—Villard-sur-Doron—Vions—Viviers-du-Lac—Voglans—Yenne — Aillon-le-Jeune — Aillon-le-Vieux — Aime-la-Plagne — Aiton — Aix-les-Bains — Entrelacs — Albertville — Allondaz — Arith — La Balme — La Bâthie — Beaufort — Bellecombe-en-Bauges — Billième — La Biolle — Bonvillard — Bonvillaret — Bourdeau — Le Bourget-du-Lac — Bourgneuf — Bourg-Saint-Maurice — Brison-Saint-Innocent — Césarches — Cevins — Chamousset — Chanaz — La Chapelle-du-Mont-du-Chat — Les Chapelles — La Chapelle-Saint-Martin — Le Châtelard — Chindrieux — Cléry — Cohennoz — La Compôte — Conjux — Crest-Voland — Les Déserts — Doucy-en-Bauges — Drumettaz-Clarafond — École — Esserts-Blay — Flumet — Fréterive — Frontenex — La Giettaz — Gilly-sur-Isère — Grésy-sur-Aix — Grésy-sur-Isère — Grignon — Hauteluce — Jarsy — Jongieux — Lescheraines — Loisieux — Lucey — La Plagne Tarentaise — Marthod — Mercury — Méry — Meyrieux-Trouet — Montailleur — Montcel — Monthion — Montsapey — La Motte-en-Bauges — La Motte-Servolex — Motz — Mouxy — Notre-Dame-de-Bellecombe — La Léchère — Notre-Dame-des-Millières — Le Noyer — Ontex — Pallud — Plancherine — Pugny-Chatenod — Queige — Val-d’Arc — Rognaix — Ruffieux — Saint-François-de-Sales — Sainte-Hélène-sur-Isère — Saint-Jean-de-Chevelu — Saint-Nicolas-la-Chapelle — Saint-Offenge — Saint-Ours — Saint-Paul-sur-Isère — Saint-Paul-sur-Yenne — Saint-Pierre-d’Albigny — Saint-Pierre-de-Curtille — Sainte-Reine — Saint-Vital — Serrières-en-Chautagne — Sonnaz — Thénésol — Tournon — Tours-en-Savoie — Traize — Tresserve — Trévignin — Ugine — Venthon — Verel-Pragondran — Verrens-Arvey — Verthemex — Villard-sur-Doron — Vions — Viviers-du-Lac — Voglans — Yenne
— Aillon-le-Jeune
— Aillon-le-Vieux
— Aime-la-Plagne
— Aiton
— Aix-les-Bains
— Entrelacs
— Albertville
— Allondaz
— Arith
— La Balme
— La Bâthie
— Beaufort
— Bellecombe-en-Bauges
— Billième
— La Biolle
— Bonvillard
— Bonvillaret
— Bourdeau
— Le Bourget-du-Lac
— Bourgneuf
— Bourg-Saint-Maurice
— Brison-Saint-Innocent
— Césarches
— Cevins
— Chamousset
— Chanaz
— La Chapelle-du-Mont-du-Chat
— Les Chapelles
— La Chapelle-Saint-Martin
— Le Châtelard
— Chindrieux
— Cléry
— Cohennoz
— La Compôte
— Conjux
— Crest-Voland
— Les Déserts
— Doucy-en-Bauges
— Drumettaz-Clarafond
— École
— Esserts-Blay
— Flumet
— Fréterive
— Frontenex
— La Giettaz
— Gilly-sur-Isère
— Grésy-sur-Aix
— Grésy-sur-Isère
— Grignon
— Hauteluce
— Jarsy
— Jongieux
— Lescheraines
— Loisieux
— Lucey
— La Plagne Tarentaise
— Marthod
— Mercury
— Méry
— Meyrieux-Trouet
— Montailleur
— Montcel
— Monthion
— Montsapey
— La Motte-en-Bauges
— La Motte-Servolex
— Motz
— Mouxy
— Notre-Dame-de-Bellecombe
— La Léchère
— Notre-Dame-des-Millières
— Le Noyer
— Ontex
— Pallud
— Plancherine
— Pugny-Chatenod
— Queige
— Val-d’Arc
— Rognaix
— Ruffieux
— Saint-François-de-Sales
— Sainte-Hélène-sur-Isère
— Saint-Jean-de-Chevelu
— Saint-Nicolas-la-Chapelle
— Saint-Offenge
— Saint-Ours
— Saint-Paul-sur-Isère
— Saint-Paul-sur-Yenne
— Saint-Pierre-d’Albigny
— Saint-Pierre-de-Curtille
— Sainte-Reine
— Saint-Vital
— Serrières-en-Chautagne
— Sonnaz
— Thénésol
— Tournon
— Tours-en-Savoie
— Traize
— Tresserve
— Trévignin
— Ugine
— Venthon
— Verel-Pragondran
— Verrens-Arvey
— Verthemex
— Villard-sur-Doron
— Vions
— Viviers-du-Lac
— Voglans
— Yenne
HAUTE-SAVOIE Department—Alby-sur-Chéran—Alex—Allèves—Annecy—Argonay—La Balme-de-Sillingy—La Balme-de-Thuy—Bassy—Bloye—Bluffy—Le Bouchet-Mont-Charvin—Boussy—Chainaz-les-Frasses—La Chapelle-Saint-Maurice—Chapeiry—Chavanod—Chevaline—Chilly—Choisy—Clermont—Les Clefs—La Clusaz—Combloux—Les Contamines-Montjoie—Cordon—Crempigny-Bonneguête—Cusy—Cuvat—Demi-Quartier—Desingy—Dingy-Saint-Clair—Domancy—Doussard—Droisy—Duingt—Entrevernes—Epagny Metz-Tessy—Étercy—Faverges-Seythenex—Giez—Le Grand-Bornand—Gruffy—Hauteville-sur-Fier—Héry-sur-Alby—Lathuile—Leschaux—Lornay—Lovagny—Manigod—Marcellaz-Albanais—Marigny-Saint-Marcel—Val de Chaise—Massingy—Megève—Menthon-Saint-Bernard—Menthonnex-sous-Clermont—Mésigny—Montagny-les-Lanches—Moye—Mûres—Nonglard—Poisy—Praz-sur-Arly—Quintal—Rumilly—Saint-Eusèbe—Saint-Eustache—Saint-Félix—Saint-Ferréol—Saint-Gervais-les-Bains—Saint-Jean-de-Sixt—Saint-Jorioz—Saint-Sylvestre—Sales—Sallanches—Sallenôves—Serraval—Sevrier—Seyssel—Sillingy—Talloires-Montmin—Thônes—Thusy—Vallières-sur-Fier—Vaulx—Versonnex—Veyrier-du-Lac—Les Villards-sur-Thônes—Viuz-la-Chiésaz — Alby-sur-Chéran — Alex — Allèves — Annecy — Argonay — La Balme-de-Sillingy — La Balme-de-Thuy — Bassy — Bloye — Bluffy — Le Bouchet-Mont-Charvin — Boussy — Chainaz-les-Frasses — La Chapelle-Saint-Maurice — Chapeiry — Chavanod — Chevaline — Chilly — Choisy — Clermont — Les Clefs — La Clusaz — Combloux — Les Contamines-Montjoie — Cordon — Crempigny-Bonneguête — Cusy — Cuvat — Demi-Quartier — Desingy — Dingy-Saint-Clair — Domancy — Doussard — Droisy — Duingt — Entrevernes — Epagny Metz-Tessy — Étercy — Faverges-Seythenex — Giez — Le Grand-Bornand — Gruffy — Hauteville-sur-Fier — Héry-sur-Alby — Lathuile — Leschaux — Lornay — Lovagny — Manigod — Marcellaz-Albanais — Marigny-Saint-Marcel — Val de Chaise — Massingy — Megève — Menthon-Saint-Bernard — Menthonnex-sous-Clermont — Mésigny — Montagny-les-Lanches — Moye — Mûres — Nonglard — Poisy — Praz-sur-Arly — Quintal — Rumilly — Saint-Eusèbe — Saint-Eustache — Saint-Félix — Saint-Ferréol — Saint-Gervais-les-Bains — Saint-Jean-de-Sixt — Saint-Jorioz — Saint-Sylvestre — Sales — Sallanches — Sallenôves — Serraval — Sevrier — Seyssel — Sillingy — Talloires-Montmin — Thônes — Thusy — Vallières-sur-Fier — Vaulx — Versonnex — Veyrier-du-Lac — Les Villards-sur-Thônes — Viuz-la-Chiésaz
— Alby-sur-Chéran
— Alex
— Allèves
— Annecy
— Argonay
— La Balme-de-Sillingy
— La Balme-de-Thuy
— Bassy
— Bloye
— Bluffy
— Le Bouchet-Mont-Charvin
— Boussy
— Chainaz-les-Frasses
— La Chapelle-Saint-Maurice
— Chapeiry
— Chavanod
— Chevaline
— Chilly
— Choisy
— Clermont
— Les Clefs
— La Clusaz
— Combloux
— Les Contamines-Montjoie
— Cordon
— Crempigny-Bonneguête
— Cusy
— Cuvat
— Demi-Quartier
— Desingy
— Dingy-Saint-Clair
— Domancy
— Doussard
— Droisy
— Duingt
— Entrevernes
— Epagny Metz-Tessy
— Étercy
— Faverges-Seythenex
— Giez
— Le Grand-Bornand
— Gruffy
— Hauteville-sur-Fier
— Héry-sur-Alby
— Lathuile
— Leschaux
— Lornay
— Lovagny
— Manigod
— Marcellaz-Albanais
— Marigny-Saint-Marcel
— Val de Chaise
— Massingy
— Megève
— Menthon-Saint-Bernard
— Menthonnex-sous-Clermont
— Mésigny
— Montagny-les-Lanches
— Moye
— Mûres
— Nonglard
— Poisy
— Praz-sur-Arly
— Quintal
— Rumilly
— Saint-Eusèbe
— Saint-Eustache
— Saint-Félix
— Saint-Ferréol
— Saint-Gervais-les-Bains
— Saint-Jean-de-Sixt
— Saint-Jorioz
— Saint-Sylvestre
— Sales
— Sallanches
— Sallenôves
— Serraval
— Sevrier
— Seyssel
— Sillingy
— Talloires-Montmin
— Thônes
— Thusy
— Vallières-sur-Fier
— Vaulx
— Versonnex
— Veyrier-du-Lac
— Les Villards-sur-Thônes
— Viuz-la-Chiésaz
Surveillance zone:The following municipalities in the following departments from region of Auvergne-Rhône-Alpes:AIN Department—L’Abergement-de-Varey—Ambérieu-en-Bugey—Ambléon—Ambronay—Ambutrix—Apremont—Aranc—Arandas—Argis—Armix—Bellignat—Valserhône—Belleydoux—Bénonces—Bettant—Billiat—Blyes—Boyeux-Saint-Jérôme—Brégnier-Cordon—Brénod—Brion—Briord—La Burbanche—Ceignes—Cerdon—Chaley—Challes-la-Montagne—Challex—Champdor-Corcelles—Champfromier—Chanay—Charix—Château-Gaillard—Chazey-sur-Ain—Chevillard—Chevry—Chézery-Forens—Cleyzieu—Collonges—Colomieu—Conand—Condamine—Confort—Conzieu—Corlier—Crozet—Douvres—Échallon—Évosges—Farges—Ferney-Voltaire—Béard-Géovreissiat—Giron—Groissiat—Hautecourt-Romanèche—Plateau d’Hauteville—Haut Valromey—Injoux-Génissiat—Innimond—Izenave—Izernore—Izieu—Jujurieux—Labalme—Lagnieu—Le Poizat-Lalleyriat—Lantenay—Léaz—Lélex—Leyment—Leyssard—Surjoux-Lhopital—Lhuis—Lompnas—Loyettes—Maillat—Marchamp—Martignat—Mérignat—Montagnieu—Montanges—Montréal-la-Cluse—Nurieux-Volognat—Murs-et-Gélignieux—Nantua—Neuville-sur-Ain—Les Neyrolles—Nivollet-Montgriffon—Oncieu—Ordonnaz—Outriaz—Oyonnax—Péron—Peyriat—Plagne—Poncin—Pont-d’Ain—Port—Pougny—Prémeyzel—Prémillieu—Prévessin-Moëns—Priay—Rossillon—Saint-Alban—Groslée-Saint-Benoit—Saint-Denis-en-Bugey—Saint-Genis-Pouilly—Saint-Germain-de-Joux—Saint-Jean-de-Gonville—Saint-Jean-de-Niost—Saint-Jean-le-Vieux—Sainte-Julie—Saint-Martin-du-Frêne—Saint-Maurice-de-Rémens—Saint-Rambert-en-Bugey—Saint-Sorlin-en-Bugey—Saint-Vulbas—Sault-Brénaz—Seillonnaz—Sergy—Serrières-de-Briord—Serrières-sur-Ain—Souclin—Tenay—Thoiry—Torcieu—Vaux-en-Bugey—Vieu-d’Izenave—Villebois—VillesISERE Department—Les Abrets en Dauphiné—Allevard—Annoisin-Chatelans—Aoste—Les Avenières Veyrins-Thuellin—La Balme-les-Grottes—Barraux—La Bâtie-Montgascon—Bilieu—Blandin—Le Bouchage—Bourgoin-Jallieu—Bouvesse-Quirieu—Brangues—La Buissière—Cessieu—Chapareillan—La Chapelle-de-la-Tour—La Chapelle-du-Bard—Charancieu—Charavines—Charette—Chassignieu—Chélieu—Le Cheylas—Chimilin—Chirens—Corbelin—Courtenay—Crémieu—Creys-Mépieu—Dizimieu—Doissin—Dolomieu—Entre-deux-Guiers—Faverges-de-la-Tour—Le Haut-Bréda—La Flachère—Goncelin—Granieu—Hières-sur-Amby—Leyrieu—Massieu—Merlas—Miribel-les-Échelles—Montagnieu—Montalieu-Vercieu—Montcarra—Montferrat—Moras—Morestel—Le Moutaret—Optevoz—Oyeu—Villages du Lac de Paladru—Parmilieu—Le Passage—Arandon-Passins—Pontcharra—Le Pont-de-Beauvoisin—Porcieu-Amblagnieu—Pressins—Rochetoirin—Romagnieu—Ruy-Montceau—Saint-Albin-de-Vaulserre—Saint-André-le-Gaz—Saint-Aupre—Saint-Baudille-de-la-Tour—Sainte-Blandine—Saint-Bueil—Saint-Chef—Saint-Christophe-sur-Guiers—Saint-Clair-de-la-Tour—Saint-Didier-de-la-Tour—Saint-Étienne-de-Crossey—Saint-Geoire-en-Valdaine—Saint-Hilaire-de-Brens—Plateau-des-Petites-Roches—Saint-Jean-d’Avelanne—Saint-Jean-de-Soudain—Saint-Joseph-de-Rivière—Saint-Laurent-du-Pont—Sainte-Marie-d’Alloix—Sainte-Marie-du-Mont—Saint-Martin-de-Vaulserre—Saint-Maximin—Saint-Nicolas-de-Macherin—Saint-Ondras—Crêts en Belledonne—Saint-Pierre-de-Chartreuse—Saint-Pierre-d’Entremont—Saint-Savin—Saint-Sorlin-de-Morestel—Saint-Sulpice-des-Rivoires—Saint-Victor-de-Cessieu—Saint-Victor-de-Morestel—Saint-Vincent-de-Mercuze—Salagnon—Sérézin-de-la-Tour—Sermérieu—Siccieu-Saint-Julien-et-Carisieu—Soleymieu—Theys—Torchefelon—La Tour-du-Pin—Le Touvet—Trept—Valencogne—Vasselin—Velanne—Vénérieu—Vernas—Vertrieu—Vézeronce-Curtin—Vignieu—Villemoirieu—Val-de-Virieu—Voiron—VoissantSAVOIE Department—Aiguebelette-le-Lac—Grand-Aigueblanche—Les Allues—Apremont—Arbin—Argentine—Arvillard—Attignat-Oncin—Les Avanchers-Valmorel—Avressieux—Ayn—Barberaz—Barby—Bassens—La Bauche—Belmont-Tramonet—Betton-Bettonet—Bourget-en-Huile—Bozel—Brides-les-Bains—La Bridoire—Challes-les-Eaux—Chambéry—La Chambre—Chamoux-sur-Gelon—Champagneux—Champagny-en-Vanoise—Champ-Laurent—La Chapelle—La Chapelle-Blanche—Châteauneuf—La Chavanne—Les Chavannes-en-Maurienne—Chignin—Cognin—Coise-Saint-Jean-Pied-Gauthier—Corbel—La Croix-de-la-Rochette—Cruet—Curienne—Détrier—Domessin—Dullin—Les Échelles—Entremont-le-Vieux—Épierre—Feissons-sur-Salins—Gerbaix—Hautecour—Hauteville—La Tour-en-Maurienne—Jacob-Bellecombette—Jarrier—Laissaud—Landry—Lépin-le-Lac—Porte-de-Savoie—Marcieux—Les Mollettes—Montagnole—Montagny—Montendry—Montgilbert—Montmélian—Montvalezan—Montvernier—Moûtiers—Myans—Nances—Notre-Dame-du-Cruet—Notre-Dame-du-Pré—Novalaise—Peisey-Nancroix—Planaise—Planay—Le Pont-de-Beauvoisin—Le Pontet—Pralognan-la-Vanoise—Presle—Puygros—La Ravoire—Rochefort—Valgelon-La Rochette—Rotherens—Saint-Alban-de-Montbel—Saint-Alban-d’Hurtières—Saint-Alban-des-Villards—Saint-Alban-Leysse—Saint-Avre—Saint-Baldoph—Saint-Béron—Courchevel—Saint-Cassin—Saint-Christophe—Saint-Colomban-des-Villards—Saint-Étienne-de-Cuines—Sainte-Foy-Tarentaise—Saint-Franc—Saint François Longchamp—Saint-Genix-les-Villages—Saint-Georges-d’Hurtières—Sainte-Hélène-du-Lac—Saint-Jean-d’Arvey—Saint-Jean-de-Couz—Saint-Jean-de-la-Porte—Saint-Jean-de-Maurienne—Saint-Jeoire-Prieuré—Saint-Julien-Mont-Denis—Saint-Léger—Saint-Marcel—Sainte-Marie-d’Alvey—Sainte-Marie-de-Cuines—Les Belleville—Saint-Martin-sur-la-Chambre—Saint-Pierre-d’Alvey—Saint-Pierre-de-Belleville—Saint-Pierre-d’Entremont—Saint-Pierre-de-Genebroz—Saint-Pierre-de-Soucy—Saint-Rémy-de-Maurienne—Saint-Sulpice—Saint-Thibaud-de-Couz—Salins-Fontaine—Séez—La Table—Thoiry—La Thuile—La Trinité—Verel-de-Montbel—Le Verneil—Villard-d’Héry—Villard-Léger—Villard-Sallet—Villaroger—Villaroux—Vimines—Val-d’Isère—TignesHAUTE-SAVOIE Department—Allonzier-la-Caille—Amancy—Ambilly—Andilly—Annemasse—Arâches-la-Frasse—Arbusigny—Archamps—Arenthon—Arthaz-Pont-Notre-Dame—Ayse—Beaumont—Bellevaux—Boëge—Bogève—Bonne—Bonneville—Bossey—Brizon—Cercier—Cernex—Challonges—Chamonix-Mont-Blanc—La Chapelle-Rambaud—Charvonnex—Châtillon-sur-Cluses—Chaumont—Chavannaz—Chêne-en-Semine—Chênex—Chessenaz—Chevrier—Clarafond-Arcine—Cluses—Collonges-sous-Salève—Contamine-Sarzin—Contamine-sur-Arve—Copponex—Cornier—La Côte-d’Arbroz—Cranves-Sales—Cruseilles—Dingy-en-Vuache—Éloise—Essert-Romand—Etaux—Étrembières—Faucigny—Feigères—Fillinges—Franclens—Frangy—Gaillard—Les Gets—Groisy—Habère-Lullin—Les Houches—Jonzier-Épagny—Juvigny—Lucinges—Magland—Marcellaz—Marignier—Marlioz—Marnaz—Mégevette—Menthonnex-en-Bornes—Mieussy—Minzier—Monnetier-Mornex—Montriond—Mont-Saxonnex—Morillon—Morzine—La Muraz—Musièges—Nancy-sur-Cluses—Nangy—Nâves-Parmelan—Neydens—Onnion—Passy—Peillonnex—Pers-Jussy—Glières-Val-de-Borne—Présilly—Reignier-Ésery—Le Reposoir—La Rivière-Enverse—La Roche-sur-Foron—Saint-André-de-Boëge—Saint-Blaise—Saint-Germain-sur-Rhône—Saint-Jean-d’Aulps—Saint-Jean-de-Tholome—Saint-Jeoire—Saint-Julien-en-Genevois—Saint-Laurent—Saint-Pierre-en-Faucigny—Saint-Sigismond—Saint-Sixt—Samoëns—Le Sappey—Savigny—Scientrier—Scionzier—Servoz—Seytroux—Sixt-Fer-à-Cheval—Taninges—Thyez—Fillière—La Tour—Usinens—Valleiry—Vallorcine—Vanzy—Verchaix—Vers—Vétraz-Monthoux—Villard—Villaz—Ville-en-Sallaz—Ville-la-Grand—Villy-le-Bouveret—Villy-le-Pelloux—Viry—Viuz-en-Sallaz—Vougy—Vovray-en-Bornes—Vulbens AIN Department—L’Abergement-de-Varey—Ambérieu-en-Bugey—Ambléon—Ambronay—Ambutrix—Apremont—Aranc—Arandas—Argis—Armix—Bellignat—Valserhône—Belleydoux—Bénonces—Bettant—Billiat—Blyes—Boyeux-Saint-Jérôme—Brégnier-Cordon—Brénod—Brion—Briord—La Burbanche—Ceignes—Cerdon—Chaley—Challes-la-Montagne—Challex—Champdor-Corcelles—Champfromier—Chanay—Charix—Château-Gaillard—Chazey-sur-Ain—Chevillard—Chevry—Chézery-Forens—Cleyzieu—Collonges—Colomieu—Conand—Condamine—Confort—Conzieu—Corlier—Crozet—Douvres—Échallon—Évosges—Farges—Ferney-Voltaire—Béard-Géovreissiat—Giron—Groissiat—Hautecourt-Romanèche—Plateau d’Hauteville—Haut Valromey—Injoux-Génissiat—Innimond—Izenave—Izernore—Izieu—Jujurieux—Labalme—Lagnieu—Le Poizat-Lalleyriat—Lantenay—Léaz—Lélex—Leyment—Leyssard—Surjoux-Lhopital—Lhuis—Lompnas—Loyettes—Maillat—Marchamp—Martignat—Mérignat—Montagnieu—Montanges—Montréal-la-Cluse—Nurieux-Volognat—Murs-et-Gélignieux—Nantua—Neuville-sur-Ain—Les Neyrolles—Nivollet-Montgriffon—Oncieu—Ordonnaz—Outriaz—Oyonnax—Péron—Peyriat—Plagne—Poncin—Pont-d’Ain—Port—Pougny—Prémeyzel—Prémillieu—Prévessin-Moëns—Priay—Rossillon—Saint-Alban—Groslée-Saint-Benoit—Saint-Denis-en-Bugey—Saint-Genis-Pouilly—Saint-Germain-de-Joux—Saint-Jean-de-Gonville—Saint-Jean-de-Niost—Saint-Jean-le-Vieux—Sainte-Julie—Saint-Martin-du-Frêne—Saint-Maurice-de-Rémens—Saint-Rambert-en-Bugey—Saint-Sorlin-en-Bugey—Saint-Vulbas—Sault-Brénaz—Seillonnaz—Sergy—Serrières-de-Briord—Serrières-sur-Ain—Souclin—Tenay—Thoiry—Torcieu—Vaux-en-Bugey—Vieu-d’Izenave—Villebois—Villes — L’Abergement-de-Varey — Ambérieu-en-Bugey — Ambléon — Ambronay — Ambutrix — Apremont — Aranc — Arandas — Argis — Armix — Bellignat — Valserhône — Belleydoux — Bénonces — Bettant — Billiat — Blyes — Boyeux-Saint-Jérôme — Brégnier-Cordon — Brénod — Brion — Briord — La Burbanche — Ceignes — Cerdon — Chaley — Challes-la-Montagne — Challex — Champdor-Corcelles — Champfromier — Chanay — Charix — Château-Gaillard — Chazey-sur-Ain — Chevillard — Chevry — Chézery-Forens — Cleyzieu — Collonges — Colomieu — Conand — Condamine — Confort — Conzieu — Corlier — Crozet — Douvres — Échallon — Évosges — Farges — Ferney-Voltaire — Béard-Géovreissiat — Giron — Groissiat — Hautecourt-Romanèche — Plateau d’Hauteville — Haut Valromey — Injoux-Génissiat — Innimond — Izenave — Izernore — Izieu — Jujurieux — Labalme — Lagnieu — Le Poizat-Lalleyriat — Lantenay — Léaz — Lélex — Leyment — Leyssard — Surjoux-Lhopital — Lhuis — Lompnas — Loyettes — Maillat — Marchamp — Martignat — Mérignat — Montagnieu — Montanges — Montréal-la-Cluse — Nurieux-Volognat — Murs-et-Gélignieux — Nantua — Neuville-sur-Ain — Les Neyrolles — Nivollet-Montgriffon — Oncieu — Ordonnaz — Outriaz — Oyonnax — Péron — Peyriat — Plagne — Poncin — Pont-d’Ain — Port — Pougny — Prémeyzel — Prémillieu — Prévessin-Moëns — Priay — Rossillon — Saint-Alban — Groslée-Saint-Benoit — Saint-Denis-en-Bugey — Saint-Genis-Pouilly — Saint-Germain-de-Joux — Saint-Jean-de-Gonville — Saint-Jean-de-Niost — Saint-Jean-le-Vieux — Sainte-Julie — Saint-Martin-du-Frêne — Saint-Maurice-de-Rémens — Saint-Rambert-en-Bugey — Saint-Sorlin-en-Bugey — Saint-Vulbas — Sault-Brénaz — Seillonnaz — Sergy — Serrières-de-Briord — Serrières-sur-Ain — Souclin — Tenay — Thoiry — Torcieu — Vaux-en-Bugey — Vieu-d’Izenave — Villebois — Villes ISERE Department—Les Abrets en Dauphiné—Allevard—Annoisin-Chatelans—Aoste—Les Avenières Veyrins-Thuellin—La Balme-les-Grottes—Barraux—La Bâtie-Montgascon—Bilieu—Blandin—Le Bouchage—Bourgoin-Jallieu—Bouvesse-Quirieu—Brangues—La Buissière—Cessieu—Chapareillan—La Chapelle-de-la-Tour—La Chapelle-du-Bard—Charancieu—Charavines—Charette—Chassignieu—Chélieu—Le Cheylas—Chimilin—Chirens—Corbelin—Courtenay—Crémieu—Creys-Mépieu—Dizimieu—Doissin—Dolomieu—Entre-deux-Guiers—Faverges-de-la-Tour—Le Haut-Bréda—La Flachère—Goncelin—Granieu—Hières-sur-Amby—Leyrieu—Massieu—Merlas—Miribel-les-Échelles—Montagnieu—Montalieu-Vercieu—Montcarra—Montferrat—Moras—Morestel—Le Moutaret—Optevoz—Oyeu—Villages du Lac de Paladru—Parmilieu—Le Passage—Arandon-Passins—Pontcharra—Le Pont-de-Beauvoisin—Porcieu-Amblagnieu—Pressins—Rochetoirin—Romagnieu—Ruy-Montceau—Saint-Albin-de-Vaulserre—Saint-André-le-Gaz—Saint-Aupre—Saint-Baudille-de-la-Tour—Sainte-Blandine—Saint-Bueil—Saint-Chef—Saint-Christophe-sur-Guiers—Saint-Clair-de-la-Tour—Saint-Didier-de-la-Tour—Saint-Étienne-de-Crossey—Saint-Geoire-en-Valdaine—Saint-Hilaire-de-Brens—Plateau-des-Petites-Roches—Saint-Jean-d’Avelanne—Saint-Jean-de-Soudain—Saint-Joseph-de-Rivière—Saint-Laurent-du-Pont—Sainte-Marie-d’Alloix—Sainte-Marie-du-Mont—Saint-Martin-de-Vaulserre—Saint-Maximin—Saint-Nicolas-de-Macherin—Saint-Ondras—Crêts en Belledonne—Saint-Pierre-de-Chartreuse—Saint-Pierre-d’Entremont—Saint-Savin—Saint-Sorlin-de-Morestel—Saint-Sulpice-des-Rivoires—Saint-Victor-de-Cessieu—Saint-Victor-de-Morestel—Saint-Vincent-de-Mercuze—Salagnon—Sérézin-de-la-Tour—Sermérieu—Siccieu-Saint-Julien-et-Carisieu—Soleymieu—Theys—Torchefelon—La Tour-du-Pin—Le Touvet—Trept—Valencogne—Vasselin—Velanne—Vénérieu—Vernas—Vertrieu—Vézeronce-Curtin—Vignieu—Villemoirieu—Val-de-Virieu—Voiron—Voissant — Les Abrets en Dauphiné — Allevard — Annoisin-Chatelans — Aoste — Les Avenières Veyrins-Thuellin — La Balme-les-Grottes — Barraux — La Bâtie-Montgascon — Bilieu — Blandin — Le Bouchage — Bourgoin-Jallieu — Bouvesse-Quirieu — Brangues — La Buissière — Cessieu — Chapareillan — La Chapelle-de-la-Tour — La Chapelle-du-Bard — Charancieu — Charavines — Charette — Chassignieu — Chélieu — Le Cheylas — Chimilin — Chirens — Corbelin — Courtenay — Crémieu — Creys-Mépieu — Dizimieu — Doissin — Dolomieu — Entre-deux-Guiers — Faverges-de-la-Tour — Le Haut-Bréda — La Flachère — Goncelin — Granieu — Hières-sur-Amby — Leyrieu — Massieu — Merlas — Miribel-les-Échelles — Montagnieu — Montalieu-Vercieu — Montcarra — Montferrat — Moras — Morestel — Le Moutaret — Optevoz — Oyeu — Villages du Lac de Paladru — Parmilieu — Le Passage — Arandon-Passins — Pontcharra — Le Pont-de-Beauvoisin — Porcieu-Amblagnieu — Pressins — Rochetoirin — Romagnieu — Ruy-Montceau — Saint-Albin-de-Vaulserre — Saint-André-le-Gaz — Saint-Aupre — Saint-Baudille-de-la-Tour — Sainte-Blandine — Saint-Bueil — Saint-Chef — Saint-Christophe-sur-Guiers — Saint-Clair-de-la-Tour — Saint-Didier-de-la-Tour — Saint-Étienne-de-Crossey — Saint-Geoire-en-Valdaine — Saint-Hilaire-de-Brens — Plateau-des-Petites-Roches — Saint-Jean-d’Avelanne — Saint-Jean-de-Soudain — Saint-Joseph-de-Rivière — Saint-Laurent-du-Pont — Sainte-Marie-d’Alloix — Sainte-Marie-du-Mont — Saint-Martin-de-Vaulserre — Saint-Maximin — Saint-Nicolas-de-Macherin — Saint-Ondras — Crêts en Belledonne — Saint-Pierre-de-Chartreuse — Saint-Pierre-d’Entremont — Saint-Savin — Saint-Sorlin-de-Morestel — Saint-Sulpice-des-Rivoires — Saint-Victor-de-Cessieu — Saint-Victor-de-Morestel — Saint-Vincent-de-Mercuze — Salagnon — Sérézin-de-la-Tour — Sermérieu — Siccieu-Saint-Julien-et-Carisieu — Soleymieu — Theys — Torchefelon — La Tour-du-Pin — Le Touvet — Trept — Valencogne — Vasselin — Velanne — Vénérieu — Vernas — Vertrieu — Vézeronce-Curtin — Vignieu — Villemoirieu — Val-de-Virieu — Voiron — Voissant SAVOIE Department—Aiguebelette-le-Lac—Grand-Aigueblanche—Les Allues—Apremont—Arbin—Argentine—Arvillard—Attignat-Oncin—Les Avanchers-Valmorel—Avressieux—Ayn—Barberaz—Barby—Bassens—La Bauche—Belmont-Tramonet—Betton-Bettonet—Bourget-en-Huile—Bozel—Brides-les-Bains—La Bridoire—Challes-les-Eaux—Chambéry—La Chambre—Chamoux-sur-Gelon—Champagneux—Champagny-en-Vanoise—Champ-Laurent—La Chapelle—La Chapelle-Blanche—Châteauneuf—La Chavanne—Les Chavannes-en-Maurienne—Chignin—Cognin—Coise-Saint-Jean-Pied-Gauthier—Corbel—La Croix-de-la-Rochette—Cruet—Curienne—Détrier—Domessin—Dullin—Les Échelles—Entremont-le-Vieux—Épierre—Feissons-sur-Salins—Gerbaix—Hautecour—Hauteville—La Tour-en-Maurienne—Jacob-Bellecombette—Jarrier—Laissaud—Landry—Lépin-le-Lac—Porte-de-Savoie—Marcieux—Les Mollettes—Montagnole—Montagny—Montendry—Montgilbert—Montmélian—Montvalezan—Montvernier—Moûtiers—Myans—Nances—Notre-Dame-du-Cruet—Notre-Dame-du-Pré—Novalaise—Peisey-Nancroix—Planaise—Planay—Le Pont-de-Beauvoisin—Le Pontet—Pralognan-la-Vanoise—Presle—Puygros—La Ravoire—Rochefort—Valgelon-La Rochette—Rotherens—Saint-Alban-de-Montbel—Saint-Alban-d’Hurtières—Saint-Alban-des-Villards—Saint-Alban-Leysse—Saint-Avre—Saint-Baldoph—Saint-Béron—Courchevel—Saint-Cassin—Saint-Christophe—Saint-Colomban-des-Villards—Saint-Étienne-de-Cuines—Sainte-Foy-Tarentaise—Saint-Franc—Saint François Longchamp—Saint-Genix-les-Villages—Saint-Georges-d’Hurtières—Sainte-Hélène-du-Lac—Saint-Jean-d’Arvey—Saint-Jean-de-Couz—Saint-Jean-de-la-Porte—Saint-Jean-de-Maurienne—Saint-Jeoire-Prieuré—Saint-Julien-Mont-Denis—Saint-Léger—Saint-Marcel—Sainte-Marie-d’Alvey—Sainte-Marie-de-Cuines—Les Belleville—Saint-Martin-sur-la-Chambre—Saint-Pierre-d’Alvey—Saint-Pierre-de-Belleville—Saint-Pierre-d’Entremont—Saint-Pierre-de-Genebroz—Saint-Pierre-de-Soucy—Saint-Rémy-de-Maurienne—Saint-Sulpice—Saint-Thibaud-de-Couz—Salins-Fontaine—Séez—La Table—Thoiry—La Thuile—La Trinité—Verel-de-Montbel—Le Verneil—Villard-d’Héry—Villard-Léger—Villard-Sallet—Villaroger—Villaroux—Vimines—Val-d’Isère—Tignes — Aiguebelette-le-Lac — Grand-Aigueblanche — Les Allues — Apremont — Arbin — Argentine — Arvillard — Attignat-Oncin — Les Avanchers-Valmorel — Avressieux — Ayn — Barberaz — Barby — Bassens — La Bauche — Belmont-Tramonet — Betton-Bettonet — Bourget-en-Huile — Bozel — Brides-les-Bains — La Bridoire — Challes-les-Eaux — Chambéry — La Chambre — Chamoux-sur-Gelon — Champagneux — Champagny-en-Vanoise — Champ-Laurent — La Chapelle — La Chapelle-Blanche — Châteauneuf — La Chavanne — Les Chavannes-en-Maurienne — Chignin — Cognin — Coise-Saint-Jean-Pied-Gauthier — Corbel — La Croix-de-la-Rochette — Cruet — Curienne — Détrier — Domessin — Dullin — Les Échelles — Entremont-le-Vieux — Épierre — Feissons-sur-Salins — Gerbaix — Hautecour — Hauteville — La Tour-en-Maurienne — Jacob-Bellecombette — Jarrier — Laissaud — Landry — Lépin-le-Lac — Porte-de-Savoie — Marcieux — Les Mollettes — Montagnole — Montagny — Montendry — Montgilbert — Montmélian — Montvalezan — Montvernier — Moûtiers — Myans — Nances — Notre-Dame-du-Cruet — Notre-Dame-du-Pré — Novalaise — Peisey-Nancroix — Planaise — Planay — Le Pont-de-Beauvoisin — Le Pontet — Pralognan-la-Vanoise — Presle — Puygros — La Ravoire — Rochefort — Valgelon-La Rochette — Rotherens — Saint-Alban-de-Montbel — Saint-Alban-d’Hurtières — Saint-Alban-des-Villards — Saint-Alban-Leysse — Saint-Avre — Saint-Baldoph — Saint-Béron — Courchevel — Saint-Cassin — Saint-Christophe — Saint-Colomban-des-Villards — Saint-Étienne-de-Cuines — Sainte-Foy-Tarentaise — Saint-Franc — Saint François Longchamp — Saint-Genix-les-Villages — Saint-Georges-d’Hurtières — Sainte-Hélène-du-Lac — Saint-Jean-d’Arvey — Saint-Jean-de-Couz — Saint-Jean-de-la-Porte — Saint-Jean-de-Maurienne — Saint-Jeoire-Prieuré — Saint-Julien-Mont-Denis — Saint-Léger — Saint-Marcel — Sainte-Marie-d’Alvey — Sainte-Marie-de-Cuines — Les Belleville — Saint-Martin-sur-la-Chambre — Saint-Pierre-d’Alvey — Saint-Pierre-de-Belleville — Saint-Pierre-d’Entremont — Saint-Pierre-de-Genebroz — Saint-Pierre-de-Soucy — Saint-Rémy-de-Maurienne — Saint-Sulpice — Saint-Thibaud-de-Couz — Salins-Fontaine — Séez — La Table — Thoiry — La Thuile — La Trinité — Verel-de-Montbel — Le Verneil — Villard-d’Héry — Villard-Léger — Villard-Sallet — Villaroger — Villaroux — Vimines — Val-d’Isère — Tignes HAUTE-SAVOIE Department—Allonzier-la-Caille—Amancy—Ambilly—Andilly—Annemasse—Arâches-la-Frasse—Arbusigny—Archamps—Arenthon—Arthaz-Pont-Notre-Dame—Ayse—Beaumont—Bellevaux—Boëge—Bogève—Bonne—Bonneville—Bossey—Brizon—Cercier—Cernex—Challonges—Chamonix-Mont-Blanc—La Chapelle-Rambaud—Charvonnex—Châtillon-sur-Cluses—Chaumont—Chavannaz—Chêne-en-Semine—Chênex—Chessenaz—Chevrier—Clarafond-Arcine—Cluses—Collonges-sous-Salève—Contamine-Sarzin—Contamine-sur-Arve—Copponex—Cornier—La Côte-d’Arbroz—Cranves-Sales—Cruseilles—Dingy-en-Vuache—Éloise—Essert-Romand—Etaux—Étrembières—Faucigny—Feigères—Fillinges—Franclens—Frangy—Gaillard—Les Gets—Groisy—Habère-Lullin—Les Houches—Jonzier-Épagny—Juvigny—Lucinges—Magland—Marcellaz—Marignier—Marlioz—Marnaz—Mégevette—Menthonnex-en-Bornes—Mieussy—Minzier—Monnetier-Mornex—Montriond—Mont-Saxonnex—Morillon—Morzine—La Muraz—Musièges—Nancy-sur-Cluses—Nangy—Nâves-Parmelan—Neydens—Onnion—Passy—Peillonnex—Pers-Jussy—Glières-Val-de-Borne—Présilly—Reignier-Ésery—Le Reposoir—La Rivière-Enverse—La Roche-sur-Foron—Saint-André-de-Boëge—Saint-Blaise—Saint-Germain-sur-Rhône—Saint-Jean-d’Aulps—Saint-Jean-de-Tholome—Saint-Jeoire—Saint-Julien-en-Genevois—Saint-Laurent—Saint-Pierre-en-Faucigny—Saint-Sigismond—Saint-Sixt—Samoëns—Le Sappey—Savigny—Scientrier—Scionzier—Servoz—Seytroux—Sixt-Fer-à-Cheval—Taninges—Thyez—Fillière—La Tour—Usinens—Valleiry—Vallorcine—Vanzy—Verchaix—Vers—Vétraz-Monthoux—Villard—Villaz—Ville-en-Sallaz—Ville-la-Grand—Villy-le-Bouveret—Villy-le-Pelloux—Viry—Viuz-en-Sallaz—Vougy—Vovray-en-Bornes—Vulbens — Allonzier-la-Caille — Amancy — Ambilly — Andilly — Annemasse — Arâches-la-Frasse — Arbusigny — Archamps — Arenthon — Arthaz-Pont-Notre-Dame — Ayse — Beaumont — Bellevaux — Boëge — Bogève — Bonne — Bonneville — Bossey — Brizon — Cercier — Cernex — Challonges — Chamonix-Mont-Blanc — La Chapelle-Rambaud — Charvonnex — Châtillon-sur-Cluses — Chaumont — Chavannaz — Chêne-en-Semine — Chênex — Chessenaz — Chevrier — Clarafond-Arcine — Cluses — Collonges-sous-Salève — Contamine-Sarzin — Contamine-sur-Arve — Copponex — Cornier — La Côte-d’Arbroz — Cranves-Sales — Cruseilles — Dingy-en-Vuache — Éloise — Essert-Romand — Etaux — Étrembières — Faucigny — Feigères — Fillinges — Franclens — Frangy — Gaillard — Les Gets — Groisy — Habère-Lullin — Les Houches — Jonzier-Épagny — Juvigny — Lucinges — Magland — Marcellaz — Marignier — Marlioz — Marnaz — Mégevette — Menthonnex-en-Bornes — Mieussy — Minzier — Monnetier-Mornex — Montriond — Mont-Saxonnex — Morillon — Morzine — La Muraz — Musièges — Nancy-sur-Cluses — Nangy — Nâves-Parmelan — Neydens — Onnion — Passy — Peillonnex — Pers-Jussy — Glières-Val-de-Borne — Présilly — Reignier-Ésery — Le Reposoir — La Rivière-Enverse — La Roche-sur-Foron — Saint-André-de-Boëge — Saint-Blaise — Saint-Germain-sur-Rhône — Saint-Jean-d’Aulps — Saint-Jean-de-Tholome — Saint-Jeoire — Saint-Julien-en-Genevois — Saint-Laurent — Saint-Pierre-en-Faucigny — Saint-Sigismond — Saint-Sixt — Samoëns — Le Sappey — Savigny — Scientrier — Scionzier — Servoz — Seytroux — Sixt-Fer-à-Cheval — Taninges — Thyez — Fillière — La Tour — Usinens — Valleiry — Vallorcine — Vanzy — Verchaix — Vers — Vétraz-Monthoux — Villard — Villaz — Ville-en-Sallaz — Ville-la-Grand — Villy-le-Bouveret — Villy-le-Pelloux — Viry — Viuz-en-Sallaz — Vougy — Vovray-en-Bornes — Vulbens 10.9.2025
AIN Department—L’Abergement-de-Varey—Ambérieu-en-Bugey—Ambléon—Ambronay—Ambutrix—Apremont—Aranc—Arandas—Argis—Armix—Bellignat—Valserhône—Belleydoux—Bénonces—Bettant—Billiat—Blyes—Boyeux-Saint-Jérôme—Brégnier-Cordon—Brénod—Brion—Briord—La Burbanche—Ceignes—Cerdon—Chaley—Challes-la-Montagne—Challex—Champdor-Corcelles—Champfromier—Chanay—Charix—Château-Gaillard—Chazey-sur-Ain—Chevillard—Chevry—Chézery-Forens—Cleyzieu—Collonges—Colomieu—Conand—Condamine—Confort—Conzieu—Corlier—Crozet—Douvres—Échallon—Évosges—Farges—Ferney-Voltaire—Béard-Géovreissiat—Giron—Groissiat—Hautecourt-Romanèche—Plateau d’Hauteville—Haut Valromey—Injoux-Génissiat—Innimond—Izenave—Izernore—Izieu—Jujurieux—Labalme—Lagnieu—Le Poizat-Lalleyriat—Lantenay—Léaz—Lélex—Leyment—Leyssard—Surjoux-Lhopital—Lhuis—Lompnas—Loyettes—Maillat—Marchamp—Martignat—Mérignat—Montagnieu—Montanges—Montréal-la-Cluse—Nurieux-Volognat—Murs-et-Gélignieux—Nantua—Neuville-sur-Ain—Les Neyrolles—Nivollet-Montgriffon—Oncieu—Ordonnaz—Outriaz—Oyonnax—Péron—Peyriat—Plagne—Poncin—Pont-d’Ain—Port—Pougny—Prémeyzel—Prémillieu—Prévessin-Moëns—Priay—Rossillon—Saint-Alban—Groslée-Saint-Benoit—Saint-Denis-en-Bugey—Saint-Genis-Pouilly—Saint-Germain-de-Joux—Saint-Jean-de-Gonville—Saint-Jean-de-Niost—Saint-Jean-le-Vieux—Sainte-Julie—Saint-Martin-du-Frêne—Saint-Maurice-de-Rémens—Saint-Rambert-en-Bugey—Saint-Sorlin-en-Bugey—Saint-Vulbas—Sault-Brénaz—Seillonnaz—Sergy—Serrières-de-Briord—Serrières-sur-Ain—Souclin—Tenay—Thoiry—Torcieu—Vaux-en-Bugey—Vieu-d’Izenave—Villebois—Villes — L’Abergement-de-Varey — Ambérieu-en-Bugey — Ambléon — Ambronay — Ambutrix — Apremont — Aranc — Arandas — Argis — Armix — Bellignat — Valserhône — Belleydoux — Bénonces — Bettant — Billiat — Blyes — Boyeux-Saint-Jérôme — Brégnier-Cordon — Brénod — Brion — Briord — La Burbanche — Ceignes — Cerdon — Chaley — Challes-la-Montagne — Challex — Champdor-Corcelles — Champfromier — Chanay — Charix — Château-Gaillard — Chazey-sur-Ain — Chevillard — Chevry — Chézery-Forens — Cleyzieu — Collonges — Colomieu — Conand — Condamine — Confort — Conzieu — Corlier — Crozet — Douvres — Échallon — Évosges — Farges — Ferney-Voltaire — Béard-Géovreissiat — Giron — Groissiat — Hautecourt-Romanèche — Plateau d’Hauteville — Haut Valromey — Injoux-Génissiat — Innimond — Izenave — Izernore — Izieu — Jujurieux — Labalme — Lagnieu — Le Poizat-Lalleyriat — Lantenay — Léaz — Lélex — Leyment — Leyssard — Surjoux-Lhopital — Lhuis — Lompnas — Loyettes — Maillat — Marchamp — Martignat — Mérignat — Montagnieu — Montanges — Montréal-la-Cluse — Nurieux-Volognat — Murs-et-Gélignieux — Nantua — Neuville-sur-Ain — Les Neyrolles — Nivollet-Montgriffon — Oncieu — Ordonnaz — Outriaz — Oyonnax — Péron — Peyriat — Plagne — Poncin — Pont-d’Ain — Port — Pougny — Prémeyzel — Prémillieu — Prévessin-Moëns — Priay — Rossillon — Saint-Alban — Groslée-Saint-Benoit — Saint-Denis-en-Bugey — Saint-Genis-Pouilly — Saint-Germain-de-Joux — Saint-Jean-de-Gonville — Saint-Jean-de-Niost — Saint-Jean-le-Vieux — Sainte-Julie — Saint-Martin-du-Frêne — Saint-Maurice-de-Rémens — Saint-Rambert-en-Bugey — Saint-Sorlin-en-Bugey — Saint-Vulbas — Sault-Brénaz — Seillonnaz — Sergy — Serrières-de-Briord — Serrières-sur-Ain — Souclin — Tenay — Thoiry — Torcieu — Vaux-en-Bugey — Vieu-d’Izenave — Villebois — Villes
— L’Abergement-de-Varey
— Ambérieu-en-Bugey
— Ambléon
— Ambronay
— Ambutrix
— Apremont
— Aranc
— Arandas
— Argis
— Armix
— Bellignat
— Valserhône
— Belleydoux
— Bénonces
— Bettant
— Billiat
— Blyes
— Boyeux-Saint-Jérôme
— Brégnier-Cordon
— Brénod
— Brion
— Briord
— La Burbanche
— Ceignes
— Cerdon
— Chaley
— Challes-la-Montagne
— Challex
— Champdor-Corcelles
— Champfromier
— Chanay
— Charix
— Château-Gaillard
— Chazey-sur-Ain
— Chevillard
— Chevry
— Chézery-Forens
— Cleyzieu
— Collonges
— Colomieu
— Conand
— Condamine
— Confort
— Conzieu
— Corlier
— Crozet
— Douvres
— Échallon
— Évosges
— Farges
— Ferney-Voltaire
— Béard-Géovreissiat
— Giron
— Groissiat
— Hautecourt-Romanèche
— Plateau d’Hauteville
— Haut Valromey
— Injoux-Génissiat
— Innimond
— Izenave
— Izernore
— Izieu
— Jujurieux
— Labalme
— Lagnieu
— Le Poizat-Lalleyriat
— Lantenay
— Léaz
— Lélex
— Leyment
— Leyssard
— Surjoux-Lhopital
— Lhuis
— Lompnas
— Loyettes
— Maillat
— Marchamp
— Martignat
— Mérignat
— Montagnieu
— Montanges
— Montréal-la-Cluse
— Nurieux-Volognat
— Murs-et-Gélignieux
— Nantua
— Neuville-sur-Ain
— Les Neyrolles
— Nivollet-Montgriffon
— Oncieu
— Ordonnaz
— Outriaz
— Oyonnax
— Péron
— Peyriat
— Plagne
— Poncin
— Pont-d’Ain
— Port
— Pougny
— Prémeyzel
— Prémillieu
— Prévessin-Moëns
— Priay
— Rossillon
— Saint-Alban
— Groslée-Saint-Benoit
— Saint-Denis-en-Bugey
— Saint-Genis-Pouilly
— Saint-Germain-de-Joux
— Saint-Jean-de-Gonville
— Saint-Jean-de-Niost
— Saint-Jean-le-Vieux
— Sainte-Julie
— Saint-Martin-du-Frêne
— Saint-Maurice-de-Rémens
— Saint-Rambert-en-Bugey
— Saint-Sorlin-en-Bugey
— Saint-Vulbas
— Sault-Brénaz
— Seillonnaz
— Sergy
— Serrières-de-Briord
— Serrières-sur-Ain
— Souclin
— Tenay
— Thoiry
— Torcieu
— Vaux-en-Bugey
— Vieu-d’Izenave
— Villebois
— Villes
ISERE Department—Les Abrets en Dauphiné—Allevard—Annoisin-Chatelans—Aoste—Les Avenières Veyrins-Thuellin—La Balme-les-Grottes—Barraux—La Bâtie-Montgascon—Bilieu—Blandin—Le Bouchage—Bourgoin-Jallieu—Bouvesse-Quirieu—Brangues—La Buissière—Cessieu—Chapareillan—La Chapelle-de-la-Tour—La Chapelle-du-Bard—Charancieu—Charavines—Charette—Chassignieu—Chélieu—Le Cheylas—Chimilin—Chirens—Corbelin—Courtenay—Crémieu—Creys-Mépieu—Dizimieu—Doissin—Dolomieu—Entre-deux-Guiers—Faverges-de-la-Tour—Le Haut-Bréda—La Flachère—Goncelin—Granieu—Hières-sur-Amby—Leyrieu—Massieu—Merlas—Miribel-les-Échelles—Montagnieu—Montalieu-Vercieu—Montcarra—Montferrat—Moras—Morestel—Le Moutaret—Optevoz—Oyeu—Villages du Lac de Paladru—Parmilieu—Le Passage—Arandon-Passins—Pontcharra—Le Pont-de-Beauvoisin—Porcieu-Amblagnieu—Pressins—Rochetoirin—Romagnieu—Ruy-Montceau—Saint-Albin-de-Vaulserre—Saint-André-le-Gaz—Saint-Aupre—Saint-Baudille-de-la-Tour—Sainte-Blandine—Saint-Bueil—Saint-Chef—Saint-Christophe-sur-Guiers—Saint-Clair-de-la-Tour—Saint-Didier-de-la-Tour—Saint-Étienne-de-Crossey—Saint-Geoire-en-Valdaine—Saint-Hilaire-de-Brens—Plateau-des-Petites-Roches—Saint-Jean-d’Avelanne—Saint-Jean-de-Soudain—Saint-Joseph-de-Rivière—Saint-Laurent-du-Pont—Sainte-Marie-d’Alloix—Sainte-Marie-du-Mont—Saint-Martin-de-Vaulserre—Saint-Maximin—Saint-Nicolas-de-Macherin—Saint-Ondras—Crêts en Belledonne—Saint-Pierre-de-Chartreuse—Saint-Pierre-d’Entremont—Saint-Savin—Saint-Sorlin-de-Morestel—Saint-Sulpice-des-Rivoires—Saint-Victor-de-Cessieu—Saint-Victor-de-Morestel—Saint-Vincent-de-Mercuze—Salagnon—Sérézin-de-la-Tour—Sermérieu—Siccieu-Saint-Julien-et-Carisieu—Soleymieu—Theys—Torchefelon—La Tour-du-Pin—Le Touvet—Trept—Valencogne—Vasselin—Velanne—Vénérieu—Vernas—Vertrieu—Vézeronce-Curtin—Vignieu—Villemoirieu—Val-de-Virieu—Voiron—Voissant — Les Abrets en Dauphiné — Allevard — Annoisin-Chatelans — Aoste — Les Avenières Veyrins-Thuellin — La Balme-les-Grottes — Barraux — La Bâtie-Montgascon — Bilieu — Blandin — Le Bouchage — Bourgoin-Jallieu — Bouvesse-Quirieu — Brangues — La Buissière — Cessieu — Chapareillan — La Chapelle-de-la-Tour — La Chapelle-du-Bard — Charancieu — Charavines — Charette — Chassignieu — Chélieu — Le Cheylas — Chimilin — Chirens — Corbelin — Courtenay — Crémieu — Creys-Mépieu — Dizimieu — Doissin — Dolomieu — Entre-deux-Guiers — Faverges-de-la-Tour — Le Haut-Bréda — La Flachère — Goncelin — Granieu — Hières-sur-Amby — Leyrieu — Massieu — Merlas — Miribel-les-Échelles — Montagnieu — Montalieu-Vercieu — Montcarra — Montferrat — Moras — Morestel — Le Moutaret — Optevoz — Oyeu — Villages du Lac de Paladru — Parmilieu — Le Passage — Arandon-Passins — Pontcharra — Le Pont-de-Beauvoisin — Porcieu-Amblagnieu — Pressins — Rochetoirin — Romagnieu — Ruy-Montceau — Saint-Albin-de-Vaulserre — Saint-André-le-Gaz — Saint-Aupre — Saint-Baudille-de-la-Tour — Sainte-Blandine — Saint-Bueil — Saint-Chef — Saint-Christophe-sur-Guiers — Saint-Clair-de-la-Tour — Saint-Didier-de-la-Tour — Saint-Étienne-de-Crossey — Saint-Geoire-en-Valdaine — Saint-Hilaire-de-Brens — Plateau-des-Petites-Roches — Saint-Jean-d’Avelanne — Saint-Jean-de-Soudain — Saint-Joseph-de-Rivière — Saint-Laurent-du-Pont — Sainte-Marie-d’Alloix — Sainte-Marie-du-Mont — Saint-Martin-de-Vaulserre — Saint-Maximin — Saint-Nicolas-de-Macherin — Saint-Ondras — Crêts en Belledonne — Saint-Pierre-de-Chartreuse — Saint-Pierre-d’Entremont — Saint-Savin — Saint-Sorlin-de-Morestel — Saint-Sulpice-des-Rivoires — Saint-Victor-de-Cessieu — Saint-Victor-de-Morestel — Saint-Vincent-de-Mercuze — Salagnon — Sérézin-de-la-Tour — Sermérieu — Siccieu-Saint-Julien-et-Carisieu — Soleymieu — Theys — Torchefelon — La Tour-du-Pin — Le Touvet — Trept — Valencogne — Vasselin — Velanne — Vénérieu — Vernas — Vertrieu — Vézeronce-Curtin — Vignieu — Villemoirieu — Val-de-Virieu — Voiron — Voissant
— Les Abrets en Dauphiné
— Allevard
— Annoisin-Chatelans
— Aoste
— Les Avenières Veyrins-Thuellin
— La Balme-les-Grottes
— Barraux
— La Bâtie-Montgascon
— Bilieu
— Blandin
— Le Bouchage
— Bourgoin-Jallieu
— Bouvesse-Quirieu
— Brangues
— La Buissière
— Cessieu
— Chapareillan
— La Chapelle-de-la-Tour
— La Chapelle-du-Bard
— Charancieu
— Charavines
— Charette
— Chassignieu
— Chélieu
— Le Cheylas
— Chimilin
— Chirens
— Corbelin
— Courtenay
— Crémieu
— Creys-Mépieu
— Dizimieu
— Doissin
— Dolomieu
— Entre-deux-Guiers
— Faverges-de-la-Tour
— Le Haut-Bréda
— La Flachère
— Goncelin
— Granieu
— Hières-sur-Amby
— Leyrieu
— Massieu
— Merlas
— Miribel-les-Échelles
— Montagnieu
— Montalieu-Vercieu
— Montcarra
— Montferrat
— Moras
— Morestel
— Le Moutaret
— Optevoz
— Oyeu
— Villages du Lac de Paladru
— Parmilieu
— Le Passage
— Arandon-Passins
— Pontcharra
— Le Pont-de-Beauvoisin
— Porcieu-Amblagnieu
— Pressins
— Rochetoirin
— Romagnieu
— Ruy-Montceau
— Saint-Albin-de-Vaulserre
— Saint-André-le-Gaz
— Saint-Aupre
— Saint-Baudille-de-la-Tour
— Sainte-Blandine
— Saint-Bueil
— Saint-Chef
— Saint-Christophe-sur-Guiers
— Saint-Clair-de-la-Tour
— Saint-Didier-de-la-Tour
— Saint-Étienne-de-Crossey
— Saint-Geoire-en-Valdaine
— Saint-Hilaire-de-Brens
— Plateau-des-Petites-Roches
— Saint-Jean-d’Avelanne
— Saint-Jean-de-Soudain
— Saint-Joseph-de-Rivière
— Saint-Laurent-du-Pont
— Sainte-Marie-d’Alloix
— Sainte-Marie-du-Mont
— Saint-Martin-de-Vaulserre
— Saint-Maximin
— Saint-Nicolas-de-Macherin
— Saint-Ondras
— Crêts en Belledonne
— Saint-Pierre-de-Chartreuse
— Saint-Pierre-d’Entremont
— Saint-Savin
— Saint-Sorlin-de-Morestel
— Saint-Sulpice-des-Rivoires
— Saint-Victor-de-Cessieu
— Saint-Victor-de-Morestel
— Saint-Vincent-de-Mercuze
— Salagnon
— Sérézin-de-la-Tour
— Sermérieu
— Siccieu-Saint-Julien-et-Carisieu
— Soleymieu
— Theys
— Torchefelon
— La Tour-du-Pin
— Le Touvet
— Trept
— Valencogne
— Vasselin
— Velanne
— Vénérieu
— Vernas
— Vertrieu
— Vézeronce-Curtin
— Vignieu
— Villemoirieu
— Val-de-Virieu
— Voiron
— Voissant
SAVOIE Department—Aiguebelette-le-Lac—Grand-Aigueblanche—Les Allues—Apremont—Arbin—Argentine—Arvillard—Attignat-Oncin—Les Avanchers-Valmorel—Avressieux—Ayn—Barberaz—Barby—Bassens—La Bauche—Belmont-Tramonet—Betton-Bettonet—Bourget-en-Huile—Bozel—Brides-les-Bains—La Bridoire—Challes-les-Eaux—Chambéry—La Chambre—Chamoux-sur-Gelon—Champagneux—Champagny-en-Vanoise—Champ-Laurent—La Chapelle—La Chapelle-Blanche—Châteauneuf—La Chavanne—Les Chavannes-en-Maurienne—Chignin—Cognin—Coise-Saint-Jean-Pied-Gauthier—Corbel—La Croix-de-la-Rochette—Cruet—Curienne—Détrier—Domessin—Dullin—Les Échelles—Entremont-le-Vieux—Épierre—Feissons-sur-Salins—Gerbaix—Hautecour—Hauteville—La Tour-en-Maurienne—Jacob-Bellecombette—Jarrier—Laissaud—Landry—Lépin-le-Lac—Porte-de-Savoie—Marcieux—Les Mollettes—Montagnole—Montagny—Montendry—Montgilbert—Montmélian—Montvalezan—Montvernier—Moûtiers—Myans—Nances—Notre-Dame-du-Cruet—Notre-Dame-du-Pré—Novalaise—Peisey-Nancroix—Planaise—Planay—Le Pont-de-Beauvoisin—Le Pontet—Pralognan-la-Vanoise—Presle—Puygros—La Ravoire—Rochefort—Valgelon-La Rochette—Rotherens—Saint-Alban-de-Montbel—Saint-Alban-d’Hurtières—Saint-Alban-des-Villards—Saint-Alban-Leysse—Saint-Avre—Saint-Baldoph—Saint-Béron—Courchevel—Saint-Cassin—Saint-Christophe—Saint-Colomban-des-Villards—Saint-Étienne-de-Cuines—Sainte-Foy-Tarentaise—Saint-Franc—Saint François Longchamp—Saint-Genix-les-Villages—Saint-Georges-d’Hurtières—Sainte-Hélène-du-Lac—Saint-Jean-d’Arvey—Saint-Jean-de-Couz—Saint-Jean-de-la-Porte—Saint-Jean-de-Maurienne—Saint-Jeoire-Prieuré—Saint-Julien-Mont-Denis—Saint-Léger—Saint-Marcel—Sainte-Marie-d’Alvey—Sainte-Marie-de-Cuines—Les Belleville—Saint-Martin-sur-la-Chambre—Saint-Pierre-d’Alvey—Saint-Pierre-de-Belleville—Saint-Pierre-d’Entremont—Saint-Pierre-de-Genebroz—Saint-Pierre-de-Soucy—Saint-Rémy-de-Maurienne—Saint-Sulpice—Saint-Thibaud-de-Couz—Salins-Fontaine—Séez—La Table—Thoiry—La Thuile—La Trinité—Verel-de-Montbel—Le Verneil—Villard-d’Héry—Villard-Léger—Villard-Sallet—Villaroger—Villaroux—Vimines—Val-d’Isère—Tignes — Aiguebelette-le-Lac — Grand-Aigueblanche — Les Allues — Apremont — Arbin — Argentine — Arvillard — Attignat-Oncin — Les Avanchers-Valmorel — Avressieux — Ayn — Barberaz — Barby — Bassens — La Bauche — Belmont-Tramonet — Betton-Bettonet — Bourget-en-Huile — Bozel — Brides-les-Bains — La Bridoire — Challes-les-Eaux — Chambéry — La Chambre — Chamoux-sur-Gelon — Champagneux — Champagny-en-Vanoise — Champ-Laurent — La Chapelle — La Chapelle-Blanche — Châteauneuf — La Chavanne — Les Chavannes-en-Maurienne — Chignin — Cognin — Coise-Saint-Jean-Pied-Gauthier — Corbel — La Croix-de-la-Rochette — Cruet — Curienne — Détrier — Domessin — Dullin — Les Échelles — Entremont-le-Vieux — Épierre — Feissons-sur-Salins — Gerbaix — Hautecour — Hauteville — La Tour-en-Maurienne — Jacob-Bellecombette — Jarrier — Laissaud — Landry — Lépin-le-Lac — Porte-de-Savoie — Marcieux — Les Mollettes — Montagnole — Montagny — Montendry — Montgilbert — Montmélian — Montvalezan — Montvernier — Moûtiers — Myans — Nances — Notre-Dame-du-Cruet — Notre-Dame-du-Pré — Novalaise — Peisey-Nancroix — Planaise — Planay — Le Pont-de-Beauvoisin — Le Pontet — Pralognan-la-Vanoise — Presle — Puygros — La Ravoire — Rochefort — Valgelon-La Rochette — Rotherens — Saint-Alban-de-Montbel — Saint-Alban-d’Hurtières — Saint-Alban-des-Villards — Saint-Alban-Leysse — Saint-Avre — Saint-Baldoph — Saint-Béron — Courchevel — Saint-Cassin — Saint-Christophe — Saint-Colomban-des-Villards — Saint-Étienne-de-Cuines — Sainte-Foy-Tarentaise — Saint-Franc — Saint François Longchamp — Saint-Genix-les-Villages — Saint-Georges-d’Hurtières — Sainte-Hélène-du-Lac — Saint-Jean-d’Arvey — Saint-Jean-de-Couz — Saint-Jean-de-la-Porte — Saint-Jean-de-Maurienne — Saint-Jeoire-Prieuré — Saint-Julien-Mont-Denis — Saint-Léger — Saint-Marcel — Sainte-Marie-d’Alvey — Sainte-Marie-de-Cuines — Les Belleville — Saint-Martin-sur-la-Chambre — Saint-Pierre-d’Alvey — Saint-Pierre-de-Belleville — Saint-Pierre-d’Entremont — Saint-Pierre-de-Genebroz — Saint-Pierre-de-Soucy — Saint-Rémy-de-Maurienne — Saint-Sulpice — Saint-Thibaud-de-Couz — Salins-Fontaine — Séez — La Table — Thoiry — La Thuile — La Trinité — Verel-de-Montbel — Le Verneil — Villard-d’Héry — Villard-Léger — Villard-Sallet — Villaroger — Villaroux — Vimines — Val-d’Isère — Tignes
— Aiguebelette-le-Lac
— Grand-Aigueblanche
— Les Allues
— Apremont
— Arbin
— Argentine
— Arvillard
— Attignat-Oncin
— Les Avanchers-Valmorel
— Avressieux
— Ayn
— Barberaz
— Barby
— Bassens
— La Bauche
— Belmont-Tramonet
— Betton-Bettonet
— Bourget-en-Huile
— Bozel
— Brides-les-Bains
— La Bridoire
— Challes-les-Eaux
— Chambéry
— La Chambre
— Chamoux-sur-Gelon
— Champagneux
— Champagny-en-Vanoise
— Champ-Laurent
— La Chapelle
— La Chapelle-Blanche
— Châteauneuf
— La Chavanne
— Les Chavannes-en-Maurienne
— Chignin
— Cognin
— Coise-Saint-Jean-Pied-Gauthier
— Corbel
— La Croix-de-la-Rochette
— Cruet
— Curienne
— Détrier
— Domessin
— Dullin
— Les Échelles
— Entremont-le-Vieux
— Épierre
— Feissons-sur-Salins
— Gerbaix
— Hautecour
— Hauteville
— La Tour-en-Maurienne
— Jacob-Bellecombette
— Jarrier
— Laissaud
— Landry
— Lépin-le-Lac
— Porte-de-Savoie
— Marcieux
— Les Mollettes
— Montagnole
— Montagny
— Montendry
— Montgilbert
— Montmélian
— Montvalezan
— Montvernier
— Moûtiers
— Myans
— Nances
— Notre-Dame-du-Cruet
— Notre-Dame-du-Pré
— Novalaise
— Peisey-Nancroix
— Planaise
— Planay
— Le Pont-de-Beauvoisin
— Le Pontet
— Pralognan-la-Vanoise
— Presle
— Puygros
— La Ravoire
— Rochefort
— Valgelon-La Rochette
— Rotherens
— Saint-Alban-de-Montbel
— Saint-Alban-d’Hurtières
— Saint-Alban-des-Villards
— Saint-Alban-Leysse
— Saint-Avre
— Saint-Baldoph
— Saint-Béron
— Courchevel
— Saint-Cassin
— Saint-Christophe
— Saint-Colomban-des-Villards
— Saint-Étienne-de-Cuines
— Sainte-Foy-Tarentaise
— Saint-Franc
— Saint François Longchamp
— Saint-Genix-les-Villages
— Saint-Georges-d’Hurtières
— Sainte-Hélène-du-Lac
— Saint-Jean-d’Arvey
— Saint-Jean-de-Couz
— Saint-Jean-de-la-Porte
— Saint-Jean-de-Maurienne
— Saint-Jeoire-Prieuré
— Saint-Julien-Mont-Denis
— Saint-Léger
— Saint-Marcel
— Sainte-Marie-d’Alvey
— Sainte-Marie-de-Cuines
— Les Belleville
— Saint-Martin-sur-la-Chambre
— Saint-Pierre-d’Alvey
— Saint-Pierre-de-Belleville
— Saint-Pierre-d’Entremont
— Saint-Pierre-de-Genebroz
— Saint-Pierre-de-Soucy
— Saint-Rémy-de-Maurienne
— Saint-Sulpice
— Saint-Thibaud-de-Couz
— Salins-Fontaine
— Séez
— La Table
— Thoiry
— La Thuile
— La Trinité
— Verel-de-Montbel
— Le Verneil
— Villard-d’Héry
— Villard-Léger
— Villard-Sallet
— Villaroger
— Villaroux
— Vimines
— Val-d’Isère
— Tignes
HAUTE-SAVOIE Department—Allonzier-la-Caille—Amancy—Ambilly—Andilly—Annemasse—Arâches-la-Frasse—Arbusigny—Archamps—Arenthon—Arthaz-Pont-Notre-Dame—Ayse—Beaumont—Bellevaux—Boëge—Bogève—Bonne—Bonneville—Bossey—Brizon—Cercier—Cernex—Challonges—Chamonix-Mont-Blanc—La Chapelle-Rambaud—Charvonnex—Châtillon-sur-Cluses—Chaumont—Chavannaz—Chêne-en-Semine—Chênex—Chessenaz—Chevrier—Clarafond-Arcine—Cluses—Collonges-sous-Salève—Contamine-Sarzin—Contamine-sur-Arve—Copponex—Cornier—La Côte-d’Arbroz—Cranves-Sales—Cruseilles—Dingy-en-Vuache—Éloise—Essert-Romand—Etaux—Étrembières—Faucigny—Feigères—Fillinges—Franclens—Frangy—Gaillard—Les Gets—Groisy—Habère-Lullin—Les Houches—Jonzier-Épagny—Juvigny—Lucinges—Magland—Marcellaz—Marignier—Marlioz—Marnaz—Mégevette—Menthonnex-en-Bornes—Mieussy—Minzier—Monnetier-Mornex—Montriond—Mont-Saxonnex—Morillon—Morzine—La Muraz—Musièges—Nancy-sur-Cluses—Nangy—Nâves-Parmelan—Neydens—Onnion—Passy—Peillonnex—Pers-Jussy—Glières-Val-de-Borne—Présilly—Reignier-Ésery—Le Reposoir—La Rivière-Enverse—La Roche-sur-Foron—Saint-André-de-Boëge—Saint-Blaise—Saint-Germain-sur-Rhône—Saint-Jean-d’Aulps—Saint-Jean-de-Tholome—Saint-Jeoire—Saint-Julien-en-Genevois—Saint-Laurent—Saint-Pierre-en-Faucigny—Saint-Sigismond—Saint-Sixt—Samoëns—Le Sappey—Savigny—Scientrier—Scionzier—Servoz—Seytroux—Sixt-Fer-à-Cheval—Taninges—Thyez—Fillière—La Tour—Usinens—Valleiry—Vallorcine—Vanzy—Verchaix—Vers—Vétraz-Monthoux—Villard—Villaz—Ville-en-Sallaz—Ville-la-Grand—Villy-le-Bouveret—Villy-le-Pelloux—Viry—Viuz-en-Sallaz—Vougy—Vovray-en-Bornes—Vulbens — Allonzier-la-Caille — Amancy — Ambilly — Andilly — Annemasse — Arâches-la-Frasse — Arbusigny — Archamps — Arenthon — Arthaz-Pont-Notre-Dame — Ayse — Beaumont — Bellevaux — Boëge — Bogève — Bonne — Bonneville — Bossey — Brizon — Cercier — Cernex — Challonges — Chamonix-Mont-Blanc — La Chapelle-Rambaud — Charvonnex — Châtillon-sur-Cluses — Chaumont — Chavannaz — Chêne-en-Semine — Chênex — Chessenaz — Chevrier — Clarafond-Arcine — Cluses — Collonges-sous-Salève — Contamine-Sarzin — Contamine-sur-Arve — Copponex — Cornier — La Côte-d’Arbroz — Cranves-Sales — Cruseilles — Dingy-en-Vuache — Éloise — Essert-Romand — Etaux — Étrembières — Faucigny — Feigères — Fillinges — Franclens — Frangy — Gaillard — Les Gets — Groisy — Habère-Lullin — Les Houches — Jonzier-Épagny — Juvigny — Lucinges — Magland — Marcellaz — Marignier — Marlioz — Marnaz — Mégevette — Menthonnex-en-Bornes — Mieussy — Minzier — Monnetier-Mornex — Montriond — Mont-Saxonnex — Morillon — Morzine — La Muraz — Musièges — Nancy-sur-Cluses — Nangy — Nâves-Parmelan — Neydens — Onnion — Passy — Peillonnex — Pers-Jussy — Glières-Val-de-Borne — Présilly — Reignier-Ésery — Le Reposoir — La Rivière-Enverse — La Roche-sur-Foron — Saint-André-de-Boëge — Saint-Blaise — Saint-Germain-sur-Rhône — Saint-Jean-d’Aulps — Saint-Jean-de-Tholome — Saint-Jeoire — Saint-Julien-en-Genevois — Saint-Laurent — Saint-Pierre-en-Faucigny — Saint-Sigismond — Saint-Sixt — Samoëns — Le Sappey — Savigny — Scientrier — Scionzier — Servoz — Seytroux — Sixt-Fer-à-Cheval — Taninges — Thyez — Fillière — La Tour — Usinens — Valleiry — Vallorcine — Vanzy — Verchaix — Vers — Vétraz-Monthoux — Villard — Villaz — Ville-en-Sallaz — Ville-la-Grand — Villy-le-Bouveret — Villy-le-Pelloux — Viry — Viuz-en-Sallaz — Vougy — Vovray-en-Bornes — Vulbens
— Allonzier-la-Caille
— Amancy
— Ambilly
— Andilly
— Annemasse
— Arâches-la-Frasse
— Arbusigny
— Archamps
— Arenthon
— Arthaz-Pont-Notre-Dame
— Ayse
— Beaumont
— Bellevaux
— Boëge
— Bogève
— Bonne
— Bonneville
— Bossey
— Brizon
— Cercier
— Cernex
— Challonges
— Chamonix-Mont-Blanc
— La Chapelle-Rambaud
— Charvonnex
— Châtillon-sur-Cluses
— Chaumont
— Chavannaz
— Chêne-en-Semine
— Chênex
— Chessenaz
— Chevrier
— Clarafond-Arcine
— Cluses
— Collonges-sous-Salève
— Contamine-Sarzin
— Contamine-sur-Arve
— Copponex
— Cornier
— La Côte-d’Arbroz
— Cranves-Sales
— Cruseilles
— Dingy-en-Vuache
— Éloise
— Essert-Romand
— Etaux
— Étrembières
— Faucigny
— Feigères
— Fillinges
— Franclens
— Frangy
— Gaillard
— Les Gets
— Groisy
— Habère-Lullin
— Les Houches
— Jonzier-Épagny
— Juvigny
— Lucinges
— Magland
— Marcellaz
— Marignier
— Marlioz
— Marnaz
— Mégevette
— Menthonnex-en-Bornes
— Mieussy
— Minzier
— Monnetier-Mornex
— Montriond
— Mont-Saxonnex
— Morillon
— Morzine
— La Muraz
— Musièges
— Nancy-sur-Cluses
— Nangy
— Nâves-Parmelan
— Neydens
— Onnion
— Passy
— Peillonnex
— Pers-Jussy
— Glières-Val-de-Borne
— Présilly
— Reignier-Ésery
— Le Reposoir
— La Rivière-Enverse
— La Roche-sur-Foron
— Saint-André-de-Boëge
— Saint-Blaise
— Saint-Germain-sur-Rhône
— Saint-Jean-d’Aulps
— Saint-Jean-de-Tholome
— Saint-Jeoire
— Saint-Julien-en-Genevois
— Saint-Laurent
— Saint-Pierre-en-Faucigny
— Saint-Sigismond
— Saint-Sixt
— Samoëns
— Le Sappey
— Savigny
— Scientrier
— Scionzier
— Servoz
— Seytroux
— Sixt-Fer-à-Cheval
— Taninges
— Thyez
— Fillière
— La Tour
— Usinens
— Valleiry
— Vallorcine
— Vanzy
— Verchaix
— Vers
— Vétraz-Monthoux
— Villard
— Villaz
— Ville-en-Sallaz
— Ville-la-Grand
— Villy-le-Bouveret
— Villy-le-Pelloux
— Viry
— Viuz-en-Sallaz
— Vougy
— Vovray-en-Bornes
— Vulbens
AIN Department—Andert-et-Condon—Anglefort—Arboys en Bugey—Artemare—Belley—Valromey-sur-Séran—Brens—Ceyzérieu—Champagne-en-Valromey—Chazey-Bons—Cheignieu-la-Balme—Contrevoz—Corbonod—Cressin-Rochefort—Culoz-Béon—Cuzieu—Flaxieu—Lavours—Magnieu—Marignieu—Massignieu-de-Rives—Parves et Nattages—Peyrieu—Pollieu—Saint-Germain-les-Paroisses—Saint-Martin-de-Bavel—Seyssel—Talissieu—Virieu-le-Grand—Arvière-en-Valromey—Virignin—Vongnes — Andert-et-Condon — Anglefort — Arboys en Bugey — Artemare — Belley — Valromey-sur-Séran — Brens — Ceyzérieu — Champagne-en-Valromey — Chazey-Bons — Cheignieu-la-Balme — Contrevoz — Corbonod — Cressin-Rochefort — Culoz-Béon — Cuzieu — Flaxieu — Lavours — Magnieu — Marignieu — Massignieu-de-Rives — Parves et Nattages — Peyrieu — Pollieu — Saint-Germain-les-Paroisses — Saint-Martin-de-Bavel — Seyssel — Talissieu — Virieu-le-Grand — Arvière-en-Valromey — Virignin — Vongnes
— Andert-et-Condon
— Anglefort
— Arboys en Bugey
— Artemare
— Belley
— Valromey-sur-Séran
— Brens
— Ceyzérieu
— Champagne-en-Valromey
— Chazey-Bons
— Cheignieu-la-Balme
— Contrevoz
— Corbonod
— Cressin-Rochefort
— Culoz-Béon
— Cuzieu
— Flaxieu
— Lavours
— Magnieu
— Marignieu
— Massignieu-de-Rives
— Parves et Nattages
— Peyrieu
— Pollieu
— Saint-Germain-les-Paroisses
— Saint-Martin-de-Bavel
— Seyssel
— Talissieu
— Virieu-le-Grand
— Arvière-en-Valromey
— Virignin
— Vongnes
— Andert-et-Condon
— Anglefort
— Arboys en Bugey
— Artemare
— Belley
— Valromey-sur-Séran
— Brens
— Ceyzérieu
— Champagne-en-Valromey
— Chazey-Bons
— Cheignieu-la-Balme
— Contrevoz
— Corbonod
— Cressin-Rochefort
— Culoz-Béon
— Cuzieu
— Flaxieu
— Lavours
— Magnieu
— Marignieu
— Massignieu-de-Rives
— Parves et Nattages
— Peyrieu
— Pollieu
— Saint-Germain-les-Paroisses
— Saint-Martin-de-Bavel
— Seyssel
— Talissieu
— Virieu-le-Grand
— Arvière-en-Valromey
— Virignin
— Vongnes
SAVOIE Department—Aillon-le-Jeune—Aillon-le-Vieux—Aime-la-Plagne—Aiton—Aix-les-Bains—Entrelacs—Albertville—Allondaz—Arith—La Balme—La Bâthie—Beaufort—Bellecombe-en-Bauges—Billième—La Biolle—Bonvillard—Bonvillaret—Bourdeau—Le Bourget-du-Lac—Bourgneuf—Bourg-Saint-Maurice—Brison-Saint-Innocent—Césarches—Cevins—Chamousset—Chanaz—La Chapelle-du-Mont-du-Chat—Les Chapelles—La Chapelle-Saint-Martin—Le Châtelard—Chindrieux—Cléry—Cohennoz—La Compôte—Conjux—Crest-Voland—Les Déserts—Doucy-en-Bauges—Drumettaz-Clarafond—École—Esserts-Blay—Flumet—Fréterive—Frontenex—La Giettaz—Gilly-sur-Isère—Grésy-sur-Aix—Grésy-sur-Isère—Grignon—Hauteluce—Jarsy—Jongieux—Lescheraines—Loisieux—Lucey—La Plagne Tarentaise—Marthod—Mercury—Méry—Meyrieux-Trouet—Montailleur—Montcel—Monthion—Montsapey—La Motte-en-Bauges—La Motte-Servolex—Motz—Mouxy—Notre-Dame-de-Bellecombe—La Léchère—Notre-Dame-des-Millières—Le Noyer—Ontex—Pallud—Plancherine—Pugny-Chatenod—Queige—Val-d’Arc—Rognaix—Ruffieux—Saint-François-de-Sales—Sainte-Hélène-sur-Isère—Saint-Jean-de-Chevelu—Saint-Nicolas-la-Chapelle—Saint-Offenge—Saint-Ours—Saint-Paul-sur-Isère—Saint-Paul-sur-Yenne—Saint-Pierre-d’Albigny—Saint-Pierre-de-Curtille—Sainte-Reine—Saint-Vital—Serrières-en-Chautagne—Sonnaz—Thénésol—Tournon—Tours-en-Savoie—Traize—Tresserve—Trévignin—Ugine—Venthon—Verel-Pragondran—Verrens-Arvey—Verthemex—Villard-sur-Doron—Vions—Viviers-du-Lac—Voglans—Yenne — Aillon-le-Jeune — Aillon-le-Vieux — Aime-la-Plagne — Aiton — Aix-les-Bains — Entrelacs — Albertville — Allondaz — Arith — La Balme — La Bâthie — Beaufort — Bellecombe-en-Bauges — Billième — La Biolle — Bonvillard — Bonvillaret — Bourdeau — Le Bourget-du-Lac — Bourgneuf — Bourg-Saint-Maurice — Brison-Saint-Innocent — Césarches — Cevins — Chamousset — Chanaz — La Chapelle-du-Mont-du-Chat — Les Chapelles — La Chapelle-Saint-Martin — Le Châtelard — Chindrieux — Cléry — Cohennoz — La Compôte — Conjux — Crest-Voland — Les Déserts — Doucy-en-Bauges — Drumettaz-Clarafond — École — Esserts-Blay — Flumet — Fréterive — Frontenex — La Giettaz — Gilly-sur-Isère — Grésy-sur-Aix — Grésy-sur-Isère — Grignon — Hauteluce — Jarsy — Jongieux — Lescheraines — Loisieux — Lucey — La Plagne Tarentaise — Marthod — Mercury — Méry — Meyrieux-Trouet — Montailleur — Montcel — Monthion — Montsapey — La Motte-en-Bauges — La Motte-Servolex — Motz — Mouxy — Notre-Dame-de-Bellecombe — La Léchère — Notre-Dame-des-Millières — Le Noyer — Ontex — Pallud — Plancherine — Pugny-Chatenod — Queige — Val-d’Arc — Rognaix — Ruffieux — Saint-François-de-Sales — Sainte-Hélène-sur-Isère — Saint-Jean-de-Chevelu — Saint-Nicolas-la-Chapelle — Saint-Offenge — Saint-Ours — Saint-Paul-sur-Isère — Saint-Paul-sur-Yenne — Saint-Pierre-d’Albigny — Saint-Pierre-de-Curtille — Sainte-Reine — Saint-Vital — Serrières-en-Chautagne — Sonnaz — Thénésol — Tournon — Tours-en-Savoie — Traize — Tresserve — Trévignin — Ugine — Venthon — Verel-Pragondran — Verrens-Arvey — Verthemex — Villard-sur-Doron — Vions — Viviers-du-Lac — Voglans — Yenne
— Aillon-le-Jeune
— Aillon-le-Vieux
— Aime-la-Plagne
— Aiton
— Aix-les-Bains
— Entrelacs
— Albertville
— Allondaz
— Arith
— La Balme
— La Bâthie
— Beaufort
— Bellecombe-en-Bauges
— Billième
— La Biolle
— Bonvillard
— Bonvillaret
— Bourdeau
— Le Bourget-du-Lac
— Bourgneuf
— Bourg-Saint-Maurice
— Brison-Saint-Innocent
— Césarches
— Cevins
— Chamousset
— Chanaz
— La Chapelle-du-Mont-du-Chat
— Les Chapelles
— La Chapelle-Saint-Martin
— Le Châtelard
— Chindrieux
— Cléry
— Cohennoz
— La Compôte
— Conjux
— Crest-Voland
— Les Déserts
— Doucy-en-Bauges
— Drumettaz-Clarafond
— École
— Esserts-Blay
— Flumet
— Fréterive
— Frontenex
— La Giettaz
— Gilly-sur-Isère
— Grésy-sur-Aix
— Grésy-sur-Isère
— Grignon
— Hauteluce
— Jarsy
— Jongieux
— Lescheraines
— Loisieux
— Lucey
— La Plagne Tarentaise
— Marthod
— Mercury
— Méry
— Meyrieux-Trouet
— Montailleur
— Montcel
— Monthion
— Montsapey
— La Motte-en-Bauges
— La Motte-Servolex
— Motz
— Mouxy
— Notre-Dame-de-Bellecombe
— La Léchère
— Notre-Dame-des-Millières
— Le Noyer
— Ontex
— Pallud
— Plancherine
— Pugny-Chatenod
— Queige
— Val-d’Arc
— Rognaix
— Ruffieux
— Saint-François-de-Sales
— Sainte-Hélène-sur-Isère
— Saint-Jean-de-Chevelu
— Saint-Nicolas-la-Chapelle
— Saint-Offenge
— Saint-Ours
— Saint-Paul-sur-Isère
— Saint-Paul-sur-Yenne
— Saint-Pierre-d’Albigny
— Saint-Pierre-de-Curtille
— Sainte-Reine
— Saint-Vital
— Serrières-en-Chautagne
— Sonnaz
— Thénésol
— Tournon
— Tours-en-Savoie
— Traize
— Tresserve
— Trévignin
— Ugine
— Venthon
— Verel-Pragondran
— Verrens-Arvey
— Verthemex
— Villard-sur-Doron
— Vions
— Viviers-du-Lac
— Voglans
— Yenne
— Aillon-le-Jeune
— Aillon-le-Vieux
— Aime-la-Plagne
— Aiton
— Aix-les-Bains
— Entrelacs
— Albertville
— Allondaz
— Arith
— La Balme
— La Bâthie
— Beaufort
— Bellecombe-en-Bauges
— Billième
— La Biolle
— Bonvillard
— Bonvillaret
— Bourdeau
— Le Bourget-du-Lac
— Bourgneuf
— Bourg-Saint-Maurice
— Brison-Saint-Innocent
— Césarches
— Cevins
— Chamousset
— Chanaz
— La Chapelle-du-Mont-du-Chat
— Les Chapelles
— La Chapelle-Saint-Martin
— Le Châtelard
— Chindrieux
— Cléry
— Cohennoz
— La Compôte
— Conjux
— Crest-Voland
— Les Déserts
— Doucy-en-Bauges
— Drumettaz-Clarafond
— École
— Esserts-Blay
— Flumet
— Fréterive
— Frontenex
— La Giettaz
— Gilly-sur-Isère
— Grésy-sur-Aix
— Grésy-sur-Isère
— Grignon
— Hauteluce
— Jarsy
— Jongieux
— Lescheraines
— Loisieux
— Lucey
— La Plagne Tarentaise
— Marthod
— Mercury
— Méry
— Meyrieux-Trouet
— Montailleur
— Montcel
— Monthion
— Montsapey
— La Motte-en-Bauges
— La Motte-Servolex
— Motz
— Mouxy
— Notre-Dame-de-Bellecombe
— La Léchère
— Notre-Dame-des-Millières
— Le Noyer
— Ontex
— Pallud
— Plancherine
— Pugny-Chatenod
— Queige
— Val-d’Arc
— Rognaix
— Ruffieux
— Saint-François-de-Sales
— Sainte-Hélène-sur-Isère
— Saint-Jean-de-Chevelu
— Saint-Nicolas-la-Chapelle
— Saint-Offenge
— Saint-Ours
— Saint-Paul-sur-Isère
— Saint-Paul-sur-Yenne
— Saint-Pierre-d’Albigny
— Saint-Pierre-de-Curtille
— Sainte-Reine
— Saint-Vital
— Serrières-en-Chautagne
— Sonnaz
— Thénésol
— Tournon
— Tours-en-Savoie
— Traize
— Tresserve
— Trévignin
— Ugine
— Venthon
— Verel-Pragondran
— Verrens-Arvey
— Verthemex
— Villard-sur-Doron
— Vions
— Viviers-du-Lac
— Voglans
— Yenne
HAUTE-SAVOIE Department—Alby-sur-Chéran—Alex—Allèves—Annecy—Argonay—La Balme-de-Sillingy—La Balme-de-Thuy—Bassy—Bloye—Bluffy—Le Bouchet-Mont-Charvin—Boussy—Chainaz-les-Frasses—La Chapelle-Saint-Maurice—Chapeiry—Chavanod—Chevaline—Chilly—Choisy—Clermont—Les Clefs—La Clusaz—Combloux—Les Contamines-Montjoie—Cordon—Crempigny-Bonneguête—Cusy—Cuvat—Demi-Quartier—Desingy—Dingy-Saint-Clair—Domancy—Doussard—Droisy—Duingt—Entrevernes—Epagny Metz-Tessy—Étercy—Faverges-Seythenex—Giez—Le Grand-Bornand—Gruffy—Hauteville-sur-Fier—Héry-sur-Alby—Lathuile—Leschaux—Lornay—Lovagny—Manigod—Marcellaz-Albanais—Marigny-Saint-Marcel—Val de Chaise—Massingy—Megève—Menthon-Saint-Bernard—Menthonnex-sous-Clermont—Mésigny—Montagny-les-Lanches—Moye—Mûres—Nonglard—Poisy—Praz-sur-Arly—Quintal—Rumilly—Saint-Eusèbe—Saint-Eustache—Saint-Félix—Saint-Ferréol—Saint-Gervais-les-Bains—Saint-Jean-de-Sixt—Saint-Jorioz—Saint-Sylvestre—Sales—Sallanches—Sallenôves—Serraval—Sevrier—Seyssel—Sillingy—Talloires-Montmin—Thônes—Thusy—Vallières-sur-Fier—Vaulx—Versonnex—Veyrier-du-Lac—Les Villards-sur-Thônes—Viuz-la-Chiésaz — Alby-sur-Chéran — Alex — Allèves — Annecy — Argonay — La Balme-de-Sillingy — La Balme-de-Thuy — Bassy — Bloye — Bluffy — Le Bouchet-Mont-Charvin — Boussy — Chainaz-les-Frasses — La Chapelle-Saint-Maurice — Chapeiry — Chavanod — Chevaline — Chilly — Choisy — Clermont — Les Clefs — La Clusaz — Combloux — Les Contamines-Montjoie — Cordon — Crempigny-Bonneguête — Cusy — Cuvat — Demi-Quartier — Desingy — Dingy-Saint-Clair — Domancy — Doussard — Droisy — Duingt — Entrevernes — Epagny Metz-Tessy — Étercy — Faverges-Seythenex — Giez — Le Grand-Bornand — Gruffy — Hauteville-sur-Fier — Héry-sur-Alby — Lathuile — Leschaux — Lornay — Lovagny — Manigod — Marcellaz-Albanais — Marigny-Saint-Marcel — Val de Chaise — Massingy — Megève — Menthon-Saint-Bernard — Menthonnex-sous-Clermont — Mésigny — Montagny-les-Lanches — Moye — Mûres — Nonglard — Poisy — Praz-sur-Arly — Quintal — Rumilly — Saint-Eusèbe — Saint-Eustache — Saint-Félix — Saint-Ferréol — Saint-Gervais-les-Bains — Saint-Jean-de-Sixt — Saint-Jorioz — Saint-Sylvestre — Sales — Sallanches — Sallenôves — Serraval — Sevrier — Seyssel — Sillingy — Talloires-Montmin — Thônes — Thusy — Vallières-sur-Fier — Vaulx — Versonnex — Veyrier-du-Lac — Les Villards-sur-Thônes — Viuz-la-Chiésaz
— Alby-sur-Chéran
— Alex
— Allèves
— Annecy
— Argonay
— La Balme-de-Sillingy
— La Balme-de-Thuy
— Bassy
— Bloye
— Bluffy
— Le Bouchet-Mont-Charvin
— Boussy
— Chainaz-les-Frasses
— La Chapelle-Saint-Maurice
— Chapeiry
— Chavanod
— Chevaline
— Chilly
— Choisy
— Clermont
— Les Clefs
— La Clusaz
— Combloux
— Les Contamines-Montjoie
— Cordon
— Crempigny-Bonneguête
— Cusy
— Cuvat
— Demi-Quartier
— Desingy
— Dingy-Saint-Clair
— Domancy
— Doussard
— Droisy
— Duingt
— Entrevernes
— Epagny Metz-Tessy
— Étercy
— Faverges-Seythenex
— Giez
— Le Grand-Bornand
— Gruffy
— Hauteville-sur-Fier
— Héry-sur-Alby
— Lathuile
— Leschaux
— Lornay
— Lovagny
— Manigod
— Marcellaz-Albanais
— Marigny-Saint-Marcel
— Val de Chaise
— Massingy
— Megève
— Menthon-Saint-Bernard
— Menthonnex-sous-Clermont
— Mésigny
— Montagny-les-Lanches
— Moye
— Mûres
— Nonglard
— Poisy
— Praz-sur-Arly
— Quintal
— Rumilly
— Saint-Eusèbe
— Saint-Eustache
— Saint-Félix
— Saint-Ferréol
— Saint-Gervais-les-Bains
— Saint-Jean-de-Sixt
— Saint-Jorioz
— Saint-Sylvestre
— Sales
— Sallanches
— Sallenôves
— Serraval
— Sevrier
— Seyssel
— Sillingy
— Talloires-Montmin
— Thônes
— Thusy
— Vallières-sur-Fier
— Vaulx
— Versonnex
— Veyrier-du-Lac
— Les Villards-sur-Thônes
— Viuz-la-Chiésaz
— Alby-sur-Chéran
— Alex
— Allèves
— Annecy
— Argonay
— La Balme-de-Sillingy
— La Balme-de-Thuy
— Bassy
— Bloye
— Bluffy
— Le Bouchet-Mont-Charvin
— Boussy
— Chainaz-les-Frasses
— La Chapelle-Saint-Maurice
— Chapeiry
— Chavanod
— Chevaline
— Chilly
— Choisy
— Clermont
— Les Clefs
— La Clusaz
— Combloux
— Les Contamines-Montjoie
— Cordon
— Crempigny-Bonneguête
— Cusy
— Cuvat
— Demi-Quartier
— Desingy
— Dingy-Saint-Clair
— Domancy
— Doussard
— Droisy
— Duingt
— Entrevernes
— Epagny Metz-Tessy
— Étercy
— Faverges-Seythenex
— Giez
— Le Grand-Bornand
— Gruffy
— Hauteville-sur-Fier
— Héry-sur-Alby
— Lathuile
— Leschaux
— Lornay
— Lovagny
— Manigod
— Marcellaz-Albanais
— Marigny-Saint-Marcel
— Val de Chaise
— Massingy
— Megève
— Menthon-Saint-Bernard
— Menthonnex-sous-Clermont
— Mésigny
— Montagny-les-Lanches
— Moye
— Mûres
— Nonglard
— Poisy
— Praz-sur-Arly
— Quintal
— Rumilly
— Saint-Eusèbe
— Saint-Eustache
— Saint-Félix
— Saint-Ferréol
— Saint-Gervais-les-Bains
— Saint-Jean-de-Sixt
— Saint-Jorioz
— Saint-Sylvestre
— Sales
— Sallanches
— Sallenôves
— Serraval
— Sevrier
— Seyssel
— Sillingy
— Talloires-Montmin
— Thônes
— Thusy
— Vallières-sur-Fier
— Vaulx
— Versonnex
— Veyrier-du-Lac
— Les Villards-sur-Thônes
— Viuz-la-Chiésaz
AIN Department
AIN Department—Andert-et-Condon—Anglefort—Arboys en Bugey—Artemare—Belley—Valromey-sur-Séran—Brens—Ceyzérieu—Champagne-en-Valromey—Chazey-Bons—Cheignieu-la-Balme—Contrevoz—Corbonod—Cressin-Rochefort—Culoz-Béon—Cuzieu—Flaxieu—Lavours—Magnieu—Marignieu—Massignieu-de-Rives—Parves et Nattages—Peyrieu—Pollieu—Saint-Germain-les-Paroisses—Saint-Martin-de-Bavel—Seyssel—Talissieu—Virieu-le-Grand—Arvière-en-Valromey—Virignin—Vongnes — Andert-et-Condon — Anglefort — Arboys en Bugey — Artemare — Belley — Valromey-sur-Séran — Brens — Ceyzérieu — Champagne-en-Valromey — Chazey-Bons — Cheignieu-la-Balme — Contrevoz — Corbonod — Cressin-Rochefort — Culoz-Béon — Cuzieu — Flaxieu — Lavours — Magnieu — Marignieu — Massignieu-de-Rives — Parves et Nattages — Peyrieu — Pollieu — Saint-Germain-les-Paroisses — Saint-Martin-de-Bavel — Seyssel — Talissieu — Virieu-le-Grand — Arvière-en-Valromey — Virignin — Vongnes
— Andert-et-Condon
— Anglefort
— Arboys en Bugey
— Artemare
— Belley
— Valromey-sur-Séran
— Brens
— Ceyzérieu
— Champagne-en-Valromey
— Chazey-Bons
— Cheignieu-la-Balme
— Contrevoz
— Corbonod
— Cressin-Rochefort
— Culoz-Béon
— Cuzieu
— Flaxieu
— Lavours
— Magnieu
— Marignieu
— Massignieu-de-Rives
— Parves et Nattages
— Peyrieu
— Pollieu
— Saint-Germain-les-Paroisses
— Saint-Martin-de-Bavel
— Seyssel
— Talissieu
— Virieu-le-Grand
— Arvière-en-Valromey
— Virignin
— Vongnes
— Andert-et-Condon
— Anglefort
— Arboys en Bugey
— Artemare
— Belley
— Valromey-sur-Séran
— Brens
— Ceyzérieu
— Champagne-en-Valromey
— Chazey-Bons
— Cheignieu-la-Balme
— Contrevoz
— Corbonod
— Cressin-Rochefort
— Culoz-Béon
— Cuzieu
— Flaxieu
— Lavours
— Magnieu
— Marignieu
— Massignieu-de-Rives
— Parves et Nattages
— Peyrieu
— Pollieu
— Saint-Germain-les-Paroisses
— Saint-Martin-de-Bavel
— Seyssel
— Talissieu
— Virieu-le-Grand
— Arvière-en-Valromey
— Virignin
— Vongnes
SAVOIE Department—Aillon-le-Jeune—Aillon-le-Vieux—Aime-la-Plagne—Aiton—Aix-les-Bains—Entrelacs—Albertville—Allondaz—Arith—La Balme—La Bâthie—Beaufort—Bellecombe-en-Bauges—Billième—La Biolle—Bonvillard—Bonvillaret—Bourdeau—Le Bourget-du-Lac—Bourgneuf—Bourg-Saint-Maurice—Brison-Saint-Innocent—Césarches—Cevins—Chamousset—Chanaz—La Chapelle-du-Mont-du-Chat—Les Chapelles—La Chapelle-Saint-Martin—Le Châtelard—Chindrieux—Cléry—Cohennoz—La Compôte—Conjux—Crest-Voland—Les Déserts—Doucy-en-Bauges—Drumettaz-Clarafond—École—Esserts-Blay—Flumet—Fréterive—Frontenex—La Giettaz—Gilly-sur-Isère—Grésy-sur-Aix—Grésy-sur-Isère—Grignon—Hauteluce—Jarsy—Jongieux—Lescheraines—Loisieux—Lucey—La Plagne Tarentaise—Marthod—Mercury—Méry—Meyrieux-Trouet—Montailleur—Montcel—Monthion—Montsapey—La Motte-en-Bauges—La Motte-Servolex—Motz—Mouxy—Notre-Dame-de-Bellecombe—La Léchère—Notre-Dame-des-Millières—Le Noyer—Ontex—Pallud—Plancherine—Pugny-Chatenod—Queige—Val-d’Arc—Rognaix—Ruffieux—Saint-François-de-Sales—Sainte-Hélène-sur-Isère—Saint-Jean-de-Chevelu—Saint-Nicolas-la-Chapelle—Saint-Offenge—Saint-Ours—Saint-Paul-sur-Isère—Saint-Paul-sur-Yenne—Saint-Pierre-d’Albigny—Saint-Pierre-de-Curtille—Sainte-Reine—Saint-Vital—Serrières-en-Chautagne—Sonnaz—Thénésol—Tournon—Tours-en-Savoie—Traize—Tresserve—Trévignin—Ugine—Venthon—Verel-Pragondran—Verrens-Arvey—Verthemex—Villard-sur-Doron—Vions—Viviers-du-Lac—Voglans—Yenne — Aillon-le-Jeune — Aillon-le-Vieux — Aime-la-Plagne — Aiton — Aix-les-Bains — Entrelacs — Albertville — Allondaz — Arith — La Balme — La Bâthie — Beaufort — Bellecombe-en-Bauges — Billième — La Biolle — Bonvillard — Bonvillaret — Bourdeau — Le Bourget-du-Lac — Bourgneuf — Bourg-Saint-Maurice — Brison-Saint-Innocent — Césarches — Cevins — Chamousset — Chanaz — La Chapelle-du-Mont-du-Chat — Les Chapelles — La Chapelle-Saint-Martin — Le Châtelard — Chindrieux — Cléry — Cohennoz — La Compôte — Conjux — Crest-Voland — Les Déserts — Doucy-en-Bauges — Drumettaz-Clarafond — École — Esserts-Blay — Flumet — Fréterive — Frontenex — La Giettaz — Gilly-sur-Isère — Grésy-sur-Aix — Grésy-sur-Isère — Grignon — Hauteluce — Jarsy — Jongieux — Lescheraines — Loisieux — Lucey — La Plagne Tarentaise — Marthod — Mercury — Méry — Meyrieux-Trouet — Montailleur — Montcel — Monthion — Montsapey — La Motte-en-Bauges — La Motte-Servolex — Motz — Mouxy — Notre-Dame-de-Bellecombe — La Léchère — Notre-Dame-des-Millières — Le Noyer — Ontex — Pallud — Plancherine — Pugny-Chatenod — Queige — Val-d’Arc — Rognaix — Ruffieux — Saint-François-de-Sales — Sainte-Hélène-sur-Isère — Saint-Jean-de-Chevelu — Saint-Nicolas-la-Chapelle — Saint-Offenge — Saint-Ours — Saint-Paul-sur-Isère — Saint-Paul-sur-Yenne — Saint-Pierre-d’Albigny — Saint-Pierre-de-Curtille — Sainte-Reine — Saint-Vital — Serrières-en-Chautagne — Sonnaz — Thénésol — Tournon — Tours-en-Savoie — Traize — Tresserve — Trévignin — Ugine — Venthon — Verel-Pragondran — Verrens-Arvey — Verthemex — Villard-sur-Doron — Vions — Viviers-du-Lac — Voglans — Yenne
— Aillon-le-Jeune
— Aillon-le-Vieux
— Aime-la-Plagne
— Aiton
— Aix-les-Bains
— Entrelacs
— Albertville
— Allondaz
— Arith
— La Balme
— La Bâthie
— Beaufort
— Bellecombe-en-Bauges
— Billième
— La Biolle
— Bonvillard
— Bonvillaret
— Bourdeau
— Le Bourget-du-Lac
— Bourgneuf
— Bourg-Saint-Maurice
— Brison-Saint-Innocent
— Césarches
— Cevins
— Chamousset
— Chanaz
— La Chapelle-du-Mont-du-Chat
— Les Chapelles
— La Chapelle-Saint-Martin
— Le Châtelard
— Chindrieux
— Cléry
— Cohennoz
— La Compôte
— Conjux
— Crest-Voland
— Les Déserts
— Doucy-en-Bauges
— Drumettaz-Clarafond
— École
— Esserts-Blay
— Flumet
— Fréterive
— Frontenex
— La Giettaz
— Gilly-sur-Isère
— Grésy-sur-Aix
— Grésy-sur-Isère
— Grignon
— Hauteluce
— Jarsy
— Jongieux
— Lescheraines
— Loisieux
— Lucey
— La Plagne Tarentaise
— Marthod
— Mercury
— Méry
— Meyrieux-Trouet
— Montailleur
— Montcel
— Monthion
— Montsapey
— La Motte-en-Bauges
— La Motte-Servolex
— Motz
— Mouxy
— Notre-Dame-de-Bellecombe
— La Léchère
— Notre-Dame-des-Millières
— Le Noyer
— Ontex
— Pallud
— Plancherine
— Pugny-Chatenod
— Queige
— Val-d’Arc
— Rognaix
— Ruffieux
— Saint-François-de-Sales
— Sainte-Hélène-sur-Isère
— Saint-Jean-de-Chevelu
— Saint-Nicolas-la-Chapelle
— Saint-Offenge
— Saint-Ours
— Saint-Paul-sur-Isère
— Saint-Paul-sur-Yenne
— Saint-Pierre-d’Albigny
— Saint-Pierre-de-Curtille
— Sainte-Reine
— Saint-Vital
— Serrières-en-Chautagne
— Sonnaz
— Thénésol
— Tournon
— Tours-en-Savoie
— Traize
— Tresserve
— Trévignin
— Ugine
— Venthon
— Verel-Pragondran
— Verrens-Arvey
— Verthemex
— Villard-sur-Doron
— Vions
— Viviers-du-Lac
— Voglans
— Yenne
— Aillon-le-Jeune
— Aillon-le-Vieux
— Aime-la-Plagne
— Aiton
— Aix-les-Bains
— Entrelacs
— Albertville
— Allondaz
— Arith
— La Balme
— La Bâthie
— Beaufort
— Bellecombe-en-Bauges
— Billième
— La Biolle
— Bonvillard
— Bonvillaret
— Bourdeau
— Le Bourget-du-Lac
— Bourgneuf
— Bourg-Saint-Maurice
— Brison-Saint-Innocent
— Césarches
— Cevins
— Chamousset
— Chanaz
— La Chapelle-du-Mont-du-Chat
— Les Chapelles
— La Chapelle-Saint-Martin
— Le Châtelard
— Chindrieux
— Cléry
— Cohennoz
— La Compôte
— Conjux
— Crest-Voland
— Les Déserts
— Doucy-en-Bauges
— Drumettaz-Clarafond
— École
— Esserts-Blay
— Flumet
— Fréterive
— Frontenex
— La Giettaz
— Gilly-sur-Isère
— Grésy-sur-Aix
— Grésy-sur-Isère
— Grignon
— Hauteluce
— Jarsy
— Jongieux
— Lescheraines
— Loisieux
— Lucey
— La Plagne Tarentaise
— Marthod
— Mercury
— Méry
— Meyrieux-Trouet
— Montailleur
— Montcel
— Monthion
— Montsapey
— La Motte-en-Bauges
— La Motte-Servolex
— Motz
— Mouxy
— Notre-Dame-de-Bellecombe
— La Léchère
— Notre-Dame-des-Millières
— Le Noyer
— Ontex
— Pallud
— Plancherine
— Pugny-Chatenod
— Queige
— Val-d’Arc
— Rognaix
— Ruffieux
— Saint-François-de-Sales
— Sainte-Hélène-sur-Isère
— Saint-Jean-de-Chevelu
— Saint-Nicolas-la-Chapelle
— Saint-Offenge
— Saint-Ours
— Saint-Paul-sur-Isère
— Saint-Paul-sur-Yenne
— Saint-Pierre-d’Albigny
— Saint-Pierre-de-Curtille
— Sainte-Reine
— Saint-Vital
— Serrières-en-Chautagne
— Sonnaz
— Thénésol
— Tournon
— Tours-en-Savoie
— Traize
— Tresserve
— Trévignin
— Ugine
— Venthon
— Verel-Pragondran
— Verrens-Arvey
— Verthemex
— Villard-sur-Doron
— Vions
— Viviers-du-Lac
— Voglans
— Yenne
HAUTE-SAVOIE Department—Alby-sur-Chéran—Alex—Allèves—Annecy—Argonay—La Balme-de-Sillingy—La Balme-de-Thuy—Bassy—Bloye—Bluffy—Le Bouchet-Mont-Charvin—Boussy—Chainaz-les-Frasses—La Chapelle-Saint-Maurice—Chapeiry—Chavanod—Chevaline—Chilly—Choisy—Clermont—Les Clefs—La Clusaz—Combloux—Les Contamines-Montjoie—Cordon—Crempigny-Bonneguête—Cusy—Cuvat—Demi-Quartier—Desingy—Dingy-Saint-Clair—Domancy—Doussard—Droisy—Duingt—Entrevernes—Epagny Metz-Tessy—Étercy—Faverges-Seythenex—Giez—Le Grand-Bornand—Gruffy—Hauteville-sur-Fier—Héry-sur-Alby—Lathuile—Leschaux—Lornay—Lovagny—Manigod—Marcellaz-Albanais—Marigny-Saint-Marcel—Val de Chaise—Massingy—Megève—Menthon-Saint-Bernard—Menthonnex-sous-Clermont—Mésigny—Montagny-les-Lanches—Moye—Mûres—Nonglard—Poisy—Praz-sur-Arly—Quintal—Rumilly—Saint-Eusèbe—Saint-Eustache—Saint-Félix—Saint-Ferréol—Saint-Gervais-les-Bains—Saint-Jean-de-Sixt—Saint-Jorioz—Saint-Sylvestre—Sales—Sallanches—Sallenôves—Serraval—Sevrier—Seyssel—Sillingy—Talloires-Montmin—Thônes—Thusy—Vallières-sur-Fier—Vaulx—Versonnex—Veyrier-du-Lac—Les Villards-sur-Thônes—Viuz-la-Chiésaz — Alby-sur-Chéran — Alex — Allèves — Annecy — Argonay — La Balme-de-Sillingy — La Balme-de-Thuy — Bassy — Bloye — Bluffy — Le Bouchet-Mont-Charvin — Boussy — Chainaz-les-Frasses — La Chapelle-Saint-Maurice — Chapeiry — Chavanod — Chevaline — Chilly — Choisy — Clermont — Les Clefs — La Clusaz — Combloux — Les Contamines-Montjoie — Cordon — Crempigny-Bonneguête — Cusy — Cuvat — Demi-Quartier — Desingy — Dingy-Saint-Clair — Domancy — Doussard — Droisy — Duingt — Entrevernes — Epagny Metz-Tessy — Étercy — Faverges-Seythenex — Giez — Le Grand-Bornand — Gruffy — Hauteville-sur-Fier — Héry-sur-Alby — Lathuile — Leschaux — Lornay — Lovagny — Manigod — Marcellaz-Albanais — Marigny-Saint-Marcel — Val de Chaise — Massingy — Megève — Menthon-Saint-Bernard — Menthonnex-sous-Clermont — Mésigny — Montagny-les-Lanches — Moye — Mûres — Nonglard — Poisy — Praz-sur-Arly — Quintal — Rumilly — Saint-Eusèbe — Saint-Eustache — Saint-Félix — Saint-Ferréol — Saint-Gervais-les-Bains — Saint-Jean-de-Sixt — Saint-Jorioz — Saint-Sylvestre — Sales — Sallanches — Sallenôves — Serraval — Sevrier — Seyssel — Sillingy — Talloires-Montmin — Thônes — Thusy — Vallières-sur-Fier — Vaulx — Versonnex — Veyrier-du-Lac — Les Villards-sur-Thônes — Viuz-la-Chiésaz
— Alby-sur-Chéran
— Alex
— Allèves
— Annecy
— Argonay
— La Balme-de-Sillingy
— La Balme-de-Thuy
— Bassy
— Bloye
— Bluffy
— Le Bouchet-Mont-Charvin
— Boussy
— Chainaz-les-Frasses
— La Chapelle-Saint-Maurice
— Chapeiry
— Chavanod
— Chevaline
— Chilly
— Choisy
— Clermont
— Les Clefs
— La Clusaz
— Combloux
— Les Contamines-Montjoie
— Cordon
— Crempigny-Bonneguête
— Cusy
— Cuvat
— Demi-Quartier
— Desingy
— Dingy-Saint-Clair
— Domancy
— Doussard
— Droisy
— Duingt
— Entrevernes
— Epagny Metz-Tessy
— Étercy
— Faverges-Seythenex
— Giez
— Le Grand-Bornand
— Gruffy
— Hauteville-sur-Fier
— Héry-sur-Alby
— Lathuile
— Leschaux
— Lornay
— Lovagny
— Manigod
— Marcellaz-Albanais
— Marigny-Saint-Marcel
— Val de Chaise
— Massingy
— Megève
— Menthon-Saint-Bernard
— Menthonnex-sous-Clermont
— Mésigny
— Montagny-les-Lanches
— Moye
— Mûres
— Nonglard
— Poisy
— Praz-sur-Arly
— Quintal
— Rumilly
— Saint-Eusèbe
— Saint-Eustache
— Saint-Félix
— Saint-Ferréol
— Saint-Gervais-les-Bains
— Saint-Jean-de-Sixt
— Saint-Jorioz
— Saint-Sylvestre
— Sales
— Sallanches
— Sallenôves
— Serraval
— Sevrier
— Seyssel
— Sillingy
— Talloires-Montmin
— Thônes
— Thusy
— Vallières-sur-Fier
— Vaulx
— Versonnex
— Veyrier-du-Lac
— Les Villards-sur-Thônes
— Viuz-la-Chiésaz
— Alby-sur-Chéran
— Alex
— Allèves
— Annecy
— Argonay
— La Balme-de-Sillingy
— La Balme-de-Thuy
— Bassy
— Bloye
— Bluffy
— Le Bouchet-Mont-Charvin
— Boussy
— Chainaz-les-Frasses
— La Chapelle-Saint-Maurice
— Chapeiry
— Chavanod
— Chevaline
— Chilly
— Choisy
— Clermont
— Les Clefs
— La Clusaz
— Combloux
— Les Contamines-Montjoie
— Cordon
— Crempigny-Bonneguête
— Cusy
— Cuvat
— Demi-Quartier
— Desingy
— Dingy-Saint-Clair
— Domancy
— Doussard
— Droisy
— Duingt
— Entrevernes
— Epagny Metz-Tessy
— Étercy
— Faverges-Seythenex
— Giez
— Le Grand-Bornand
— Gruffy
— Hauteville-sur-Fier
— Héry-sur-Alby
— Lathuile
— Leschaux
— Lornay
— Lovagny
— Manigod
— Marcellaz-Albanais
— Marigny-Saint-Marcel
— Val de Chaise
— Massingy
— Megève
— Menthon-Saint-Bernard
— Menthonnex-sous-Clermont
— Mésigny
— Montagny-les-Lanches
— Moye
— Mûres
— Nonglard
— Poisy
— Praz-sur-Arly
— Quintal
— Rumilly
— Saint-Eusèbe
— Saint-Eustache
— Saint-Félix
— Saint-Ferréol
— Saint-Gervais-les-Bains
— Saint-Jean-de-Sixt
— Saint-Jorioz
— Saint-Sylvestre
— Sales
— Sallanches
— Sallenôves
— Serraval
— Sevrier
— Seyssel
— Sillingy
— Talloires-Montmin
— Thônes
— Thusy
— Vallières-sur-Fier
— Vaulx
— Versonnex
— Veyrier-du-Lac
— Les Villards-sur-Thônes
— Viuz-la-Chiésaz
AIN Department—L’Abergement-de-Varey—Ambérieu-en-Bugey—Ambléon—Ambronay—Ambutrix—Apremont—Aranc—Arandas—Argis—Armix—Bellignat—Valserhône—Belleydoux—Bénonces—Bettant—Billiat—Blyes—Boyeux-Saint-Jérôme—Brégnier-Cordon—Brénod—Brion—Briord—La Burbanche—Ceignes—Cerdon—Chaley—Challes-la-Montagne—Challex—Champdor-Corcelles—Champfromier—Chanay—Charix—Château-Gaillard—Chazey-sur-Ain—Chevillard—Chevry—Chézery-Forens—Cleyzieu—Collonges—Colomieu—Conand—Condamine—Confort—Conzieu—Corlier—Crozet—Douvres—Échallon—Évosges—Farges—Ferney-Voltaire—Béard-Géovreissiat—Giron—Groissiat—Hautecourt-Romanèche—Plateau d’Hauteville—Haut Valromey—Injoux-Génissiat—Innimond—Izenave—Izernore—Izieu—Jujurieux—Labalme—Lagnieu—Le Poizat-Lalleyriat—Lantenay—Léaz—Lélex—Leyment—Leyssard—Surjoux-Lhopital—Lhuis—Lompnas—Loyettes—Maillat—Marchamp—Martignat—Mérignat—Montagnieu—Montanges—Montréal-la-Cluse—Nurieux-Volognat—Murs-et-Gélignieux—Nantua—Neuville-sur-Ain—Les Neyrolles—Nivollet-Montgriffon—Oncieu—Ordonnaz—Outriaz—Oyonnax—Péron—Peyriat—Plagne—Poncin—Pont-d’Ain—Port—Pougny—Prémeyzel—Prémillieu—Prévessin-Moëns—Priay—Rossillon—Saint-Alban—Groslée-Saint-Benoit—Saint-Denis-en-Bugey—Saint-Genis-Pouilly—Saint-Germain-de-Joux—Saint-Jean-de-Gonville—Saint-Jean-de-Niost—Saint-Jean-le-Vieux—Sainte-Julie—Saint-Martin-du-Frêne—Saint-Maurice-de-Rémens—Saint-Rambert-en-Bugey—Saint-Sorlin-en-Bugey—Saint-Vulbas—Sault-Brénaz—Seillonnaz—Sergy—Serrières-de-Briord—Serrières-sur-Ain—Souclin—Tenay—Thoiry—Torcieu—Vaux-en-Bugey—Vieu-d’Izenave—Villebois—Villes — L’Abergement-de-Varey — Ambérieu-en-Bugey — Ambléon — Ambronay — Ambutrix — Apremont — Aranc — Arandas — Argis — Armix — Bellignat — Valserhône — Belleydoux — Bénonces — Bettant — Billiat — Blyes — Boyeux-Saint-Jérôme — Brégnier-Cordon — Brénod — Brion — Briord — La Burbanche — Ceignes — Cerdon — Chaley — Challes-la-Montagne — Challex — Champdor-Corcelles — Champfromier — Chanay — Charix — Château-Gaillard — Chazey-sur-Ain — Chevillard — Chevry — Chézery-Forens — Cleyzieu — Collonges — Colomieu — Conand — Condamine — Confort — Conzieu — Corlier — Crozet — Douvres — Échallon — Évosges — Farges — Ferney-Voltaire — Béard-Géovreissiat — Giron — Groissiat — Hautecourt-Romanèche — Plateau d’Hauteville — Haut Valromey — Injoux-Génissiat — Innimond — Izenave — Izernore — Izieu — Jujurieux — Labalme — Lagnieu — Le Poizat-Lalleyriat — Lantenay — Léaz — Lélex — Leyment — Leyssard — Surjoux-Lhopital — Lhuis — Lompnas — Loyettes — Maillat — Marchamp — Martignat — Mérignat — Montagnieu — Montanges — Montréal-la-Cluse — Nurieux-Volognat — Murs-et-Gélignieux — Nantua — Neuville-sur-Ain — Les Neyrolles — Nivollet-Montgriffon — Oncieu — Ordonnaz — Outriaz — Oyonnax — Péron — Peyriat — Plagne — Poncin — Pont-d’Ain — Port — Pougny — Prémeyzel — Prémillieu — Prévessin-Moëns — Priay — Rossillon — Saint-Alban — Groslée-Saint-Benoit — Saint-Denis-en-Bugey — Saint-Genis-Pouilly — Saint-Germain-de-Joux — Saint-Jean-de-Gonville — Saint-Jean-de-Niost — Saint-Jean-le-Vieux — Sainte-Julie — Saint-Martin-du-Frêne — Saint-Maurice-de-Rémens — Saint-Rambert-en-Bugey — Saint-Sorlin-en-Bugey — Saint-Vulbas — Sault-Brénaz — Seillonnaz — Sergy — Serrières-de-Briord — Serrières-sur-Ain — Souclin — Tenay — Thoiry — Torcieu — Vaux-en-Bugey — Vieu-d’Izenave — Villebois — Villes
— L’Abergement-de-Varey
— Ambérieu-en-Bugey
— Ambléon
— Ambronay
— Ambutrix
— Apremont
— Aranc
— Arandas
— Argis
— Armix
— Bellignat
— Valserhône
— Belleydoux
— Bénonces
— Bettant
— Billiat
— Blyes
— Boyeux-Saint-Jérôme
— Brégnier-Cordon
— Brénod
— Brion
— Briord
— La Burbanche
— Ceignes
— Cerdon
— Chaley
— Challes-la-Montagne
— Challex
— Champdor-Corcelles
— Champfromier
— Chanay
— Charix
— Château-Gaillard
— Chazey-sur-Ain
— Chevillard
— Chevry
— Chézery-Forens
— Cleyzieu
— Collonges
— Colomieu
— Conand
— Condamine
— Confort
— Conzieu
— Corlier
— Crozet
— Douvres
— Échallon
— Évosges
— Farges
— Ferney-Voltaire
— Béard-Géovreissiat
— Giron
— Groissiat
— Hautecourt-Romanèche
— Plateau d’Hauteville
— Haut Valromey
— Injoux-Génissiat
— Innimond
— Izenave
— Izernore
— Izieu
— Jujurieux
— Labalme
— Lagnieu
— Le Poizat-Lalleyriat
— Lantenay
— Léaz
— Lélex
— Leyment
— Leyssard
— Surjoux-Lhopital
— Lhuis
— Lompnas
— Loyettes
— Maillat
— Marchamp
— Martignat
— Mérignat
— Montagnieu
— Montanges
— Montréal-la-Cluse
— Nurieux-Volognat
— Murs-et-Gélignieux
— Nantua
— Neuville-sur-Ain
— Les Neyrolles
— Nivollet-Montgriffon
— Oncieu
— Ordonnaz
— Outriaz
— Oyonnax
— Péron
— Peyriat
— Plagne
— Poncin
— Pont-d’Ain
— Port
— Pougny
— Prémeyzel
— Prémillieu
— Prévessin-Moëns
— Priay
— Rossillon
— Saint-Alban
— Groslée-Saint-Benoit
— Saint-Denis-en-Bugey
— Saint-Genis-Pouilly
— Saint-Germain-de-Joux
— Saint-Jean-de-Gonville
— Saint-Jean-de-Niost
— Saint-Jean-le-Vieux
— Sainte-Julie
— Saint-Martin-du-Frêne
— Saint-Maurice-de-Rémens
— Saint-Rambert-en-Bugey
— Saint-Sorlin-en-Bugey
— Saint-Vulbas
— Sault-Brénaz
— Seillonnaz
— Sergy
— Serrières-de-Briord
— Serrières-sur-Ain
— Souclin
— Tenay
— Thoiry
— Torcieu
— Vaux-en-Bugey
— Vieu-d’Izenave
— Villebois
— Villes
— L’Abergement-de-Varey
— Ambérieu-en-Bugey
— Ambléon
— Ambronay
— Ambutrix
— Apremont
— Aranc
— Arandas
— Argis
— Armix
— Bellignat
— Valserhône
— Belleydoux
— Bénonces
— Bettant
— Billiat
— Blyes
— Boyeux-Saint-Jérôme
— Brégnier-Cordon
— Brénod
— Brion
— Briord
— La Burbanche
— Ceignes
— Cerdon
— Chaley
— Challes-la-Montagne
— Challex
— Champdor-Corcelles
— Champfromier
— Chanay
— Charix
— Château-Gaillard
— Chazey-sur-Ain
— Chevillard
— Chevry
— Chézery-Forens
— Cleyzieu
— Collonges
— Colomieu
— Conand
— Condamine
— Confort
— Conzieu
— Corlier
— Crozet
— Douvres
— Échallon
— Évosges
— Farges
— Ferney-Voltaire
— Béard-Géovreissiat
— Giron
— Groissiat
— Hautecourt-Romanèche
— Plateau d’Hauteville
— Haut Valromey
— Injoux-Génissiat
— Innimond
— Izenave
— Izernore
— Izieu
— Jujurieux
— Labalme
— Lagnieu
— Le Poizat-Lalleyriat
— Lantenay
— Léaz
— Lélex
— Leyment
— Leyssard
— Surjoux-Lhopital
— Lhuis
— Lompnas
— Loyettes
— Maillat
— Marchamp
— Martignat
— Mérignat
— Montagnieu
— Montanges
— Montréal-la-Cluse
— Nurieux-Volognat
— Murs-et-Gélignieux
— Nantua
— Neuville-sur-Ain
— Les Neyrolles
— Nivollet-Montgriffon
— Oncieu
— Ordonnaz
— Outriaz
— Oyonnax
— Péron
— Peyriat
— Plagne
— Poncin
— Pont-d’Ain
— Port
— Pougny
— Prémeyzel
— Prémillieu
— Prévessin-Moëns
— Priay
— Rossillon
— Saint-Alban
— Groslée-Saint-Benoit
— Saint-Denis-en-Bugey
— Saint-Genis-Pouilly
— Saint-Germain-de-Joux
— Saint-Jean-de-Gonville
— Saint-Jean-de-Niost
— Saint-Jean-le-Vieux
— Sainte-Julie
— Saint-Martin-du-Frêne
— Saint-Maurice-de-Rémens
— Saint-Rambert-en-Bugey
— Saint-Sorlin-en-Bugey
— Saint-Vulbas
— Sault-Brénaz
— Seillonnaz
— Sergy
— Serrières-de-Briord
— Serrières-sur-Ain
— Souclin
— Tenay
— Thoiry
— Torcieu
— Vaux-en-Bugey
— Vieu-d’Izenave
— Villebois
— Villes
ISERE Department—Les Abrets en Dauphiné—Allevard—Annoisin-Chatelans—Aoste—Les Avenières Veyrins-Thuellin—La Balme-les-Grottes—Barraux—La Bâtie-Montgascon—Bilieu—Blandin—Le Bouchage—Bourgoin-Jallieu—Bouvesse-Quirieu—Brangues—La Buissière—Cessieu—Chapareillan—La Chapelle-de-la-Tour—La Chapelle-du-Bard—Charancieu—Charavines—Charette—Chassignieu—Chélieu—Le Cheylas—Chimilin—Chirens—Corbelin—Courtenay—Crémieu—Creys-Mépieu—Dizimieu—Doissin—Dolomieu—Entre-deux-Guiers—Faverges-de-la-Tour—Le Haut-Bréda—La Flachère—Goncelin—Granieu—Hières-sur-Amby—Leyrieu—Massieu—Merlas—Miribel-les-Échelles—Montagnieu—Montalieu-Vercieu—Montcarra—Montferrat—Moras—Morestel—Le Moutaret—Optevoz—Oyeu—Villages du Lac de Paladru—Parmilieu—Le Passage—Arandon-Passins—Pontcharra—Le Pont-de-Beauvoisin—Porcieu-Amblagnieu—Pressins—Rochetoirin—Romagnieu—Ruy-Montceau—Saint-Albin-de-Vaulserre—Saint-André-le-Gaz—Saint-Aupre—Saint-Baudille-de-la-Tour—Sainte-Blandine—Saint-Bueil—Saint-Chef—Saint-Christophe-sur-Guiers—Saint-Clair-de-la-Tour—Saint-Didier-de-la-Tour—Saint-Étienne-de-Crossey—Saint-Geoire-en-Valdaine—Saint-Hilaire-de-Brens—Plateau-des-Petites-Roches—Saint-Jean-d’Avelanne—Saint-Jean-de-Soudain—Saint-Joseph-de-Rivière—Saint-Laurent-du-Pont—Sainte-Marie-d’Alloix—Sainte-Marie-du-Mont—Saint-Martin-de-Vaulserre—Saint-Maximin—Saint-Nicolas-de-Macherin—Saint-Ondras—Crêts en Belledonne—Saint-Pierre-de-Chartreuse—Saint-Pierre-d’Entremont—Saint-Savin—Saint-Sorlin-de-Morestel—Saint-Sulpice-des-Rivoires—Saint-Victor-de-Cessieu—Saint-Victor-de-Morestel—Saint-Vincent-de-Mercuze—Salagnon—Sérézin-de-la-Tour—Sermérieu—Siccieu-Saint-Julien-et-Carisieu—Soleymieu—Theys—Torchefelon—La Tour-du-Pin—Le Touvet—Trept—Valencogne—Vasselin—Velanne—Vénérieu—Vernas—Vertrieu—Vézeronce-Curtin—Vignieu—Villemoirieu—Val-de-Virieu—Voiron—Voissant — Les Abrets en Dauphiné — Allevard — Annoisin-Chatelans — Aoste — Les Avenières Veyrins-Thuellin — La Balme-les-Grottes — Barraux — La Bâtie-Montgascon — Bilieu — Blandin — Le Bouchage — Bourgoin-Jallieu — Bouvesse-Quirieu — Brangues — La Buissière — Cessieu — Chapareillan — La Chapelle-de-la-Tour — La Chapelle-du-Bard — Charancieu — Charavines — Charette — Chassignieu — Chélieu — Le Cheylas — Chimilin — Chirens — Corbelin — Courtenay — Crémieu — Creys-Mépieu — Dizimieu — Doissin — Dolomieu — Entre-deux-Guiers — Faverges-de-la-Tour — Le Haut-Bréda — La Flachère — Goncelin — Granieu — Hières-sur-Amby — Leyrieu — Massieu — Merlas — Miribel-les-Échelles — Montagnieu — Montalieu-Vercieu — Montcarra — Montferrat — Moras — Morestel — Le Moutaret — Optevoz — Oyeu — Villages du Lac de Paladru — Parmilieu — Le Passage — Arandon-Passins — Pontcharra — Le Pont-de-Beauvoisin — Porcieu-Amblagnieu — Pressins — Rochetoirin — Romagnieu — Ruy-Montceau — Saint-Albin-de-Vaulserre — Saint-André-le-Gaz — Saint-Aupre — Saint-Baudille-de-la-Tour — Sainte-Blandine — Saint-Bueil — Saint-Chef — Saint-Christophe-sur-Guiers — Saint-Clair-de-la-Tour — Saint-Didier-de-la-Tour — Saint-Étienne-de-Crossey — Saint-Geoire-en-Valdaine — Saint-Hilaire-de-Brens — Plateau-des-Petites-Roches — Saint-Jean-d’Avelanne — Saint-Jean-de-Soudain — Saint-Joseph-de-Rivière — Saint-Laurent-du-Pont — Sainte-Marie-d’Alloix — Sainte-Marie-du-Mont — Saint-Martin-de-Vaulserre — Saint-Maximin — Saint-Nicolas-de-Macherin — Saint-Ondras — Crêts en Belledonne — Saint-Pierre-de-Chartreuse — Saint-Pierre-d’Entremont — Saint-Savin — Saint-Sorlin-de-Morestel — Saint-Sulpice-des-Rivoires — Saint-Victor-de-Cessieu — Saint-Victor-de-Morestel — Saint-Vincent-de-Mercuze — Salagnon — Sérézin-de-la-Tour — Sermérieu — Siccieu-Saint-Julien-et-Carisieu — Soleymieu — Theys — Torchefelon — La Tour-du-Pin — Le Touvet — Trept — Valencogne — Vasselin — Velanne — Vénérieu — Vernas — Vertrieu — Vézeronce-Curtin — Vignieu — Villemoirieu — Val-de-Virieu — Voiron — Voissant
— Les Abrets en Dauphiné
— Allevard
— Annoisin-Chatelans
— Aoste
— Les Avenières Veyrins-Thuellin
— La Balme-les-Grottes
— Barraux
— La Bâtie-Montgascon
— Bilieu
— Blandin
— Le Bouchage
— Bourgoin-Jallieu
— Bouvesse-Quirieu
— Brangues
— La Buissière
— Cessieu
— Chapareillan
— La Chapelle-de-la-Tour
— La Chapelle-du-Bard
— Charancieu
— Charavines
— Charette
— Chassignieu
— Chélieu
— Le Cheylas
— Chimilin
— Chirens
— Corbelin
— Courtenay
— Crémieu
— Creys-Mépieu
— Dizimieu
— Doissin
— Dolomieu
— Entre-deux-Guiers
— Faverges-de-la-Tour
— Le Haut-Bréda
— La Flachère
— Goncelin
— Granieu
— Hières-sur-Amby
— Leyrieu
— Massieu
— Merlas
— Miribel-les-Échelles
— Montagnieu
— Montalieu-Vercieu
— Montcarra
— Montferrat
— Moras
— Morestel
— Le Moutaret
— Optevoz
— Oyeu
— Villages du Lac de Paladru
— Parmilieu
— Le Passage
— Arandon-Passins
— Pontcharra
— Le Pont-de-Beauvoisin
— Porcieu-Amblagnieu
— Pressins
— Rochetoirin
— Romagnieu
— Ruy-Montceau
— Saint-Albin-de-Vaulserre
— Saint-André-le-Gaz
— Saint-Aupre
— Saint-Baudille-de-la-Tour
— Sainte-Blandine
— Saint-Bueil
— Saint-Chef
— Saint-Christophe-sur-Guiers
— Saint-Clair-de-la-Tour
— Saint-Didier-de-la-Tour
— Saint-Étienne-de-Crossey
— Saint-Geoire-en-Valdaine
— Saint-Hilaire-de-Brens
— Plateau-des-Petites-Roches
— Saint-Jean-d’Avelanne
— Saint-Jean-de-Soudain
— Saint-Joseph-de-Rivière
— Saint-Laurent-du-Pont
— Sainte-Marie-d’Alloix
— Sainte-Marie-du-Mont
— Saint-Martin-de-Vaulserre
— Saint-Maximin
— Saint-Nicolas-de-Macherin
— Saint-Ondras
— Crêts en Belledonne
— Saint-Pierre-de-Chartreuse
— Saint-Pierre-d’Entremont
— Saint-Savin
— Saint-Sorlin-de-Morestel
— Saint-Sulpice-des-Rivoires
— Saint-Victor-de-Cessieu
— Saint-Victor-de-Morestel
— Saint-Vincent-de-Mercuze
— Salagnon
— Sérézin-de-la-Tour
— Sermérieu
— Siccieu-Saint-Julien-et-Carisieu
— Soleymieu
— Theys
— Torchefelon
— La Tour-du-Pin
— Le Touvet
— Trept
— Valencogne
— Vasselin
— Velanne
— Vénérieu
— Vernas
— Vertrieu
— Vézeronce-Curtin
— Vignieu
— Villemoirieu
— Val-de-Virieu
— Voiron
— Voissant
— Les Abrets en Dauphiné
— Allevard
— Annoisin-Chatelans
— Aoste
— Les Avenières Veyrins-Thuellin
— La Balme-les-Grottes
— Barraux
— La Bâtie-Montgascon
— Bilieu
— Blandin
— Le Bouchage
— Bourgoin-Jallieu
— Bouvesse-Quirieu
— Brangues
— La Buissière
— Cessieu
— Chapareillan
— La Chapelle-de-la-Tour
— La Chapelle-du-Bard
— Charancieu
— Charavines
— Charette
— Chassignieu
— Chélieu
— Le Cheylas
— Chimilin
— Chirens
— Corbelin
— Courtenay
— Crémieu
— Creys-Mépieu
— Dizimieu
— Doissin
— Dolomieu
— Entre-deux-Guiers
— Faverges-de-la-Tour
— Le Haut-Bréda
— La Flachère
— Goncelin
— Granieu
— Hières-sur-Amby
— Leyrieu
— Massieu
— Merlas
— Miribel-les-Échelles
— Montagnieu
— Montalieu-Vercieu
— Montcarra
— Montferrat
— Moras
— Morestel
— Le Moutaret
— Optevoz
— Oyeu
— Villages du Lac de Paladru
— Parmilieu
— Le Passage
— Arandon-Passins
— Pontcharra
— Le Pont-de-Beauvoisin
— Porcieu-Amblagnieu
— Pressins
— Rochetoirin
— Romagnieu
— Ruy-Montceau
— Saint-Albin-de-Vaulserre
— Saint-André-le-Gaz
— Saint-Aupre
— Saint-Baudille-de-la-Tour
— Sainte-Blandine
— Saint-Bueil
— Saint-Chef
— Saint-Christophe-sur-Guiers
— Saint-Clair-de-la-Tour
— Saint-Didier-de-la-Tour
— Saint-Étienne-de-Crossey
— Saint-Geoire-en-Valdaine
— Saint-Hilaire-de-Brens
— Plateau-des-Petites-Roches
— Saint-Jean-d’Avelanne
— Saint-Jean-de-Soudain
— Saint-Joseph-de-Rivière
— Saint-Laurent-du-Pont
— Sainte-Marie-d’Alloix
— Sainte-Marie-du-Mont
— Saint-Martin-de-Vaulserre
— Saint-Maximin
— Saint-Nicolas-de-Macherin
— Saint-Ondras
— Crêts en Belledonne
— Saint-Pierre-de-Chartreuse
— Saint-Pierre-d’Entremont
— Saint-Savin
— Saint-Sorlin-de-Morestel
— Saint-Sulpice-des-Rivoires
— Saint-Victor-de-Cessieu
— Saint-Victor-de-Morestel
— Saint-Vincent-de-Mercuze
— Salagnon
— Sérézin-de-la-Tour
— Sermérieu
— Siccieu-Saint-Julien-et-Carisieu
— Soleymieu
— Theys
— Torchefelon
— La Tour-du-Pin
— Le Touvet
— Trept
— Valencogne
— Vasselin
— Velanne
— Vénérieu
— Vernas
— Vertrieu
— Vézeronce-Curtin
— Vignieu
— Villemoirieu
— Val-de-Virieu
— Voiron
— Voissant
SAVOIE Department—Aiguebelette-le-Lac—Grand-Aigueblanche—Les Allues—Apremont—Arbin—Argentine—Arvillard—Attignat-Oncin—Les Avanchers-Valmorel—Avressieux—Ayn—Barberaz—Barby—Bassens—La Bauche—Belmont-Tramonet—Betton-Bettonet—Bourget-en-Huile—Bozel—Brides-les-Bains—La Bridoire—Challes-les-Eaux—Chambéry—La Chambre—Chamoux-sur-Gelon—Champagneux—Champagny-en-Vanoise—Champ-Laurent—La Chapelle—La Chapelle-Blanche—Châteauneuf—La Chavanne—Les Chavannes-en-Maurienne—Chignin—Cognin—Coise-Saint-Jean-Pied-Gauthier—Corbel—La Croix-de-la-Rochette—Cruet—Curienne—Détrier—Domessin—Dullin—Les Échelles—Entremont-le-Vieux—Épierre—Feissons-sur-Salins—Gerbaix—Hautecour—Hauteville—La Tour-en-Maurienne—Jacob-Bellecombette—Jarrier—Laissaud—Landry—Lépin-le-Lac—Porte-de-Savoie—Marcieux—Les Mollettes—Montagnole—Montagny—Montendry—Montgilbert—Montmélian—Montvalezan—Montvernier—Moûtiers—Myans—Nances—Notre-Dame-du-Cruet—Notre-Dame-du-Pré—Novalaise—Peisey-Nancroix—Planaise—Planay—Le Pont-de-Beauvoisin—Le Pontet—Pralognan-la-Vanoise—Presle—Puygros—La Ravoire—Rochefort—Valgelon-La Rochette—Rotherens—Saint-Alban-de-Montbel—Saint-Alban-d’Hurtières—Saint-Alban-des-Villards—Saint-Alban-Leysse—Saint-Avre—Saint-Baldoph—Saint-Béron—Courchevel—Saint-Cassin—Saint-Christophe—Saint-Colomban-des-Villards—Saint-Étienne-de-Cuines—Sainte-Foy-Tarentaise—Saint-Franc—Saint François Longchamp—Saint-Genix-les-Villages—Saint-Georges-d’Hurtières—Sainte-Hélène-du-Lac—Saint-Jean-d’Arvey—Saint-Jean-de-Couz—Saint-Jean-de-la-Porte—Saint-Jean-de-Maurienne—Saint-Jeoire-Prieuré—Saint-Julien-Mont-Denis—Saint-Léger—Saint-Marcel—Sainte-Marie-d’Alvey—Sainte-Marie-de-Cuines—Les Belleville—Saint-Martin-sur-la-Chambre—Saint-Pierre-d’Alvey—Saint-Pierre-de-Belleville—Saint-Pierre-d’Entremont—Saint-Pierre-de-Genebroz—Saint-Pierre-de-Soucy—Saint-Rémy-de-Maurienne—Saint-Sulpice—Saint-Thibaud-de-Couz—Salins-Fontaine—Séez—La Table—Thoiry—La Thuile—La Trinité—Verel-de-Montbel—Le Verneil—Villard-d’Héry—Villard-Léger—Villard-Sallet—Villaroger—Villaroux—Vimines—Val-d’Isère—Tignes — Aiguebelette-le-Lac — Grand-Aigueblanche — Les Allues — Apremont — Arbin — Argentine — Arvillard — Attignat-Oncin — Les Avanchers-Valmorel — Avressieux — Ayn — Barberaz — Barby — Bassens — La Bauche — Belmont-Tramonet — Betton-Bettonet — Bourget-en-Huile — Bozel — Brides-les-Bains — La Bridoire — Challes-les-Eaux — Chambéry — La Chambre — Chamoux-sur-Gelon — Champagneux — Champagny-en-Vanoise — Champ-Laurent — La Chapelle — La Chapelle-Blanche — Châteauneuf — La Chavanne — Les Chavannes-en-Maurienne — Chignin — Cognin — Coise-Saint-Jean-Pied-Gauthier — Corbel — La Croix-de-la-Rochette — Cruet — Curienne — Détrier — Domessin — Dullin — Les Échelles — Entremont-le-Vieux — Épierre — Feissons-sur-Salins — Gerbaix — Hautecour — Hauteville — La Tour-en-Maurienne — Jacob-Bellecombette — Jarrier — Laissaud — Landry — Lépin-le-Lac — Porte-de-Savoie — Marcieux — Les Mollettes — Montagnole — Montagny — Montendry — Montgilbert — Montmélian — Montvalezan — Montvernier — Moûtiers — Myans — Nances — Notre-Dame-du-Cruet — Notre-Dame-du-Pré — Novalaise — Peisey-Nancroix — Planaise — Planay — Le Pont-de-Beauvoisin — Le Pontet — Pralognan-la-Vanoise — Presle — Puygros — La Ravoire — Rochefort — Valgelon-La Rochette — Rotherens — Saint-Alban-de-Montbel — Saint-Alban-d’Hurtières — Saint-Alban-des-Villards — Saint-Alban-Leysse — Saint-Avre — Saint-Baldoph — Saint-Béron — Courchevel — Saint-Cassin — Saint-Christophe — Saint-Colomban-des-Villards — Saint-Étienne-de-Cuines — Sainte-Foy-Tarentaise — Saint-Franc — Saint François Longchamp — Saint-Genix-les-Villages — Saint-Georges-d’Hurtières — Sainte-Hélène-du-Lac — Saint-Jean-d’Arvey — Saint-Jean-de-Couz — Saint-Jean-de-la-Porte — Saint-Jean-de-Maurienne — Saint-Jeoire-Prieuré — Saint-Julien-Mont-Denis — Saint-Léger — Saint-Marcel — Sainte-Marie-d’Alvey — Sainte-Marie-de-Cuines — Les Belleville — Saint-Martin-sur-la-Chambre — Saint-Pierre-d’Alvey — Saint-Pierre-de-Belleville — Saint-Pierre-d’Entremont — Saint-Pierre-de-Genebroz — Saint-Pierre-de-Soucy — Saint-Rémy-de-Maurienne — Saint-Sulpice — Saint-Thibaud-de-Couz — Salins-Fontaine — Séez — La Table — Thoiry — La Thuile — La Trinité — Verel-de-Montbel — Le Verneil — Villard-d’Héry — Villard-Léger — Villard-Sallet — Villaroger — Villaroux — Vimines — Val-d’Isère — Tignes
— Aiguebelette-le-Lac
— Grand-Aigueblanche
— Les Allues
— Apremont
— Arbin
— Argentine
— Arvillard
— Attignat-Oncin
— Les Avanchers-Valmorel
— Avressieux
— Ayn
— Barberaz
— Barby
— Bassens
— La Bauche
— Belmont-Tramonet
— Betton-Bettonet
— Bourget-en-Huile
— Bozel
— Brides-les-Bains
— La Bridoire
— Challes-les-Eaux
— Chambéry
— La Chambre
— Chamoux-sur-Gelon
— Champagneux
— Champagny-en-Vanoise
— Champ-Laurent
— La Chapelle
— La Chapelle-Blanche
— Châteauneuf
— La Chavanne
— Les Chavannes-en-Maurienne
— Chignin
— Cognin
— Coise-Saint-Jean-Pied-Gauthier
— Corbel
— La Croix-de-la-Rochette
— Cruet
— Curienne
— Détrier
— Domessin
— Dullin
— Les Échelles
— Entremont-le-Vieux
— Épierre
— Feissons-sur-Salins
— Gerbaix
— Hautecour
— Hauteville
— La Tour-en-Maurienne
— Jacob-Bellecombette
— Jarrier
— Laissaud
— Landry
— Lépin-le-Lac
— Porte-de-Savoie
— Marcieux
— Les Mollettes
— Montagnole
— Montagny
— Montendry
— Montgilbert
— Montmélian
— Montvalezan
— Montvernier
— Moûtiers
— Myans
— Nances
— Notre-Dame-du-Cruet
— Notre-Dame-du-Pré
— Novalaise
— Peisey-Nancroix
— Planaise
— Planay
— Le Pont-de-Beauvoisin
— Le Pontet
— Pralognan-la-Vanoise
— Presle
— Puygros
— La Ravoire
— Rochefort
— Valgelon-La Rochette
— Rotherens
— Saint-Alban-de-Montbel
— Saint-Alban-d’Hurtières
— Saint-Alban-des-Villards
— Saint-Alban-Leysse
— Saint-Avre
— Saint-Baldoph
— Saint-Béron
— Courchevel
— Saint-Cassin
— Saint-Christophe
— Saint-Colomban-des-Villards
— Saint-Étienne-de-Cuines
— Sainte-Foy-Tarentaise
— Saint-Franc
— Saint François Longchamp
— Saint-Genix-les-Villages
— Saint-Georges-d’Hurtières
— Sainte-Hélène-du-Lac
— Saint-Jean-d’Arvey
— Saint-Jean-de-Couz
— Saint-Jean-de-la-Porte
— Saint-Jean-de-Maurienne
— Saint-Jeoire-Prieuré
— Saint-Julien-Mont-Denis
— Saint-Léger
— Saint-Marcel
— Sainte-Marie-d’Alvey
— Sainte-Marie-de-Cuines
— Les Belleville
— Saint-Martin-sur-la-Chambre
— Saint-Pierre-d’Alvey
— Saint-Pierre-de-Belleville
— Saint-Pierre-d’Entremont
— Saint-Pierre-de-Genebroz
— Saint-Pierre-de-Soucy
— Saint-Rémy-de-Maurienne
— Saint-Sulpice
— Saint-Thibaud-de-Couz
— Salins-Fontaine
— Séez
— La Table
— Thoiry
— La Thuile
— La Trinité
— Verel-de-Montbel
— Le Verneil
— Villard-d’Héry
— Villard-Léger
— Villard-Sallet
— Villaroger
— Villaroux
— Vimines
— Val-d’Isère
— Tignes
— Aiguebelette-le-Lac
— Grand-Aigueblanche
— Les Allues
— Apremont
— Arbin
— Argentine
— Arvillard
— Attignat-Oncin
— Les Avanchers-Valmorel
— Avressieux
— Ayn
— Barberaz
— Barby
— Bassens
— La Bauche
— Belmont-Tramonet
— Betton-Bettonet
— Bourget-en-Huile
— Bozel
— Brides-les-Bains
— La Bridoire
— Challes-les-Eaux
— Chambéry
— La Chambre
— Chamoux-sur-Gelon
— Champagneux
— Champagny-en-Vanoise
— Champ-Laurent
— La Chapelle
— La Chapelle-Blanche
— Châteauneuf
— La Chavanne
— Les Chavannes-en-Maurienne
— Chignin
— Cognin
— Coise-Saint-Jean-Pied-Gauthier
— Corbel
— La Croix-de-la-Rochette
— Cruet
— Curienne
— Détrier
— Domessin
— Dullin
— Les Échelles
— Entremont-le-Vieux
— Épierre
— Feissons-sur-Salins
— Gerbaix
— Hautecour
— Hauteville
— La Tour-en-Maurienne
— Jacob-Bellecombette
— Jarrier
— Laissaud
— Landry
— Lépin-le-Lac
— Porte-de-Savoie
— Marcieux
— Les Mollettes
— Montagnole
— Montagny
— Montendry
— Montgilbert
— Montmélian
— Montvalezan
— Montvernier
— Moûtiers
— Myans
— Nances
— Notre-Dame-du-Cruet
— Notre-Dame-du-Pré
— Novalaise
— Peisey-Nancroix
— Planaise
— Planay
— Le Pont-de-Beauvoisin
— Le Pontet
— Pralognan-la-Vanoise
— Presle
— Puygros
— La Ravoire
— Rochefort
— Valgelon-La Rochette
— Rotherens
— Saint-Alban-de-Montbel
— Saint-Alban-d’Hurtières
— Saint-Alban-des-Villards
— Saint-Alban-Leysse
— Saint-Avre
— Saint-Baldoph
— Saint-Béron
— Courchevel
— Saint-Cassin
— Saint-Christophe
— Saint-Colomban-des-Villards
— Saint-Étienne-de-Cuines
— Sainte-Foy-Tarentaise
— Saint-Franc
— Saint François Longchamp
— Saint-Genix-les-Villages
— Saint-Georges-d’Hurtières
— Sainte-Hélène-du-Lac
— Saint-Jean-d’Arvey
— Saint-Jean-de-Couz
— Saint-Jean-de-la-Porte
— Saint-Jean-de-Maurienne
— Saint-Jeoire-Prieuré
— Saint-Julien-Mont-Denis
— Saint-Léger
— Saint-Marcel
— Sainte-Marie-d’Alvey
— Sainte-Marie-de-Cuines
— Les Belleville
— Saint-Martin-sur-la-Chambre
— Saint-Pierre-d’Alvey
— Saint-Pierre-de-Belleville
— Saint-Pierre-d’Entremont
— Saint-Pierre-de-Genebroz
— Saint-Pierre-de-Soucy
— Saint-Rémy-de-Maurienne
— Saint-Sulpice
— Saint-Thibaud-de-Couz
— Salins-Fontaine
— Séez
— La Table
— Thoiry
— La Thuile
— La Trinité
— Verel-de-Montbel
— Le Verneil
— Villard-d’Héry
— Villard-Léger
— Villard-Sallet
— Villaroger
— Villaroux
— Vimines
— Val-d’Isère
— Tignes
HAUTE-SAVOIE Department—Allonzier-la-Caille—Amancy—Ambilly—Andilly—Annemasse—Arâches-la-Frasse—Arbusigny—Archamps—Arenthon—Arthaz-Pont-Notre-Dame—Ayse—Beaumont—Bellevaux—Boëge—Bogève—Bonne—Bonneville—Bossey—Brizon—Cercier—Cernex—Challonges—Chamonix-Mont-Blanc—La Chapelle-Rambaud—Charvonnex—Châtillon-sur-Cluses—Chaumont—Chavannaz—Chêne-en-Semine—Chênex—Chessenaz—Chevrier—Clarafond-Arcine—Cluses—Collonges-sous-Salève—Contamine-Sarzin—Contamine-sur-Arve—Copponex—Cornier—La Côte-d’Arbroz—Cranves-Sales—Cruseilles—Dingy-en-Vuache—Éloise—Essert-Romand—Etaux—Étrembières—Faucigny—Feigères—Fillinges—Franclens—Frangy—Gaillard—Les Gets—Groisy—Habère-Lullin—Les Houches—Jonzier-Épagny—Juvigny—Lucinges—Magland—Marcellaz—Marignier—Marlioz—Marnaz—Mégevette—Menthonnex-en-Bornes—Mieussy—Minzier—Monnetier-Mornex—Montriond—Mont-Saxonnex—Morillon—Morzine—La Muraz—Musièges—Nancy-sur-Cluses—Nangy—Nâves-Parmelan—Neydens—Onnion—Passy—Peillonnex—Pers-Jussy—Glières-Val-de-Borne—Présilly—Reignier-Ésery—Le Reposoir—La Rivière-Enverse—La Roche-sur-Foron—Saint-André-de-Boëge—Saint-Blaise—Saint-Germain-sur-Rhône—Saint-Jean-d’Aulps—Saint-Jean-de-Tholome—Saint-Jeoire—Saint-Julien-en-Genevois—Saint-Laurent—Saint-Pierre-en-Faucigny—Saint-Sigismond—Saint-Sixt—Samoëns—Le Sappey—Savigny—Scientrier—Scionzier—Servoz—Seytroux—Sixt-Fer-à-Cheval—Taninges—Thyez—Fillière—La Tour—Usinens—Valleiry—Vallorcine—Vanzy—Verchaix—Vers—Vétraz-Monthoux—Villard—Villaz—Ville-en-Sallaz—Ville-la-Grand—Villy-le-Bouveret—Villy-le-Pelloux—Viry—Viuz-en-Sallaz—Vougy—Vovray-en-Bornes—Vulbens — Allonzier-la-Caille — Amancy — Ambilly — Andilly — Annemasse — Arâches-la-Frasse — Arbusigny — Archamps — Arenthon — Arthaz-Pont-Notre-Dame — Ayse — Beaumont — Bellevaux — Boëge — Bogève — Bonne — Bonneville — Bossey — Brizon — Cercier — Cernex — Challonges — Chamonix-Mont-Blanc — La Chapelle-Rambaud — Charvonnex — Châtillon-sur-Cluses — Chaumont — Chavannaz — Chêne-en-Semine — Chênex — Chessenaz — Chevrier — Clarafond-Arcine — Cluses — Collonges-sous-Salève — Contamine-Sarzin — Contamine-sur-Arve — Copponex — Cornier — La Côte-d’Arbroz — Cranves-Sales — Cruseilles — Dingy-en-Vuache — Éloise — Essert-Romand — Etaux — Étrembières — Faucigny — Feigères — Fillinges — Franclens — Frangy — Gaillard — Les Gets — Groisy — Habère-Lullin — Les Houches — Jonzier-Épagny — Juvigny — Lucinges — Magland — Marcellaz — Marignier — Marlioz — Marnaz — Mégevette — Menthonnex-en-Bornes — Mieussy — Minzier — Monnetier-Mornex — Montriond — Mont-Saxonnex — Morillon — Morzine — La Muraz — Musièges — Nancy-sur-Cluses — Nangy — Nâves-Parmelan — Neydens — Onnion — Passy — Peillonnex — Pers-Jussy — Glières-Val-de-Borne — Présilly — Reignier-Ésery — Le Reposoir — La Rivière-Enverse — La Roche-sur-Foron — Saint-André-de-Boëge — Saint-Blaise — Saint-Germain-sur-Rhône — Saint-Jean-d’Aulps — Saint-Jean-de-Tholome — Saint-Jeoire — Saint-Julien-en-Genevois — Saint-Laurent — Saint-Pierre-en-Faucigny — Saint-Sigismond — Saint-Sixt — Samoëns — Le Sappey — Savigny — Scientrier — Scionzier — Servoz — Seytroux — Sixt-Fer-à-Cheval — Taninges — Thyez — Fillière — La Tour — Usinens — Valleiry — Vallorcine — Vanzy — Verchaix — Vers — Vétraz-Monthoux — Villard — Villaz — Ville-en-Sallaz — Ville-la-Grand — Villy-le-Bouveret — Villy-le-Pelloux — Viry — Viuz-en-Sallaz — Vougy — Vovray-en-Bornes — Vulbens
— Allonzier-la-Caille
— Amancy
— Ambilly
— Andilly
— Annemasse
— Arâches-la-Frasse
— Arbusigny
— Archamps
— Arenthon
— Arthaz-Pont-Notre-Dame
— Ayse
— Beaumont
— Bellevaux
— Boëge
— Bogève
— Bonne
— Bonneville
— Bossey
— Brizon
— Cercier
— Cernex
— Challonges
— Chamonix-Mont-Blanc
— La Chapelle-Rambaud
— Charvonnex
— Châtillon-sur-Cluses
— Chaumont
— Chavannaz
— Chêne-en-Semine
— Chênex
— Chessenaz
— Chevrier
— Clarafond-Arcine
— Cluses
— Collonges-sous-Salève
— Contamine-Sarzin
— Contamine-sur-Arve
— Copponex
— Cornier
— La Côte-d’Arbroz
— Cranves-Sales
— Cruseilles
— Dingy-en-Vuache
— Éloise
— Essert-Romand
— Etaux
— Étrembières
— Faucigny
— Feigères
— Fillinges
— Franclens
— Frangy
— Gaillard
— Les Gets
— Groisy
— Habère-Lullin
— Les Houches
— Jonzier-Épagny
— Juvigny
— Lucinges
— Magland
— Marcellaz
— Marignier
— Marlioz
— Marnaz
— Mégevette
— Menthonnex-en-Bornes
— Mieussy
— Minzier
— Monnetier-Mornex
— Montriond
— Mont-Saxonnex
— Morillon
— Morzine
— La Muraz
— Musièges
— Nancy-sur-Cluses
— Nangy
— Nâves-Parmelan
— Neydens
— Onnion
— Passy
— Peillonnex
— Pers-Jussy
— Glières-Val-de-Borne
— Présilly
— Reignier-Ésery
— Le Reposoir
— La Rivière-Enverse
— La Roche-sur-Foron
— Saint-André-de-Boëge
— Saint-Blaise
— Saint-Germain-sur-Rhône
— Saint-Jean-d’Aulps
— Saint-Jean-de-Tholome
— Saint-Jeoire
— Saint-Julien-en-Genevois
— Saint-Laurent
— Saint-Pierre-en-Faucigny
— Saint-Sigismond
— Saint-Sixt
— Samoëns
— Le Sappey
— Savigny
— Scientrier
— Scionzier
— Servoz
— Seytroux
— Sixt-Fer-à-Cheval
— Taninges
— Thyez
— Fillière
— La Tour
— Usinens
— Valleiry
— Vallorcine
— Vanzy
— Verchaix
— Vers
— Vétraz-Monthoux
— Villard
— Villaz
— Ville-en-Sallaz
— Ville-la-Grand
— Villy-le-Bouveret
— Villy-le-Pelloux
— Viry
— Viuz-en-Sallaz
— Vougy
— Vovray-en-Bornes
— Vulbens
— Allonzier-la-Caille
— Amancy
— Ambilly
— Andilly
— Annemasse
— Arâches-la-Frasse
— Arbusigny
— Archamps
— Arenthon
— Arthaz-Pont-Notre-Dame
— Ayse
— Beaumont
— Bellevaux
— Boëge
— Bogève
— Bonne
— Bonneville
— Bossey
— Brizon
— Cercier
— Cernex
— Challonges
— Chamonix-Mont-Blanc
— La Chapelle-Rambaud
— Charvonnex
— Châtillon-sur-Cluses
— Chaumont
— Chavannaz
— Chêne-en-Semine
— Chênex
— Chessenaz
— Chevrier
— Clarafond-Arcine
— Cluses
— Collonges-sous-Salève
— Contamine-Sarzin
— Contamine-sur-Arve
— Copponex
— Cornier
— La Côte-d’Arbroz
— Cranves-Sales
— Cruseilles
— Dingy-en-Vuache
— Éloise
— Essert-Romand
— Etaux
— Étrembières
— Faucigny
— Feigères
— Fillinges
— Franclens
— Frangy
— Gaillard
— Les Gets
— Groisy
— Habère-Lullin
— Les Houches
— Jonzier-Épagny
— Juvigny
— Lucinges
— Magland
— Marcellaz
— Marignier
— Marlioz
— Marnaz
— Mégevette
— Menthonnex-en-Bornes
— Mieussy
— Minzier
— Monnetier-Mornex
— Montriond
— Mont-Saxonnex
— Morillon
— Morzine
— La Muraz
— Musièges
— Nancy-sur-Cluses
— Nangy
— Nâves-Parmelan
— Neydens
— Onnion
— Passy
— Peillonnex
— Pers-Jussy
— Glières-Val-de-Borne
— Présilly
— Reignier-Ésery
— Le Reposoir
— La Rivière-Enverse
— La Roche-sur-Foron
— Saint-André-de-Boëge
— Saint-Blaise
— Saint-Germain-sur-Rhône
— Saint-Jean-d’Aulps
— Saint-Jean-de-Tholome
— Saint-Jeoire
— Saint-Julien-en-Genevois
— Saint-Laurent
— Saint-Pierre-en-Faucigny
— Saint-Sigismond
— Saint-Sixt
— Samoëns
— Le Sappey
— Savigny
— Scientrier
— Scionzier
— Servoz
— Seytroux
— Sixt-Fer-à-Cheval
— Taninges
— Thyez
— Fillière
— La Tour
— Usinens
— Valleiry
— Vallorcine
— Vanzy
— Verchaix
— Vers
— Vétraz-Monthoux
— Villard
— Villaz
— Ville-en-Sallaz
— Ville-la-Grand
— Villy-le-Bouveret
— Villy-le-Pelloux
— Viry
— Viuz-en-Sallaz
— Vougy
— Vovray-en-Bornes
— Vulbens
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) 2016/429 of the European Parliament and of the Council of 9 March 2016 on transmissible animal diseases and amending and repealing certain acts in the area of animal health (‘Animal Health Law’) (1), and in particular Article 259(1) thereof,
Whereas:
(1) Infection with lumpy skin disease virus is an infectious, vector-borne disease affecting bovine animals. Its occurrence can have a severe impact on the concerned animal population and on the profitability of farming, also causing disturbance to movements of those animals and products thereof within the Union and exports to third countries.
(2) In the event of an outbreak of infection lumpy skin disease virus in bovine animals, there is a serious risk of the spread of that disease to other establishments of bovine animals particularly due its main mode of transmission through vectors.
(3) Commission Delegated Regulation (EU) 2020/687 (2) supplements the rules for the control of the listed diseases referred to in Article 9(1), points (a), (b) and (c), of Regulation (EU) 2016/429, and defined as category A, B and C diseases in Commission Implementing Regulation (EU) 2018/1882 (3). In particular, Articles 21 and 22 of Delegated Regulation (EU) 2020/687 provide for the establishment of a restricted zone in the event of an outbreak of a category A disease, including infection with lumpy skin disease virus, and for certain measures to be applied therein. In addition, Article 21(1) of that Delegated Regulation provides that the restricted zone is to comprise at least a protection zone, a surveillance zone, and, if necessary, further restricted zones around or adjacent to the protection and surveillance zones.
(4) Commission Implementing Decision (EU) 2025/1336 (4) was adopted on the basis of Regulation (EU) 2016/429, and it lays down certain interim emergency measures relating to infection with lumpy skin disease virus in France.
(5) More particularly, Implementing Decision (EU) 2025/1336 requires the establishment of restricted zones in the sense of Delegated Regulation (EU) 2020/687 in that Member State, and determine the areas listed in their respective Annexes as such zones.
(6) Since the adoption of Implementing Decision (EU) 2025/1336, France has notified the Commission of 33 additional outbreaks of infection with lumpy skin disease virus in establishments keeping bovine animals in the communes of Chambéry and Annecy, departments of Savoie and Haute Savoie, region of Auvergne-Rhône-Alpes, which were reported between 4-23 July 2025. In response to these outbreaks, France has established protection and surveillance zones in the departments of Ain, Isere, Savoie, and Haute Savoie, region of Auvergne-Rhône-Alpe, where the disease control measures laid down in accordance with Delegated Regulation (EU) 2020/687 are applied.
(7) The size of the areas indicated as protection and surveillance zones in Annex I to this Decision, as well as the duration of the measures to be applied therein, are based on the criteria laid down in Article 64(1) of Regulation (EU) 2016/429 as well as on the rules laid down in Delegated Regulation (EU) 2020/687. The criteria applied for the choice of the size of the protection zone and the surveillance zone, as well as of the duration of the measures to be applied therein, include the consideration of not only the epidemiological situation as regards infection with lumpy skin disease virus in the areas affected by that disease, but also of other epidemiological factors, including geographical parameters and the risk for the further spread of the disease in view of the presence of insect vectors. The chosen duration of the measures foreseen in this Decision has also taken into account the international standards of the Terrestrial Animal Health Code of the World Organisation for Animal Health (5).
(8) Regulation (EU) 2016/429, in particular Article 69, provides that the competent authority of a Member State may use emergency protective vaccination where necessary for the effective control of a listed disease in kept animals. To that end, the competent authority is to establish vaccination zones and implement an official vaccination plan that meets specific requirements. Commission Delegated Regulation (EU) 2023/361 (6), which supplements Regulation (EU) 2016/429 lays down, inter alia, the specific rules to be implemented by Member States when using emergency protective vaccination in bovine animals to prevent or control a listed disease. That Delegated Regulation also contains the conditions under which the movement of vaccinated animals and products thereof may be allowed. Specific conditions for emergency protective vaccination against infection with lumpy skin disease are laid down in Annex IX to that Delegated Regulation.
(9) Commission Implementing Regulation (EU) 2022/140 (7) lays down rules for the application of Regulation (EU) 2016/429 with regard to the Union antigen, vaccine and diagnostic reagent banks. In particular, it lays down the procedural and technical requirements under Article 8 for Member States to request emergency access to vaccines, including those for lumpy skin disease, from vaccine banks.
(10) On 1 July 2025, France submitted to the Commission its official vaccination plan for emergency protective vaccination against infection with lumpy skin disease. The plan includes information on the geographical and administrative scope of the vaccination zone, the number of establishments and animals to be vaccinated, and the duration of the vaccination, as required by Article 6(4), point (a), of Delegated Regulation (EU) 2023/361. They also requested sufficient vaccine doses from the Union vaccine bank, in accordance with Article 8 of Implementing Regulation (EU) 2022/140 in order to commence emergency protective vaccination in the territory of the four departments of Ain, Savoie, Haute-Savoie and Isère in the Auvergne-Rhône-Alpes region of France.
(11) The conditions under which France is to apply emergency protective vaccination against infection with lumpy skin disease virus, as well as the risk-mitigating measures that are to be taken for the movement of vaccinated animals and their products are laid down in Annex IX to Delegated Regulation (EU) 2023/361. In line with these conditions, vaccination may be implemented in vaccination zones I or II, depending on the confirmation of infection with lumpy skin disease virus.
(12) The type, size and duration of vaccination zones I and II may need to be adjusted in the light of the evolving epidemiological situation and the progress of the vaccination campaigns, particularly taking into account the evolving level of vaccine coverage achieved. Where appropriate or necessary, a vaccination zone II or part thereof may need to be converted into a vaccination zone I and vice versa, in line with the criteria set out in Delegated Regulation (EU) 2023/361 and based on the information provided by the competent authorities of the affected Member States. Accordingly, it is necessary to indicate, in the Annex to this Decision, the dates for the conversion of one type of vaccination zone to another.
(13) In view of the current epidemiological situation and the risk that infection with lumpy skin disease virus can spread through sub-clinically infected bovine animals, it is necessary to prohibit the movement of such animals from any location within the protection and surveillance zones to destinations outside the external perimeters of those zones in France or outside that Member State until a certain date.
(14) In order to prevent any unnecessary disturbance to trade within the Union, and to avoid unjustified barriers to trade being imposed by third countries, the areas identified as protection and surveillance zones, as well as the vaccination zone, should be set out in the Annex to this Decision, and the duration of those measures fixed, in collaboration with that Member State.
(15) To ensure legal clarity, the restricted zones and vaccination zones should be clearly defined in terms of their geographical scope and their duration to prevent the further spread of the disease within France to other Member States or to third countries. In light of the epidemiological situation, the provisions of this Decision should apply as soon as possible.
(16) Implementing Decision (EU) 2025/1336 should, therefore, be repealed and replaced by this Decision.
(17) The measures provided for in this Decision are in accordance with the opinion of the Standing Committee on Plants, Animals, Food and Feed,
HAS ADOPTED THIS DECISION:
France shall ensure that:

(a) a restricted zone, which comprises the protection and surveillance zones, is established immediately by the competent authorities of that Member State in accordance with Article 21 of Delegated Regulation (EU) 2020/687, and under the conditions laid down in that Article;
(b) a vaccination zone is established immediately by the competent authorities of that Member State in accordance with Part 1 of Annex IX to Delegated Regulation (EU) 2023/361, and under the conditions laid down in that Annex;
(c) the protection and surveillance zones referred to in point (a) as well as the vaccination zone referred to in point (b) comprise at least the areas listed in the Annexes to this Decision;
(d) the measures required to be applied in the protection and surveillance zones as well as the vaccination zone are applied at least until the dates listed in the Annexes to this Decision.

France shall ensure that movements of bovine animals from the protection and surveillance zones set out in Annex I to a destination located outside the external perimeter of those zones in France or outside that Member State are prohibited until the dates listed in that Annex.
Implementing Decision (EU) 2025/1336 is repealed.
This Decision is addressed to the French Republic.

Part A: Protection and surveillance zones established around the confirmed outbreaks

Administrative area and ADIS reference number of the outbreak
Areas established as protection and surveillance zones, part of the restricted zone, referred to in Article 1
Date until applicable
Region of Auvergne-Rhône-Alpes
FR-LSD-2025-00001
FR-LSD-2025-00002
FR-LSD-2025-00003
FR-LSD-2025-00004
FR-LSD-2025-00005
FR-LSD-2025-00006
FR-LSD-2025-00007
FR-LSD-2025-00008
FR-LSD-2025-00009
FR-LSD-2025-00010
FR-LSD-2025-00011
FR-LSD-2025-00012
FR-LSD-2025-00013
FR-LSD-2025-00014
FR-LSD-2025-00015
FR-LSD-2025-00016
FR-LSD-2025-00017
FR-LSD-2025-00018
FR-LSD-2025-00019
FR-LSD-2025-00020
FR-LSD-2025-00021
FR-LSD-2025-00022
FR-LSD-2025-00023
FR-LSD-2025-00024
FR-LSD-2025-00025
FR-LSD-2025-00026
FR-LSD-2025-00027
FR-LSD-2025-00028
FR-LSD-2025-00029
FR-LSD-2025-00030
FR-LSD-2025-00031
FR-LSD-2025-00032
FR-LSD-2025-00033
FR-LSD-2025-00034
Protection zone:
The following municipalities in the following departments from region of Auvergne-Rhône-Alpes:

AIN Department
—
Andert-et-Condon
—
Anglefort
—
Arboys en Bugey
—
Artemare
—
Belley
—
Valromey-sur-Séran
—
Brens
—
Ceyzérieu
—
Champagne-en-Valromey
—
Chazey-Bons
—
Cheignieu-la-Balme
—
Contrevoz
—
Corbonod
—
Cressin-Rochefort
—
Culoz-Béon
—
Cuzieu
—
Flaxieu
—
Lavours
—
Magnieu
—
Marignieu
—
Massignieu-de-Rives
—
Parves et Nattages
—
Peyrieu
—
Pollieu
—
Saint-Germain-les-Paroisses
—
Saint-Martin-de-Bavel
—
Seyssel
—
Talissieu
—
Virieu-le-Grand
—
Arvière-en-Valromey
—
Virignin
—
Vongnes

SAVOIE Department
—
Aillon-le-Jeune
—
Aillon-le-Vieux
—
Aime-la-Plagne
—
Aiton
—
Aix-les-Bains
—
Entrelacs
—
Albertville
—
Allondaz
—
Arith
—
La Balme
—
La Bâthie
—
Beaufort
—
Bellecombe-en-Bauges
—
Billième
—
La Biolle
—
Bonvillard
—
Bonvillaret
—
Bourdeau
—
Le Bourget-du-Lac
—
Bourgneuf
—
Bourg-Saint-Maurice
—
Brison-Saint-Innocent
—
Césarches
—
Cevins
—
Chamousset
—
Chanaz
—
La Chapelle-du-Mont-du-Chat
—
Les Chapelles
—
La Chapelle-Saint-Martin
—
Le Châtelard
—
Chindrieux
—
Cléry
—
Cohennoz
—
La Compôte
—
Conjux
—
Crest-Voland
—
Les Déserts
—
Doucy-en-Bauges
—
Drumettaz-Clarafond
—
École
—
Esserts-Blay
—
Flumet
—
Fréterive
—
Frontenex
—
La Giettaz
—
Gilly-sur-Isère
—
Grésy-sur-Aix
—
Grésy-sur-Isère
—
Grignon
—
Hauteluce
—
Jarsy
—
Jongieux
—
Lescheraines
—
Loisieux
—
Lucey
—
La Plagne Tarentaise
—
Marthod
—
Mercury
—
Méry
—
Meyrieux-Trouet
—
Montailleur
—
Montcel
—
Monthion
—
Montsapey
—
La Motte-en-Bauges
—
La Motte-Servolex
—
Motz
—
Mouxy
—
Notre-Dame-de-Bellecombe
—
La Léchère
—
Notre-Dame-des-Millières
—
Le Noyer
—
Ontex
—
Pallud
—
Plancherine
—
Pugny-Chatenod
—
Queige
—
Val-d’Arc
—
Rognaix
—
Ruffieux
—
Saint-François-de-Sales
—
Sainte-Hélène-sur-Isère
—
Saint-Jean-de-Chevelu
—
Saint-Nicolas-la-Chapelle
—
Saint-Offenge
—
Saint-Ours
—
Saint-Paul-sur-Isère
—
Saint-Paul-sur-Yenne
—
Saint-Pierre-d’Albigny
—
Saint-Pierre-de-Curtille
—
Sainte-Reine
—
Saint-Vital
—
Serrières-en-Chautagne
—
Sonnaz
—
Thénésol
—
Tournon
—
Tours-en-Savoie
—
Traize
—
Tresserve
—
Trévignin
—
Ugine
—
Venthon
—
Verel-Pragondran
—
Verrens-Arvey
—
Verthemex
—
Villard-sur-Doron
—
Vions
—
Viviers-du-Lac
—
Voglans
—
Yenne

HAUTE-SAVOIE Department
—
Alby-sur-Chéran
—
Alex
—
Allèves
—
Annecy
—
Argonay
—
La Balme-de-Sillingy
—
La Balme-de-Thuy
—
Bassy
—
Bloye
—
Bluffy
—
Le Bouchet-Mont-Charvin
—
Boussy
—
Chainaz-les-Frasses
—
La Chapelle-Saint-Maurice
—
Chapeiry
—
Chavanod
—
Chevaline
—
Chilly
—
Choisy
—
Clermont
—
Les Clefs
—
La Clusaz
—
Combloux
—
Les Contamines-Montjoie
—
Cordon
—
Crempigny-Bonneguête
—
Cusy
—
Cuvat
—
Demi-Quartier
—
Desingy
—
Dingy-Saint-Clair
—
Domancy
—
Doussard
—
Droisy
—
Duingt
—
Entrevernes
—
Epagny Metz-Tessy
—
Étercy
—
Faverges-Seythenex
—
Giez
—
Le Grand-Bornand
—
Gruffy
—
Hauteville-sur-Fier
—
Héry-sur-Alby
—
Lathuile
—
Leschaux
—
Lornay
—
Lovagny
—
Manigod
—
Marcellaz-Albanais
—
Marigny-Saint-Marcel
—
Val de Chaise
—
Massingy
—
Megève
—
Menthon-Saint-Bernard
—
Menthonnex-sous-Clermont
—
Mésigny
—
Montagny-les-Lanches
—
Moye
—
Mûres
—
Nonglard
—
Poisy
—
Praz-sur-Arly
—
Quintal
—
Rumilly
—
Saint-Eusèbe
—
Saint-Eustache
—
Saint-Félix
—
Saint-Ferréol
—
Saint-Gervais-les-Bains
—
Saint-Jean-de-Sixt
—
Saint-Jorioz
—
Saint-Sylvestre
—
Sales
—
Sallanches
—
Sallenôves
—
Serraval
—
Sevrier
—
Seyssel
—
Sillingy
—
Talloires-Montmin
—
Thônes
—
Thusy
—
Vallières-sur-Fier
—
Vaulx
—
Versonnex
—
Veyrier-du-Lac
—
Les Villards-sur-Thônes
—
Viuz-la-Chiésaz
24.8.2025

Surveillance zone:
The following municipalities in the following departments from region of Auvergne-Rhône-Alpes:

AIN Department

AIN Department
—
Andert-et-Condon
—
Anglefort
—
Arboys en Bugey
—
Artemare
—
Belley
—
Valromey-sur-Séran
—
Brens
—
Ceyzérieu
—
Champagne-en-Valromey
—
Chazey-Bons
—
Cheignieu-la-Balme
—
Contrevoz
—
Corbonod
—
Cressin-Rochefort
—
Culoz-Béon
—
Cuzieu
—
Flaxieu
—
Lavours
—
Magnieu
—
Marignieu
—
Massignieu-de-Rives
—
Parves et Nattages
—
Peyrieu
—
Pollieu
—
Saint-Germain-les-Paroisses
—
Saint-Martin-de-Bavel
—
Seyssel
—
Talissieu
—
Virieu-le-Grand
—
Arvière-en-Valromey
—
Virignin
—
Vongnes

SAVOIE Department
—
Aillon-le-Jeune
—
Aillon-le-Vieux
—
Aime-la-Plagne
—
Aiton
—
Aix-les-Bains
—
Entrelacs
—
Albertville
—
Allondaz
—
Arith
—
La Balme
—
La Bâthie
—
Beaufort
—
Bellecombe-en-Bauges
—
Billième
—
La Biolle
—
Bonvillard
—
Bonvillaret
—
Bourdeau
—
Le Bourget-du-Lac
—
Bourgneuf
—
Bourg-Saint-Maurice
—
Brison-Saint-Innocent
—
Césarches
—
Cevins
—
Chamousset
—
Chanaz
—
La Chapelle-du-Mont-du-Chat
—
Les Chapelles
—
La Chapelle-Saint-Martin
—
Le Châtelard
—
Chindrieux
—
Cléry
—
Cohennoz
—
La Compôte
—
Conjux
—
Crest-Voland
—
Les Déserts
—
Doucy-en-Bauges
—
Drumettaz-Clarafond
—
École
—
Esserts-Blay
—
Flumet
—
Fréterive
—
Frontenex
—
La Giettaz
—
Gilly-sur-Isère
—
Grésy-sur-Aix
—
Grésy-sur-Isère
—
Grignon
—
Hauteluce
—
Jarsy
—
Jongieux
—
Lescheraines
—
Loisieux
—
Lucey
—
La Plagne Tarentaise
—
Marthod
—
Mercury
—
Méry
—
Meyrieux-Trouet
—
Montailleur
—
Montcel
—
Monthion
—
Montsapey
—
La Motte-en-Bauges
—
La Motte-Servolex
—
Motz
—
Mouxy
—
Notre-Dame-de-Bellecombe
—
La Léchère
—
Notre-Dame-des-Millières
—
Le Noyer
—
Ontex
—
Pallud
—
Plancherine
—
Pugny-Chatenod
—
Queige
—
Val-d’Arc
—
Rognaix
—
Ruffieux
—
Saint-François-de-Sales
—
Sainte-Hélène-sur-Isère
—
Saint-Jean-de-Chevelu
—
Saint-Nicolas-la-Chapelle
—
Saint-Offenge
—
Saint-Ours
—
Saint-Paul-sur-Isère
—
Saint-Paul-sur-Yenne
—
Saint-Pierre-d’Albigny
—
Saint-Pierre-de-Curtille
—
Sainte-Reine
—
Saint-Vital
—
Serrières-en-Chautagne
—
Sonnaz
—
Thénésol
—
Tournon
—
Tours-en-Savoie
—
Traize
—
Tresserve
—
Trévignin
—
Ugine
—
Venthon
—
Verel-Pragondran
—
Verrens-Arvey
—
Verthemex
—
Villard-sur-Doron
—
Vions
—
Viviers-du-Lac
—
Voglans
—
Yenne

HAUTE-SAVOIE Department
—
Alby-sur-Chéran
—
Alex
—
Allèves
—
Annecy
—
Argonay
—
La Balme-de-Sillingy
—
La Balme-de-Thuy
—
Bassy
—
Bloye
—
Bluffy
—
Le Bouchet-Mont-Charvin
—
Boussy
—
Chainaz-les-Frasses
—
La Chapelle-Saint-Maurice
—
Chapeiry
—
Chavanod
—
Chevaline
—
Chilly
—
Choisy
—
Clermont
—
Les Clefs
—
La Clusaz
—
Combloux
—
Les Contamines-Montjoie
—
Cordon
—
Crempigny-Bonneguête
—
Cusy
—
Cuvat
—
Demi-Quartier
—
Desingy
—
Dingy-Saint-Clair
—
Domancy
—
Doussard
—
Droisy
—
Duingt
—
Entrevernes
—
Epagny Metz-Tessy
—
Étercy
—
Faverges-Seythenex
—
Giez
—
Le Grand-Bornand
—
Gruffy
—
Hauteville-sur-Fier
—
Héry-sur-Alby
—
Lathuile
—
Leschaux
—
Lornay
—
Lovagny
—
Manigod
—
Marcellaz-Albanais
—
Marigny-Saint-Marcel
—
Val de Chaise
—
Massingy
—
Megève
—
Menthon-Saint-Bernard
—
Menthonnex-sous-Clermont
—
Mésigny
—
Montagny-les-Lanches
—
Moye
—
Mûres
—
Nonglard
—
Poisy
—
Praz-sur-Arly
—
Quintal
—
Rumilly
—
Saint-Eusèbe
—
Saint-Eustache
—
Saint-Félix
—
Saint-Ferréol
—
Saint-Gervais-les-Bains
—
Saint-Jean-de-Sixt
—
Saint-Jorioz
—
Saint-Sylvestre
—
Sales
—
Sallanches
—
Sallenôves
—
Serraval
—
Sevrier
—
Seyssel
—
Sillingy
—
Talloires-Montmin
—
Thônes
—
Thusy
—
Vallières-sur-Fier
—
Vaulx
—
Versonnex
—
Veyrier-du-Lac
—
Les Villards-sur-Thônes
—
Viuz-la-Chiésaz
25.8.2025 – 10.9.2025

Surveillance zone:
The following municipalities in the following departments from region of Auvergne-Rhône-Alpes:

AIN Department
—
L’Abergement-de-Varey
—
Ambérieu-en-Bugey
—
Ambléon
—
Ambronay
—
Ambutrix
—
Apremont
—
Aranc
—
Arandas
—
Argis
—
Armix
—
Bellignat
—
Valserhône
—
Belleydoux
—
Bénonces
—
Bettant
—
Billiat
—
Blyes
—
Boyeux-Saint-Jérôme
—
Brégnier-Cordon
—
Brénod
—
Brion
—
Briord
—
La Burbanche
—
Ceignes
—
Cerdon
—
Chaley
—
Challes-la-Montagne
—
Challex
—
Champdor-Corcelles
—
Champfromier
—
Chanay
—
Charix
—
Château-Gaillard
—
Chazey-sur-Ain
—
Chevillard
—
Chevry
—
Chézery-Forens
—
Cleyzieu
—
Collonges
—
Colomieu
—
Conand
—
Condamine
—
Confort
—
Conzieu
—
Corlier
—
Crozet
—
Douvres
—
Échallon
—
Évosges
—
Farges
—
Ferney-Voltaire
—
Béard-Géovreissiat
—
Giron
—
Groissiat
—
Hautecourt-Romanèche
—
Plateau d’Hauteville
—
Haut Valromey
—
Injoux-Génissiat
—
Innimond
—
Izenave
—
Izernore
—
Izieu
—
Jujurieux
—
Labalme
—
Lagnieu
—
Le Poizat-Lalleyriat
—
Lantenay
—
Léaz
—
Lélex
—
Leyment
—
Leyssard
—
Surjoux-Lhopital
—
Lhuis
—
Lompnas
—
Loyettes
—
Maillat
—
Marchamp
—
Martignat
—
Mérignat
—
Montagnieu
—
Montanges
—
Montréal-la-Cluse
—
Nurieux-Volognat
—
Murs-et-Gélignieux
—
Nantua
—
Neuville-sur-Ain
—
Les Neyrolles
—
Nivollet-Montgriffon
—
Oncieu
—
Ordonnaz
—
Outriaz
—
Oyonnax
—
Péron
—
Peyriat
—
Plagne
—
Poncin
—
Pont-d’Ain
—
Port
—
Pougny
—
Prémeyzel
—
Prémillieu
—
Prévessin-Moëns
—
Priay
—
Rossillon
—
Saint-Alban
—
Groslée-Saint-Benoit
—
Saint-Denis-en-Bugey
—
Saint-Genis-Pouilly
—
Saint-Germain-de-Joux
—
Saint-Jean-de-Gonville
—
Saint-Jean-de-Niost
—
Saint-Jean-le-Vieux
—
Sainte-Julie
—
Saint-Martin-du-Frêne
—
Saint-Maurice-de-Rémens
—
Saint-Rambert-en-Bugey
—
Saint-Sorlin-en-Bugey
—
Saint-Vulbas
—
Sault-Brénaz
—
Seillonnaz
—
Sergy
—
Serrières-de-Briord
—
Serrières-sur-Ain
—
Souclin
—
Tenay
—
Thoiry
—
Torcieu
—
Vaux-en-Bugey
—
Vieu-d’Izenave
—
Villebois
—
Villes

ISERE Department
—
Les Abrets en Dauphiné
—
Allevard
—
Annoisin-Chatelans
—
Aoste
—
Les Avenières Veyrins-Thuellin
—
La Balme-les-Grottes
—
Barraux
—
La Bâtie-Montgascon
—
Bilieu
—
Blandin
—
Le Bouchage
—
Bourgoin-Jallieu
—
Bouvesse-Quirieu
—
Brangues
—
La Buissière
—
Cessieu
—
Chapareillan
—
La Chapelle-de-la-Tour
—
La Chapelle-du-Bard
—
Charancieu
—
Charavines
—
Charette
—
Chassignieu
—
Chélieu
—
Le Cheylas
—
Chimilin
—
Chirens
—
Corbelin
—
Courtenay
—
Crémieu
—
Creys-Mépieu
—
Dizimieu
—
Doissin
—
Dolomieu
—
Entre-deux-Guiers
—
Faverges-de-la-Tour
—
Le Haut-Bréda
—
La Flachère
—
Goncelin
—
Granieu
—
Hières-sur-Amby
—
Leyrieu
—
Massieu
—
Merlas
—
Miribel-les-Échelles
—
Montagnieu
—
Montalieu-Vercieu
—
Montcarra
—
Montferrat
—
Moras
—
Morestel
—
Le Moutaret
—
Optevoz
—
Oyeu
—
Villages du Lac de Paladru
—
Parmilieu
—
Le Passage
—
Arandon-Passins
—
Pontcharra
—
Le Pont-de-Beauvoisin
—
Porcieu-Amblagnieu
—
Pressins
—
Rochetoirin
—
Romagnieu
—
Ruy-Montceau
—
Saint-Albin-de-Vaulserre
—
Saint-André-le-Gaz
—
Saint-Aupre
—
Saint-Baudille-de-la-Tour
—
Sainte-Blandine
—
Saint-Bueil
—
Saint-Chef
—
Saint-Christophe-sur-Guiers
—
Saint-Clair-de-la-Tour
—
Saint-Didier-de-la-Tour
—
Saint-Étienne-de-Crossey
—
Saint-Geoire-en-Valdaine
—
Saint-Hilaire-de-Brens
—
Plateau-des-Petites-Roches
—
Saint-Jean-d’Avelanne
—
Saint-Jean-de-Soudain
—
Saint-Joseph-de-Rivière
—
Saint-Laurent-du-Pont
—
Sainte-Marie-d’Alloix
—
Sainte-Marie-du-Mont
—
Saint-Martin-de-Vaulserre
—
Saint-Maximin
—
Saint-Nicolas-de-Macherin
—
Saint-Ondras
—
Crêts en Belledonne
—
Saint-Pierre-de-Chartreuse
—
Saint-Pierre-d’Entremont
—
Saint-Savin
—
Saint-Sorlin-de-Morestel
—
Saint-Sulpice-des-Rivoires
—
Saint-Victor-de-Cessieu
—
Saint-Victor-de-Morestel
—
Saint-Vincent-de-Mercuze
—
Salagnon
—
Sérézin-de-la-Tour
—
Sermérieu
—
Siccieu-Saint-Julien-et-Carisieu
—
Soleymieu
—
Theys
—
Torchefelon
—
La Tour-du-Pin
—
Le Touvet
—
Trept
—
Valencogne
—
Vasselin
—
Velanne
—
Vénérieu
—
Vernas
—
Vertrieu
—
Vézeronce-Curtin
—
Vignieu
—
Villemoirieu
—
Val-de-Virieu
—
Voiron
—
Voissant

SAVOIE Department
—
Aiguebelette-le-Lac
—
Grand-Aigueblanche
—
Les Allues
—
Apremont
—
Arbin
—
Argentine
—
Arvillard
—
Attignat-Oncin
—
Les Avanchers-Valmorel
—
Avressieux
—
Ayn
—
Barberaz
—
Barby
—
Bassens
—
La Bauche
—
Belmont-Tramonet
—
Betton-Bettonet
—
Bourget-en-Huile
—
Bozel
—
Brides-les-Bains
—
La Bridoire
—
Challes-les-Eaux
—
Chambéry
—
La Chambre
—
Chamoux-sur-Gelon
—
Champagneux
—
Champagny-en-Vanoise
—
Champ-Laurent
—
La Chapelle
—
La Chapelle-Blanche
—
Châteauneuf
—
La Chavanne
—
Les Chavannes-en-Maurienne
—
Chignin
—
Cognin
—
Coise-Saint-Jean-Pied-Gauthier
—
Corbel
—
La Croix-de-la-Rochette
—
Cruet
—
Curienne
—
Détrier
—
Domessin
—
Dullin
—
Les Échelles
—
Entremont-le-Vieux
—
Épierre
—
Feissons-sur-Salins
—
Gerbaix
—
Hautecour
—
Hauteville
—
La Tour-en-Maurienne
—
Jacob-Bellecombette
—
Jarrier
—
Laissaud
—
Landry
—
Lépin-le-Lac
—
Porte-de-Savoie
—
Marcieux
—
Les Mollettes
—
Montagnole
—
Montagny
—
Montendry
—
Montgilbert
—
Montmélian
—
Montvalezan
—
Montvernier
—
Moûtiers
—
Myans
—
Nances
—
Notre-Dame-du-Cruet
—
Notre-Dame-du-Pré
—
Novalaise
—
Peisey-Nancroix
—
Planaise
—
Planay
—
Le Pont-de-Beauvoisin
—
Le Pontet
—
Pralognan-la-Vanoise
—
Presle
—
Puygros
—
La Ravoire
—
Rochefort
—
Valgelon-La Rochette
—
Rotherens
—
Saint-Alban-de-Montbel
—
Saint-Alban-d’Hurtières
—
Saint-Alban-des-Villards
—
Saint-Alban-Leysse
—
Saint-Avre
—
Saint-Baldoph
—
Saint-Béron
—
Courchevel
—
Saint-Cassin
—
Saint-Christophe
—
Saint-Colomban-des-Villards
—
Saint-Étienne-de-Cuines
—
Sainte-Foy-Tarentaise
—
Saint-Franc
—
Saint François Longchamp
—
Saint-Genix-les-Villages
—
Saint-Georges-d’Hurtières
—
Sainte-Hélène-du-Lac
—
Saint-Jean-d’Arvey
—
Saint-Jean-de-Couz
—
Saint-Jean-de-la-Porte
—
Saint-Jean-de-Maurienne
—
Saint-Jeoire-Prieuré
—
Saint-Julien-Mont-Denis
—
Saint-Léger
—
Saint-Marcel
—
Sainte-Marie-d’Alvey
—
Sainte-Marie-de-Cuines
—
Les Belleville
—
Saint-Martin-sur-la-Chambre
—
Saint-Pierre-d’Alvey
—
Saint-Pierre-de-Belleville
—
Saint-Pierre-d’Entremont
—
Saint-Pierre-de-Genebroz
—
Saint-Pierre-de-Soucy
—
Saint-Rémy-de-Maurienne
—
Saint-Sulpice
—
Saint-Thibaud-de-Couz
—
Salins-Fontaine
—
Séez
—
La Table
—
Thoiry
—
La Thuile
—
La Trinité
—
Verel-de-Montbel
—
Le Verneil
—
Villard-d’Héry
—
Villard-Léger
—
Villard-Sallet
—
Villaroger
—
Villaroux
—
Vimines
—
Val-d’Isère
—
Tignes

HAUTE-SAVOIE Department
—
Allonzier-la-Caille
—
Amancy
—
Ambilly
—
Andilly
—
Annemasse
—
Arâches-la-Frasse
—
Arbusigny
—
Archamps
—
Arenthon
—
Arthaz-Pont-Notre-Dame
—
Ayse
—
Beaumont
—
Bellevaux
—
Boëge
—
Bogève
—
Bonne
—
Bonneville
—
Bossey
—
Brizon
—
Cercier
—
Cernex
—
Challonges
—
Chamonix-Mont-Blanc
—
La Chapelle-Rambaud
—
Charvonnex
—
Châtillon-sur-Cluses
—
Chaumont
—
Chavannaz
—
Chêne-en-Semine
—
Chênex
—
Chessenaz
—
Chevrier
—
Clarafond-Arcine
—
Cluses
—
Collonges-sous-Salève
—
Contamine-Sarzin
—
Contamine-sur-Arve
—
Copponex
—
Cornier
—
La Côte-d’Arbroz
—
Cranves-Sales
—
Cruseilles
—
Dingy-en-Vuache
—
Éloise
—
Essert-Romand
—
Etaux
—
Étrembières
—
Faucigny
—
Feigères
—
Fillinges
—
Franclens
—
Frangy
—
Gaillard
—
Les Gets
—
Groisy
—
Habère-Lullin
—
Les Houches
—
Jonzier-Épagny
—
Juvigny
—
Lucinges
—
Magland
—
Marcellaz
—
Marignier
—
Marlioz
—
Marnaz
—
Mégevette
—
Menthonnex-en-Bornes
—
Mieussy
—
Minzier
—
Monnetier-Mornex
—
Montriond
—
Mont-Saxonnex
—
Morillon
—
Morzine
—
La Muraz
—
Musièges
—
Nancy-sur-Cluses
—
Nangy
—
Nâves-Parmelan
—
Neydens
—
Onnion
—
Passy
—
Peillonnex
—
Pers-Jussy
—
Glières-Val-de-Borne
—
Présilly
—
Reignier-Ésery
—
Le Reposoir
—
La Rivière-Enverse
—
La Roche-sur-Foron
—
Saint-André-de-Boëge
—
Saint-Blaise
—
Saint-Germain-sur-Rhône
—
Saint-Jean-d’Aulps
—
Saint-Jean-de-Tholome
—
Saint-Jeoire
—
Saint-Julien-en-Genevois
—
Saint-Laurent
—
Saint-Pierre-en-Faucigny
—
Saint-Sigismond
—
Saint-Sixt
—
Samoëns
—
Le Sappey
—
Savigny
—
Scientrier
—
Scionzier
—
Servoz
—
Seytroux
—
Sixt-Fer-à-Cheval
—
Taninges
—
Thyez
—
Fillière
—
La Tour
—
Usinens
—
Valleiry
—
Vallorcine
—
Vanzy
—
Verchaix
—
Vers
—
Vétraz-Monthoux
—
Villard
—
Villaz
—
Ville-en-Sallaz
—
Ville-la-Grand
—
Villy-le-Bouveret
—
Villy-le-Pelloux
—
Viry
—
Viuz-en-Sallaz
—
Vougy
—
Vovray-en-Bornes
—
Vulbens
10.9.2025

Part A: Vaccination zone II

The municipalities of the departments listed in Annex I until 30.9.2025.

Part B: Vaccination zone I

The municipalities of the departments listed in Annex I as of 1.10.2025.