Council Decision (EU) 2025/2362 of 13 November 2025 establishing the position to be taken on behalf of the European Union within the Joint Committee established by the Agreement on the withdrawal of the United Kingdom of Great Britain and Northern Ireland from the European Union and the European Atomic Energy Community as regards the adoption of a decision adding a newly adopted Union act to Annex 2 to the Windsor Framework

Official Journalof the European Union ENL series
2025/2362 20.11.2025
(1) The Agreement on the withdrawal of the United Kingdom of Great Britain and Northern Ireland from the European Union and the European Atomic Energy Community(1)(the ‘Withdrawal Agreement’) was concluded by the Union by Council Decision (EU) 2020/135(2)and entered into force on 1 February 2020.
(2) Pursuant to Article 13(4) of the Windsor Framework(3), which forms an integral part of the Withdrawal Agreement, the Joint Committee established under Article 164(1) thereof (the ‘Joint Committee’) is empowered to adopt decisions to amend the relevant Annexes to the Windsor Framework by adding newly adopted Union acts that fall within the scope of the Windsor Framework, but which neither amend nor replace Union acts listed in the Annexes to the Windsor Framework.
(3) Whilst Article 51 of Regulation (EU) 2025/14 of the European Parliament and of the Council(4)is applicable pursuant to Article 13(3) of the Windsor Framework, the remainder of the provisions of that Regulation are provisions of a newly adopted Union act falling within the scope of the Windsor Framework which should be added to Annex 2 to the Windsor Framework.
(4) The Joint Committee, at its next meeting, should adopt a decision pursuant to Article 13(4) of the Windsor Framework adding this newly adopted Union act to Annex 2 to the Windsor Framework.
(5) It is appropriate to establish the position to be taken on behalf of the Union within the Joint Committee as regards the adoption of a decision adding the newly adopted Union act to Annex 2 to the Windsor Framework,
(1) Article 13(4) of the Windsor Framework empowers the Joint Committee established under Article 164(1) of the Withdrawal Agreement (the ‘Joint Committee’) to adopt decisions adding newly adopted Union acts falling within the scope of the Windsor Framework to the relevant Annexes to the Windsor Framework.
(2) Pursuant to Article 166(2) of the Withdrawal Agreement, the decisions adopted by the Joint Committee are binding on the Union and the United Kingdom. The Union and the United Kingdom are to implement such decisions, which have the same legal effect as the Withdrawal Agreement.
(3) Whilst Article 51 of Regulation (EU) 2025/14 of the European Parliament and of the Council of 19 December 2024 on the approval and market surveillance of non-road mobile machinery circulating on public roads and amending Regulation (EU) 2019/1020(3)is applicable pursuant to Article 13(3) of the Windsor Framework, the remainder of the provisions of that Regulation are provisions of a newly adopted Union act falling within the scope of the Windsor Framework which should be added to Annex 2 to the Windsor Framework,
THE COUNCIL OF THE EUROPEAN UNION,
Having regard to the Treaty on European Union, and in particular Article 50(2) thereof,
Having regard to the Treaty on the Functioning of the European Union, and in particular Article 218(9) thereof,
Having regard to the proposal from the European Commission,
Whereas:
(1) The Agreement on the withdrawal of the United Kingdom of Great Britain and Northern Ireland from the European Union and the European Atomic Energy Community (1) (the ‘Withdrawal Agreement’) was concluded by the Union by Council Decision (EU) 2020/135 (2) and entered into force on 1 February 2020.
(2) Pursuant to Article 13(4) of the Windsor Framework (3), which forms an integral part of the Withdrawal Agreement, the Joint Committee established under Article 164(1) thereof (the ‘Joint Committee’) is empowered to adopt decisions to amend the relevant Annexes to the Windsor Framework by adding newly adopted Union acts that fall within the scope of the Windsor Framework, but which neither amend nor replace Union acts listed in the Annexes to the Windsor Framework.
(3) Whilst Article 51 of Regulation (EU) 2025/14 of the European Parliament and of the Council (4) is applicable pursuant to Article 13(3) of the Windsor Framework, the remainder of the provisions of that Regulation are provisions of a newly adopted Union act falling within the scope of the Windsor Framework which should be added to Annex 2 to the Windsor Framework.
(4) The Joint Committee, at its next meeting, should adopt a decision pursuant to Article 13(4) of the Windsor Framework adding this newly adopted Union act to Annex 2 to the Windsor Framework.
(5) It is appropriate to establish the position to be taken on behalf of the Union within the Joint Committee as regards the adoption of a decision adding the newly adopted Union act to Annex 2 to the Windsor Framework,
HAS ADOPTED THIS DECISION:
The position to be taken on behalf of the European Union within the Joint Committee established under Article 164(1) of the Agreement on the withdrawal of the United Kingdom of Great Britain and Northern Ireland from the European Union and the European Atomic Energy Community (the ‘Joint Committee’) is set out in the draft decision of the Joint Committee attached to this Decision.
This Decision shall enter into force on the date of its adoption.
Regulation (EU) 2025/14 of the European Parliament and of the Council of 19 December 2024 on the approval and market surveillance of non-road mobile machinery circulating on public roads and amending Regulation (EU) 2019/1020 shall be added to Annex 2 to the Windsor Framework under point 14 ‘Construction products, machinery, cableways, personal protective equipment’.
This Decision shall enter into force on the day following the date of its adoption.

Commission Implementing Decision (EU) 2025/2361 of 18 November 2025 amending the Annex to Implementing Decision (EU) 2025/2256 concerning emergency measures in relation to outbreaks of Newcastle disease in Poland (notified under document C(2025) 7865)

Official Journalof the European Union ENL series
2025/2361 21.11.2025
(1) Newcastle disease (ND) is an infectious viral disease in birds and can have a severe impact on the profitability of poultry farming, causing disturbance to trade within the Union and exports to third countries. In the event of an outbreak of ND, there is a risk that the disease agent may spread to other establishments keeping poultry or captive birds.
(2) Regulation (EU) 2016/429 establishes the legislative framework for the prevention and control of diseases that are transmissible to animals or humans. ND falls within the definition of a listed disease in that Regulation, and it is subject to the disease prevention and control rules laid down therein. In addition, Commission Delegated Regulation (EU) 2020/687(2)supplements Regulation (EU) 2016/429 as regards the rules for the control of certain listed diseases, including ND. In particular, Articles 21 and 22 of Delegated Regulation (EU) 2020/687 provide that in the event of an outbreak of a category A disease, including ND, in an establishment, the competent authority is to immediately establish a restricted zone, and for certain measures to be applied therein. Article 21(1) of that Delegated Regulation provides that the restricted zone is to comprise a protection zone, a surveillance zone, and, if necessary, further restricted zones around or adjacent to the protection and surveillance zones.
(3) Commission Implementing Decision (EU) 2025/2256(3)was adopted on the basis of Regulation (EU) 2016/429, and it lays down emergency measures at Union level in relation to outbreaks of ND in Poland. In particular, Implementing Decision (EU) 2025/2256 provides that the protection, surveillance, and further restricted zones, to be established by Poland following outbreaks of ND, in accordance with Delegated Regulation (EU) 2020/687, are to comprise at least the areas listed as protection, surveillance, and further restricted zones in the Annex to that Implementing Decision. It also provides that the measures to be applied in those zones, in accordance with that Delegated Regulation, are to be maintained until at least the dates set out in that Annex.
(4) Since the date of adoption of Implementing Decision (EU) 2025/2256, Poland has notified the Commission of three new outbreaks of ND in establishments where poultry or captive birds were kept, located in the Podlaskie, Wielkopolskie and Zachodniopomorskie voivodships.
(5) Following those three new outbreaks, the competent authority of Poland has taken the necessary disease control measures required in accordance with Delegated Regulation (EU) 2020/687, including the establishment of protection and surveillance zones around the outbreaks.
(6) The Commission has examined the disease control measures taken by Poland and it is satisfied that the boundaries of the protection and surveillances zones established by that Member State, following the three new outbreaks, are at a sufficient distance from the establishments where the outbreaks of ND have been confirmed.
(7) In order to prevent any unnecessary disturbance to trade within the Union and to avoid any unjustified disruptions to trade with third countries, it is necessary to rapidly lay down at Union level, in collaboration with Poland, the protection and surveillance zones established by that Member State, in accordance with Delegated Regulation (EU) 2020/687, following the three new outbreaks.
(8) Therefore, the areas concerned should now be listed as protection and surveillance zones for Poland in the Annex to Implementing Decision (EU) 2025/2256, to take account of the boundaries of the protection and surveillance zones established by that Member State following the three new ND outbreaks in that Member State, as well as the duration of the measures required to be applied in those zones, in accordance with Delegated Regulation (EU) 2020/687.
(9) Given the urgency of the epidemiological situation in Poland as regards the spread of ND, and the need to prevent the disease spreading from the affected establishments in Poland to other parts of that Member State or to other Member States or third countries, it is appropriate that the amendments to be made to the Annex to Implementing Decision (EU) 2025/2256, by this Decision, take effect as soon as possible.
(10) The measures provided for in this Decision are in accordance with the opinion of the Standing Committee on Plants, Animals, Food and Feed,
Administrative area and ADIS reference number of the outbreak Areas established as protection, surveillance, and further restricted zones, referred to in Articles 2, 3 and 4. Date until applicable
Kujawsko-Pomorskie voivodship
PL-ND-2025-00063PL-ND.NON-P-2025-00044 Protection zone:W woj. kujawsko-pomorskim:1)w powiecie aleksandrowskim:a)miasto Aleksandrów Kujawski,b)w gminie Aleksandrów Kujawski miejscowości: Białe Błota, Łazieniec, Nowy Ciechocinek część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Otłoczyn, Rożno-Parcele, Stawki, Wołuszewo, Wygoda,c)w gminie Zakrzewo miejscowości: Gosławice, Gęsin, Kolonia Bodzanowska, Lepsze, Siniarzewo, Sinki, Ujma Duża, Wola Bachorna,d)w gminie Koneck miejscowości: Kajetanowo, Kamieniec, Pomiany,e)w gminie Bądkowo miejscowości: Sinki, Łowiczek.2)w powiecie radziejowskim:a)w gminie Osięciny miejscowości: Bilno, Ujma Mała. 1) w powiecie aleksandrowskim:a)miasto Aleksandrów Kujawski,b)w gminie Aleksandrów Kujawski miejscowości: Białe Błota, Łazieniec, Nowy Ciechocinek część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Otłoczyn, Rożno-Parcele, Stawki, Wołuszewo, Wygoda,c)w gminie Zakrzewo miejscowości: Gosławice, Gęsin, Kolonia Bodzanowska, Lepsze, Siniarzewo, Sinki, Ujma Duża, Wola Bachorna,d)w gminie Koneck miejscowości: Kajetanowo, Kamieniec, Pomiany,e)w gminie Bądkowo miejscowości: Sinki, Łowiczek. a) miasto Aleksandrów Kujawski, b) w gminie Aleksandrów Kujawski miejscowości: Białe Błota, Łazieniec, Nowy Ciechocinek część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Otłoczyn, Rożno-Parcele, Stawki, Wołuszewo, Wygoda, c) w gminie Zakrzewo miejscowości: Gosławice, Gęsin, Kolonia Bodzanowska, Lepsze, Siniarzewo, Sinki, Ujma Duża, Wola Bachorna, d) w gminie Koneck miejscowości: Kajetanowo, Kamieniec, Pomiany, e) w gminie Bądkowo miejscowości: Sinki, Łowiczek. 2) w powiecie radziejowskim:a)w gminie Osięciny miejscowości: Bilno, Ujma Mała. a) w gminie Osięciny miejscowości: Bilno, Ujma Mała. 15.11.2025
1) w powiecie aleksandrowskim:a)miasto Aleksandrów Kujawski,b)w gminie Aleksandrów Kujawski miejscowości: Białe Błota, Łazieniec, Nowy Ciechocinek część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Otłoczyn, Rożno-Parcele, Stawki, Wołuszewo, Wygoda,c)w gminie Zakrzewo miejscowości: Gosławice, Gęsin, Kolonia Bodzanowska, Lepsze, Siniarzewo, Sinki, Ujma Duża, Wola Bachorna,d)w gminie Koneck miejscowości: Kajetanowo, Kamieniec, Pomiany,e)w gminie Bądkowo miejscowości: Sinki, Łowiczek. a) miasto Aleksandrów Kujawski, b) w gminie Aleksandrów Kujawski miejscowości: Białe Błota, Łazieniec, Nowy Ciechocinek część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Otłoczyn, Rożno-Parcele, Stawki, Wołuszewo, Wygoda, c) w gminie Zakrzewo miejscowości: Gosławice, Gęsin, Kolonia Bodzanowska, Lepsze, Siniarzewo, Sinki, Ujma Duża, Wola Bachorna, d) w gminie Koneck miejscowości: Kajetanowo, Kamieniec, Pomiany, e) w gminie Bądkowo miejscowości: Sinki, Łowiczek.
a) miasto Aleksandrów Kujawski,
b) w gminie Aleksandrów Kujawski miejscowości: Białe Błota, Łazieniec, Nowy Ciechocinek część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Otłoczyn, Rożno-Parcele, Stawki, Wołuszewo, Wygoda,
c) w gminie Zakrzewo miejscowości: Gosławice, Gęsin, Kolonia Bodzanowska, Lepsze, Siniarzewo, Sinki, Ujma Duża, Wola Bachorna,
d) w gminie Koneck miejscowości: Kajetanowo, Kamieniec, Pomiany,
e) w gminie Bądkowo miejscowości: Sinki, Łowiczek.
2) w powiecie radziejowskim:a)w gminie Osięciny miejscowości: Bilno, Ujma Mała. a) w gminie Osięciny miejscowości: Bilno, Ujma Mała.
a) w gminie Osięciny miejscowości: Bilno, Ujma Mała.
Surveillance zone:W woj. kujawsko-pomorskim:1)w powiecie aleksandrowskim:a)miasto Aleksandrów Kujawski,b)w gminie Aleksandrów Kujawski miejscowości: Białe Błota, Łazieniec, Nowy Ciechocinek część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Otłoczyn, Rożno-Parcele, Stawki, Wołuszewo, Wygoda,c)w gminie Zakrzewo miejscowości: Gosławice, Gęsin, Kolonia Bodzanowska, Lepsze, Siniarzewo, Sinki, Ujma Duża, Wola Bachorna,d)w gminie Koneck miejscowości: Kajetanowo, Kamieniec, Pomiany,e)w gminie Bądkowo miejscowości: Sinki, Łowiczek.2)w powiecie radziejowskim:a)w gminie Osięciny miejscowości: Bilno, Ujma Mała. 1) w powiecie aleksandrowskim:a)miasto Aleksandrów Kujawski,b)w gminie Aleksandrów Kujawski miejscowości: Białe Błota, Łazieniec, Nowy Ciechocinek część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Otłoczyn, Rożno-Parcele, Stawki, Wołuszewo, Wygoda,c)w gminie Zakrzewo miejscowości: Gosławice, Gęsin, Kolonia Bodzanowska, Lepsze, Siniarzewo, Sinki, Ujma Duża, Wola Bachorna,d)w gminie Koneck miejscowości: Kajetanowo, Kamieniec, Pomiany,e)w gminie Bądkowo miejscowości: Sinki, Łowiczek. a) miasto Aleksandrów Kujawski, b) w gminie Aleksandrów Kujawski miejscowości: Białe Błota, Łazieniec, Nowy Ciechocinek część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Otłoczyn, Rożno-Parcele, Stawki, Wołuszewo, Wygoda, c) w gminie Zakrzewo miejscowości: Gosławice, Gęsin, Kolonia Bodzanowska, Lepsze, Siniarzewo, Sinki, Ujma Duża, Wola Bachorna, d) w gminie Koneck miejscowości: Kajetanowo, Kamieniec, Pomiany, e) w gminie Bądkowo miejscowości: Sinki, Łowiczek. 2) w powiecie radziejowskim:a)w gminie Osięciny miejscowości: Bilno, Ujma Mała. a) w gminie Osięciny miejscowości: Bilno, Ujma Mała. 16.11.2025 – 24.11.2025
1) w powiecie aleksandrowskim:a)miasto Aleksandrów Kujawski,b)w gminie Aleksandrów Kujawski miejscowości: Białe Błota, Łazieniec, Nowy Ciechocinek część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Otłoczyn, Rożno-Parcele, Stawki, Wołuszewo, Wygoda,c)w gminie Zakrzewo miejscowości: Gosławice, Gęsin, Kolonia Bodzanowska, Lepsze, Siniarzewo, Sinki, Ujma Duża, Wola Bachorna,d)w gminie Koneck miejscowości: Kajetanowo, Kamieniec, Pomiany,e)w gminie Bądkowo miejscowości: Sinki, Łowiczek. a) miasto Aleksandrów Kujawski, b) w gminie Aleksandrów Kujawski miejscowości: Białe Błota, Łazieniec, Nowy Ciechocinek część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Otłoczyn, Rożno-Parcele, Stawki, Wołuszewo, Wygoda, c) w gminie Zakrzewo miejscowości: Gosławice, Gęsin, Kolonia Bodzanowska, Lepsze, Siniarzewo, Sinki, Ujma Duża, Wola Bachorna, d) w gminie Koneck miejscowości: Kajetanowo, Kamieniec, Pomiany, e) w gminie Bądkowo miejscowości: Sinki, Łowiczek.
a) miasto Aleksandrów Kujawski,
b) w gminie Aleksandrów Kujawski miejscowości: Białe Błota, Łazieniec, Nowy Ciechocinek część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Otłoczyn, Rożno-Parcele, Stawki, Wołuszewo, Wygoda,
c) w gminie Zakrzewo miejscowości: Gosławice, Gęsin, Kolonia Bodzanowska, Lepsze, Siniarzewo, Sinki, Ujma Duża, Wola Bachorna,
d) w gminie Koneck miejscowości: Kajetanowo, Kamieniec, Pomiany,
e) w gminie Bądkowo miejscowości: Sinki, Łowiczek.
2) w powiecie radziejowskim:a)w gminie Osięciny miejscowości: Bilno, Ujma Mała. a) w gminie Osięciny miejscowości: Bilno, Ujma Mała.
a) w gminie Osięciny miejscowości: Bilno, Ujma Mała.
Surveillance zone:1)w powiecie aleksandrowskim:a)w gminie Aleksandrów Kujawski miejscowości: Broniszewo, Chrusty, Goszczewo, Grabie, Konradowo, Kuczek, Nowy Ciechocinek część południowa miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część południowa miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Opoki, Ostrowąs, Ośno, Ośno Drugie, Plebanka, Poczałkowo, Podgaj, Przybranowo, Przybranówek, Rudunki, Słomkowo, Słońsk Dolny, Służewo, Wólka, Wilkostowo, Zgoda,b)w gminie Ciechocinek miejscowość: Ciechocinek,c)w gminie Waganiec miejscowość: Konstantynowo, Brudnowo, Kolonia Święte, Michalin, Niszczewy, Wiktoryn, Śliwkowo,d)w gminie Koneck miejscowości: Brzeźno, Chromowola, Jeziorno, Kolonia Kruszynek, Kruszynek, Młynek, Ossówka, Romanowo, Straszewo, Kolonia Straszewska część wschodnia miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Zazdromin, Koneck, Opalanka, Spoczynek, Zapustek, Święte, Żołnowo,e)w gminie Raciążek miejscowości: Dąbrówka, Niestuszewo, Podole, Podzamcze, Raciążek, Raciążek Pole, Siarzewo, Turzno, Turzynek,f)w gminie Bądkowo miejscowości: Biele, Bądkowo, Bądkówek, Jaranowo, Jaranowo Duże, Kalinowiec, Kaniewo, Kolonia Łowiczek, Kujawka, Kwiatkowo-część północna do drogi wojewódzkiej nr 252 (Inowrocław – Włocławek), Olszynka, Słupy Duże, Słupy Małe, Tomaszewo, Toporzyszczewo, Toporzyszczewo Stare, Wysocin, Wójtówka, Łowiczek, Łówkowice, Żabieniec, Wysocinek,g)w gminie Zakrzewo miejscowości: Bachorza, Kolonia Serocka, Kuczkowo, Seroczki, Sędzin, Sędzin-Kolonia, Zakrzewo, Zarębowo;2)w powiecie toruńskim:a)w gminie Obrowo miejscowości: Dzikowo, Obory, Osiek n/Wisłą, Sąsieczno, Silno, Smogorzewiec, Stajenczynki,b)miasto Toruń: Obręb 76, Obręb 78,c)w gminie Lubicz miejscowości: Grabowiec, Kopanino, Złotoria,d)w gminie Wielka Nieszawka miejscowości: Brzoza, Popioły,e)w gminie Czernikowo miejscowość: Pokrzywno;3)w powiecie radziejowskim:a)w gminie Dobre miejscowości: Altana, Bodzanowo, Bodzanowo Drugie, Borowo, Byczyna, Byczyna Kolonia, Czołpin, Dobre, Dobre Wieś, Dęby, Krzywosądz, Ludwikowo, Morawy, Narkowo, Przysiek, Smarglin, Ułomie,b)w gminie Osięciny miejscowości: Bartłomiejowice, Bełszewo, Belszewo Kolonia, Bodzanówek, Kościelna Wieś, Krotoszyn, Leonowo, Nagórki, Pilichowo, Pocierzyn, Ruszki, Szalonki, Sęczkowo, Wola Skarbkowa, Włodzimierka, Zielińsk, Pieńki Kościelskie, Witoldowo, Pułkownikowo, Zagaj,c)w gminie Radziejów miejscowość: Piołunowo;4)w powiecie inowrocławskim:a)w gminie Dąbrowa Biskupia miejscowości: Chlewiska, Chróstowo, Dąbrowa Biskupia, Mleczkowo, Przybysław, Walentynowo;5)w powiecie włocławskim:a)w gminie Lubanie miejscowości: Janowice, Przywieczerzynek, Zapomnianowo, Przywieczerzyn, Tadzin, Zosin. 1) w powiecie aleksandrowskim:a)w gminie Aleksandrów Kujawski miejscowości: Broniszewo, Chrusty, Goszczewo, Grabie, Konradowo, Kuczek, Nowy Ciechocinek część południowa miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część południowa miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Opoki, Ostrowąs, Ośno, Ośno Drugie, Plebanka, Poczałkowo, Podgaj, Przybranowo, Przybranówek, Rudunki, Słomkowo, Słońsk Dolny, Służewo, Wólka, Wilkostowo, Zgoda,b)w gminie Ciechocinek miejscowość: Ciechocinek,c)w gminie Waganiec miejscowość: Konstantynowo, Brudnowo, Kolonia Święte, Michalin, Niszczewy, Wiktoryn, Śliwkowo,d)w gminie Koneck miejscowości: Brzeźno, Chromowola, Jeziorno, Kolonia Kruszynek, Kruszynek, Młynek, Ossówka, Romanowo, Straszewo, Kolonia Straszewska część wschodnia miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Zazdromin, Koneck, Opalanka, Spoczynek, Zapustek, Święte, Żołnowo,e)w gminie Raciążek miejscowości: Dąbrówka, Niestuszewo, Podole, Podzamcze, Raciążek, Raciążek Pole, Siarzewo, Turzno, Turzynek,f)w gminie Bądkowo miejscowości: Biele, Bądkowo, Bądkówek, Jaranowo, Jaranowo Duże, Kalinowiec, Kaniewo, Kolonia Łowiczek, Kujawka, Kwiatkowo-część północna do drogi wojewódzkiej nr 252 (Inowrocław – Włocławek), Olszynka, Słupy Duże, Słupy Małe, Tomaszewo, Toporzyszczewo, Toporzyszczewo Stare, Wysocin, Wójtówka, Łowiczek, Łówkowice, Żabieniec, Wysocinek,g)w gminie Zakrzewo miejscowości: Bachorza, Kolonia Serocka, Kuczkowo, Seroczki, Sędzin, Sędzin-Kolonia, Zakrzewo, Zarębowo; a) w gminie Aleksandrów Kujawski miejscowości: Broniszewo, Chrusty, Goszczewo, Grabie, Konradowo, Kuczek, Nowy Ciechocinek część południowa miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część południowa miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Opoki, Ostrowąs, Ośno, Ośno Drugie, Plebanka, Poczałkowo, Podgaj, Przybranowo, Przybranówek, Rudunki, Słomkowo, Słońsk Dolny, Służewo, Wólka, Wilkostowo, Zgoda, b) w gminie Ciechocinek miejscowość: Ciechocinek, c) w gminie Waganiec miejscowość: Konstantynowo, Brudnowo, Kolonia Święte, Michalin, Niszczewy, Wiktoryn, Śliwkowo, d) w gminie Koneck miejscowości: Brzeźno, Chromowola, Jeziorno, Kolonia Kruszynek, Kruszynek, Młynek, Ossówka, Romanowo, Straszewo, Kolonia Straszewska część wschodnia miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Zazdromin, Koneck, Opalanka, Spoczynek, Zapustek, Święte, Żołnowo, e) w gminie Raciążek miejscowości: Dąbrówka, Niestuszewo, Podole, Podzamcze, Raciążek, Raciążek Pole, Siarzewo, Turzno, Turzynek, f) w gminie Bądkowo miejscowości: Biele, Bądkowo, Bądkówek, Jaranowo, Jaranowo Duże, Kalinowiec, Kaniewo, Kolonia Łowiczek, Kujawka, Kwiatkowo-część północna do drogi wojewódzkiej nr 252 (Inowrocław – Włocławek), Olszynka, Słupy Duże, Słupy Małe, Tomaszewo, Toporzyszczewo, Toporzyszczewo Stare, Wysocin, Wójtówka, Łowiczek, Łówkowice, Żabieniec, Wysocinek, g) w gminie Zakrzewo miejscowości: Bachorza, Kolonia Serocka, Kuczkowo, Seroczki, Sędzin, Sędzin-Kolonia, Zakrzewo, Zarębowo; 2) w powiecie toruńskim:a)w gminie Obrowo miejscowości: Dzikowo, Obory, Osiek n/Wisłą, Sąsieczno, Silno, Smogorzewiec, Stajenczynki,b)miasto Toruń: Obręb 76, Obręb 78,c)w gminie Lubicz miejscowości: Grabowiec, Kopanino, Złotoria,d)w gminie Wielka Nieszawka miejscowości: Brzoza, Popioły,e)w gminie Czernikowo miejscowość: Pokrzywno; a) w gminie Obrowo miejscowości: Dzikowo, Obory, Osiek n/Wisłą, Sąsieczno, Silno, Smogorzewiec, Stajenczynki, b) miasto Toruń: Obręb 76, Obręb 78, c) w gminie Lubicz miejscowości: Grabowiec, Kopanino, Złotoria, d) w gminie Wielka Nieszawka miejscowości: Brzoza, Popioły, e) w gminie Czernikowo miejscowość: Pokrzywno; 3) w powiecie radziejowskim:a)w gminie Dobre miejscowości: Altana, Bodzanowo, Bodzanowo Drugie, Borowo, Byczyna, Byczyna Kolonia, Czołpin, Dobre, Dobre Wieś, Dęby, Krzywosądz, Ludwikowo, Morawy, Narkowo, Przysiek, Smarglin, Ułomie,b)w gminie Osięciny miejscowości: Bartłomiejowice, Bełszewo, Belszewo Kolonia, Bodzanówek, Kościelna Wieś, Krotoszyn, Leonowo, Nagórki, Pilichowo, Pocierzyn, Ruszki, Szalonki, Sęczkowo, Wola Skarbkowa, Włodzimierka, Zielińsk, Pieńki Kościelskie, Witoldowo, Pułkownikowo, Zagaj,c)w gminie Radziejów miejscowość: Piołunowo; a) w gminie Dobre miejscowości: Altana, Bodzanowo, Bodzanowo Drugie, Borowo, Byczyna, Byczyna Kolonia, Czołpin, Dobre, Dobre Wieś, Dęby, Krzywosądz, Ludwikowo, Morawy, Narkowo, Przysiek, Smarglin, Ułomie, b) w gminie Osięciny miejscowości: Bartłomiejowice, Bełszewo, Belszewo Kolonia, Bodzanówek, Kościelna Wieś, Krotoszyn, Leonowo, Nagórki, Pilichowo, Pocierzyn, Ruszki, Szalonki, Sęczkowo, Wola Skarbkowa, Włodzimierka, Zielińsk, Pieńki Kościelskie, Witoldowo, Pułkownikowo, Zagaj, c) w gminie Radziejów miejscowość: Piołunowo; 4) w powiecie inowrocławskim:a)w gminie Dąbrowa Biskupia miejscowości: Chlewiska, Chróstowo, Dąbrowa Biskupia, Mleczkowo, Przybysław, Walentynowo; a) w gminie Dąbrowa Biskupia miejscowości: Chlewiska, Chróstowo, Dąbrowa Biskupia, Mleczkowo, Przybysław, Walentynowo; 5) w powiecie włocławskim:a)w gminie Lubanie miejscowości: Janowice, Przywieczerzynek, Zapomnianowo, Przywieczerzyn, Tadzin, Zosin. a) w gminie Lubanie miejscowości: Janowice, Przywieczerzynek, Zapomnianowo, Przywieczerzyn, Tadzin, Zosin. 24.11.2025
1) w powiecie aleksandrowskim:a)w gminie Aleksandrów Kujawski miejscowości: Broniszewo, Chrusty, Goszczewo, Grabie, Konradowo, Kuczek, Nowy Ciechocinek część południowa miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część południowa miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Opoki, Ostrowąs, Ośno, Ośno Drugie, Plebanka, Poczałkowo, Podgaj, Przybranowo, Przybranówek, Rudunki, Słomkowo, Słońsk Dolny, Służewo, Wólka, Wilkostowo, Zgoda,b)w gminie Ciechocinek miejscowość: Ciechocinek,c)w gminie Waganiec miejscowość: Konstantynowo, Brudnowo, Kolonia Święte, Michalin, Niszczewy, Wiktoryn, Śliwkowo,d)w gminie Koneck miejscowości: Brzeźno, Chromowola, Jeziorno, Kolonia Kruszynek, Kruszynek, Młynek, Ossówka, Romanowo, Straszewo, Kolonia Straszewska część wschodnia miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Zazdromin, Koneck, Opalanka, Spoczynek, Zapustek, Święte, Żołnowo,e)w gminie Raciążek miejscowości: Dąbrówka, Niestuszewo, Podole, Podzamcze, Raciążek, Raciążek Pole, Siarzewo, Turzno, Turzynek,f)w gminie Bądkowo miejscowości: Biele, Bądkowo, Bądkówek, Jaranowo, Jaranowo Duże, Kalinowiec, Kaniewo, Kolonia Łowiczek, Kujawka, Kwiatkowo-część północna do drogi wojewódzkiej nr 252 (Inowrocław – Włocławek), Olszynka, Słupy Duże, Słupy Małe, Tomaszewo, Toporzyszczewo, Toporzyszczewo Stare, Wysocin, Wójtówka, Łowiczek, Łówkowice, Żabieniec, Wysocinek,g)w gminie Zakrzewo miejscowości: Bachorza, Kolonia Serocka, Kuczkowo, Seroczki, Sędzin, Sędzin-Kolonia, Zakrzewo, Zarębowo; a) w gminie Aleksandrów Kujawski miejscowości: Broniszewo, Chrusty, Goszczewo, Grabie, Konradowo, Kuczek, Nowy Ciechocinek część południowa miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część południowa miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Opoki, Ostrowąs, Ośno, Ośno Drugie, Plebanka, Poczałkowo, Podgaj, Przybranowo, Przybranówek, Rudunki, Słomkowo, Słońsk Dolny, Służewo, Wólka, Wilkostowo, Zgoda, b) w gminie Ciechocinek miejscowość: Ciechocinek, c) w gminie Waganiec miejscowość: Konstantynowo, Brudnowo, Kolonia Święte, Michalin, Niszczewy, Wiktoryn, Śliwkowo, d) w gminie Koneck miejscowości: Brzeźno, Chromowola, Jeziorno, Kolonia Kruszynek, Kruszynek, Młynek, Ossówka, Romanowo, Straszewo, Kolonia Straszewska część wschodnia miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Zazdromin, Koneck, Opalanka, Spoczynek, Zapustek, Święte, Żołnowo, e) w gminie Raciążek miejscowości: Dąbrówka, Niestuszewo, Podole, Podzamcze, Raciążek, Raciążek Pole, Siarzewo, Turzno, Turzynek, f) w gminie Bądkowo miejscowości: Biele, Bądkowo, Bądkówek, Jaranowo, Jaranowo Duże, Kalinowiec, Kaniewo, Kolonia Łowiczek, Kujawka, Kwiatkowo-część północna do drogi wojewódzkiej nr 252 (Inowrocław – Włocławek), Olszynka, Słupy Duże, Słupy Małe, Tomaszewo, Toporzyszczewo, Toporzyszczewo Stare, Wysocin, Wójtówka, Łowiczek, Łówkowice, Żabieniec, Wysocinek, g) w gminie Zakrzewo miejscowości: Bachorza, Kolonia Serocka, Kuczkowo, Seroczki, Sędzin, Sędzin-Kolonia, Zakrzewo, Zarębowo;
a) w gminie Aleksandrów Kujawski miejscowości: Broniszewo, Chrusty, Goszczewo, Grabie, Konradowo, Kuczek, Nowy Ciechocinek część południowa miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część południowa miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Opoki, Ostrowąs, Ośno, Ośno Drugie, Plebanka, Poczałkowo, Podgaj, Przybranowo, Przybranówek, Rudunki, Słomkowo, Słońsk Dolny, Służewo, Wólka, Wilkostowo, Zgoda,
b) w gminie Ciechocinek miejscowość: Ciechocinek,
c) w gminie Waganiec miejscowość: Konstantynowo, Brudnowo, Kolonia Święte, Michalin, Niszczewy, Wiktoryn, Śliwkowo,
d) w gminie Koneck miejscowości: Brzeźno, Chromowola, Jeziorno, Kolonia Kruszynek, Kruszynek, Młynek, Ossówka, Romanowo, Straszewo, Kolonia Straszewska część wschodnia miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Zazdromin, Koneck, Opalanka, Spoczynek, Zapustek, Święte, Żołnowo,
e) w gminie Raciążek miejscowości: Dąbrówka, Niestuszewo, Podole, Podzamcze, Raciążek, Raciążek Pole, Siarzewo, Turzno, Turzynek,
f) w gminie Bądkowo miejscowości: Biele, Bądkowo, Bądkówek, Jaranowo, Jaranowo Duże, Kalinowiec, Kaniewo, Kolonia Łowiczek, Kujawka, Kwiatkowo-część północna do drogi wojewódzkiej nr 252 (Inowrocław – Włocławek), Olszynka, Słupy Duże, Słupy Małe, Tomaszewo, Toporzyszczewo, Toporzyszczewo Stare, Wysocin, Wójtówka, Łowiczek, Łówkowice, Żabieniec, Wysocinek,
g) w gminie Zakrzewo miejscowości: Bachorza, Kolonia Serocka, Kuczkowo, Seroczki, Sędzin, Sędzin-Kolonia, Zakrzewo, Zarębowo;
2) w powiecie toruńskim:a)w gminie Obrowo miejscowości: Dzikowo, Obory, Osiek n/Wisłą, Sąsieczno, Silno, Smogorzewiec, Stajenczynki,b)miasto Toruń: Obręb 76, Obręb 78,c)w gminie Lubicz miejscowości: Grabowiec, Kopanino, Złotoria,d)w gminie Wielka Nieszawka miejscowości: Brzoza, Popioły,e)w gminie Czernikowo miejscowość: Pokrzywno; a) w gminie Obrowo miejscowości: Dzikowo, Obory, Osiek n/Wisłą, Sąsieczno, Silno, Smogorzewiec, Stajenczynki, b) miasto Toruń: Obręb 76, Obręb 78, c) w gminie Lubicz miejscowości: Grabowiec, Kopanino, Złotoria, d) w gminie Wielka Nieszawka miejscowości: Brzoza, Popioły, e) w gminie Czernikowo miejscowość: Pokrzywno;
a) w gminie Obrowo miejscowości: Dzikowo, Obory, Osiek n/Wisłą, Sąsieczno, Silno, Smogorzewiec, Stajenczynki,
b) miasto Toruń: Obręb 76, Obręb 78,
c) w gminie Lubicz miejscowości: Grabowiec, Kopanino, Złotoria,
d) w gminie Wielka Nieszawka miejscowości: Brzoza, Popioły,
e) w gminie Czernikowo miejscowość: Pokrzywno;
3) w powiecie radziejowskim:a)w gminie Dobre miejscowości: Altana, Bodzanowo, Bodzanowo Drugie, Borowo, Byczyna, Byczyna Kolonia, Czołpin, Dobre, Dobre Wieś, Dęby, Krzywosądz, Ludwikowo, Morawy, Narkowo, Przysiek, Smarglin, Ułomie,b)w gminie Osięciny miejscowości: Bartłomiejowice, Bełszewo, Belszewo Kolonia, Bodzanówek, Kościelna Wieś, Krotoszyn, Leonowo, Nagórki, Pilichowo, Pocierzyn, Ruszki, Szalonki, Sęczkowo, Wola Skarbkowa, Włodzimierka, Zielińsk, Pieńki Kościelskie, Witoldowo, Pułkownikowo, Zagaj,c)w gminie Radziejów miejscowość: Piołunowo; a) w gminie Dobre miejscowości: Altana, Bodzanowo, Bodzanowo Drugie, Borowo, Byczyna, Byczyna Kolonia, Czołpin, Dobre, Dobre Wieś, Dęby, Krzywosądz, Ludwikowo, Morawy, Narkowo, Przysiek, Smarglin, Ułomie, b) w gminie Osięciny miejscowości: Bartłomiejowice, Bełszewo, Belszewo Kolonia, Bodzanówek, Kościelna Wieś, Krotoszyn, Leonowo, Nagórki, Pilichowo, Pocierzyn, Ruszki, Szalonki, Sęczkowo, Wola Skarbkowa, Włodzimierka, Zielińsk, Pieńki Kościelskie, Witoldowo, Pułkownikowo, Zagaj, c) w gminie Radziejów miejscowość: Piołunowo;
a) w gminie Dobre miejscowości: Altana, Bodzanowo, Bodzanowo Drugie, Borowo, Byczyna, Byczyna Kolonia, Czołpin, Dobre, Dobre Wieś, Dęby, Krzywosądz, Ludwikowo, Morawy, Narkowo, Przysiek, Smarglin, Ułomie,
b) w gminie Osięciny miejscowości: Bartłomiejowice, Bełszewo, Belszewo Kolonia, Bodzanówek, Kościelna Wieś, Krotoszyn, Leonowo, Nagórki, Pilichowo, Pocierzyn, Ruszki, Szalonki, Sęczkowo, Wola Skarbkowa, Włodzimierka, Zielińsk, Pieńki Kościelskie, Witoldowo, Pułkownikowo, Zagaj,
c) w gminie Radziejów miejscowość: Piołunowo;
4) w powiecie inowrocławskim:a)w gminie Dąbrowa Biskupia miejscowości: Chlewiska, Chróstowo, Dąbrowa Biskupia, Mleczkowo, Przybysław, Walentynowo; a) w gminie Dąbrowa Biskupia miejscowości: Chlewiska, Chróstowo, Dąbrowa Biskupia, Mleczkowo, Przybysław, Walentynowo;
a) w gminie Dąbrowa Biskupia miejscowości: Chlewiska, Chróstowo, Dąbrowa Biskupia, Mleczkowo, Przybysław, Walentynowo;
5) w powiecie włocławskim:a)w gminie Lubanie miejscowości: Janowice, Przywieczerzynek, Zapomnianowo, Przywieczerzyn, Tadzin, Zosin. a) w gminie Lubanie miejscowości: Janowice, Przywieczerzynek, Zapomnianowo, Przywieczerzyn, Tadzin, Zosin.
a) w gminie Lubanie miejscowości: Janowice, Przywieczerzynek, Zapomnianowo, Przywieczerzyn, Tadzin, Zosin.
Mazowieckie voivodship
PL-ND-2025-00061PL-ND-2025-00060PL-ND-2025-00057 Surveillance zone:W województwie mazowieckim:1)w powiecie żuromińskim:a)w gminie Kuczbork – Osada, miejscowości: Chodubka, Kuczbork, Nidzgora, Olszewko,b)w gminie Żuromin, miejscowości: Brudnice, Będzymin, Dębsk, Franciszkowo, Kliczewo Małe, Kliczewo Duże, Kosewo, Kruszewo, Nowe Nadratowo, Olszewo, Poniatowo, Rzężawy, Stare Nadratowo, Wiadrowo, Wólka Kliczewska, miasto Żuromin,c)w gminie Lubowidz, miejscowości: Bądzyn, Łazy,d)w gminie Bieżuń, miejscowości: Bielawy Gołuskie, Dźwierzno, Gołuszyn, Karniszyn, Karniszyn – Parcele, Kobyla Łąka, Kocewo, Myślin, Sadłowo, Sadłowo-Parcele, Stawiszyn-Zwalewo, Stawiszyn-Łaziska, Sławęcin, miasto Bieżuń;2)w powiecie mławskim, w gminie Szreńsk, miejscowość Miłotki. 1) w powiecie żuromińskim:a)w gminie Kuczbork – Osada, miejscowości: Chodubka, Kuczbork, Nidzgora, Olszewko,b)w gminie Żuromin, miejscowości: Brudnice, Będzymin, Dębsk, Franciszkowo, Kliczewo Małe, Kliczewo Duże, Kosewo, Kruszewo, Nowe Nadratowo, Olszewo, Poniatowo, Rzężawy, Stare Nadratowo, Wiadrowo, Wólka Kliczewska, miasto Żuromin,c)w gminie Lubowidz, miejscowości: Bądzyn, Łazy,d)w gminie Bieżuń, miejscowości: Bielawy Gołuskie, Dźwierzno, Gołuszyn, Karniszyn, Karniszyn – Parcele, Kobyla Łąka, Kocewo, Myślin, Sadłowo, Sadłowo-Parcele, Stawiszyn-Zwalewo, Stawiszyn-Łaziska, Sławęcin, miasto Bieżuń; a) w gminie Kuczbork – Osada, miejscowości: Chodubka, Kuczbork, Nidzgora, Olszewko, b) w gminie Żuromin, miejscowości: Brudnice, Będzymin, Dębsk, Franciszkowo, Kliczewo Małe, Kliczewo Duże, Kosewo, Kruszewo, Nowe Nadratowo, Olszewo, Poniatowo, Rzężawy, Stare Nadratowo, Wiadrowo, Wólka Kliczewska, miasto Żuromin, c) w gminie Lubowidz, miejscowości: Bądzyn, Łazy, d) w gminie Bieżuń, miejscowości: Bielawy Gołuskie, Dźwierzno, Gołuszyn, Karniszyn, Karniszyn – Parcele, Kobyla Łąka, Kocewo, Myślin, Sadłowo, Sadłowo-Parcele, Stawiszyn-Zwalewo, Stawiszyn-Łaziska, Sławęcin, miasto Bieżuń; 2) w powiecie mławskim, w gminie Szreńsk, miejscowość Miłotki. 12.11.2025 – 20.11.2025
1) w powiecie żuromińskim:a)w gminie Kuczbork – Osada, miejscowości: Chodubka, Kuczbork, Nidzgora, Olszewko,b)w gminie Żuromin, miejscowości: Brudnice, Będzymin, Dębsk, Franciszkowo, Kliczewo Małe, Kliczewo Duże, Kosewo, Kruszewo, Nowe Nadratowo, Olszewo, Poniatowo, Rzężawy, Stare Nadratowo, Wiadrowo, Wólka Kliczewska, miasto Żuromin,c)w gminie Lubowidz, miejscowości: Bądzyn, Łazy,d)w gminie Bieżuń, miejscowości: Bielawy Gołuskie, Dźwierzno, Gołuszyn, Karniszyn, Karniszyn – Parcele, Kobyla Łąka, Kocewo, Myślin, Sadłowo, Sadłowo-Parcele, Stawiszyn-Zwalewo, Stawiszyn-Łaziska, Sławęcin, miasto Bieżuń; a) w gminie Kuczbork – Osada, miejscowości: Chodubka, Kuczbork, Nidzgora, Olszewko, b) w gminie Żuromin, miejscowości: Brudnice, Będzymin, Dębsk, Franciszkowo, Kliczewo Małe, Kliczewo Duże, Kosewo, Kruszewo, Nowe Nadratowo, Olszewo, Poniatowo, Rzężawy, Stare Nadratowo, Wiadrowo, Wólka Kliczewska, miasto Żuromin, c) w gminie Lubowidz, miejscowości: Bądzyn, Łazy, d) w gminie Bieżuń, miejscowości: Bielawy Gołuskie, Dźwierzno, Gołuszyn, Karniszyn, Karniszyn – Parcele, Kobyla Łąka, Kocewo, Myślin, Sadłowo, Sadłowo-Parcele, Stawiszyn-Zwalewo, Stawiszyn-Łaziska, Sławęcin, miasto Bieżuń;
a) w gminie Kuczbork – Osada, miejscowości: Chodubka, Kuczbork, Nidzgora, Olszewko,
b) w gminie Żuromin, miejscowości: Brudnice, Będzymin, Dębsk, Franciszkowo, Kliczewo Małe, Kliczewo Duże, Kosewo, Kruszewo, Nowe Nadratowo, Olszewo, Poniatowo, Rzężawy, Stare Nadratowo, Wiadrowo, Wólka Kliczewska, miasto Żuromin,
c) w gminie Lubowidz, miejscowości: Bądzyn, Łazy,
d) w gminie Bieżuń, miejscowości: Bielawy Gołuskie, Dźwierzno, Gołuszyn, Karniszyn, Karniszyn – Parcele, Kobyla Łąka, Kocewo, Myślin, Sadłowo, Sadłowo-Parcele, Stawiszyn-Zwalewo, Stawiszyn-Łaziska, Sławęcin, miasto Bieżuń;
2) w powiecie mławskim, w gminie Szreńsk, miejscowość Miłotki.
Surveillance zone:W województwie mazowieckim:1)w powiecie żuromińskim:a)w gminie Kuczbork – Osada, miejscowości: Bagienice Małe, Bagienice Nowe, Chojnowo, Gościszka, Gościszka – Baraki, Kozielsk, Krzywki – Bratki, Kuczbork – Osada, Mianowo, Niedziałki Sadykierz, Nowa Wieś, Osowa, Sarnowo, Zielona,b)w gminie Żuromin, miejscowości: Chamsk, Cierpigórz, Dąbrowa, Dąbrowice, Młudzyn, Raczyny, Rozwozin, Sadowo, Tadajówka,c)w gminie Bieżuń, miejscowości: Adamowo, Dąbrówki, Mak, Małocin, Pełki, Pozga, Stanisławowo, Strzeszewo, Trzaski, Wieluń – Zalesie, Wilewo, Władysławowo, Zgliczyn Pobodzy,d)w gminie Lubowidz, miejscowości: Biały Dwór, Cieszki, Dziwy, Galumin, Konopaty, Konopaty – Lasy Chłopskie, Lisiny, Lubowidz, Mały Las, Osówka, Pątki, Ruda, Rynowo, Sinogóra, Straszewy, Syberia, Toruniak, Zieluń, Żarnówka, Żelaźnia,e)w gminie Lutocin, miejscowości: Chromakowo, Głęboka, Felcyn, Jonne, Mojnowo, Obręb, Parlin, Pietrzyk, Przeradz Mały, Przeradz Nowy, Przeradz Wielki, Seroki, Siemcichy, Swojęcin, Szoniec, Zimolza,f)w gminie Siemiątkowo, miejscowości: Antoniewo, Dzieczewo, Gradzanowo, Nowa Wieś, Nowopole, Pijawnia, Rostowa, Siemiątkowo, Siciarz, Siemiątkowo – Rogale, Sokołowy Kąt, Suwaki, Ziemiany;2)w powiecie mławskim:a)w gminie Szreńsk, miejscowości: Bielawy, Grądek, Kobuszyn, Krzywki – Bośki, Krzywki – Piaski, Mostowo, Nowe Garkowo, Przychód, Pączkowo, Stare Garkowo, Szreńsk, Sławkowo, Wola Proszkowska, Złotowo, Ługi,b)w gminie Radzanów, miejscowości: Bojanowo, Bębnowo, Cegielnia Ratowska, Luszewo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Ratowo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Radzanów, Wróblewo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Zgliczyn – Glinki, Zgliczyn Witowy,c)w gminie Lipowiec Kościelny, miejscowości: Lipowiec Kościelny, Niegocin, Zawady;3)w powiecie sierpeckim:a)w gminie Zawidz, miejscowości: Jaworowo – Kolonia, Jaworowo – Kłódź, Jaworowo – Lipa, Kosemin,b)w gminie Rościszewo, miejscowości: część miejscowości Lipniki na wschód od rzeki dopływ spod Władysławowa, część miejscowości Polik na wschód od rzeki dopływ spod Władysławowa, Rzeszotary – Chwały, Rzeszotary Rumunki – Stara Wieś, Rzeszotary – Zawady.W województwie warmińsko-mazurskim:—w powiecie działdowskim w gminie Lidzbark, w granicach administracyjnych miejscowości Glinki. 1) w powiecie żuromińskim:a)w gminie Kuczbork – Osada, miejscowości: Bagienice Małe, Bagienice Nowe, Chojnowo, Gościszka, Gościszka – Baraki, Kozielsk, Krzywki – Bratki, Kuczbork – Osada, Mianowo, Niedziałki Sadykierz, Nowa Wieś, Osowa, Sarnowo, Zielona,b)w gminie Żuromin, miejscowości: Chamsk, Cierpigórz, Dąbrowa, Dąbrowice, Młudzyn, Raczyny, Rozwozin, Sadowo, Tadajówka,c)w gminie Bieżuń, miejscowości: Adamowo, Dąbrówki, Mak, Małocin, Pełki, Pozga, Stanisławowo, Strzeszewo, Trzaski, Wieluń – Zalesie, Wilewo, Władysławowo, Zgliczyn Pobodzy,d)w gminie Lubowidz, miejscowości: Biały Dwór, Cieszki, Dziwy, Galumin, Konopaty, Konopaty – Lasy Chłopskie, Lisiny, Lubowidz, Mały Las, Osówka, Pątki, Ruda, Rynowo, Sinogóra, Straszewy, Syberia, Toruniak, Zieluń, Żarnówka, Żelaźnia,e)w gminie Lutocin, miejscowości: Chromakowo, Głęboka, Felcyn, Jonne, Mojnowo, Obręb, Parlin, Pietrzyk, Przeradz Mały, Przeradz Nowy, Przeradz Wielki, Seroki, Siemcichy, Swojęcin, Szoniec, Zimolza,f)w gminie Siemiątkowo, miejscowości: Antoniewo, Dzieczewo, Gradzanowo, Nowa Wieś, Nowopole, Pijawnia, Rostowa, Siemiątkowo, Siciarz, Siemiątkowo – Rogale, Sokołowy Kąt, Suwaki, Ziemiany; a) w gminie Kuczbork – Osada, miejscowości: Bagienice Małe, Bagienice Nowe, Chojnowo, Gościszka, Gościszka – Baraki, Kozielsk, Krzywki – Bratki, Kuczbork – Osada, Mianowo, Niedziałki Sadykierz, Nowa Wieś, Osowa, Sarnowo, Zielona, b) w gminie Żuromin, miejscowości: Chamsk, Cierpigórz, Dąbrowa, Dąbrowice, Młudzyn, Raczyny, Rozwozin, Sadowo, Tadajówka, c) w gminie Bieżuń, miejscowości: Adamowo, Dąbrówki, Mak, Małocin, Pełki, Pozga, Stanisławowo, Strzeszewo, Trzaski, Wieluń – Zalesie, Wilewo, Władysławowo, Zgliczyn Pobodzy, d) w gminie Lubowidz, miejscowości: Biały Dwór, Cieszki, Dziwy, Galumin, Konopaty, Konopaty – Lasy Chłopskie, Lisiny, Lubowidz, Mały Las, Osówka, Pątki, Ruda, Rynowo, Sinogóra, Straszewy, Syberia, Toruniak, Zieluń, Żarnówka, Żelaźnia, e) w gminie Lutocin, miejscowości: Chromakowo, Głęboka, Felcyn, Jonne, Mojnowo, Obręb, Parlin, Pietrzyk, Przeradz Mały, Przeradz Nowy, Przeradz Wielki, Seroki, Siemcichy, Swojęcin, Szoniec, Zimolza, f) w gminie Siemiątkowo, miejscowości: Antoniewo, Dzieczewo, Gradzanowo, Nowa Wieś, Nowopole, Pijawnia, Rostowa, Siemiątkowo, Siciarz, Siemiątkowo – Rogale, Sokołowy Kąt, Suwaki, Ziemiany; 2) w powiecie mławskim:a)w gminie Szreńsk, miejscowości: Bielawy, Grądek, Kobuszyn, Krzywki – Bośki, Krzywki – Piaski, Mostowo, Nowe Garkowo, Przychód, Pączkowo, Stare Garkowo, Szreńsk, Sławkowo, Wola Proszkowska, Złotowo, Ługi,b)w gminie Radzanów, miejscowości: Bojanowo, Bębnowo, Cegielnia Ratowska, Luszewo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Ratowo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Radzanów, Wróblewo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Zgliczyn – Glinki, Zgliczyn Witowy,c)w gminie Lipowiec Kościelny, miejscowości: Lipowiec Kościelny, Niegocin, Zawady; a) w gminie Szreńsk, miejscowości: Bielawy, Grądek, Kobuszyn, Krzywki – Bośki, Krzywki – Piaski, Mostowo, Nowe Garkowo, Przychód, Pączkowo, Stare Garkowo, Szreńsk, Sławkowo, Wola Proszkowska, Złotowo, Ługi, b) w gminie Radzanów, miejscowości: Bojanowo, Bębnowo, Cegielnia Ratowska, Luszewo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Ratowo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Radzanów, Wróblewo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Zgliczyn – Glinki, Zgliczyn Witowy, c) w gminie Lipowiec Kościelny, miejscowości: Lipowiec Kościelny, Niegocin, Zawady; 3) w powiecie sierpeckim:a)w gminie Zawidz, miejscowości: Jaworowo – Kolonia, Jaworowo – Kłódź, Jaworowo – Lipa, Kosemin,b)w gminie Rościszewo, miejscowości: część miejscowości Lipniki na wschód od rzeki dopływ spod Władysławowa, część miejscowości Polik na wschód od rzeki dopływ spod Władysławowa, Rzeszotary – Chwały, Rzeszotary Rumunki – Stara Wieś, Rzeszotary – Zawady. a) w gminie Zawidz, miejscowości: Jaworowo – Kolonia, Jaworowo – Kłódź, Jaworowo – Lipa, Kosemin, b) w gminie Rościszewo, miejscowości: część miejscowości Lipniki na wschód od rzeki dopływ spod Władysławowa, część miejscowości Polik na wschód od rzeki dopływ spod Władysławowa, Rzeszotary – Chwały, Rzeszotary Rumunki – Stara Wieś, Rzeszotary – Zawady. — w powiecie działdowskim w gminie Lidzbark, w granicach administracyjnych miejscowości Glinki. 20.11.2025
1) w powiecie żuromińskim:a)w gminie Kuczbork – Osada, miejscowości: Bagienice Małe, Bagienice Nowe, Chojnowo, Gościszka, Gościszka – Baraki, Kozielsk, Krzywki – Bratki, Kuczbork – Osada, Mianowo, Niedziałki Sadykierz, Nowa Wieś, Osowa, Sarnowo, Zielona,b)w gminie Żuromin, miejscowości: Chamsk, Cierpigórz, Dąbrowa, Dąbrowice, Młudzyn, Raczyny, Rozwozin, Sadowo, Tadajówka,c)w gminie Bieżuń, miejscowości: Adamowo, Dąbrówki, Mak, Małocin, Pełki, Pozga, Stanisławowo, Strzeszewo, Trzaski, Wieluń – Zalesie, Wilewo, Władysławowo, Zgliczyn Pobodzy,d)w gminie Lubowidz, miejscowości: Biały Dwór, Cieszki, Dziwy, Galumin, Konopaty, Konopaty – Lasy Chłopskie, Lisiny, Lubowidz, Mały Las, Osówka, Pątki, Ruda, Rynowo, Sinogóra, Straszewy, Syberia, Toruniak, Zieluń, Żarnówka, Żelaźnia,e)w gminie Lutocin, miejscowości: Chromakowo, Głęboka, Felcyn, Jonne, Mojnowo, Obręb, Parlin, Pietrzyk, Przeradz Mały, Przeradz Nowy, Przeradz Wielki, Seroki, Siemcichy, Swojęcin, Szoniec, Zimolza,f)w gminie Siemiątkowo, miejscowości: Antoniewo, Dzieczewo, Gradzanowo, Nowa Wieś, Nowopole, Pijawnia, Rostowa, Siemiątkowo, Siciarz, Siemiątkowo – Rogale, Sokołowy Kąt, Suwaki, Ziemiany; a) w gminie Kuczbork – Osada, miejscowości: Bagienice Małe, Bagienice Nowe, Chojnowo, Gościszka, Gościszka – Baraki, Kozielsk, Krzywki – Bratki, Kuczbork – Osada, Mianowo, Niedziałki Sadykierz, Nowa Wieś, Osowa, Sarnowo, Zielona, b) w gminie Żuromin, miejscowości: Chamsk, Cierpigórz, Dąbrowa, Dąbrowice, Młudzyn, Raczyny, Rozwozin, Sadowo, Tadajówka, c) w gminie Bieżuń, miejscowości: Adamowo, Dąbrówki, Mak, Małocin, Pełki, Pozga, Stanisławowo, Strzeszewo, Trzaski, Wieluń – Zalesie, Wilewo, Władysławowo, Zgliczyn Pobodzy, d) w gminie Lubowidz, miejscowości: Biały Dwór, Cieszki, Dziwy, Galumin, Konopaty, Konopaty – Lasy Chłopskie, Lisiny, Lubowidz, Mały Las, Osówka, Pątki, Ruda, Rynowo, Sinogóra, Straszewy, Syberia, Toruniak, Zieluń, Żarnówka, Żelaźnia, e) w gminie Lutocin, miejscowości: Chromakowo, Głęboka, Felcyn, Jonne, Mojnowo, Obręb, Parlin, Pietrzyk, Przeradz Mały, Przeradz Nowy, Przeradz Wielki, Seroki, Siemcichy, Swojęcin, Szoniec, Zimolza, f) w gminie Siemiątkowo, miejscowości: Antoniewo, Dzieczewo, Gradzanowo, Nowa Wieś, Nowopole, Pijawnia, Rostowa, Siemiątkowo, Siciarz, Siemiątkowo – Rogale, Sokołowy Kąt, Suwaki, Ziemiany;
a) w gminie Kuczbork – Osada, miejscowości: Bagienice Małe, Bagienice Nowe, Chojnowo, Gościszka, Gościszka – Baraki, Kozielsk, Krzywki – Bratki, Kuczbork – Osada, Mianowo, Niedziałki Sadykierz, Nowa Wieś, Osowa, Sarnowo, Zielona,
b) w gminie Żuromin, miejscowości: Chamsk, Cierpigórz, Dąbrowa, Dąbrowice, Młudzyn, Raczyny, Rozwozin, Sadowo, Tadajówka,
c) w gminie Bieżuń, miejscowości: Adamowo, Dąbrówki, Mak, Małocin, Pełki, Pozga, Stanisławowo, Strzeszewo, Trzaski, Wieluń – Zalesie, Wilewo, Władysławowo, Zgliczyn Pobodzy,
d) w gminie Lubowidz, miejscowości: Biały Dwór, Cieszki, Dziwy, Galumin, Konopaty, Konopaty – Lasy Chłopskie, Lisiny, Lubowidz, Mały Las, Osówka, Pątki, Ruda, Rynowo, Sinogóra, Straszewy, Syberia, Toruniak, Zieluń, Żarnówka, Żelaźnia,
e) w gminie Lutocin, miejscowości: Chromakowo, Głęboka, Felcyn, Jonne, Mojnowo, Obręb, Parlin, Pietrzyk, Przeradz Mały, Przeradz Nowy, Przeradz Wielki, Seroki, Siemcichy, Swojęcin, Szoniec, Zimolza,
f) w gminie Siemiątkowo, miejscowości: Antoniewo, Dzieczewo, Gradzanowo, Nowa Wieś, Nowopole, Pijawnia, Rostowa, Siemiątkowo, Siciarz, Siemiątkowo – Rogale, Sokołowy Kąt, Suwaki, Ziemiany;
2) w powiecie mławskim:a)w gminie Szreńsk, miejscowości: Bielawy, Grądek, Kobuszyn, Krzywki – Bośki, Krzywki – Piaski, Mostowo, Nowe Garkowo, Przychód, Pączkowo, Stare Garkowo, Szreńsk, Sławkowo, Wola Proszkowska, Złotowo, Ługi,b)w gminie Radzanów, miejscowości: Bojanowo, Bębnowo, Cegielnia Ratowska, Luszewo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Ratowo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Radzanów, Wróblewo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Zgliczyn – Glinki, Zgliczyn Witowy,c)w gminie Lipowiec Kościelny, miejscowości: Lipowiec Kościelny, Niegocin, Zawady; a) w gminie Szreńsk, miejscowości: Bielawy, Grądek, Kobuszyn, Krzywki – Bośki, Krzywki – Piaski, Mostowo, Nowe Garkowo, Przychód, Pączkowo, Stare Garkowo, Szreńsk, Sławkowo, Wola Proszkowska, Złotowo, Ługi, b) w gminie Radzanów, miejscowości: Bojanowo, Bębnowo, Cegielnia Ratowska, Luszewo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Ratowo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Radzanów, Wróblewo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Zgliczyn – Glinki, Zgliczyn Witowy, c) w gminie Lipowiec Kościelny, miejscowości: Lipowiec Kościelny, Niegocin, Zawady;
a) w gminie Szreńsk, miejscowości: Bielawy, Grądek, Kobuszyn, Krzywki – Bośki, Krzywki – Piaski, Mostowo, Nowe Garkowo, Przychód, Pączkowo, Stare Garkowo, Szreńsk, Sławkowo, Wola Proszkowska, Złotowo, Ługi,
b) w gminie Radzanów, miejscowości: Bojanowo, Bębnowo, Cegielnia Ratowska, Luszewo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Ratowo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Radzanów, Wróblewo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Zgliczyn – Glinki, Zgliczyn Witowy,
c) w gminie Lipowiec Kościelny, miejscowości: Lipowiec Kościelny, Niegocin, Zawady;
3) w powiecie sierpeckim:a)w gminie Zawidz, miejscowości: Jaworowo – Kolonia, Jaworowo – Kłódź, Jaworowo – Lipa, Kosemin,b)w gminie Rościszewo, miejscowości: część miejscowości Lipniki na wschód od rzeki dopływ spod Władysławowa, część miejscowości Polik na wschód od rzeki dopływ spod Władysławowa, Rzeszotary – Chwały, Rzeszotary Rumunki – Stara Wieś, Rzeszotary – Zawady. a) w gminie Zawidz, miejscowości: Jaworowo – Kolonia, Jaworowo – Kłódź, Jaworowo – Lipa, Kosemin, b) w gminie Rościszewo, miejscowości: część miejscowości Lipniki na wschód od rzeki dopływ spod Władysławowa, część miejscowości Polik na wschód od rzeki dopływ spod Władysławowa, Rzeszotary – Chwały, Rzeszotary Rumunki – Stara Wieś, Rzeszotary – Zawady.
a) w gminie Zawidz, miejscowości: Jaworowo – Kolonia, Jaworowo – Kłódź, Jaworowo – Lipa, Kosemin,
b) w gminie Rościszewo, miejscowości: część miejscowości Lipniki na wschód od rzeki dopływ spod Władysławowa, część miejscowości Polik na wschód od rzeki dopływ spod Władysławowa, Rzeszotary – Chwały, Rzeszotary Rumunki – Stara Wieś, Rzeszotary – Zawady.
— w powiecie działdowskim w gminie Lidzbark, w granicach administracyjnych miejscowości Glinki.
Further restricted zone:W województwie mazowieckim:1)W powiecie żuromińskim:a)W gminie Kuczbork-Osada, miejscowości: Bagienice Duże, Łążek, Szronka;b)W gminie Lubowidz, miejscowości: Goliaty, Huta, Jasiony, Kipichy, Kozilas, Mleczówka, Obórki, Płociczno, Przerodki, Purzyce, Suchy Grunt, Wronka, Wylazłowo, Zatorowizna, Zdrojkic)W gminie Lutocin, miejscowości: Boguszewiec, Chrapoń, Chrapoń Rudziska, Dębówka, Elżbiecin, Lutocin, Psota, Starcz-Bombol,d)W gminie Siemiątkowo, miejscowości: Budy Osieckie Nowe, Budy Osieckie Stare, Budy Koziebrodzkie, Gutkowo, Krzeczanowo, Łaszewo, Łaszewo Wietrznik, Ossowa, Wojciechowo, Wola Łaszewska. 1) W powiecie żuromińskim:a)W gminie Kuczbork-Osada, miejscowości: Bagienice Duże, Łążek, Szronka;b)W gminie Lubowidz, miejscowości: Goliaty, Huta, Jasiony, Kipichy, Kozilas, Mleczówka, Obórki, Płociczno, Przerodki, Purzyce, Suchy Grunt, Wronka, Wylazłowo, Zatorowizna, Zdrojkic)W gminie Lutocin, miejscowości: Boguszewiec, Chrapoń, Chrapoń Rudziska, Dębówka, Elżbiecin, Lutocin, Psota, Starcz-Bombol,d)W gminie Siemiątkowo, miejscowości: Budy Osieckie Nowe, Budy Osieckie Stare, Budy Koziebrodzkie, Gutkowo, Krzeczanowo, Łaszewo, Łaszewo Wietrznik, Ossowa, Wojciechowo, Wola Łaszewska. a) W gminie Kuczbork-Osada, miejscowości: Bagienice Duże, Łążek, Szronka; b) W gminie Lubowidz, miejscowości: Goliaty, Huta, Jasiony, Kipichy, Kozilas, Mleczówka, Obórki, Płociczno, Przerodki, Purzyce, Suchy Grunt, Wronka, Wylazłowo, Zatorowizna, Zdrojki c) W gminie Lutocin, miejscowości: Boguszewiec, Chrapoń, Chrapoń Rudziska, Dębówka, Elżbiecin, Lutocin, Psota, Starcz-Bombol, d) W gminie Siemiątkowo, miejscowości: Budy Osieckie Nowe, Budy Osieckie Stare, Budy Koziebrodzkie, Gutkowo, Krzeczanowo, Łaszewo, Łaszewo Wietrznik, Ossowa, Wojciechowo, Wola Łaszewska. 20.11.2025
1) W powiecie żuromińskim:a)W gminie Kuczbork-Osada, miejscowości: Bagienice Duże, Łążek, Szronka;b)W gminie Lubowidz, miejscowości: Goliaty, Huta, Jasiony, Kipichy, Kozilas, Mleczówka, Obórki, Płociczno, Przerodki, Purzyce, Suchy Grunt, Wronka, Wylazłowo, Zatorowizna, Zdrojkic)W gminie Lutocin, miejscowości: Boguszewiec, Chrapoń, Chrapoń Rudziska, Dębówka, Elżbiecin, Lutocin, Psota, Starcz-Bombol,d)W gminie Siemiątkowo, miejscowości: Budy Osieckie Nowe, Budy Osieckie Stare, Budy Koziebrodzkie, Gutkowo, Krzeczanowo, Łaszewo, Łaszewo Wietrznik, Ossowa, Wojciechowo, Wola Łaszewska. a) W gminie Kuczbork-Osada, miejscowości: Bagienice Duże, Łążek, Szronka; b) W gminie Lubowidz, miejscowości: Goliaty, Huta, Jasiony, Kipichy, Kozilas, Mleczówka, Obórki, Płociczno, Przerodki, Purzyce, Suchy Grunt, Wronka, Wylazłowo, Zatorowizna, Zdrojki c) W gminie Lutocin, miejscowości: Boguszewiec, Chrapoń, Chrapoń Rudziska, Dębówka, Elżbiecin, Lutocin, Psota, Starcz-Bombol, d) W gminie Siemiątkowo, miejscowości: Budy Osieckie Nowe, Budy Osieckie Stare, Budy Koziebrodzkie, Gutkowo, Krzeczanowo, Łaszewo, Łaszewo Wietrznik, Ossowa, Wojciechowo, Wola Łaszewska.
a) W gminie Kuczbork-Osada, miejscowości: Bagienice Duże, Łążek, Szronka;
b) W gminie Lubowidz, miejscowości: Goliaty, Huta, Jasiony, Kipichy, Kozilas, Mleczówka, Obórki, Płociczno, Przerodki, Purzyce, Suchy Grunt, Wronka, Wylazłowo, Zatorowizna, Zdrojki
c) W gminie Lutocin, miejscowości: Boguszewiec, Chrapoń, Chrapoń Rudziska, Dębówka, Elżbiecin, Lutocin, Psota, Starcz-Bombol,
d) W gminie Siemiątkowo, miejscowości: Budy Osieckie Nowe, Budy Osieckie Stare, Budy Koziebrodzkie, Gutkowo, Krzeczanowo, Łaszewo, Łaszewo Wietrznik, Ossowa, Wojciechowo, Wola Łaszewska.
Podlaskie voivodship
PL-ND-2025-00058PL-ND-2025-00069 Protection zone:W woj. podlaskim:a)w powiecie monieckim w gminie Goniądz miejscowości: Krzecze, Klewianka, Smogorówka Dolistowska, Smogorówka Goniądzka, Wroceń, Białosuknia.b)w powiecie monieckim w gminie Knyszyn, miejscowości: Knyszyn, Grądy, Poniklica, Wodziłówka, Zofiówka. a) w powiecie monieckim w gminie Goniądz miejscowości: Krzecze, Klewianka, Smogorówka Dolistowska, Smogorówka Goniądzka, Wroceń, Białosuknia. b) w powiecie monieckim w gminie Knyszyn, miejscowości: Knyszyn, Grądy, Poniklica, Wodziłówka, Zofiówka. 1.12.2025
a) w powiecie monieckim w gminie Goniądz miejscowości: Krzecze, Klewianka, Smogorówka Dolistowska, Smogorówka Goniądzka, Wroceń, Białosuknia.
b) w powiecie monieckim w gminie Knyszyn, miejscowości: Knyszyn, Grądy, Poniklica, Wodziłówka, Zofiówka.
Surveillance zone:W woj. podlaskim:a)w powiecie monieckim w gminie Goniądz miejscowości: Krzecze, Klewianka, Smogorówka Dolistowska, Smogorówka Goniądzka, Wroceń, Białosuknia.b)w powiecie monieckim w gminie Knyszyn, miejscowości: Knyszyn, Grądy, Poniklica, Wodziłówka, Zofiówka. a) w powiecie monieckim w gminie Goniądz miejscowości: Krzecze, Klewianka, Smogorówka Dolistowska, Smogorówka Goniądzka, Wroceń, Białosuknia. b) w powiecie monieckim w gminie Knyszyn, miejscowości: Knyszyn, Grądy, Poniklica, Wodziłówka, Zofiówka. 2.12.2025 – 10.12.2025
a) w powiecie monieckim w gminie Goniądz miejscowości: Krzecze, Klewianka, Smogorówka Dolistowska, Smogorówka Goniądzka, Wroceń, Białosuknia.
b) w powiecie monieckim w gminie Knyszyn, miejscowości: Knyszyn, Grądy, Poniklica, Wodziłówka, Zofiówka.
1)w powiecie monieckim:a)w gminie Goniądz miejscowości: Dawidowizna, Dolistowo Nowe, Dolistowo Stare, Doły, Goniądz, Mierkienniki, Owieczki, Piwowary, Szafranki, Wojtówstwo, Wólka Piaseczna, Łazy;b)w gminie Jaświły miejscowości: Bagno, Dolistowo Nowe, Dolistowo Stare, Dzięciołowo, Gurbicze, Jadeszki, Jaświłki, Jaświły, Mikicin, Mociesze, Moniuszki, Radzie, Romejki, Rutkowskie Duże, Rutkowskie Małe, Szaciły, Szpakowo, Zabiele;c)w gminie Jasionówka, miejscowości: Brzozówka Folwarczna, Czarnystok, Dobrzyniówka, Górnystok, Jasionówka, Jasionóweczka, Kalinówka Królewska, Krasne Folwarczne, Krasne Małe, Krasne Stare, Kąty, Milewskie, Łękobudy;d)w gminie Knyszn, miejscowości: Chobotki, Czechowizna, Guzy, Jaskra, Kalinówka Kościelna, Knyszyn Zamek, Nowiny Zdroje, Nowiny Kasjerskie, Ogrodniki, Wojtówce;e)w gminie Mońki miejscowości: Hornostaje, Jaski, Koleśniki, Kosiorki, Krzeczkowo, Ołdaki, Potoczyzna, Pyzy, Zyburty, Łupichy, Świerzbienie, Żodzie, Dudki, Dudki Kolonia, Konopczyn, Kropiwnica, Przytulanka, Rusaki;f)w gminie Krypno, miejscowości: Krypno Kościelne, Krypno Wielkie, Ruda, Zastocze;2)w powiecie augustowskim w gminie Sztabin miejscowości: Jasionowo Dębowskie, Kopytkowo.3)w powiecie białostockim, w gminie Dobrzyniewo Durze, miejscowości: Chraboły, Kulikówka, Kozińce, Borsukówka, Kobuzie, Nowosiółki, Szaciły.4)w powiecie sokólskim, w gminie Korycin, miejscowości: Wojtachy, Stok, Czarlona, Brody. 1) w powiecie monieckim:a)w gminie Goniądz miejscowości: Dawidowizna, Dolistowo Nowe, Dolistowo Stare, Doły, Goniądz, Mierkienniki, Owieczki, Piwowary, Szafranki, Wojtówstwo, Wólka Piaseczna, Łazy;b)w gminie Jaświły miejscowości: Bagno, Dolistowo Nowe, Dolistowo Stare, Dzięciołowo, Gurbicze, Jadeszki, Jaświłki, Jaświły, Mikicin, Mociesze, Moniuszki, Radzie, Romejki, Rutkowskie Duże, Rutkowskie Małe, Szaciły, Szpakowo, Zabiele;c)w gminie Jasionówka, miejscowości: Brzozówka Folwarczna, Czarnystok, Dobrzyniówka, Górnystok, Jasionówka, Jasionóweczka, Kalinówka Królewska, Krasne Folwarczne, Krasne Małe, Krasne Stare, Kąty, Milewskie, Łękobudy;d)w gminie Knyszn, miejscowości: Chobotki, Czechowizna, Guzy, Jaskra, Kalinówka Kościelna, Knyszyn Zamek, Nowiny Zdroje, Nowiny Kasjerskie, Ogrodniki, Wojtówce;e)w gminie Mońki miejscowości: Hornostaje, Jaski, Koleśniki, Kosiorki, Krzeczkowo, Ołdaki, Potoczyzna, Pyzy, Zyburty, Łupichy, Świerzbienie, Żodzie, Dudki, Dudki Kolonia, Konopczyn, Kropiwnica, Przytulanka, Rusaki;f)w gminie Krypno, miejscowości: Krypno Kościelne, Krypno Wielkie, Ruda, Zastocze; a) w gminie Goniądz miejscowości: Dawidowizna, Dolistowo Nowe, Dolistowo Stare, Doły, Goniądz, Mierkienniki, Owieczki, Piwowary, Szafranki, Wojtówstwo, Wólka Piaseczna, Łazy; b) w gminie Jaświły miejscowości: Bagno, Dolistowo Nowe, Dolistowo Stare, Dzięciołowo, Gurbicze, Jadeszki, Jaświłki, Jaświły, Mikicin, Mociesze, Moniuszki, Radzie, Romejki, Rutkowskie Duże, Rutkowskie Małe, Szaciły, Szpakowo, Zabiele; c) w gminie Jasionówka, miejscowości: Brzozówka Folwarczna, Czarnystok, Dobrzyniówka, Górnystok, Jasionówka, Jasionóweczka, Kalinówka Królewska, Krasne Folwarczne, Krasne Małe, Krasne Stare, Kąty, Milewskie, Łękobudy; d) w gminie Knyszn, miejscowości: Chobotki, Czechowizna, Guzy, Jaskra, Kalinówka Kościelna, Knyszyn Zamek, Nowiny Zdroje, Nowiny Kasjerskie, Ogrodniki, Wojtówce; e) w gminie Mońki miejscowości: Hornostaje, Jaski, Koleśniki, Kosiorki, Krzeczkowo, Ołdaki, Potoczyzna, Pyzy, Zyburty, Łupichy, Świerzbienie, Żodzie, Dudki, Dudki Kolonia, Konopczyn, Kropiwnica, Przytulanka, Rusaki; f) w gminie Krypno, miejscowości: Krypno Kościelne, Krypno Wielkie, Ruda, Zastocze; 2) w powiecie augustowskim w gminie Sztabin miejscowości: Jasionowo Dębowskie, Kopytkowo. 3) w powiecie białostockim, w gminie Dobrzyniewo Durze, miejscowości: Chraboły, Kulikówka, Kozińce, Borsukówka, Kobuzie, Nowosiółki, Szaciły. 4) w powiecie sokólskim, w gminie Korycin, miejscowości: Wojtachy, Stok, Czarlona, Brody. 10.12.2025
1) w powiecie monieckim:a)w gminie Goniądz miejscowości: Dawidowizna, Dolistowo Nowe, Dolistowo Stare, Doły, Goniądz, Mierkienniki, Owieczki, Piwowary, Szafranki, Wojtówstwo, Wólka Piaseczna, Łazy;b)w gminie Jaświły miejscowości: Bagno, Dolistowo Nowe, Dolistowo Stare, Dzięciołowo, Gurbicze, Jadeszki, Jaświłki, Jaświły, Mikicin, Mociesze, Moniuszki, Radzie, Romejki, Rutkowskie Duże, Rutkowskie Małe, Szaciły, Szpakowo, Zabiele;c)w gminie Jasionówka, miejscowości: Brzozówka Folwarczna, Czarnystok, Dobrzyniówka, Górnystok, Jasionówka, Jasionóweczka, Kalinówka Królewska, Krasne Folwarczne, Krasne Małe, Krasne Stare, Kąty, Milewskie, Łękobudy;d)w gminie Knyszn, miejscowości: Chobotki, Czechowizna, Guzy, Jaskra, Kalinówka Kościelna, Knyszyn Zamek, Nowiny Zdroje, Nowiny Kasjerskie, Ogrodniki, Wojtówce;e)w gminie Mońki miejscowości: Hornostaje, Jaski, Koleśniki, Kosiorki, Krzeczkowo, Ołdaki, Potoczyzna, Pyzy, Zyburty, Łupichy, Świerzbienie, Żodzie, Dudki, Dudki Kolonia, Konopczyn, Kropiwnica, Przytulanka, Rusaki;f)w gminie Krypno, miejscowości: Krypno Kościelne, Krypno Wielkie, Ruda, Zastocze; a) w gminie Goniądz miejscowości: Dawidowizna, Dolistowo Nowe, Dolistowo Stare, Doły, Goniądz, Mierkienniki, Owieczki, Piwowary, Szafranki, Wojtówstwo, Wólka Piaseczna, Łazy; b) w gminie Jaświły miejscowości: Bagno, Dolistowo Nowe, Dolistowo Stare, Dzięciołowo, Gurbicze, Jadeszki, Jaświłki, Jaświły, Mikicin, Mociesze, Moniuszki, Radzie, Romejki, Rutkowskie Duże, Rutkowskie Małe, Szaciły, Szpakowo, Zabiele; c) w gminie Jasionówka, miejscowości: Brzozówka Folwarczna, Czarnystok, Dobrzyniówka, Górnystok, Jasionówka, Jasionóweczka, Kalinówka Królewska, Krasne Folwarczne, Krasne Małe, Krasne Stare, Kąty, Milewskie, Łękobudy; d) w gminie Knyszn, miejscowości: Chobotki, Czechowizna, Guzy, Jaskra, Kalinówka Kościelna, Knyszyn Zamek, Nowiny Zdroje, Nowiny Kasjerskie, Ogrodniki, Wojtówce; e) w gminie Mońki miejscowości: Hornostaje, Jaski, Koleśniki, Kosiorki, Krzeczkowo, Ołdaki, Potoczyzna, Pyzy, Zyburty, Łupichy, Świerzbienie, Żodzie, Dudki, Dudki Kolonia, Konopczyn, Kropiwnica, Przytulanka, Rusaki; f) w gminie Krypno, miejscowości: Krypno Kościelne, Krypno Wielkie, Ruda, Zastocze;
a) w gminie Goniądz miejscowości: Dawidowizna, Dolistowo Nowe, Dolistowo Stare, Doły, Goniądz, Mierkienniki, Owieczki, Piwowary, Szafranki, Wojtówstwo, Wólka Piaseczna, Łazy;
b) w gminie Jaświły miejscowości: Bagno, Dolistowo Nowe, Dolistowo Stare, Dzięciołowo, Gurbicze, Jadeszki, Jaświłki, Jaświły, Mikicin, Mociesze, Moniuszki, Radzie, Romejki, Rutkowskie Duże, Rutkowskie Małe, Szaciły, Szpakowo, Zabiele;
c) w gminie Jasionówka, miejscowości: Brzozówka Folwarczna, Czarnystok, Dobrzyniówka, Górnystok, Jasionówka, Jasionóweczka, Kalinówka Królewska, Krasne Folwarczne, Krasne Małe, Krasne Stare, Kąty, Milewskie, Łękobudy;
d) w gminie Knyszn, miejscowości: Chobotki, Czechowizna, Guzy, Jaskra, Kalinówka Kościelna, Knyszyn Zamek, Nowiny Zdroje, Nowiny Kasjerskie, Ogrodniki, Wojtówce;
e) w gminie Mońki miejscowości: Hornostaje, Jaski, Koleśniki, Kosiorki, Krzeczkowo, Ołdaki, Potoczyzna, Pyzy, Zyburty, Łupichy, Świerzbienie, Żodzie, Dudki, Dudki Kolonia, Konopczyn, Kropiwnica, Przytulanka, Rusaki;
f) w gminie Krypno, miejscowości: Krypno Kościelne, Krypno Wielkie, Ruda, Zastocze;
2) w powiecie augustowskim w gminie Sztabin miejscowości: Jasionowo Dębowskie, Kopytkowo.
3) w powiecie białostockim, w gminie Dobrzyniewo Durze, miejscowości: Chraboły, Kulikówka, Kozińce, Borsukówka, Kobuzie, Nowosiółki, Szaciły.
4) w powiecie sokólskim, w gminie Korycin, miejscowości: Wojtachy, Stok, Czarlona, Brody.
Wielkopolskie and Lubuskie voivodships
PL-ND-2025-00059PL-ND-2025-00064PL-ND-2025-00066 Protection zone:W woj. wielkopolskim:1.W powiecie wolsztyńskim, w gminie Wolsztyn, miejscowości: Świętno, Obra, Kębłowo, Krzyż;2.W powiecie leszczyńskim, w gminie Święciechowa: Długie Stare;3.W powiecie leszczyńskim, w gminie Wijewo, miejscowości: Wijewo, Brenno, Radomyśl, Przylesie, Potrzebowo, Wilanów.W woj. lubuskim:—w powiecie wschowskim:1)w gminie Wschowa, miejscowość Wschowa oraz obszary wiejskie: Dębowa Łęka, Olbrachcice, Przyczyna Dolna, Siedlnica, Łęgoń;2)w gminie Sława, miejscowości: Przybyszów, Nowe Strącze, część miejscowości Stare Strącze leżąca na północ od drogi wojewódzkiej 278.W woj. dolnośląskim:—w powiecie górowskim, w gminie Niechlów: część obrębu miejscowości Siciny na północ od cieku wodnego Śląski Rów i na zachód od drogi wojewódzkiej nr 305. 1. W powiecie wolsztyńskim, w gminie Wolsztyn, miejscowości: Świętno, Obra, Kębłowo, Krzyż; 2. W powiecie leszczyńskim, w gminie Święciechowa: Długie Stare; 3. W powiecie leszczyńskim, w gminie Wijewo, miejscowości: Wijewo, Brenno, Radomyśl, Przylesie, Potrzebowo, Wilanów. — w powiecie wschowskim:1)w gminie Wschowa, miejscowość Wschowa oraz obszary wiejskie: Dębowa Łęka, Olbrachcice, Przyczyna Dolna, Siedlnica, Łęgoń;2)w gminie Sława, miejscowości: Przybyszów, Nowe Strącze, część miejscowości Stare Strącze leżąca na północ od drogi wojewódzkiej 278. 1) w gminie Wschowa, miejscowość Wschowa oraz obszary wiejskie: Dębowa Łęka, Olbrachcice, Przyczyna Dolna, Siedlnica, Łęgoń; 2) w gminie Sława, miejscowości: Przybyszów, Nowe Strącze, część miejscowości Stare Strącze leżąca na północ od drogi wojewódzkiej 278. — w powiecie górowskim, w gminie Niechlów: część obrębu miejscowości Siciny na północ od cieku wodnego Śląski Rów i na zachód od drogi wojewódzkiej nr 305. 21.11.2025
1. W powiecie wolsztyńskim, w gminie Wolsztyn, miejscowości: Świętno, Obra, Kębłowo, Krzyż;
2. W powiecie leszczyńskim, w gminie Święciechowa: Długie Stare;
3. W powiecie leszczyńskim, w gminie Wijewo, miejscowości: Wijewo, Brenno, Radomyśl, Przylesie, Potrzebowo, Wilanów.
— w powiecie wschowskim:1)w gminie Wschowa, miejscowość Wschowa oraz obszary wiejskie: Dębowa Łęka, Olbrachcice, Przyczyna Dolna, Siedlnica, Łęgoń;2)w gminie Sława, miejscowości: Przybyszów, Nowe Strącze, część miejscowości Stare Strącze leżąca na północ od drogi wojewódzkiej 278. 1) w gminie Wschowa, miejscowość Wschowa oraz obszary wiejskie: Dębowa Łęka, Olbrachcice, Przyczyna Dolna, Siedlnica, Łęgoń; 2) w gminie Sława, miejscowości: Przybyszów, Nowe Strącze, część miejscowości Stare Strącze leżąca na północ od drogi wojewódzkiej 278.
1) w gminie Wschowa, miejscowość Wschowa oraz obszary wiejskie: Dębowa Łęka, Olbrachcice, Przyczyna Dolna, Siedlnica, Łęgoń;
2) w gminie Sława, miejscowości: Przybyszów, Nowe Strącze, część miejscowości Stare Strącze leżąca na północ od drogi wojewódzkiej 278.
— w powiecie górowskim, w gminie Niechlów: część obrębu miejscowości Siciny na północ od cieku wodnego Śląski Rów i na zachód od drogi wojewódzkiej nr 305.
Surveillance zone:W woj. wielkopolskim:1.W powiecie wolsztyńskim, w gminie Wolsztyn, miejscowości: Świętno, Obra, Kębłowo, Krzyż;2.W powiecie leszczyńskim, w gminie Święciechowa: Długie Stare;3.W powiecie leszczyńskim, w gminie Wijewo, miejscowości: Wijewo, Brenno, Radomyśl, Przylesie, Potrzebowo, Wilanów.W woj. lubuskim:—w powiecie wschowskim:1)w gminie Wschowa, miejscowość Wschowa oraz obszary wiejskie: Dębowa Łęka, Olbrachcice, Przyczyna Dolna, Siedlnica, Łęgoń;2)w gminie Sława, miejscowości: Przybyszów, Nowe Strącze, część miejscowości Stare Strącze leżąca na północ od drogi wojewódzkiej 278.W woj. dolnośląskim:—w powiecie górowskim, w gminie Niechlów: część obrębu miejscowości Siciny na północ od cieku wodnego Śląski Rów i na zachód od drogi wojewódzkiej nr 305. 1. W powiecie wolsztyńskim, w gminie Wolsztyn, miejscowości: Świętno, Obra, Kębłowo, Krzyż; 2. W powiecie leszczyńskim, w gminie Święciechowa: Długie Stare; 3. W powiecie leszczyńskim, w gminie Wijewo, miejscowości: Wijewo, Brenno, Radomyśl, Przylesie, Potrzebowo, Wilanów. — w powiecie wschowskim:1)w gminie Wschowa, miejscowość Wschowa oraz obszary wiejskie: Dębowa Łęka, Olbrachcice, Przyczyna Dolna, Siedlnica, Łęgoń;2)w gminie Sława, miejscowości: Przybyszów, Nowe Strącze, część miejscowości Stare Strącze leżąca na północ od drogi wojewódzkiej 278. 1) w gminie Wschowa, miejscowość Wschowa oraz obszary wiejskie: Dębowa Łęka, Olbrachcice, Przyczyna Dolna, Siedlnica, Łęgoń; 2) w gminie Sława, miejscowości: Przybyszów, Nowe Strącze, część miejscowości Stare Strącze leżąca na północ od drogi wojewódzkiej 278. — w powiecie górowskim, w gminie Niechlów: część obrębu miejscowości Siciny na północ od cieku wodnego Śląski Rów i na zachód od drogi wojewódzkiej nr 305. 22.11.2025 – 30.11.2025
1. W powiecie wolsztyńskim, w gminie Wolsztyn, miejscowości: Świętno, Obra, Kębłowo, Krzyż;
2. W powiecie leszczyńskim, w gminie Święciechowa: Długie Stare;
3. W powiecie leszczyńskim, w gminie Wijewo, miejscowości: Wijewo, Brenno, Radomyśl, Przylesie, Potrzebowo, Wilanów.
— w powiecie wschowskim:1)w gminie Wschowa, miejscowość Wschowa oraz obszary wiejskie: Dębowa Łęka, Olbrachcice, Przyczyna Dolna, Siedlnica, Łęgoń;2)w gminie Sława, miejscowości: Przybyszów, Nowe Strącze, część miejscowości Stare Strącze leżąca na północ od drogi wojewódzkiej 278. 1) w gminie Wschowa, miejscowość Wschowa oraz obszary wiejskie: Dębowa Łęka, Olbrachcice, Przyczyna Dolna, Siedlnica, Łęgoń; 2) w gminie Sława, miejscowości: Przybyszów, Nowe Strącze, część miejscowości Stare Strącze leżąca na północ od drogi wojewódzkiej 278.
1) w gminie Wschowa, miejscowość Wschowa oraz obszary wiejskie: Dębowa Łęka, Olbrachcice, Przyczyna Dolna, Siedlnica, Łęgoń;
2) w gminie Sława, miejscowości: Przybyszów, Nowe Strącze, część miejscowości Stare Strącze leżąca na północ od drogi wojewódzkiej 278.
— w powiecie górowskim, w gminie Niechlów: część obrębu miejscowości Siciny na północ od cieku wodnego Śląski Rów i na zachód od drogi wojewódzkiej nr 305.
Surveillance zone:W woj. wielkopolskim:1.W powiecie leszczyńskim, w gminie Wijewo, miejscowości: Miastko, Zaborówiec;2.W powiecie leszczyńskim, w gminie Włoszakowice, miejscowości: Dominice, Włoszakowice, Koczury, Krzyżowiec, Mścigniew, Tłucznia, Papiernia, Zbarzewo, Daćbogi, Jezierzyce Kościelne;3.W powiecie leszczyńskim, w gminie Święciechowa, miejscowości: Święciechowa, Piotrowice, Niechłód, Trzebiny, Długie Nowe, Lasocice, Przybyszewo. Henrykowo, Gołanice, Książęcy Las, Ogrody;4.W powiecie wolsztyńskim, w gminie Przemęt, miejscowości: Wieleń, Osłonin, Olejnica, Radomierz, Starkowo, Górsko, Kaszczor, Mochy, Nowa Wieś, Perkowo, Solec, Solec Nowy, Przemęt-Leśniczówka;5.W powiecie wolsztyńskim, w gminie Wolsztyn, miejscowości: Adamowo, Komorowo, Niałek Wielki, Nowa Dąbrowa, Nowa Obra, Nowy Widzim, Powodowo, Rudno, Stara Dąbrowa, Stary Widzim, Stradyń, Wilcze, Wroniawy, Berzyna, Borki;6.W powiecie wolsztyńskim, w gminie Siedlec, miejscowości: Jaromierz, Jażyniec, Kiełkowo, Żodyń, Marianice, Podborowo.W woj. lubuskim:1)w powiecie wschowskim:a)w gminie Sława, miejscowości: Łupice, Spokojna, Bagno, Szreniawa, Ciosaniec, Droniki, Lipinki, Radzyń, Sława, Lubogoszcz, Gola, Wróblów, Śmieszkowo i część miejscowości Stare Strącze leżąca na południe od drogi wojewódzkiej 278,b)w gminie Szlichtyngowa, obszar wiejski: Dryżyna, Górczyna, Jędrzychowice, Kowalewo, Stare Drzewce, Zamysłów,c)w gminie Wschowa, obszar wiejski: Hetmanice, Kandlewo, Konradowo, Nowa Wieś, Osowa Sień, Przyczyna Górna, Tylewice, Łysiny, Wygnańczyce, Lgiń;2)w powiecie nowosolskim, w gminie Kolsko, miejscowości: Uście, Tatarki, Jesiona, Sławocin, Tyrszeliny, Kolsko, część miejscowości Konotop na północ od drogi leśnej łączącej m. Głuszyca z drogą pożarową nr 6;3)w powiecie zielonogórskim:a)w gminie Kargowa, miejscowości: Obra Dolna, Nowy Jaromierz, Stary Jaromierz, część miejscowości Karszyn na wschód od drogi gminnej z miejscowości Kargowa do miejscowości Siadcza,b)w gminie Bojadła, część miejscowości Susłów, na wschód od drogi pożarowej nr 18.W woj. dolnośląskim :—w powiecie górowskim:a)gmina Niechlów – miejscowości: Łękanów, część obrębu miejscowości Siciny na południe od cieku wodnego Śląski Rów i na wschód od drogi wojewódzkiej nr 305, Wronów, Wioska, Tarpno;b)gmina Góra – miejscowości: Radosław, Nowa Wioska. 1. W powiecie leszczyńskim, w gminie Wijewo, miejscowości: Miastko, Zaborówiec; 2. W powiecie leszczyńskim, w gminie Włoszakowice, miejscowości: Dominice, Włoszakowice, Koczury, Krzyżowiec, Mścigniew, Tłucznia, Papiernia, Zbarzewo, Daćbogi, Jezierzyce Kościelne; 3. W powiecie leszczyńskim, w gminie Święciechowa, miejscowości: Święciechowa, Piotrowice, Niechłód, Trzebiny, Długie Nowe, Lasocice, Przybyszewo. Henrykowo, Gołanice, Książęcy Las, Ogrody; 4. W powiecie wolsztyńskim, w gminie Przemęt, miejscowości: Wieleń, Osłonin, Olejnica, Radomierz, Starkowo, Górsko, Kaszczor, Mochy, Nowa Wieś, Perkowo, Solec, Solec Nowy, Przemęt-Leśniczówka; 5. W powiecie wolsztyńskim, w gminie Wolsztyn, miejscowości: Adamowo, Komorowo, Niałek Wielki, Nowa Dąbrowa, Nowa Obra, Nowy Widzim, Powodowo, Rudno, Stara Dąbrowa, Stary Widzim, Stradyń, Wilcze, Wroniawy, Berzyna, Borki; 6. W powiecie wolsztyńskim, w gminie Siedlec, miejscowości: Jaromierz, Jażyniec, Kiełkowo, Żodyń, Marianice, Podborowo. 1) w powiecie wschowskim:a)w gminie Sława, miejscowości: Łupice, Spokojna, Bagno, Szreniawa, Ciosaniec, Droniki, Lipinki, Radzyń, Sława, Lubogoszcz, Gola, Wróblów, Śmieszkowo i część miejscowości Stare Strącze leżąca na południe od drogi wojewódzkiej 278,b)w gminie Szlichtyngowa, obszar wiejski: Dryżyna, Górczyna, Jędrzychowice, Kowalewo, Stare Drzewce, Zamysłów,c)w gminie Wschowa, obszar wiejski: Hetmanice, Kandlewo, Konradowo, Nowa Wieś, Osowa Sień, Przyczyna Górna, Tylewice, Łysiny, Wygnańczyce, Lgiń; a) w gminie Sława, miejscowości: Łupice, Spokojna, Bagno, Szreniawa, Ciosaniec, Droniki, Lipinki, Radzyń, Sława, Lubogoszcz, Gola, Wróblów, Śmieszkowo i część miejscowości Stare Strącze leżąca na południe od drogi wojewódzkiej 278, b) w gminie Szlichtyngowa, obszar wiejski: Dryżyna, Górczyna, Jędrzychowice, Kowalewo, Stare Drzewce, Zamysłów, c) w gminie Wschowa, obszar wiejski: Hetmanice, Kandlewo, Konradowo, Nowa Wieś, Osowa Sień, Przyczyna Górna, Tylewice, Łysiny, Wygnańczyce, Lgiń; 2) w powiecie nowosolskim, w gminie Kolsko, miejscowości: Uście, Tatarki, Jesiona, Sławocin, Tyrszeliny, Kolsko, część miejscowości Konotop na północ od drogi leśnej łączącej m. Głuszyca z drogą pożarową nr 6; 3) w powiecie zielonogórskim:a)w gminie Kargowa, miejscowości: Obra Dolna, Nowy Jaromierz, Stary Jaromierz, część miejscowości Karszyn na wschód od drogi gminnej z miejscowości Kargowa do miejscowości Siadcza,b)w gminie Bojadła, część miejscowości Susłów, na wschód od drogi pożarowej nr 18. a) w gminie Kargowa, miejscowości: Obra Dolna, Nowy Jaromierz, Stary Jaromierz, część miejscowości Karszyn na wschód od drogi gminnej z miejscowości Kargowa do miejscowości Siadcza, b) w gminie Bojadła, część miejscowości Susłów, na wschód od drogi pożarowej nr 18. — w powiecie górowskim:a)gmina Niechlów – miejscowości: Łękanów, część obrębu miejscowości Siciny na południe od cieku wodnego Śląski Rów i na wschód od drogi wojewódzkiej nr 305, Wronów, Wioska, Tarpno;b)gmina Góra – miejscowości: Radosław, Nowa Wioska. a) gmina Niechlów – miejscowości: Łękanów, część obrębu miejscowości Siciny na południe od cieku wodnego Śląski Rów i na wschód od drogi wojewódzkiej nr 305, Wronów, Wioska, Tarpno; b) gmina Góra – miejscowości: Radosław, Nowa Wioska. 30.11.2025
1. W powiecie leszczyńskim, w gminie Wijewo, miejscowości: Miastko, Zaborówiec;
2. W powiecie leszczyńskim, w gminie Włoszakowice, miejscowości: Dominice, Włoszakowice, Koczury, Krzyżowiec, Mścigniew, Tłucznia, Papiernia, Zbarzewo, Daćbogi, Jezierzyce Kościelne;
3. W powiecie leszczyńskim, w gminie Święciechowa, miejscowości: Święciechowa, Piotrowice, Niechłód, Trzebiny, Długie Nowe, Lasocice, Przybyszewo. Henrykowo, Gołanice, Książęcy Las, Ogrody;
4. W powiecie wolsztyńskim, w gminie Przemęt, miejscowości: Wieleń, Osłonin, Olejnica, Radomierz, Starkowo, Górsko, Kaszczor, Mochy, Nowa Wieś, Perkowo, Solec, Solec Nowy, Przemęt-Leśniczówka;
5. W powiecie wolsztyńskim, w gminie Wolsztyn, miejscowości: Adamowo, Komorowo, Niałek Wielki, Nowa Dąbrowa, Nowa Obra, Nowy Widzim, Powodowo, Rudno, Stara Dąbrowa, Stary Widzim, Stradyń, Wilcze, Wroniawy, Berzyna, Borki;
6. W powiecie wolsztyńskim, w gminie Siedlec, miejscowości: Jaromierz, Jażyniec, Kiełkowo, Żodyń, Marianice, Podborowo.
1) w powiecie wschowskim:a)w gminie Sława, miejscowości: Łupice, Spokojna, Bagno, Szreniawa, Ciosaniec, Droniki, Lipinki, Radzyń, Sława, Lubogoszcz, Gola, Wróblów, Śmieszkowo i część miejscowości Stare Strącze leżąca na południe od drogi wojewódzkiej 278,b)w gminie Szlichtyngowa, obszar wiejski: Dryżyna, Górczyna, Jędrzychowice, Kowalewo, Stare Drzewce, Zamysłów,c)w gminie Wschowa, obszar wiejski: Hetmanice, Kandlewo, Konradowo, Nowa Wieś, Osowa Sień, Przyczyna Górna, Tylewice, Łysiny, Wygnańczyce, Lgiń; a) w gminie Sława, miejscowości: Łupice, Spokojna, Bagno, Szreniawa, Ciosaniec, Droniki, Lipinki, Radzyń, Sława, Lubogoszcz, Gola, Wróblów, Śmieszkowo i część miejscowości Stare Strącze leżąca na południe od drogi wojewódzkiej 278, b) w gminie Szlichtyngowa, obszar wiejski: Dryżyna, Górczyna, Jędrzychowice, Kowalewo, Stare Drzewce, Zamysłów, c) w gminie Wschowa, obszar wiejski: Hetmanice, Kandlewo, Konradowo, Nowa Wieś, Osowa Sień, Przyczyna Górna, Tylewice, Łysiny, Wygnańczyce, Lgiń;
a) w gminie Sława, miejscowości: Łupice, Spokojna, Bagno, Szreniawa, Ciosaniec, Droniki, Lipinki, Radzyń, Sława, Lubogoszcz, Gola, Wróblów, Śmieszkowo i część miejscowości Stare Strącze leżąca na południe od drogi wojewódzkiej 278,
b) w gminie Szlichtyngowa, obszar wiejski: Dryżyna, Górczyna, Jędrzychowice, Kowalewo, Stare Drzewce, Zamysłów,
c) w gminie Wschowa, obszar wiejski: Hetmanice, Kandlewo, Konradowo, Nowa Wieś, Osowa Sień, Przyczyna Górna, Tylewice, Łysiny, Wygnańczyce, Lgiń;
2) w powiecie nowosolskim, w gminie Kolsko, miejscowości: Uście, Tatarki, Jesiona, Sławocin, Tyrszeliny, Kolsko, część miejscowości Konotop na północ od drogi leśnej łączącej m. Głuszyca z drogą pożarową nr 6;
3) w powiecie zielonogórskim:a)w gminie Kargowa, miejscowości: Obra Dolna, Nowy Jaromierz, Stary Jaromierz, część miejscowości Karszyn na wschód od drogi gminnej z miejscowości Kargowa do miejscowości Siadcza,b)w gminie Bojadła, część miejscowości Susłów, na wschód od drogi pożarowej nr 18. a) w gminie Kargowa, miejscowości: Obra Dolna, Nowy Jaromierz, Stary Jaromierz, część miejscowości Karszyn na wschód od drogi gminnej z miejscowości Kargowa do miejscowości Siadcza, b) w gminie Bojadła, część miejscowości Susłów, na wschód od drogi pożarowej nr 18.
a) w gminie Kargowa, miejscowości: Obra Dolna, Nowy Jaromierz, Stary Jaromierz, część miejscowości Karszyn na wschód od drogi gminnej z miejscowości Kargowa do miejscowości Siadcza,
b) w gminie Bojadła, część miejscowości Susłów, na wschód od drogi pożarowej nr 18.
— w powiecie górowskim:a)gmina Niechlów – miejscowości: Łękanów, część obrębu miejscowości Siciny na południe od cieku wodnego Śląski Rów i na wschód od drogi wojewódzkiej nr 305, Wronów, Wioska, Tarpno;b)gmina Góra – miejscowości: Radosław, Nowa Wioska. a) gmina Niechlów – miejscowości: Łękanów, część obrębu miejscowości Siciny na południe od cieku wodnego Śląski Rów i na wschód od drogi wojewódzkiej nr 305, Wronów, Wioska, Tarpno; b) gmina Góra – miejscowości: Radosław, Nowa Wioska.
a) gmina Niechlów – miejscowości: Łękanów, część obrębu miejscowości Siciny na południe od cieku wodnego Śląski Rów i na wschód od drogi wojewódzkiej nr 305, Wronów, Wioska, Tarpno;
b) gmina Góra – miejscowości: Radosław, Nowa Wioska.
PL-ND-2025-00065PL-ND-2025-00068 Protection zone:W woj. wielkopolskim:1)w powiecie poznańskim, w gminie Stęszew, miejscowości: Zamysłowo, Stęszew, Wielkawieś, Antoninek, Strykowo, Strykówko, Twardowo, Srocko Małe, Wronczyn, Zaparcin, Witobel, Dębno, Dębienko, Dębina, Krąplewo, Drogosławiec, Sapowice, Trzebaw, Górka, Łódź, Będlewo;2)w powiecie poznańskim, w gminie Dopiewo, miejscowości: Lisówki, Trzcielin, Joanka, Podgaj. 1) w powiecie poznańskim, w gminie Stęszew, miejscowości: Zamysłowo, Stęszew, Wielkawieś, Antoninek, Strykowo, Strykówko, Twardowo, Srocko Małe, Wronczyn, Zaparcin, Witobel, Dębno, Dębienko, Dębina, Krąplewo, Drogosławiec, Sapowice, Trzebaw, Górka, Łódź, Będlewo; 2) w powiecie poznańskim, w gminie Dopiewo, miejscowości: Lisówki, Trzcielin, Joanka, Podgaj. 30.11.2025
1) w powiecie poznańskim, w gminie Stęszew, miejscowości: Zamysłowo, Stęszew, Wielkawieś, Antoninek, Strykowo, Strykówko, Twardowo, Srocko Małe, Wronczyn, Zaparcin, Witobel, Dębno, Dębienko, Dębina, Krąplewo, Drogosławiec, Sapowice, Trzebaw, Górka, Łódź, Będlewo;
2) w powiecie poznańskim, w gminie Dopiewo, miejscowości: Lisówki, Trzcielin, Joanka, Podgaj.
Surveillance zone:W woj. wielkopolskim:1)w powiecie poznańskim, w gminie Stęszew, miejscowości: Zamysłowo, Stęszew, Wielkawieś, Antoninek, Strykowo, Strykówko, Twardowo, Srocko Małe, Wronczyn, Zaparcin, Witobel, Dębno, Dębienko, Dębina, Krąplewo, Drogosławiec, Sapowice, Trzebaw, Górka, Łódź, Będlewo;2)w powiecie poznańskim, w gminie Dopiewo, miejscowości: Lisówki, Trzcielin, Joanka, Podgaj. 1) w powiecie poznańskim, w gminie Stęszew, miejscowości: Zamysłowo, Stęszew, Wielkawieś, Antoninek, Strykowo, Strykówko, Twardowo, Srocko Małe, Wronczyn, Zaparcin, Witobel, Dębno, Dębienko, Dębina, Krąplewo, Drogosławiec, Sapowice, Trzebaw, Górka, Łódź, Będlewo; 2) w powiecie poznańskim, w gminie Dopiewo, miejscowości: Lisówki, Trzcielin, Joanka, Podgaj. 1.12.2025 – 9.12.2025
1) w powiecie poznańskim, w gminie Stęszew, miejscowości: Zamysłowo, Stęszew, Wielkawieś, Antoninek, Strykowo, Strykówko, Twardowo, Srocko Małe, Wronczyn, Zaparcin, Witobel, Dębno, Dębienko, Dębina, Krąplewo, Drogosławiec, Sapowice, Trzebaw, Górka, Łódź, Będlewo;
2) w powiecie poznańskim, w gminie Dopiewo, miejscowości: Lisówki, Trzcielin, Joanka, Podgaj.
Surveillance zone:W woj. wielkopolskim :1)w powiecie poznańskim, w gminie Stęszew, miejscowości: Mirosławki, Rybojedzko, Tomice, Skrzynki, Tomiczki, Jeziorki, Piekary, Słupia, Modrze, Będlewo, Łódź, Górka, Trzebaw;2)w powiecie poznańskim, w gminie Dopiewo, miejscowości: Zborowo, Zborówko, Dopiewo, Dopiewiec, Konarzewo, Podłoziny, Gołuski, Żarnowiec;3)w powiecie poznańskim, w gminie Komorniki, miejscowości: Rosnówko, Walerianowo, Rosnowo, Chomęcice, Głuchowo, Komorniki, Wiry, Szreniawa, Jarosławiec, Kątnik, Wypalanki;4)w powiecie poznańskim, w gminie Mosina, miejscowości: Dymaczewo Nowe, Dymaczewo Stare, Kierzki, Krosinko, Ludwikowo, Pożegowo, Mosina, Borkowice, Bolesławiec, Jeziory, Krosno, Drużyna, Pecna, Konstantynowo;5)w powiecie poznańskim, w gminie Buk, miejscowości: Sznyfin, Dakowy Suche, Szewce, Dobra, Dobieżyn, Otusz, Cieśle;6)w powiecie kościańskim, w gminie Czempiń, miejscowości: Bieczyny, Sierniki, Głuchowo, Piotrowo Pierwsze, Piotrowo Drugie, Maruszkowo, Zadory, Roszkowo, Srocko Wielkie, część miejscowości Jarogniewice na zachód od drogi S5;7)w powiecie grodziskim, w gminie Granowo, miejscowości: Kąkolewo, część miejscowości Granowo na północny-wschód od skrzyżowania DK32 i ulicy Kolejowej, Separowo, Niemierzyce, Strzępiń, Bielawy, Zemsko, Januszewice, część miejscowości Kubaczyn na wschód od drogi powiatowej nr 2498P.8)w powiecie poznańskim, gmina Puszczykowo. 1) w powiecie poznańskim, w gminie Stęszew, miejscowości: Mirosławki, Rybojedzko, Tomice, Skrzynki, Tomiczki, Jeziorki, Piekary, Słupia, Modrze, Będlewo, Łódź, Górka, Trzebaw; 2) w powiecie poznańskim, w gminie Dopiewo, miejscowości: Zborowo, Zborówko, Dopiewo, Dopiewiec, Konarzewo, Podłoziny, Gołuski, Żarnowiec; 3) w powiecie poznańskim, w gminie Komorniki, miejscowości: Rosnówko, Walerianowo, Rosnowo, Chomęcice, Głuchowo, Komorniki, Wiry, Szreniawa, Jarosławiec, Kątnik, Wypalanki; 4) w powiecie poznańskim, w gminie Mosina, miejscowości: Dymaczewo Nowe, Dymaczewo Stare, Kierzki, Krosinko, Ludwikowo, Pożegowo, Mosina, Borkowice, Bolesławiec, Jeziory, Krosno, Drużyna, Pecna, Konstantynowo; 5) w powiecie poznańskim, w gminie Buk, miejscowości: Sznyfin, Dakowy Suche, Szewce, Dobra, Dobieżyn, Otusz, Cieśle; 6) w powiecie kościańskim, w gminie Czempiń, miejscowości: Bieczyny, Sierniki, Głuchowo, Piotrowo Pierwsze, Piotrowo Drugie, Maruszkowo, Zadory, Roszkowo, Srocko Wielkie, część miejscowości Jarogniewice na zachód od drogi S5; 7) w powiecie grodziskim, w gminie Granowo, miejscowości: Kąkolewo, część miejscowości Granowo na północny-wschód od skrzyżowania DK32 i ulicy Kolejowej, Separowo, Niemierzyce, Strzępiń, Bielawy, Zemsko, Januszewice, część miejscowości Kubaczyn na wschód od drogi powiatowej nr 2498P. 8) w powiecie poznańskim, gmina Puszczykowo. 9.12.2025
1) w powiecie poznańskim, w gminie Stęszew, miejscowości: Mirosławki, Rybojedzko, Tomice, Skrzynki, Tomiczki, Jeziorki, Piekary, Słupia, Modrze, Będlewo, Łódź, Górka, Trzebaw;
2) w powiecie poznańskim, w gminie Dopiewo, miejscowości: Zborowo, Zborówko, Dopiewo, Dopiewiec, Konarzewo, Podłoziny, Gołuski, Żarnowiec;
3) w powiecie poznańskim, w gminie Komorniki, miejscowości: Rosnówko, Walerianowo, Rosnowo, Chomęcice, Głuchowo, Komorniki, Wiry, Szreniawa, Jarosławiec, Kątnik, Wypalanki;
4) w powiecie poznańskim, w gminie Mosina, miejscowości: Dymaczewo Nowe, Dymaczewo Stare, Kierzki, Krosinko, Ludwikowo, Pożegowo, Mosina, Borkowice, Bolesławiec, Jeziory, Krosno, Drużyna, Pecna, Konstantynowo;
5) w powiecie poznańskim, w gminie Buk, miejscowości: Sznyfin, Dakowy Suche, Szewce, Dobra, Dobieżyn, Otusz, Cieśle;
6) w powiecie kościańskim, w gminie Czempiń, miejscowości: Bieczyny, Sierniki, Głuchowo, Piotrowo Pierwsze, Piotrowo Drugie, Maruszkowo, Zadory, Roszkowo, Srocko Wielkie, część miejscowości Jarogniewice na zachód od drogi S5;
7) w powiecie grodziskim, w gminie Granowo, miejscowości: Kąkolewo, część miejscowości Granowo na północny-wschód od skrzyżowania DK32 i ulicy Kolejowej, Separowo, Niemierzyce, Strzępiń, Bielawy, Zemsko, Januszewice, część miejscowości Kubaczyn na wschód od drogi powiatowej nr 2498P.
8) w powiecie poznańskim, gmina Puszczykowo.
PL-ND-2025-00062 Surveillance zone:W woj. wielkopolskim:1)w powiecie ostrowskim, w gminie Nowe Skalmierzyce, miejscowości: Biskupice Ołoboczne, Ociąż, Fabianów, Skalmierzyce, Śliwniki;2)w powiecie ostrowskim, w gminie Sieroszewice, miejscowości: Bilczew, Psary, Latowice, Kowalew, Bibianki, Kęszyce, w miejscowości Rossoszyca obszar na północny zachód od skrzyżowania ul. Kaliskiej z ul. Ostrowską;3)w powiecie ostrowskim, w gminie Ostrów Wlkp., miejscowości: Czekanów, Bagatela. 1) w powiecie ostrowskim, w gminie Nowe Skalmierzyce, miejscowości: Biskupice Ołoboczne, Ociąż, Fabianów, Skalmierzyce, Śliwniki; 2) w powiecie ostrowskim, w gminie Sieroszewice, miejscowości: Bilczew, Psary, Latowice, Kowalew, Bibianki, Kęszyce, w miejscowości Rossoszyca obszar na północny zachód od skrzyżowania ul. Kaliskiej z ul. Ostrowską; 3) w powiecie ostrowskim, w gminie Ostrów Wlkp., miejscowości: Czekanów, Bagatela. 12.11.2025 – 20.11.2025
1) w powiecie ostrowskim, w gminie Nowe Skalmierzyce, miejscowości: Biskupice Ołoboczne, Ociąż, Fabianów, Skalmierzyce, Śliwniki;
2) w powiecie ostrowskim, w gminie Sieroszewice, miejscowości: Bilczew, Psary, Latowice, Kowalew, Bibianki, Kęszyce, w miejscowości Rossoszyca obszar na północny zachód od skrzyżowania ul. Kaliskiej z ul. Ostrowską;
3) w powiecie ostrowskim, w gminie Ostrów Wlkp., miejscowości: Czekanów, Bagatela.
Surveillance zone:1)w powiecie ostrowskim, gmina Nowe Skalmierzyce, na terenie nie objętym obszarem zapowietrzonym;2)w powiecie ostrowskim, w gminie Sieroszewice, miejscowości: Parczew, Strzyżew, Sieroszewice, Namysłaki, Wielowieś, Masanów, Miłaszka, Ołobok, Sławin, Westrza, Kaliszkowice, w miejscowości Rososzyca obszar na południowy wschód od skrzyżowania ul. Kaliskiej z ul. Ostrowską;3)w powiecie ostrowskim, w gminie Ostrów Wlkp., miejscowości: Gutów, Górzno, Górzenko, Będzieszyn, Młynów, Słaborowice, Kwiatków, Lewków, Kołątajew, Szczury, Franklinów, Karski, Wysocko Wielkie, Wtórek, Nowe Kamienice, Sadowie, Smardowskie Olendry, Trąba, Warszty, Kąkolewo, Biłgoraje, Jamy, Gręblów, Michałków, Stary Staw;4)w powiecie ostrowskim, w gminie Przygodzice, miejscowości: Chynowa, Bogufałów;5)w powiecie kaliskim, w gminie Godziesze Wielkie, miejscowości: Wola Droszowska, Zadowice, Żydów;6)w mieście Kalisz, osiedla: Dobrzec, Dobrzec P, Szczypiorno, Sulisławice, Sulisławice Kolonia, Piwonice, Piwonice Zachód, Nosków, Zagorzynek;7)w powiecie pleszewskim, w gminie Gołuchów, miejscowości: Kościelna Wieś, Borczysko. 1) w powiecie ostrowskim, gmina Nowe Skalmierzyce, na terenie nie objętym obszarem zapowietrzonym; 2) w powiecie ostrowskim, w gminie Sieroszewice, miejscowości: Parczew, Strzyżew, Sieroszewice, Namysłaki, Wielowieś, Masanów, Miłaszka, Ołobok, Sławin, Westrza, Kaliszkowice, w miejscowości Rososzyca obszar na południowy wschód od skrzyżowania ul. Kaliskiej z ul. Ostrowską; 3) w powiecie ostrowskim, w gminie Ostrów Wlkp., miejscowości: Gutów, Górzno, Górzenko, Będzieszyn, Młynów, Słaborowice, Kwiatków, Lewków, Kołątajew, Szczury, Franklinów, Karski, Wysocko Wielkie, Wtórek, Nowe Kamienice, Sadowie, Smardowskie Olendry, Trąba, Warszty, Kąkolewo, Biłgoraje, Jamy, Gręblów, Michałków, Stary Staw; 4) w powiecie ostrowskim, w gminie Przygodzice, miejscowości: Chynowa, Bogufałów; 5) w powiecie kaliskim, w gminie Godziesze Wielkie, miejscowości: Wola Droszowska, Zadowice, Żydów; 6) w mieście Kalisz, osiedla: Dobrzec, Dobrzec P, Szczypiorno, Sulisławice, Sulisławice Kolonia, Piwonice, Piwonice Zachód, Nosków, Zagorzynek; 7) w powiecie pleszewskim, w gminie Gołuchów, miejscowości: Kościelna Wieś, Borczysko. 20.11.2025
1) w powiecie ostrowskim, gmina Nowe Skalmierzyce, na terenie nie objętym obszarem zapowietrzonym;
2) w powiecie ostrowskim, w gminie Sieroszewice, miejscowości: Parczew, Strzyżew, Sieroszewice, Namysłaki, Wielowieś, Masanów, Miłaszka, Ołobok, Sławin, Westrza, Kaliszkowice, w miejscowości Rososzyca obszar na południowy wschód od skrzyżowania ul. Kaliskiej z ul. Ostrowską;
3) w powiecie ostrowskim, w gminie Ostrów Wlkp., miejscowości: Gutów, Górzno, Górzenko, Będzieszyn, Młynów, Słaborowice, Kwiatków, Lewków, Kołątajew, Szczury, Franklinów, Karski, Wysocko Wielkie, Wtórek, Nowe Kamienice, Sadowie, Smardowskie Olendry, Trąba, Warszty, Kąkolewo, Biłgoraje, Jamy, Gręblów, Michałków, Stary Staw;
4) w powiecie ostrowskim, w gminie Przygodzice, miejscowości: Chynowa, Bogufałów;
5) w powiecie kaliskim, w gminie Godziesze Wielkie, miejscowości: Wola Droszowska, Zadowice, Żydów;
6) w mieście Kalisz, osiedla: Dobrzec, Dobrzec P, Szczypiorno, Sulisławice, Sulisławice Kolonia, Piwonice, Piwonice Zachód, Nosków, Zagorzynek;
7) w powiecie pleszewskim, w gminie Gołuchów, miejscowości: Kościelna Wieś, Borczysko.
Zachodniopomorskie voivodeship
PL-ND-2025-00067PL-ND.NON-P-2025-00050 Protection zone:W województwie zachodniopomorskim:1)w powiecie białogardzkim część Miasta Białogard znajdująca się w promieniu 3 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 3 km od współrzędnych 54.02053 15.891838;2)w powiecie białogardzkim w gminie Białogard miejscowości: Lulewiczki, Redlino, Rościno, Trzebiele;3)w powiecie białogardzkim w gminie Karlino miejscowość Karlino.. 1) w powiecie białogardzkim część Miasta Białogard znajdująca się w promieniu 3 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 3 km od współrzędnych 54.02053 15.891838; 2) w powiecie białogardzkim w gminie Białogard miejscowości: Lulewiczki, Redlino, Rościno, Trzebiele; 3) w powiecie białogardzkim w gminie Karlino miejscowość Karlino.. 29.11.2025
1) w powiecie białogardzkim część Miasta Białogard znajdująca się w promieniu 3 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 3 km od współrzędnych 54.02053 15.891838;
2) w powiecie białogardzkim w gminie Białogard miejscowości: Lulewiczki, Redlino, Rościno, Trzebiele;
3) w powiecie białogardzkim w gminie Karlino miejscowość Karlino..
Surveillance zone:W województwie zachodniopomorskim:1)w powiecie białogardzkim część Miasta Białogard znajdująca się w promieniu 3 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 3 km od współrzędnych 54.02053 15.891838;2)w powiecie białogardzkim w gminie Białogard miejscowości: Lulewiczki, Redlino, Rościno, Trzebiele;3)w powiecie białogardzkim w gminie Karlino miejscowość Karlino. 1) w powiecie białogardzkim część Miasta Białogard znajdująca się w promieniu 3 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 3 km od współrzędnych 54.02053 15.891838; 2) w powiecie białogardzkim w gminie Białogard miejscowości: Lulewiczki, Redlino, Rościno, Trzebiele; 3) w powiecie białogardzkim w gminie Karlino miejscowość Karlino. 30.11.2025 – 8.12.2025
1) w powiecie białogardzkim część Miasta Białogard znajdująca się w promieniu 3 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 3 km od współrzędnych 54.02053 15.891838;
2) w powiecie białogardzkim w gminie Białogard miejscowości: Lulewiczki, Redlino, Rościno, Trzebiele;
3) w powiecie białogardzkim w gminie Karlino miejscowość Karlino.
Surveillance zone:W województwie zachodniopomorskim:1)w powiecie białogardzkim część Miasta Białogard niewymieniona w obszarze zapowietrzonym;2)w powiecie białogardzkim w gminie Białogard miejscowości: część obrębu miejscowości Byszyno znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838, Dargikowo, Dargikowo Kolonia, Dębczyno, Gruszewo, Kamosowo, Klępino Białogardzkie, Kościernica, Laski, Leśniki, Lulewice, Łęczenko, Łęczno, Łęczno Kolonia, Łęczynko, Moczyłki, Nasutowo, Nawino, część obrębu miejscowości Nosówko znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838, Pękaninko, Pękanino, Pomianowo, Pomianowo Kolonia, Pustkowo, Pustkówko, Rarwino, Rogowo, Rogowo Kolonia, Rychowo, Rychówko, Sińce, Stanomino, Strzelec, Tarpnowo, Zagórze, Ząbki, Żabiniec, Żelezno Kolonia, Żeleźno, Żelimucha, Żytelkowo;3)w powiecie białogardzkim w gminie Karlino, miejscowości: Brzeźno, Chotyń, Czerwięcino, Daszewo, Daszewo Kolonia, Dębolas, część obrębu miejscowości Domacyno znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838, Garnki, część obrębu miejscowości Gościnko znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838, Karlinko, Karścino, Karwin, Kowańcz, Kozia Góra, Krukowo, Krzywopłoty, Lubiechowo, Lubiechowo-Przystanek, Malonowo, Mierzynek, Mierzynek Kolonia, Poczernino, Pobłocie Wielkie, Syrkowice, Ubysławice, Witolub, Zwartowo;4)w powiecie kołobrzeskim, w gminie Dygowo miejscowości: część miejscowości Kłopotowo znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838, Łykowo;5)w powiecie kołobrzeskim, część gminy Gościno znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838;6)w powiecie koszalińskim w gminie Biesiekierz miejscowości: Parsowo, Świeminko, Świemino, Warnino. 1) w powiecie białogardzkim część Miasta Białogard niewymieniona w obszarze zapowietrzonym; 2) w powiecie białogardzkim w gminie Białogard miejscowości: część obrębu miejscowości Byszyno znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838, Dargikowo, Dargikowo Kolonia, Dębczyno, Gruszewo, Kamosowo, Klępino Białogardzkie, Kościernica, Laski, Leśniki, Lulewice, Łęczenko, Łęczno, Łęczno Kolonia, Łęczynko, Moczyłki, Nasutowo, Nawino, część obrębu miejscowości Nosówko znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838, Pękaninko, Pękanino, Pomianowo, Pomianowo Kolonia, Pustkowo, Pustkówko, Rarwino, Rogowo, Rogowo Kolonia, Rychowo, Rychówko, Sińce, Stanomino, Strzelec, Tarpnowo, Zagórze, Ząbki, Żabiniec, Żelezno Kolonia, Żeleźno, Żelimucha, Żytelkowo; 3) w powiecie białogardzkim w gminie Karlino, miejscowości: Brzeźno, Chotyń, Czerwięcino, Daszewo, Daszewo Kolonia, Dębolas, część obrębu miejscowości Domacyno znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838, Garnki, część obrębu miejscowości Gościnko znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838, Karlinko, Karścino, Karwin, Kowańcz, Kozia Góra, Krukowo, Krzywopłoty, Lubiechowo, Lubiechowo-Przystanek, Malonowo, Mierzynek, Mierzynek Kolonia, Poczernino, Pobłocie Wielkie, Syrkowice, Ubysławice, Witolub, Zwartowo; 4) w powiecie kołobrzeskim, w gminie Dygowo miejscowości: część miejscowości Kłopotowo znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838, Łykowo; 5) w powiecie kołobrzeskim, część gminy Gościno znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838; 6) w powiecie koszalińskim w gminie Biesiekierz miejscowości: Parsowo, Świeminko, Świemino, Warnino. 8.12.2025
1) w powiecie białogardzkim część Miasta Białogard niewymieniona w obszarze zapowietrzonym;
2) w powiecie białogardzkim w gminie Białogard miejscowości: część obrębu miejscowości Byszyno znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838, Dargikowo, Dargikowo Kolonia, Dębczyno, Gruszewo, Kamosowo, Klępino Białogardzkie, Kościernica, Laski, Leśniki, Lulewice, Łęczenko, Łęczno, Łęczno Kolonia, Łęczynko, Moczyłki, Nasutowo, Nawino, część obrębu miejscowości Nosówko znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838, Pękaninko, Pękanino, Pomianowo, Pomianowo Kolonia, Pustkowo, Pustkówko, Rarwino, Rogowo, Rogowo Kolonia, Rychowo, Rychówko, Sińce, Stanomino, Strzelec, Tarpnowo, Zagórze, Ząbki, Żabiniec, Żelezno Kolonia, Żeleźno, Żelimucha, Żytelkowo;
3) w powiecie białogardzkim w gminie Karlino, miejscowości: Brzeźno, Chotyń, Czerwięcino, Daszewo, Daszewo Kolonia, Dębolas, część obrębu miejscowości Domacyno znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838, Garnki, część obrębu miejscowości Gościnko znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838, Karlinko, Karścino, Karwin, Kowańcz, Kozia Góra, Krukowo, Krzywopłoty, Lubiechowo, Lubiechowo-Przystanek, Malonowo, Mierzynek, Mierzynek Kolonia, Poczernino, Pobłocie Wielkie, Syrkowice, Ubysławice, Witolub, Zwartowo;
4) w powiecie kołobrzeskim, w gminie Dygowo miejscowości: część miejscowości Kłopotowo znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838, Łykowo;
5) w powiecie kołobrzeskim, część gminy Gościno znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838;
6) w powiecie koszalińskim w gminie Biesiekierz miejscowości: Parsowo, Świeminko, Świemino, Warnino.
1) w powiecie aleksandrowskim:a)miasto Aleksandrów Kujawski,b)w gminie Aleksandrów Kujawski miejscowości: Białe Błota, Łazieniec, Nowy Ciechocinek część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Otłoczyn, Rożno-Parcele, Stawki, Wołuszewo, Wygoda,c)w gminie Zakrzewo miejscowości: Gosławice, Gęsin, Kolonia Bodzanowska, Lepsze, Siniarzewo, Sinki, Ujma Duża, Wola Bachorna,d)w gminie Koneck miejscowości: Kajetanowo, Kamieniec, Pomiany,e)w gminie Bądkowo miejscowości: Sinki, Łowiczek. a) miasto Aleksandrów Kujawski, b) w gminie Aleksandrów Kujawski miejscowości: Białe Błota, Łazieniec, Nowy Ciechocinek część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Otłoczyn, Rożno-Parcele, Stawki, Wołuszewo, Wygoda, c) w gminie Zakrzewo miejscowości: Gosławice, Gęsin, Kolonia Bodzanowska, Lepsze, Siniarzewo, Sinki, Ujma Duża, Wola Bachorna, d) w gminie Koneck miejscowości: Kajetanowo, Kamieniec, Pomiany, e) w gminie Bądkowo miejscowości: Sinki, Łowiczek.
a) miasto Aleksandrów Kujawski,
b) w gminie Aleksandrów Kujawski miejscowości: Białe Błota, Łazieniec, Nowy Ciechocinek część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Otłoczyn, Rożno-Parcele, Stawki, Wołuszewo, Wygoda,
c) w gminie Zakrzewo miejscowości: Gosławice, Gęsin, Kolonia Bodzanowska, Lepsze, Siniarzewo, Sinki, Ujma Duża, Wola Bachorna,
d) w gminie Koneck miejscowości: Kajetanowo, Kamieniec, Pomiany,
e) w gminie Bądkowo miejscowości: Sinki, Łowiczek.
a) miasto Aleksandrów Kujawski,
b) w gminie Aleksandrów Kujawski miejscowości: Białe Błota, Łazieniec, Nowy Ciechocinek część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Otłoczyn, Rożno-Parcele, Stawki, Wołuszewo, Wygoda,
c) w gminie Zakrzewo miejscowości: Gosławice, Gęsin, Kolonia Bodzanowska, Lepsze, Siniarzewo, Sinki, Ujma Duża, Wola Bachorna,
d) w gminie Koneck miejscowości: Kajetanowo, Kamieniec, Pomiany,
e) w gminie Bądkowo miejscowości: Sinki, Łowiczek.
2) w powiecie radziejowskim:a)w gminie Osięciny miejscowości: Bilno, Ujma Mała. a) w gminie Osięciny miejscowości: Bilno, Ujma Mała.
a) w gminie Osięciny miejscowości: Bilno, Ujma Mała.
a) w gminie Osięciny miejscowości: Bilno, Ujma Mała.
1) w powiecie aleksandrowskim:a)miasto Aleksandrów Kujawski,b)w gminie Aleksandrów Kujawski miejscowości: Białe Błota, Łazieniec, Nowy Ciechocinek część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Otłoczyn, Rożno-Parcele, Stawki, Wołuszewo, Wygoda,c)w gminie Zakrzewo miejscowości: Gosławice, Gęsin, Kolonia Bodzanowska, Lepsze, Siniarzewo, Sinki, Ujma Duża, Wola Bachorna,d)w gminie Koneck miejscowości: Kajetanowo, Kamieniec, Pomiany,e)w gminie Bądkowo miejscowości: Sinki, Łowiczek. a) miasto Aleksandrów Kujawski, b) w gminie Aleksandrów Kujawski miejscowości: Białe Błota, Łazieniec, Nowy Ciechocinek część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Otłoczyn, Rożno-Parcele, Stawki, Wołuszewo, Wygoda, c) w gminie Zakrzewo miejscowości: Gosławice, Gęsin, Kolonia Bodzanowska, Lepsze, Siniarzewo, Sinki, Ujma Duża, Wola Bachorna, d) w gminie Koneck miejscowości: Kajetanowo, Kamieniec, Pomiany, e) w gminie Bądkowo miejscowości: Sinki, Łowiczek.
a) miasto Aleksandrów Kujawski,
b) w gminie Aleksandrów Kujawski miejscowości: Białe Błota, Łazieniec, Nowy Ciechocinek część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Otłoczyn, Rożno-Parcele, Stawki, Wołuszewo, Wygoda,
c) w gminie Zakrzewo miejscowości: Gosławice, Gęsin, Kolonia Bodzanowska, Lepsze, Siniarzewo, Sinki, Ujma Duża, Wola Bachorna,
d) w gminie Koneck miejscowości: Kajetanowo, Kamieniec, Pomiany,
e) w gminie Bądkowo miejscowości: Sinki, Łowiczek.
a) miasto Aleksandrów Kujawski,
b) w gminie Aleksandrów Kujawski miejscowości: Białe Błota, Łazieniec, Nowy Ciechocinek część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Otłoczyn, Rożno-Parcele, Stawki, Wołuszewo, Wygoda,
c) w gminie Zakrzewo miejscowości: Gosławice, Gęsin, Kolonia Bodzanowska, Lepsze, Siniarzewo, Sinki, Ujma Duża, Wola Bachorna,
d) w gminie Koneck miejscowości: Kajetanowo, Kamieniec, Pomiany,
e) w gminie Bądkowo miejscowości: Sinki, Łowiczek.
2) w powiecie radziejowskim:a)w gminie Osięciny miejscowości: Bilno, Ujma Mała. a) w gminie Osięciny miejscowości: Bilno, Ujma Mała.
a) w gminie Osięciny miejscowości: Bilno, Ujma Mała.
a) w gminie Osięciny miejscowości: Bilno, Ujma Mała.
1) w powiecie aleksandrowskim:a)w gminie Aleksandrów Kujawski miejscowości: Broniszewo, Chrusty, Goszczewo, Grabie, Konradowo, Kuczek, Nowy Ciechocinek część południowa miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część południowa miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Opoki, Ostrowąs, Ośno, Ośno Drugie, Plebanka, Poczałkowo, Podgaj, Przybranowo, Przybranówek, Rudunki, Słomkowo, Słońsk Dolny, Służewo, Wólka, Wilkostowo, Zgoda,b)w gminie Ciechocinek miejscowość: Ciechocinek,c)w gminie Waganiec miejscowość: Konstantynowo, Brudnowo, Kolonia Święte, Michalin, Niszczewy, Wiktoryn, Śliwkowo,d)w gminie Koneck miejscowości: Brzeźno, Chromowola, Jeziorno, Kolonia Kruszynek, Kruszynek, Młynek, Ossówka, Romanowo, Straszewo, Kolonia Straszewska część wschodnia miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Zazdromin, Koneck, Opalanka, Spoczynek, Zapustek, Święte, Żołnowo,e)w gminie Raciążek miejscowości: Dąbrówka, Niestuszewo, Podole, Podzamcze, Raciążek, Raciążek Pole, Siarzewo, Turzno, Turzynek,f)w gminie Bądkowo miejscowości: Biele, Bądkowo, Bądkówek, Jaranowo, Jaranowo Duże, Kalinowiec, Kaniewo, Kolonia Łowiczek, Kujawka, Kwiatkowo-część północna do drogi wojewódzkiej nr 252 (Inowrocław – Włocławek), Olszynka, Słupy Duże, Słupy Małe, Tomaszewo, Toporzyszczewo, Toporzyszczewo Stare, Wysocin, Wójtówka, Łowiczek, Łówkowice, Żabieniec, Wysocinek,g)w gminie Zakrzewo miejscowości: Bachorza, Kolonia Serocka, Kuczkowo, Seroczki, Sędzin, Sędzin-Kolonia, Zakrzewo, Zarębowo; a) w gminie Aleksandrów Kujawski miejscowości: Broniszewo, Chrusty, Goszczewo, Grabie, Konradowo, Kuczek, Nowy Ciechocinek część południowa miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część południowa miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Opoki, Ostrowąs, Ośno, Ośno Drugie, Plebanka, Poczałkowo, Podgaj, Przybranowo, Przybranówek, Rudunki, Słomkowo, Słońsk Dolny, Służewo, Wólka, Wilkostowo, Zgoda, b) w gminie Ciechocinek miejscowość: Ciechocinek, c) w gminie Waganiec miejscowość: Konstantynowo, Brudnowo, Kolonia Święte, Michalin, Niszczewy, Wiktoryn, Śliwkowo, d) w gminie Koneck miejscowości: Brzeźno, Chromowola, Jeziorno, Kolonia Kruszynek, Kruszynek, Młynek, Ossówka, Romanowo, Straszewo, Kolonia Straszewska część wschodnia miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Zazdromin, Koneck, Opalanka, Spoczynek, Zapustek, Święte, Żołnowo, e) w gminie Raciążek miejscowości: Dąbrówka, Niestuszewo, Podole, Podzamcze, Raciążek, Raciążek Pole, Siarzewo, Turzno, Turzynek, f) w gminie Bądkowo miejscowości: Biele, Bądkowo, Bądkówek, Jaranowo, Jaranowo Duże, Kalinowiec, Kaniewo, Kolonia Łowiczek, Kujawka, Kwiatkowo-część północna do drogi wojewódzkiej nr 252 (Inowrocław – Włocławek), Olszynka, Słupy Duże, Słupy Małe, Tomaszewo, Toporzyszczewo, Toporzyszczewo Stare, Wysocin, Wójtówka, Łowiczek, Łówkowice, Żabieniec, Wysocinek, g) w gminie Zakrzewo miejscowości: Bachorza, Kolonia Serocka, Kuczkowo, Seroczki, Sędzin, Sędzin-Kolonia, Zakrzewo, Zarębowo;
a) w gminie Aleksandrów Kujawski miejscowości: Broniszewo, Chrusty, Goszczewo, Grabie, Konradowo, Kuczek, Nowy Ciechocinek część południowa miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część południowa miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Opoki, Ostrowąs, Ośno, Ośno Drugie, Plebanka, Poczałkowo, Podgaj, Przybranowo, Przybranówek, Rudunki, Słomkowo, Słońsk Dolny, Służewo, Wólka, Wilkostowo, Zgoda,
b) w gminie Ciechocinek miejscowość: Ciechocinek,
c) w gminie Waganiec miejscowość: Konstantynowo, Brudnowo, Kolonia Święte, Michalin, Niszczewy, Wiktoryn, Śliwkowo,
d) w gminie Koneck miejscowości: Brzeźno, Chromowola, Jeziorno, Kolonia Kruszynek, Kruszynek, Młynek, Ossówka, Romanowo, Straszewo, Kolonia Straszewska część wschodnia miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Zazdromin, Koneck, Opalanka, Spoczynek, Zapustek, Święte, Żołnowo,
e) w gminie Raciążek miejscowości: Dąbrówka, Niestuszewo, Podole, Podzamcze, Raciążek, Raciążek Pole, Siarzewo, Turzno, Turzynek,
f) w gminie Bądkowo miejscowości: Biele, Bądkowo, Bądkówek, Jaranowo, Jaranowo Duże, Kalinowiec, Kaniewo, Kolonia Łowiczek, Kujawka, Kwiatkowo-część północna do drogi wojewódzkiej nr 252 (Inowrocław – Włocławek), Olszynka, Słupy Duże, Słupy Małe, Tomaszewo, Toporzyszczewo, Toporzyszczewo Stare, Wysocin, Wójtówka, Łowiczek, Łówkowice, Żabieniec, Wysocinek,
g) w gminie Zakrzewo miejscowości: Bachorza, Kolonia Serocka, Kuczkowo, Seroczki, Sędzin, Sędzin-Kolonia, Zakrzewo, Zarębowo;
a) w gminie Aleksandrów Kujawski miejscowości: Broniszewo, Chrusty, Goszczewo, Grabie, Konradowo, Kuczek, Nowy Ciechocinek część południowa miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część południowa miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Opoki, Ostrowąs, Ośno, Ośno Drugie, Plebanka, Poczałkowo, Podgaj, Przybranowo, Przybranówek, Rudunki, Słomkowo, Słońsk Dolny, Służewo, Wólka, Wilkostowo, Zgoda,
b) w gminie Ciechocinek miejscowość: Ciechocinek,
c) w gminie Waganiec miejscowość: Konstantynowo, Brudnowo, Kolonia Święte, Michalin, Niszczewy, Wiktoryn, Śliwkowo,
d) w gminie Koneck miejscowości: Brzeźno, Chromowola, Jeziorno, Kolonia Kruszynek, Kruszynek, Młynek, Ossówka, Romanowo, Straszewo, Kolonia Straszewska część wschodnia miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Zazdromin, Koneck, Opalanka, Spoczynek, Zapustek, Święte, Żołnowo,
e) w gminie Raciążek miejscowości: Dąbrówka, Niestuszewo, Podole, Podzamcze, Raciążek, Raciążek Pole, Siarzewo, Turzno, Turzynek,
f) w gminie Bądkowo miejscowości: Biele, Bądkowo, Bądkówek, Jaranowo, Jaranowo Duże, Kalinowiec, Kaniewo, Kolonia Łowiczek, Kujawka, Kwiatkowo-część północna do drogi wojewódzkiej nr 252 (Inowrocław – Włocławek), Olszynka, Słupy Duże, Słupy Małe, Tomaszewo, Toporzyszczewo, Toporzyszczewo Stare, Wysocin, Wójtówka, Łowiczek, Łówkowice, Żabieniec, Wysocinek,
g) w gminie Zakrzewo miejscowości: Bachorza, Kolonia Serocka, Kuczkowo, Seroczki, Sędzin, Sędzin-Kolonia, Zakrzewo, Zarębowo;
2) w powiecie toruńskim:a)w gminie Obrowo miejscowości: Dzikowo, Obory, Osiek n/Wisłą, Sąsieczno, Silno, Smogorzewiec, Stajenczynki,b)miasto Toruń: Obręb 76, Obręb 78,c)w gminie Lubicz miejscowości: Grabowiec, Kopanino, Złotoria,d)w gminie Wielka Nieszawka miejscowości: Brzoza, Popioły,e)w gminie Czernikowo miejscowość: Pokrzywno; a) w gminie Obrowo miejscowości: Dzikowo, Obory, Osiek n/Wisłą, Sąsieczno, Silno, Smogorzewiec, Stajenczynki, b) miasto Toruń: Obręb 76, Obręb 78, c) w gminie Lubicz miejscowości: Grabowiec, Kopanino, Złotoria, d) w gminie Wielka Nieszawka miejscowości: Brzoza, Popioły, e) w gminie Czernikowo miejscowość: Pokrzywno;
a) w gminie Obrowo miejscowości: Dzikowo, Obory, Osiek n/Wisłą, Sąsieczno, Silno, Smogorzewiec, Stajenczynki,
b) miasto Toruń: Obręb 76, Obręb 78,
c) w gminie Lubicz miejscowości: Grabowiec, Kopanino, Złotoria,
d) w gminie Wielka Nieszawka miejscowości: Brzoza, Popioły,
e) w gminie Czernikowo miejscowość: Pokrzywno;
a) w gminie Obrowo miejscowości: Dzikowo, Obory, Osiek n/Wisłą, Sąsieczno, Silno, Smogorzewiec, Stajenczynki,
b) miasto Toruń: Obręb 76, Obręb 78,
c) w gminie Lubicz miejscowości: Grabowiec, Kopanino, Złotoria,
d) w gminie Wielka Nieszawka miejscowości: Brzoza, Popioły,
e) w gminie Czernikowo miejscowość: Pokrzywno;
3) w powiecie radziejowskim:a)w gminie Dobre miejscowości: Altana, Bodzanowo, Bodzanowo Drugie, Borowo, Byczyna, Byczyna Kolonia, Czołpin, Dobre, Dobre Wieś, Dęby, Krzywosądz, Ludwikowo, Morawy, Narkowo, Przysiek, Smarglin, Ułomie,b)w gminie Osięciny miejscowości: Bartłomiejowice, Bełszewo, Belszewo Kolonia, Bodzanówek, Kościelna Wieś, Krotoszyn, Leonowo, Nagórki, Pilichowo, Pocierzyn, Ruszki, Szalonki, Sęczkowo, Wola Skarbkowa, Włodzimierka, Zielińsk, Pieńki Kościelskie, Witoldowo, Pułkownikowo, Zagaj,c)w gminie Radziejów miejscowość: Piołunowo; a) w gminie Dobre miejscowości: Altana, Bodzanowo, Bodzanowo Drugie, Borowo, Byczyna, Byczyna Kolonia, Czołpin, Dobre, Dobre Wieś, Dęby, Krzywosądz, Ludwikowo, Morawy, Narkowo, Przysiek, Smarglin, Ułomie, b) w gminie Osięciny miejscowości: Bartłomiejowice, Bełszewo, Belszewo Kolonia, Bodzanówek, Kościelna Wieś, Krotoszyn, Leonowo, Nagórki, Pilichowo, Pocierzyn, Ruszki, Szalonki, Sęczkowo, Wola Skarbkowa, Włodzimierka, Zielińsk, Pieńki Kościelskie, Witoldowo, Pułkownikowo, Zagaj, c) w gminie Radziejów miejscowość: Piołunowo;
a) w gminie Dobre miejscowości: Altana, Bodzanowo, Bodzanowo Drugie, Borowo, Byczyna, Byczyna Kolonia, Czołpin, Dobre, Dobre Wieś, Dęby, Krzywosądz, Ludwikowo, Morawy, Narkowo, Przysiek, Smarglin, Ułomie,
b) w gminie Osięciny miejscowości: Bartłomiejowice, Bełszewo, Belszewo Kolonia, Bodzanówek, Kościelna Wieś, Krotoszyn, Leonowo, Nagórki, Pilichowo, Pocierzyn, Ruszki, Szalonki, Sęczkowo, Wola Skarbkowa, Włodzimierka, Zielińsk, Pieńki Kościelskie, Witoldowo, Pułkownikowo, Zagaj,
c) w gminie Radziejów miejscowość: Piołunowo;
a) w gminie Dobre miejscowości: Altana, Bodzanowo, Bodzanowo Drugie, Borowo, Byczyna, Byczyna Kolonia, Czołpin, Dobre, Dobre Wieś, Dęby, Krzywosądz, Ludwikowo, Morawy, Narkowo, Przysiek, Smarglin, Ułomie,
b) w gminie Osięciny miejscowości: Bartłomiejowice, Bełszewo, Belszewo Kolonia, Bodzanówek, Kościelna Wieś, Krotoszyn, Leonowo, Nagórki, Pilichowo, Pocierzyn, Ruszki, Szalonki, Sęczkowo, Wola Skarbkowa, Włodzimierka, Zielińsk, Pieńki Kościelskie, Witoldowo, Pułkownikowo, Zagaj,
c) w gminie Radziejów miejscowość: Piołunowo;
4) w powiecie inowrocławskim:a)w gminie Dąbrowa Biskupia miejscowości: Chlewiska, Chróstowo, Dąbrowa Biskupia, Mleczkowo, Przybysław, Walentynowo; a) w gminie Dąbrowa Biskupia miejscowości: Chlewiska, Chróstowo, Dąbrowa Biskupia, Mleczkowo, Przybysław, Walentynowo;
a) w gminie Dąbrowa Biskupia miejscowości: Chlewiska, Chróstowo, Dąbrowa Biskupia, Mleczkowo, Przybysław, Walentynowo;
a) w gminie Dąbrowa Biskupia miejscowości: Chlewiska, Chróstowo, Dąbrowa Biskupia, Mleczkowo, Przybysław, Walentynowo;
5) w powiecie włocławskim:a)w gminie Lubanie miejscowości: Janowice, Przywieczerzynek, Zapomnianowo, Przywieczerzyn, Tadzin, Zosin. a) w gminie Lubanie miejscowości: Janowice, Przywieczerzynek, Zapomnianowo, Przywieczerzyn, Tadzin, Zosin.
a) w gminie Lubanie miejscowości: Janowice, Przywieczerzynek, Zapomnianowo, Przywieczerzyn, Tadzin, Zosin.
a) w gminie Lubanie miejscowości: Janowice, Przywieczerzynek, Zapomnianowo, Przywieczerzyn, Tadzin, Zosin.
1) w powiecie żuromińskim:a)w gminie Kuczbork – Osada, miejscowości: Chodubka, Kuczbork, Nidzgora, Olszewko,b)w gminie Żuromin, miejscowości: Brudnice, Będzymin, Dębsk, Franciszkowo, Kliczewo Małe, Kliczewo Duże, Kosewo, Kruszewo, Nowe Nadratowo, Olszewo, Poniatowo, Rzężawy, Stare Nadratowo, Wiadrowo, Wólka Kliczewska, miasto Żuromin,c)w gminie Lubowidz, miejscowości: Bądzyn, Łazy,d)w gminie Bieżuń, miejscowości: Bielawy Gołuskie, Dźwierzno, Gołuszyn, Karniszyn, Karniszyn – Parcele, Kobyla Łąka, Kocewo, Myślin, Sadłowo, Sadłowo-Parcele, Stawiszyn-Zwalewo, Stawiszyn-Łaziska, Sławęcin, miasto Bieżuń; a) w gminie Kuczbork – Osada, miejscowości: Chodubka, Kuczbork, Nidzgora, Olszewko, b) w gminie Żuromin, miejscowości: Brudnice, Będzymin, Dębsk, Franciszkowo, Kliczewo Małe, Kliczewo Duże, Kosewo, Kruszewo, Nowe Nadratowo, Olszewo, Poniatowo, Rzężawy, Stare Nadratowo, Wiadrowo, Wólka Kliczewska, miasto Żuromin, c) w gminie Lubowidz, miejscowości: Bądzyn, Łazy, d) w gminie Bieżuń, miejscowości: Bielawy Gołuskie, Dźwierzno, Gołuszyn, Karniszyn, Karniszyn – Parcele, Kobyla Łąka, Kocewo, Myślin, Sadłowo, Sadłowo-Parcele, Stawiszyn-Zwalewo, Stawiszyn-Łaziska, Sławęcin, miasto Bieżuń;
a) w gminie Kuczbork – Osada, miejscowości: Chodubka, Kuczbork, Nidzgora, Olszewko,
b) w gminie Żuromin, miejscowości: Brudnice, Będzymin, Dębsk, Franciszkowo, Kliczewo Małe, Kliczewo Duże, Kosewo, Kruszewo, Nowe Nadratowo, Olszewo, Poniatowo, Rzężawy, Stare Nadratowo, Wiadrowo, Wólka Kliczewska, miasto Żuromin,
c) w gminie Lubowidz, miejscowości: Bądzyn, Łazy,
d) w gminie Bieżuń, miejscowości: Bielawy Gołuskie, Dźwierzno, Gołuszyn, Karniszyn, Karniszyn – Parcele, Kobyla Łąka, Kocewo, Myślin, Sadłowo, Sadłowo-Parcele, Stawiszyn-Zwalewo, Stawiszyn-Łaziska, Sławęcin, miasto Bieżuń;
a) w gminie Kuczbork – Osada, miejscowości: Chodubka, Kuczbork, Nidzgora, Olszewko,
b) w gminie Żuromin, miejscowości: Brudnice, Będzymin, Dębsk, Franciszkowo, Kliczewo Małe, Kliczewo Duże, Kosewo, Kruszewo, Nowe Nadratowo, Olszewo, Poniatowo, Rzężawy, Stare Nadratowo, Wiadrowo, Wólka Kliczewska, miasto Żuromin,
c) w gminie Lubowidz, miejscowości: Bądzyn, Łazy,
d) w gminie Bieżuń, miejscowości: Bielawy Gołuskie, Dźwierzno, Gołuszyn, Karniszyn, Karniszyn – Parcele, Kobyla Łąka, Kocewo, Myślin, Sadłowo, Sadłowo-Parcele, Stawiszyn-Zwalewo, Stawiszyn-Łaziska, Sławęcin, miasto Bieżuń;
2) w powiecie mławskim, w gminie Szreńsk, miejscowość Miłotki.
1) w powiecie żuromińskim:a)w gminie Kuczbork – Osada, miejscowości: Bagienice Małe, Bagienice Nowe, Chojnowo, Gościszka, Gościszka – Baraki, Kozielsk, Krzywki – Bratki, Kuczbork – Osada, Mianowo, Niedziałki Sadykierz, Nowa Wieś, Osowa, Sarnowo, Zielona,b)w gminie Żuromin, miejscowości: Chamsk, Cierpigórz, Dąbrowa, Dąbrowice, Młudzyn, Raczyny, Rozwozin, Sadowo, Tadajówka,c)w gminie Bieżuń, miejscowości: Adamowo, Dąbrówki, Mak, Małocin, Pełki, Pozga, Stanisławowo, Strzeszewo, Trzaski, Wieluń – Zalesie, Wilewo, Władysławowo, Zgliczyn Pobodzy,d)w gminie Lubowidz, miejscowości: Biały Dwór, Cieszki, Dziwy, Galumin, Konopaty, Konopaty – Lasy Chłopskie, Lisiny, Lubowidz, Mały Las, Osówka, Pątki, Ruda, Rynowo, Sinogóra, Straszewy, Syberia, Toruniak, Zieluń, Żarnówka, Żelaźnia,e)w gminie Lutocin, miejscowości: Chromakowo, Głęboka, Felcyn, Jonne, Mojnowo, Obręb, Parlin, Pietrzyk, Przeradz Mały, Przeradz Nowy, Przeradz Wielki, Seroki, Siemcichy, Swojęcin, Szoniec, Zimolza,f)w gminie Siemiątkowo, miejscowości: Antoniewo, Dzieczewo, Gradzanowo, Nowa Wieś, Nowopole, Pijawnia, Rostowa, Siemiątkowo, Siciarz, Siemiątkowo – Rogale, Sokołowy Kąt, Suwaki, Ziemiany; a) w gminie Kuczbork – Osada, miejscowości: Bagienice Małe, Bagienice Nowe, Chojnowo, Gościszka, Gościszka – Baraki, Kozielsk, Krzywki – Bratki, Kuczbork – Osada, Mianowo, Niedziałki Sadykierz, Nowa Wieś, Osowa, Sarnowo, Zielona, b) w gminie Żuromin, miejscowości: Chamsk, Cierpigórz, Dąbrowa, Dąbrowice, Młudzyn, Raczyny, Rozwozin, Sadowo, Tadajówka, c) w gminie Bieżuń, miejscowości: Adamowo, Dąbrówki, Mak, Małocin, Pełki, Pozga, Stanisławowo, Strzeszewo, Trzaski, Wieluń – Zalesie, Wilewo, Władysławowo, Zgliczyn Pobodzy, d) w gminie Lubowidz, miejscowości: Biały Dwór, Cieszki, Dziwy, Galumin, Konopaty, Konopaty – Lasy Chłopskie, Lisiny, Lubowidz, Mały Las, Osówka, Pątki, Ruda, Rynowo, Sinogóra, Straszewy, Syberia, Toruniak, Zieluń, Żarnówka, Żelaźnia, e) w gminie Lutocin, miejscowości: Chromakowo, Głęboka, Felcyn, Jonne, Mojnowo, Obręb, Parlin, Pietrzyk, Przeradz Mały, Przeradz Nowy, Przeradz Wielki, Seroki, Siemcichy, Swojęcin, Szoniec, Zimolza, f) w gminie Siemiątkowo, miejscowości: Antoniewo, Dzieczewo, Gradzanowo, Nowa Wieś, Nowopole, Pijawnia, Rostowa, Siemiątkowo, Siciarz, Siemiątkowo – Rogale, Sokołowy Kąt, Suwaki, Ziemiany;
a) w gminie Kuczbork – Osada, miejscowości: Bagienice Małe, Bagienice Nowe, Chojnowo, Gościszka, Gościszka – Baraki, Kozielsk, Krzywki – Bratki, Kuczbork – Osada, Mianowo, Niedziałki Sadykierz, Nowa Wieś, Osowa, Sarnowo, Zielona,
b) w gminie Żuromin, miejscowości: Chamsk, Cierpigórz, Dąbrowa, Dąbrowice, Młudzyn, Raczyny, Rozwozin, Sadowo, Tadajówka,
c) w gminie Bieżuń, miejscowości: Adamowo, Dąbrówki, Mak, Małocin, Pełki, Pozga, Stanisławowo, Strzeszewo, Trzaski, Wieluń – Zalesie, Wilewo, Władysławowo, Zgliczyn Pobodzy,
d) w gminie Lubowidz, miejscowości: Biały Dwór, Cieszki, Dziwy, Galumin, Konopaty, Konopaty – Lasy Chłopskie, Lisiny, Lubowidz, Mały Las, Osówka, Pątki, Ruda, Rynowo, Sinogóra, Straszewy, Syberia, Toruniak, Zieluń, Żarnówka, Żelaźnia,
e) w gminie Lutocin, miejscowości: Chromakowo, Głęboka, Felcyn, Jonne, Mojnowo, Obręb, Parlin, Pietrzyk, Przeradz Mały, Przeradz Nowy, Przeradz Wielki, Seroki, Siemcichy, Swojęcin, Szoniec, Zimolza,
f) w gminie Siemiątkowo, miejscowości: Antoniewo, Dzieczewo, Gradzanowo, Nowa Wieś, Nowopole, Pijawnia, Rostowa, Siemiątkowo, Siciarz, Siemiątkowo – Rogale, Sokołowy Kąt, Suwaki, Ziemiany;
a) w gminie Kuczbork – Osada, miejscowości: Bagienice Małe, Bagienice Nowe, Chojnowo, Gościszka, Gościszka – Baraki, Kozielsk, Krzywki – Bratki, Kuczbork – Osada, Mianowo, Niedziałki Sadykierz, Nowa Wieś, Osowa, Sarnowo, Zielona,
b) w gminie Żuromin, miejscowości: Chamsk, Cierpigórz, Dąbrowa, Dąbrowice, Młudzyn, Raczyny, Rozwozin, Sadowo, Tadajówka,
c) w gminie Bieżuń, miejscowości: Adamowo, Dąbrówki, Mak, Małocin, Pełki, Pozga, Stanisławowo, Strzeszewo, Trzaski, Wieluń – Zalesie, Wilewo, Władysławowo, Zgliczyn Pobodzy,
d) w gminie Lubowidz, miejscowości: Biały Dwór, Cieszki, Dziwy, Galumin, Konopaty, Konopaty – Lasy Chłopskie, Lisiny, Lubowidz, Mały Las, Osówka, Pątki, Ruda, Rynowo, Sinogóra, Straszewy, Syberia, Toruniak, Zieluń, Żarnówka, Żelaźnia,
e) w gminie Lutocin, miejscowości: Chromakowo, Głęboka, Felcyn, Jonne, Mojnowo, Obręb, Parlin, Pietrzyk, Przeradz Mały, Przeradz Nowy, Przeradz Wielki, Seroki, Siemcichy, Swojęcin, Szoniec, Zimolza,
f) w gminie Siemiątkowo, miejscowości: Antoniewo, Dzieczewo, Gradzanowo, Nowa Wieś, Nowopole, Pijawnia, Rostowa, Siemiątkowo, Siciarz, Siemiątkowo – Rogale, Sokołowy Kąt, Suwaki, Ziemiany;
2) w powiecie mławskim:a)w gminie Szreńsk, miejscowości: Bielawy, Grądek, Kobuszyn, Krzywki – Bośki, Krzywki – Piaski, Mostowo, Nowe Garkowo, Przychód, Pączkowo, Stare Garkowo, Szreńsk, Sławkowo, Wola Proszkowska, Złotowo, Ługi,b)w gminie Radzanów, miejscowości: Bojanowo, Bębnowo, Cegielnia Ratowska, Luszewo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Ratowo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Radzanów, Wróblewo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Zgliczyn – Glinki, Zgliczyn Witowy,c)w gminie Lipowiec Kościelny, miejscowości: Lipowiec Kościelny, Niegocin, Zawady; a) w gminie Szreńsk, miejscowości: Bielawy, Grądek, Kobuszyn, Krzywki – Bośki, Krzywki – Piaski, Mostowo, Nowe Garkowo, Przychód, Pączkowo, Stare Garkowo, Szreńsk, Sławkowo, Wola Proszkowska, Złotowo, Ługi, b) w gminie Radzanów, miejscowości: Bojanowo, Bębnowo, Cegielnia Ratowska, Luszewo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Ratowo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Radzanów, Wróblewo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Zgliczyn – Glinki, Zgliczyn Witowy, c) w gminie Lipowiec Kościelny, miejscowości: Lipowiec Kościelny, Niegocin, Zawady;
a) w gminie Szreńsk, miejscowości: Bielawy, Grądek, Kobuszyn, Krzywki – Bośki, Krzywki – Piaski, Mostowo, Nowe Garkowo, Przychód, Pączkowo, Stare Garkowo, Szreńsk, Sławkowo, Wola Proszkowska, Złotowo, Ługi,
b) w gminie Radzanów, miejscowości: Bojanowo, Bębnowo, Cegielnia Ratowska, Luszewo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Ratowo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Radzanów, Wróblewo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Zgliczyn – Glinki, Zgliczyn Witowy,
c) w gminie Lipowiec Kościelny, miejscowości: Lipowiec Kościelny, Niegocin, Zawady;
a) w gminie Szreńsk, miejscowości: Bielawy, Grądek, Kobuszyn, Krzywki – Bośki, Krzywki – Piaski, Mostowo, Nowe Garkowo, Przychód, Pączkowo, Stare Garkowo, Szreńsk, Sławkowo, Wola Proszkowska, Złotowo, Ługi,
b) w gminie Radzanów, miejscowości: Bojanowo, Bębnowo, Cegielnia Ratowska, Luszewo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Ratowo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Radzanów, Wróblewo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Zgliczyn – Glinki, Zgliczyn Witowy,
c) w gminie Lipowiec Kościelny, miejscowości: Lipowiec Kościelny, Niegocin, Zawady;
3) w powiecie sierpeckim:a)w gminie Zawidz, miejscowości: Jaworowo – Kolonia, Jaworowo – Kłódź, Jaworowo – Lipa, Kosemin,b)w gminie Rościszewo, miejscowości: część miejscowości Lipniki na wschód od rzeki dopływ spod Władysławowa, część miejscowości Polik na wschód od rzeki dopływ spod Władysławowa, Rzeszotary – Chwały, Rzeszotary Rumunki – Stara Wieś, Rzeszotary – Zawady. a) w gminie Zawidz, miejscowości: Jaworowo – Kolonia, Jaworowo – Kłódź, Jaworowo – Lipa, Kosemin, b) w gminie Rościszewo, miejscowości: część miejscowości Lipniki na wschód od rzeki dopływ spod Władysławowa, część miejscowości Polik na wschód od rzeki dopływ spod Władysławowa, Rzeszotary – Chwały, Rzeszotary Rumunki – Stara Wieś, Rzeszotary – Zawady.
a) w gminie Zawidz, miejscowości: Jaworowo – Kolonia, Jaworowo – Kłódź, Jaworowo – Lipa, Kosemin,
b) w gminie Rościszewo, miejscowości: część miejscowości Lipniki na wschód od rzeki dopływ spod Władysławowa, część miejscowości Polik na wschód od rzeki dopływ spod Władysławowa, Rzeszotary – Chwały, Rzeszotary Rumunki – Stara Wieś, Rzeszotary – Zawady.
a) w gminie Zawidz, miejscowości: Jaworowo – Kolonia, Jaworowo – Kłódź, Jaworowo – Lipa, Kosemin,
b) w gminie Rościszewo, miejscowości: część miejscowości Lipniki na wschód od rzeki dopływ spod Władysławowa, część miejscowości Polik na wschód od rzeki dopływ spod Władysławowa, Rzeszotary – Chwały, Rzeszotary Rumunki – Stara Wieś, Rzeszotary – Zawady.
— w powiecie działdowskim w gminie Lidzbark, w granicach administracyjnych miejscowości Glinki.
1) W powiecie żuromińskim:a)W gminie Kuczbork-Osada, miejscowości: Bagienice Duże, Łążek, Szronka;b)W gminie Lubowidz, miejscowości: Goliaty, Huta, Jasiony, Kipichy, Kozilas, Mleczówka, Obórki, Płociczno, Przerodki, Purzyce, Suchy Grunt, Wronka, Wylazłowo, Zatorowizna, Zdrojkic)W gminie Lutocin, miejscowości: Boguszewiec, Chrapoń, Chrapoń Rudziska, Dębówka, Elżbiecin, Lutocin, Psota, Starcz-Bombol,d)W gminie Siemiątkowo, miejscowości: Budy Osieckie Nowe, Budy Osieckie Stare, Budy Koziebrodzkie, Gutkowo, Krzeczanowo, Łaszewo, Łaszewo Wietrznik, Ossowa, Wojciechowo, Wola Łaszewska. a) W gminie Kuczbork-Osada, miejscowości: Bagienice Duże, Łążek, Szronka; b) W gminie Lubowidz, miejscowości: Goliaty, Huta, Jasiony, Kipichy, Kozilas, Mleczówka, Obórki, Płociczno, Przerodki, Purzyce, Suchy Grunt, Wronka, Wylazłowo, Zatorowizna, Zdrojki c) W gminie Lutocin, miejscowości: Boguszewiec, Chrapoń, Chrapoń Rudziska, Dębówka, Elżbiecin, Lutocin, Psota, Starcz-Bombol, d) W gminie Siemiątkowo, miejscowości: Budy Osieckie Nowe, Budy Osieckie Stare, Budy Koziebrodzkie, Gutkowo, Krzeczanowo, Łaszewo, Łaszewo Wietrznik, Ossowa, Wojciechowo, Wola Łaszewska.
a) W gminie Kuczbork-Osada, miejscowości: Bagienice Duże, Łążek, Szronka;
b) W gminie Lubowidz, miejscowości: Goliaty, Huta, Jasiony, Kipichy, Kozilas, Mleczówka, Obórki, Płociczno, Przerodki, Purzyce, Suchy Grunt, Wronka, Wylazłowo, Zatorowizna, Zdrojki
c) W gminie Lutocin, miejscowości: Boguszewiec, Chrapoń, Chrapoń Rudziska, Dębówka, Elżbiecin, Lutocin, Psota, Starcz-Bombol,
d) W gminie Siemiątkowo, miejscowości: Budy Osieckie Nowe, Budy Osieckie Stare, Budy Koziebrodzkie, Gutkowo, Krzeczanowo, Łaszewo, Łaszewo Wietrznik, Ossowa, Wojciechowo, Wola Łaszewska.
a) W gminie Kuczbork-Osada, miejscowości: Bagienice Duże, Łążek, Szronka;
b) W gminie Lubowidz, miejscowości: Goliaty, Huta, Jasiony, Kipichy, Kozilas, Mleczówka, Obórki, Płociczno, Przerodki, Purzyce, Suchy Grunt, Wronka, Wylazłowo, Zatorowizna, Zdrojki
c) W gminie Lutocin, miejscowości: Boguszewiec, Chrapoń, Chrapoń Rudziska, Dębówka, Elżbiecin, Lutocin, Psota, Starcz-Bombol,
d) W gminie Siemiątkowo, miejscowości: Budy Osieckie Nowe, Budy Osieckie Stare, Budy Koziebrodzkie, Gutkowo, Krzeczanowo, Łaszewo, Łaszewo Wietrznik, Ossowa, Wojciechowo, Wola Łaszewska.
a) w powiecie monieckim w gminie Goniądz miejscowości: Krzecze, Klewianka, Smogorówka Dolistowska, Smogorówka Goniądzka, Wroceń, Białosuknia.
b) w powiecie monieckim w gminie Knyszyn, miejscowości: Knyszyn, Grądy, Poniklica, Wodziłówka, Zofiówka.
a) w powiecie monieckim w gminie Goniądz miejscowości: Krzecze, Klewianka, Smogorówka Dolistowska, Smogorówka Goniądzka, Wroceń, Białosuknia.
b) w powiecie monieckim w gminie Knyszyn, miejscowości: Knyszyn, Grądy, Poniklica, Wodziłówka, Zofiówka.
1) w powiecie monieckim:a)w gminie Goniądz miejscowości: Dawidowizna, Dolistowo Nowe, Dolistowo Stare, Doły, Goniądz, Mierkienniki, Owieczki, Piwowary, Szafranki, Wojtówstwo, Wólka Piaseczna, Łazy;b)w gminie Jaświły miejscowości: Bagno, Dolistowo Nowe, Dolistowo Stare, Dzięciołowo, Gurbicze, Jadeszki, Jaświłki, Jaświły, Mikicin, Mociesze, Moniuszki, Radzie, Romejki, Rutkowskie Duże, Rutkowskie Małe, Szaciły, Szpakowo, Zabiele;c)w gminie Jasionówka, miejscowości: Brzozówka Folwarczna, Czarnystok, Dobrzyniówka, Górnystok, Jasionówka, Jasionóweczka, Kalinówka Królewska, Krasne Folwarczne, Krasne Małe, Krasne Stare, Kąty, Milewskie, Łękobudy;d)w gminie Knyszn, miejscowości: Chobotki, Czechowizna, Guzy, Jaskra, Kalinówka Kościelna, Knyszyn Zamek, Nowiny Zdroje, Nowiny Kasjerskie, Ogrodniki, Wojtówce;e)w gminie Mońki miejscowości: Hornostaje, Jaski, Koleśniki, Kosiorki, Krzeczkowo, Ołdaki, Potoczyzna, Pyzy, Zyburty, Łupichy, Świerzbienie, Żodzie, Dudki, Dudki Kolonia, Konopczyn, Kropiwnica, Przytulanka, Rusaki;f)w gminie Krypno, miejscowości: Krypno Kościelne, Krypno Wielkie, Ruda, Zastocze; a) w gminie Goniądz miejscowości: Dawidowizna, Dolistowo Nowe, Dolistowo Stare, Doły, Goniądz, Mierkienniki, Owieczki, Piwowary, Szafranki, Wojtówstwo, Wólka Piaseczna, Łazy; b) w gminie Jaświły miejscowości: Bagno, Dolistowo Nowe, Dolistowo Stare, Dzięciołowo, Gurbicze, Jadeszki, Jaświłki, Jaświły, Mikicin, Mociesze, Moniuszki, Radzie, Romejki, Rutkowskie Duże, Rutkowskie Małe, Szaciły, Szpakowo, Zabiele; c) w gminie Jasionówka, miejscowości: Brzozówka Folwarczna, Czarnystok, Dobrzyniówka, Górnystok, Jasionówka, Jasionóweczka, Kalinówka Królewska, Krasne Folwarczne, Krasne Małe, Krasne Stare, Kąty, Milewskie, Łękobudy; d) w gminie Knyszn, miejscowości: Chobotki, Czechowizna, Guzy, Jaskra, Kalinówka Kościelna, Knyszyn Zamek, Nowiny Zdroje, Nowiny Kasjerskie, Ogrodniki, Wojtówce; e) w gminie Mońki miejscowości: Hornostaje, Jaski, Koleśniki, Kosiorki, Krzeczkowo, Ołdaki, Potoczyzna, Pyzy, Zyburty, Łupichy, Świerzbienie, Żodzie, Dudki, Dudki Kolonia, Konopczyn, Kropiwnica, Przytulanka, Rusaki; f) w gminie Krypno, miejscowości: Krypno Kościelne, Krypno Wielkie, Ruda, Zastocze;
a) w gminie Goniądz miejscowości: Dawidowizna, Dolistowo Nowe, Dolistowo Stare, Doły, Goniądz, Mierkienniki, Owieczki, Piwowary, Szafranki, Wojtówstwo, Wólka Piaseczna, Łazy;
b) w gminie Jaświły miejscowości: Bagno, Dolistowo Nowe, Dolistowo Stare, Dzięciołowo, Gurbicze, Jadeszki, Jaświłki, Jaświły, Mikicin, Mociesze, Moniuszki, Radzie, Romejki, Rutkowskie Duże, Rutkowskie Małe, Szaciły, Szpakowo, Zabiele;
c) w gminie Jasionówka, miejscowości: Brzozówka Folwarczna, Czarnystok, Dobrzyniówka, Górnystok, Jasionówka, Jasionóweczka, Kalinówka Królewska, Krasne Folwarczne, Krasne Małe, Krasne Stare, Kąty, Milewskie, Łękobudy;
d) w gminie Knyszn, miejscowości: Chobotki, Czechowizna, Guzy, Jaskra, Kalinówka Kościelna, Knyszyn Zamek, Nowiny Zdroje, Nowiny Kasjerskie, Ogrodniki, Wojtówce;
e) w gminie Mońki miejscowości: Hornostaje, Jaski, Koleśniki, Kosiorki, Krzeczkowo, Ołdaki, Potoczyzna, Pyzy, Zyburty, Łupichy, Świerzbienie, Żodzie, Dudki, Dudki Kolonia, Konopczyn, Kropiwnica, Przytulanka, Rusaki;
f) w gminie Krypno, miejscowości: Krypno Kościelne, Krypno Wielkie, Ruda, Zastocze;
a) w gminie Goniądz miejscowości: Dawidowizna, Dolistowo Nowe, Dolistowo Stare, Doły, Goniądz, Mierkienniki, Owieczki, Piwowary, Szafranki, Wojtówstwo, Wólka Piaseczna, Łazy;
b) w gminie Jaświły miejscowości: Bagno, Dolistowo Nowe, Dolistowo Stare, Dzięciołowo, Gurbicze, Jadeszki, Jaświłki, Jaświły, Mikicin, Mociesze, Moniuszki, Radzie, Romejki, Rutkowskie Duże, Rutkowskie Małe, Szaciły, Szpakowo, Zabiele;
c) w gminie Jasionówka, miejscowości: Brzozówka Folwarczna, Czarnystok, Dobrzyniówka, Górnystok, Jasionówka, Jasionóweczka, Kalinówka Królewska, Krasne Folwarczne, Krasne Małe, Krasne Stare, Kąty, Milewskie, Łękobudy;
d) w gminie Knyszn, miejscowości: Chobotki, Czechowizna, Guzy, Jaskra, Kalinówka Kościelna, Knyszyn Zamek, Nowiny Zdroje, Nowiny Kasjerskie, Ogrodniki, Wojtówce;
e) w gminie Mońki miejscowości: Hornostaje, Jaski, Koleśniki, Kosiorki, Krzeczkowo, Ołdaki, Potoczyzna, Pyzy, Zyburty, Łupichy, Świerzbienie, Żodzie, Dudki, Dudki Kolonia, Konopczyn, Kropiwnica, Przytulanka, Rusaki;
f) w gminie Krypno, miejscowości: Krypno Kościelne, Krypno Wielkie, Ruda, Zastocze;
2) w powiecie augustowskim w gminie Sztabin miejscowości: Jasionowo Dębowskie, Kopytkowo.
3) w powiecie białostockim, w gminie Dobrzyniewo Durze, miejscowości: Chraboły, Kulikówka, Kozińce, Borsukówka, Kobuzie, Nowosiółki, Szaciły.
4) w powiecie sokólskim, w gminie Korycin, miejscowości: Wojtachy, Stok, Czarlona, Brody.
1. W powiecie wolsztyńskim, w gminie Wolsztyn, miejscowości: Świętno, Obra, Kębłowo, Krzyż;
2. W powiecie leszczyńskim, w gminie Święciechowa: Długie Stare;
3. W powiecie leszczyńskim, w gminie Wijewo, miejscowości: Wijewo, Brenno, Radomyśl, Przylesie, Potrzebowo, Wilanów.
— w powiecie wschowskim:1)w gminie Wschowa, miejscowość Wschowa oraz obszary wiejskie: Dębowa Łęka, Olbrachcice, Przyczyna Dolna, Siedlnica, Łęgoń;2)w gminie Sława, miejscowości: Przybyszów, Nowe Strącze, część miejscowości Stare Strącze leżąca na północ od drogi wojewódzkiej 278. 1) w gminie Wschowa, miejscowość Wschowa oraz obszary wiejskie: Dębowa Łęka, Olbrachcice, Przyczyna Dolna, Siedlnica, Łęgoń; 2) w gminie Sława, miejscowości: Przybyszów, Nowe Strącze, część miejscowości Stare Strącze leżąca na północ od drogi wojewódzkiej 278.
1) w gminie Wschowa, miejscowość Wschowa oraz obszary wiejskie: Dębowa Łęka, Olbrachcice, Przyczyna Dolna, Siedlnica, Łęgoń;
2) w gminie Sława, miejscowości: Przybyszów, Nowe Strącze, część miejscowości Stare Strącze leżąca na północ od drogi wojewódzkiej 278.
1) w gminie Wschowa, miejscowość Wschowa oraz obszary wiejskie: Dębowa Łęka, Olbrachcice, Przyczyna Dolna, Siedlnica, Łęgoń;
2) w gminie Sława, miejscowości: Przybyszów, Nowe Strącze, część miejscowości Stare Strącze leżąca na północ od drogi wojewódzkiej 278.
— w powiecie górowskim, w gminie Niechlów: część obrębu miejscowości Siciny na północ od cieku wodnego Śląski Rów i na zachód od drogi wojewódzkiej nr 305.
1. W powiecie wolsztyńskim, w gminie Wolsztyn, miejscowości: Świętno, Obra, Kębłowo, Krzyż;
2. W powiecie leszczyńskim, w gminie Święciechowa: Długie Stare;
3. W powiecie leszczyńskim, w gminie Wijewo, miejscowości: Wijewo, Brenno, Radomyśl, Przylesie, Potrzebowo, Wilanów.
— w powiecie wschowskim:1)w gminie Wschowa, miejscowość Wschowa oraz obszary wiejskie: Dębowa Łęka, Olbrachcice, Przyczyna Dolna, Siedlnica, Łęgoń;2)w gminie Sława, miejscowości: Przybyszów, Nowe Strącze, część miejscowości Stare Strącze leżąca na północ od drogi wojewódzkiej 278. 1) w gminie Wschowa, miejscowość Wschowa oraz obszary wiejskie: Dębowa Łęka, Olbrachcice, Przyczyna Dolna, Siedlnica, Łęgoń; 2) w gminie Sława, miejscowości: Przybyszów, Nowe Strącze, część miejscowości Stare Strącze leżąca na północ od drogi wojewódzkiej 278.
1) w gminie Wschowa, miejscowość Wschowa oraz obszary wiejskie: Dębowa Łęka, Olbrachcice, Przyczyna Dolna, Siedlnica, Łęgoń;
2) w gminie Sława, miejscowości: Przybyszów, Nowe Strącze, część miejscowości Stare Strącze leżąca na północ od drogi wojewódzkiej 278.
1) w gminie Wschowa, miejscowość Wschowa oraz obszary wiejskie: Dębowa Łęka, Olbrachcice, Przyczyna Dolna, Siedlnica, Łęgoń;
2) w gminie Sława, miejscowości: Przybyszów, Nowe Strącze, część miejscowości Stare Strącze leżąca na północ od drogi wojewódzkiej 278.
— w powiecie górowskim, w gminie Niechlów: część obrębu miejscowości Siciny na północ od cieku wodnego Śląski Rów i na zachód od drogi wojewódzkiej nr 305.
1. W powiecie leszczyńskim, w gminie Wijewo, miejscowości: Miastko, Zaborówiec;
2. W powiecie leszczyńskim, w gminie Włoszakowice, miejscowości: Dominice, Włoszakowice, Koczury, Krzyżowiec, Mścigniew, Tłucznia, Papiernia, Zbarzewo, Daćbogi, Jezierzyce Kościelne;
3. W powiecie leszczyńskim, w gminie Święciechowa, miejscowości: Święciechowa, Piotrowice, Niechłód, Trzebiny, Długie Nowe, Lasocice, Przybyszewo. Henrykowo, Gołanice, Książęcy Las, Ogrody;
4. W powiecie wolsztyńskim, w gminie Przemęt, miejscowości: Wieleń, Osłonin, Olejnica, Radomierz, Starkowo, Górsko, Kaszczor, Mochy, Nowa Wieś, Perkowo, Solec, Solec Nowy, Przemęt-Leśniczówka;
5. W powiecie wolsztyńskim, w gminie Wolsztyn, miejscowości: Adamowo, Komorowo, Niałek Wielki, Nowa Dąbrowa, Nowa Obra, Nowy Widzim, Powodowo, Rudno, Stara Dąbrowa, Stary Widzim, Stradyń, Wilcze, Wroniawy, Berzyna, Borki;
6. W powiecie wolsztyńskim, w gminie Siedlec, miejscowości: Jaromierz, Jażyniec, Kiełkowo, Żodyń, Marianice, Podborowo.
1) w powiecie wschowskim:a)w gminie Sława, miejscowości: Łupice, Spokojna, Bagno, Szreniawa, Ciosaniec, Droniki, Lipinki, Radzyń, Sława, Lubogoszcz, Gola, Wróblów, Śmieszkowo i część miejscowości Stare Strącze leżąca na południe od drogi wojewódzkiej 278,b)w gminie Szlichtyngowa, obszar wiejski: Dryżyna, Górczyna, Jędrzychowice, Kowalewo, Stare Drzewce, Zamysłów,c)w gminie Wschowa, obszar wiejski: Hetmanice, Kandlewo, Konradowo, Nowa Wieś, Osowa Sień, Przyczyna Górna, Tylewice, Łysiny, Wygnańczyce, Lgiń; a) w gminie Sława, miejscowości: Łupice, Spokojna, Bagno, Szreniawa, Ciosaniec, Droniki, Lipinki, Radzyń, Sława, Lubogoszcz, Gola, Wróblów, Śmieszkowo i część miejscowości Stare Strącze leżąca na południe od drogi wojewódzkiej 278, b) w gminie Szlichtyngowa, obszar wiejski: Dryżyna, Górczyna, Jędrzychowice, Kowalewo, Stare Drzewce, Zamysłów, c) w gminie Wschowa, obszar wiejski: Hetmanice, Kandlewo, Konradowo, Nowa Wieś, Osowa Sień, Przyczyna Górna, Tylewice, Łysiny, Wygnańczyce, Lgiń;
a) w gminie Sława, miejscowości: Łupice, Spokojna, Bagno, Szreniawa, Ciosaniec, Droniki, Lipinki, Radzyń, Sława, Lubogoszcz, Gola, Wróblów, Śmieszkowo i część miejscowości Stare Strącze leżąca na południe od drogi wojewódzkiej 278,
b) w gminie Szlichtyngowa, obszar wiejski: Dryżyna, Górczyna, Jędrzychowice, Kowalewo, Stare Drzewce, Zamysłów,
c) w gminie Wschowa, obszar wiejski: Hetmanice, Kandlewo, Konradowo, Nowa Wieś, Osowa Sień, Przyczyna Górna, Tylewice, Łysiny, Wygnańczyce, Lgiń;
a) w gminie Sława, miejscowości: Łupice, Spokojna, Bagno, Szreniawa, Ciosaniec, Droniki, Lipinki, Radzyń, Sława, Lubogoszcz, Gola, Wróblów, Śmieszkowo i część miejscowości Stare Strącze leżąca na południe od drogi wojewódzkiej 278,
b) w gminie Szlichtyngowa, obszar wiejski: Dryżyna, Górczyna, Jędrzychowice, Kowalewo, Stare Drzewce, Zamysłów,
c) w gminie Wschowa, obszar wiejski: Hetmanice, Kandlewo, Konradowo, Nowa Wieś, Osowa Sień, Przyczyna Górna, Tylewice, Łysiny, Wygnańczyce, Lgiń;
2) w powiecie nowosolskim, w gminie Kolsko, miejscowości: Uście, Tatarki, Jesiona, Sławocin, Tyrszeliny, Kolsko, część miejscowości Konotop na północ od drogi leśnej łączącej m. Głuszyca z drogą pożarową nr 6;
3) w powiecie zielonogórskim:a)w gminie Kargowa, miejscowości: Obra Dolna, Nowy Jaromierz, Stary Jaromierz, część miejscowości Karszyn na wschód od drogi gminnej z miejscowości Kargowa do miejscowości Siadcza,b)w gminie Bojadła, część miejscowości Susłów, na wschód od drogi pożarowej nr 18. a) w gminie Kargowa, miejscowości: Obra Dolna, Nowy Jaromierz, Stary Jaromierz, część miejscowości Karszyn na wschód od drogi gminnej z miejscowości Kargowa do miejscowości Siadcza, b) w gminie Bojadła, część miejscowości Susłów, na wschód od drogi pożarowej nr 18.
a) w gminie Kargowa, miejscowości: Obra Dolna, Nowy Jaromierz, Stary Jaromierz, część miejscowości Karszyn na wschód od drogi gminnej z miejscowości Kargowa do miejscowości Siadcza,
b) w gminie Bojadła, część miejscowości Susłów, na wschód od drogi pożarowej nr 18.
a) w gminie Kargowa, miejscowości: Obra Dolna, Nowy Jaromierz, Stary Jaromierz, część miejscowości Karszyn na wschód od drogi gminnej z miejscowości Kargowa do miejscowości Siadcza,
b) w gminie Bojadła, część miejscowości Susłów, na wschód od drogi pożarowej nr 18.
— w powiecie górowskim:a)gmina Niechlów – miejscowości: Łękanów, część obrębu miejscowości Siciny na południe od cieku wodnego Śląski Rów i na wschód od drogi wojewódzkiej nr 305, Wronów, Wioska, Tarpno;b)gmina Góra – miejscowości: Radosław, Nowa Wioska. a) gmina Niechlów – miejscowości: Łękanów, część obrębu miejscowości Siciny na południe od cieku wodnego Śląski Rów i na wschód od drogi wojewódzkiej nr 305, Wronów, Wioska, Tarpno; b) gmina Góra – miejscowości: Radosław, Nowa Wioska.
a) gmina Niechlów – miejscowości: Łękanów, część obrębu miejscowości Siciny na południe od cieku wodnego Śląski Rów i na wschód od drogi wojewódzkiej nr 305, Wronów, Wioska, Tarpno;
b) gmina Góra – miejscowości: Radosław, Nowa Wioska.
a) gmina Niechlów – miejscowości: Łękanów, część obrębu miejscowości Siciny na południe od cieku wodnego Śląski Rów i na wschód od drogi wojewódzkiej nr 305, Wronów, Wioska, Tarpno;
b) gmina Góra – miejscowości: Radosław, Nowa Wioska.
1) w powiecie poznańskim, w gminie Stęszew, miejscowości: Zamysłowo, Stęszew, Wielkawieś, Antoninek, Strykowo, Strykówko, Twardowo, Srocko Małe, Wronczyn, Zaparcin, Witobel, Dębno, Dębienko, Dębina, Krąplewo, Drogosławiec, Sapowice, Trzebaw, Górka, Łódź, Będlewo;
2) w powiecie poznańskim, w gminie Dopiewo, miejscowości: Lisówki, Trzcielin, Joanka, Podgaj.
1) w powiecie poznańskim, w gminie Stęszew, miejscowości: Zamysłowo, Stęszew, Wielkawieś, Antoninek, Strykowo, Strykówko, Twardowo, Srocko Małe, Wronczyn, Zaparcin, Witobel, Dębno, Dębienko, Dębina, Krąplewo, Drogosławiec, Sapowice, Trzebaw, Górka, Łódź, Będlewo;
2) w powiecie poznańskim, w gminie Dopiewo, miejscowości: Lisówki, Trzcielin, Joanka, Podgaj.
1) w powiecie poznańskim, w gminie Stęszew, miejscowości: Mirosławki, Rybojedzko, Tomice, Skrzynki, Tomiczki, Jeziorki, Piekary, Słupia, Modrze, Będlewo, Łódź, Górka, Trzebaw;
2) w powiecie poznańskim, w gminie Dopiewo, miejscowości: Zborowo, Zborówko, Dopiewo, Dopiewiec, Konarzewo, Podłoziny, Gołuski, Żarnowiec;
3) w powiecie poznańskim, w gminie Komorniki, miejscowości: Rosnówko, Walerianowo, Rosnowo, Chomęcice, Głuchowo, Komorniki, Wiry, Szreniawa, Jarosławiec, Kątnik, Wypalanki;
4) w powiecie poznańskim, w gminie Mosina, miejscowości: Dymaczewo Nowe, Dymaczewo Stare, Kierzki, Krosinko, Ludwikowo, Pożegowo, Mosina, Borkowice, Bolesławiec, Jeziory, Krosno, Drużyna, Pecna, Konstantynowo;
5) w powiecie poznańskim, w gminie Buk, miejscowości: Sznyfin, Dakowy Suche, Szewce, Dobra, Dobieżyn, Otusz, Cieśle;
6) w powiecie kościańskim, w gminie Czempiń, miejscowości: Bieczyny, Sierniki, Głuchowo, Piotrowo Pierwsze, Piotrowo Drugie, Maruszkowo, Zadory, Roszkowo, Srocko Wielkie, część miejscowości Jarogniewice na zachód od drogi S5;
7) w powiecie grodziskim, w gminie Granowo, miejscowości: Kąkolewo, część miejscowości Granowo na północny-wschód od skrzyżowania DK32 i ulicy Kolejowej, Separowo, Niemierzyce, Strzępiń, Bielawy, Zemsko, Januszewice, część miejscowości Kubaczyn na wschód od drogi powiatowej nr 2498P.
8) w powiecie poznańskim, gmina Puszczykowo.
1) w powiecie ostrowskim, w gminie Nowe Skalmierzyce, miejscowości: Biskupice Ołoboczne, Ociąż, Fabianów, Skalmierzyce, Śliwniki;
2) w powiecie ostrowskim, w gminie Sieroszewice, miejscowości: Bilczew, Psary, Latowice, Kowalew, Bibianki, Kęszyce, w miejscowości Rossoszyca obszar na północny zachód od skrzyżowania ul. Kaliskiej z ul. Ostrowską;
3) w powiecie ostrowskim, w gminie Ostrów Wlkp., miejscowości: Czekanów, Bagatela.
1) w powiecie ostrowskim, gmina Nowe Skalmierzyce, na terenie nie objętym obszarem zapowietrzonym;
2) w powiecie ostrowskim, w gminie Sieroszewice, miejscowości: Parczew, Strzyżew, Sieroszewice, Namysłaki, Wielowieś, Masanów, Miłaszka, Ołobok, Sławin, Westrza, Kaliszkowice, w miejscowości Rososzyca obszar na południowy wschód od skrzyżowania ul. Kaliskiej z ul. Ostrowską;
3) w powiecie ostrowskim, w gminie Ostrów Wlkp., miejscowości: Gutów, Górzno, Górzenko, Będzieszyn, Młynów, Słaborowice, Kwiatków, Lewków, Kołątajew, Szczury, Franklinów, Karski, Wysocko Wielkie, Wtórek, Nowe Kamienice, Sadowie, Smardowskie Olendry, Trąba, Warszty, Kąkolewo, Biłgoraje, Jamy, Gręblów, Michałków, Stary Staw;
4) w powiecie ostrowskim, w gminie Przygodzice, miejscowości: Chynowa, Bogufałów;
5) w powiecie kaliskim, w gminie Godziesze Wielkie, miejscowości: Wola Droszowska, Zadowice, Żydów;
6) w mieście Kalisz, osiedla: Dobrzec, Dobrzec P, Szczypiorno, Sulisławice, Sulisławice Kolonia, Piwonice, Piwonice Zachód, Nosków, Zagorzynek;
7) w powiecie pleszewskim, w gminie Gołuchów, miejscowości: Kościelna Wieś, Borczysko.
1) w powiecie białogardzkim część Miasta Białogard znajdująca się w promieniu 3 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 3 km od współrzędnych 54.02053 15.891838;
2) w powiecie białogardzkim w gminie Białogard miejscowości: Lulewiczki, Redlino, Rościno, Trzebiele;
3) w powiecie białogardzkim w gminie Karlino miejscowość Karlino..
1) w powiecie białogardzkim część Miasta Białogard znajdująca się w promieniu 3 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 3 km od współrzędnych 54.02053 15.891838;
2) w powiecie białogardzkim w gminie Białogard miejscowości: Lulewiczki, Redlino, Rościno, Trzebiele;
3) w powiecie białogardzkim w gminie Karlino miejscowość Karlino.
1) w powiecie białogardzkim część Miasta Białogard niewymieniona w obszarze zapowietrzonym;
2) w powiecie białogardzkim w gminie Białogard miejscowości: część obrębu miejscowości Byszyno znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838, Dargikowo, Dargikowo Kolonia, Dębczyno, Gruszewo, Kamosowo, Klępino Białogardzkie, Kościernica, Laski, Leśniki, Lulewice, Łęczenko, Łęczno, Łęczno Kolonia, Łęczynko, Moczyłki, Nasutowo, Nawino, część obrębu miejscowości Nosówko znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838, Pękaninko, Pękanino, Pomianowo, Pomianowo Kolonia, Pustkowo, Pustkówko, Rarwino, Rogowo, Rogowo Kolonia, Rychowo, Rychówko, Sińce, Stanomino, Strzelec, Tarpnowo, Zagórze, Ząbki, Żabiniec, Żelezno Kolonia, Żeleźno, Żelimucha, Żytelkowo;
3) w powiecie białogardzkim w gminie Karlino, miejscowości: Brzeźno, Chotyń, Czerwięcino, Daszewo, Daszewo Kolonia, Dębolas, część obrębu miejscowości Domacyno znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838, Garnki, część obrębu miejscowości Gościnko znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838, Karlinko, Karścino, Karwin, Kowańcz, Kozia Góra, Krukowo, Krzywopłoty, Lubiechowo, Lubiechowo-Przystanek, Malonowo, Mierzynek, Mierzynek Kolonia, Poczernino, Pobłocie Wielkie, Syrkowice, Ubysławice, Witolub, Zwartowo;
4) w powiecie kołobrzeskim, w gminie Dygowo miejscowości: część miejscowości Kłopotowo znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838, Łykowo;
5) w powiecie kołobrzeskim, część gminy Gościno znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838;
6) w powiecie koszalińskim w gminie Biesiekierz miejscowości: Parsowo, Świeminko, Świemino, Warnino.
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) 2016/429 of the European Parliament and of the Council of 9 March 2016 on transmissible animal diseases and amending and repealing certain acts in the area of animal health (‘Animal Health Law’) (1), and in particular Article 259(1), point (c), thereof,
Whereas:
(1) Newcastle disease (ND) is an infectious viral disease in birds and can have a severe impact on the profitability of poultry farming, causing disturbance to trade within the Union and exports to third countries. In the event of an outbreak of ND, there is a risk that the disease agent may spread to other establishments keeping poultry or captive birds.
(2) Regulation (EU) 2016/429 establishes the legislative framework for the prevention and control of diseases that are transmissible to animals or humans. ND falls within the definition of a listed disease in that Regulation, and it is subject to the disease prevention and control rules laid down therein. In addition, Commission Delegated Regulation (EU) 2020/687 (2) supplements Regulation (EU) 2016/429 as regards the rules for the control of certain listed diseases, including ND. In particular, Articles 21 and 22 of Delegated Regulation (EU) 2020/687 provide that in the event of an outbreak of a category A disease, including ND, in an establishment, the competent authority is to immediately establish a restricted zone, and for certain measures to be applied therein. Article 21(1) of that Delegated Regulation provides that the restricted zone is to comprise a protection zone, a surveillance zone, and, if necessary, further restricted zones around or adjacent to the protection and surveillance zones.
(3) Commission Implementing Decision (EU) 2025/2256 (3) was adopted on the basis of Regulation (EU) 2016/429, and it lays down emergency measures at Union level in relation to outbreaks of ND in Poland. In particular, Implementing Decision (EU) 2025/2256 provides that the protection, surveillance, and further restricted zones, to be established by Poland following outbreaks of ND, in accordance with Delegated Regulation (EU) 2020/687, are to comprise at least the areas listed as protection, surveillance, and further restricted zones in the Annex to that Implementing Decision. It also provides that the measures to be applied in those zones, in accordance with that Delegated Regulation, are to be maintained until at least the dates set out in that Annex.
(4) Since the date of adoption of Implementing Decision (EU) 2025/2256, Poland has notified the Commission of three new outbreaks of ND in establishments where poultry or captive birds were kept, located in the Podlaskie, Wielkopolskie and Zachodniopomorskie voivodships.
(5) Following those three new outbreaks, the competent authority of Poland has taken the necessary disease control measures required in accordance with Delegated Regulation (EU) 2020/687, including the establishment of protection and surveillance zones around the outbreaks.
(6) The Commission has examined the disease control measures taken by Poland and it is satisfied that the boundaries of the protection and surveillances zones established by that Member State, following the three new outbreaks, are at a sufficient distance from the establishments where the outbreaks of ND have been confirmed.
(7) In order to prevent any unnecessary disturbance to trade within the Union and to avoid any unjustified disruptions to trade with third countries, it is necessary to rapidly lay down at Union level, in collaboration with Poland, the protection and surveillance zones established by that Member State, in accordance with Delegated Regulation (EU) 2020/687, following the three new outbreaks.
(8) Therefore, the areas concerned should now be listed as protection and surveillance zones for Poland in the Annex to Implementing Decision (EU) 2025/2256, to take account of the boundaries of the protection and surveillance zones established by that Member State following the three new ND outbreaks in that Member State, as well as the duration of the measures required to be applied in those zones, in accordance with Delegated Regulation (EU) 2020/687.
(9) Given the urgency of the epidemiological situation in Poland as regards the spread of ND, and the need to prevent the disease spreading from the affected establishments in Poland to other parts of that Member State or to other Member States or third countries, it is appropriate that the amendments to be made to the Annex to Implementing Decision (EU) 2025/2256, by this Decision, take effect as soon as possible.
(10) The measures provided for in this Decision are in accordance with the opinion of the Standing Committee on Plants, Animals, Food and Feed,
HAS ADOPTED THIS DECISION:
The Annex to Implementing Decision (EU) 2025/2256 is replaced by the text set out in the Annex to this Decision.
This Decision is addressed to the Republic of Poland.

‘ANNEX
Restricted zones established around the confirmed outbreaks:
Administrative area and ADIS reference number of the outbreak
Areas established as protection, surveillance, and further restricted zones, referred to in Articles 2, 3 and 4. Date until applicable
Kujawsko-Pomorskie voivodship
PL-ND-2025-00063
PL-ND.NON-P-2025-00044
Protection zone:
W woj. kujawsko-pomorskim: 1)
w powiecie aleksandrowskim: a)
miasto Aleksandrów Kujawski, b)
w gminie Aleksandrów Kujawski miejscowości: Białe Błota, Łazieniec, Nowy Ciechocinek część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Otłoczyn, Rożno-Parcele, Stawki, Wołuszewo, Wygoda, c)
w gminie Zakrzewo miejscowości: Gosławice, Gęsin, Kolonia Bodzanowska, Lepsze, Siniarzewo, Sinki, Ujma Duża, Wola Bachorna, d)
w gminie Koneck miejscowości: Kajetanowo, Kamieniec, Pomiany, e)
w gminie Bądkowo miejscowości: Sinki, Łowiczek. 2)
w powiecie radziejowskim: a)
w gminie Osięciny miejscowości: Bilno, Ujma Mała.
15.11.2025
Surveillance zone:
W woj. kujawsko-pomorskim: 1)
w powiecie aleksandrowskim: a)
miasto Aleksandrów Kujawski, b)
w gminie Aleksandrów Kujawski miejscowości: Białe Błota, Łazieniec, Nowy Ciechocinek część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część północna miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Otłoczyn, Rożno-Parcele, Stawki, Wołuszewo, Wygoda, c)
w gminie Zakrzewo miejscowości: Gosławice, Gęsin, Kolonia Bodzanowska, Lepsze, Siniarzewo, Sinki, Ujma Duża, Wola Bachorna, d)
w gminie Koneck miejscowości: Kajetanowo, Kamieniec, Pomiany, e)
w gminie Bądkowo miejscowości: Sinki, Łowiczek. 2)
w powiecie radziejowskim: a)
w gminie Osięciny miejscowości: Bilno, Ujma Mała.
16.11.2025 – 24.11.2025
Surveillance zone: 1)
w powiecie aleksandrowskim: a)
w gminie Aleksandrów Kujawski miejscowości: Broniszewo, Chrusty, Goszczewo, Grabie, Konradowo, Kuczek, Nowy Ciechocinek część południowa miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Odolion część południowa miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Opoki, Ostrowąs, Ośno, Ośno Drugie, Plebanka, Poczałkowo, Podgaj, Przybranowo, Przybranówek, Rudunki, Słomkowo, Słońsk Dolny, Służewo, Wólka, Wilkostowo, Zgoda, b)
w gminie Ciechocinek miejscowość: Ciechocinek, c)
w gminie Waganiec miejscowość: Konstantynowo, Brudnowo, Kolonia Święte, Michalin, Niszczewy, Wiktoryn, Śliwkowo, d)
w gminie Koneck miejscowości: Brzeźno, Chromowola, Jeziorno, Kolonia Kruszynek, Kruszynek, Młynek, Ossówka, Romanowo, Straszewo, Kolonia Straszewska część wschodnia miejscowości do drogi wojewódzkiej nr 266 (Ciechocinek – Konin), Zazdromin, Koneck, Opalanka, Spoczynek, Zapustek, Święte, Żołnowo, e)
w gminie Raciążek miejscowości: Dąbrówka, Niestuszewo, Podole, Podzamcze, Raciążek, Raciążek Pole, Siarzewo, Turzno, Turzynek, f)
w gminie Bądkowo miejscowości: Biele, Bądkowo, Bądkówek, Jaranowo, Jaranowo Duże, Kalinowiec, Kaniewo, Kolonia Łowiczek, Kujawka, Kwiatkowo-część północna do drogi wojewódzkiej nr 252 (Inowrocław – Włocławek), Olszynka, Słupy Duże, Słupy Małe, Tomaszewo, Toporzyszczewo, Toporzyszczewo Stare, Wysocin, Wójtówka, Łowiczek, Łówkowice, Żabieniec, Wysocinek, g)
w gminie Zakrzewo miejscowości: Bachorza, Kolonia Serocka, Kuczkowo, Seroczki, Sędzin, Sędzin-Kolonia, Zakrzewo, Zarębowo; 2)
w powiecie toruńskim: a)
w gminie Obrowo miejscowości: Dzikowo, Obory, Osiek n/Wisłą, Sąsieczno, Silno, Smogorzewiec, Stajenczynki, b)
miasto Toruń: Obręb 76, Obręb 78, c)
w gminie Lubicz miejscowości: Grabowiec, Kopanino, Złotoria, d)
w gminie Wielka Nieszawka miejscowości: Brzoza, Popioły, e)
w gminie Czernikowo miejscowość: Pokrzywno; 3)
w powiecie radziejowskim: a)
w gminie Dobre miejscowości: Altana, Bodzanowo, Bodzanowo Drugie, Borowo, Byczyna, Byczyna Kolonia, Czołpin, Dobre, Dobre Wieś, Dęby, Krzywosądz, Ludwikowo, Morawy, Narkowo, Przysiek, Smarglin, Ułomie, b)
w gminie Osięciny miejscowości: Bartłomiejowice, Bełszewo, Belszewo Kolonia, Bodzanówek, Kościelna Wieś, Krotoszyn, Leonowo, Nagórki, Pilichowo, Pocierzyn, Ruszki, Szalonki, Sęczkowo, Wola Skarbkowa, Włodzimierka, Zielińsk, Pieńki Kościelskie, Witoldowo, Pułkownikowo, Zagaj, c)
w gminie Radziejów miejscowość: Piołunowo; 4)
w powiecie inowrocławskim: a)
w gminie Dąbrowa Biskupia miejscowości: Chlewiska, Chróstowo, Dąbrowa Biskupia, Mleczkowo, Przybysław, Walentynowo; 5)
w powiecie włocławskim: a)
w gminie Lubanie miejscowości: Janowice, Przywieczerzynek, Zapomnianowo, Przywieczerzyn, Tadzin, Zosin.
24.11.2025
Mazowieckie voivodship
PL-ND-2025-00061
PL-ND-2025-00060
PL-ND-2025-00057
Surveillance zone:
W województwie mazowieckim: 1)
w powiecie żuromińskim: a)
w gminie Kuczbork – Osada, miejscowości: Chodubka, Kuczbork, Nidzgora, Olszewko, b)
w gminie Żuromin, miejscowości: Brudnice, Będzymin, Dębsk, Franciszkowo, Kliczewo Małe, Kliczewo Duże, Kosewo, Kruszewo, Nowe Nadratowo, Olszewo, Poniatowo, Rzężawy, Stare Nadratowo, Wiadrowo, Wólka Kliczewska, miasto Żuromin, c)
w gminie Lubowidz, miejscowości: Bądzyn, Łazy, d)
w gminie Bieżuń, miejscowości: Bielawy Gołuskie, Dźwierzno, Gołuszyn, Karniszyn, Karniszyn – Parcele, Kobyla Łąka, Kocewo, Myślin, Sadłowo, Sadłowo-Parcele, Stawiszyn-Zwalewo, Stawiszyn-Łaziska, Sławęcin, miasto Bieżuń; 2)
w powiecie mławskim, w gminie Szreńsk, miejscowość Miłotki.
12.11.2025 – 20.11.2025
Surveillance zone:
W województwie mazowieckim: 1)
w powiecie żuromińskim: a)
w gminie Kuczbork – Osada, miejscowości: Bagienice Małe, Bagienice Nowe, Chojnowo, Gościszka, Gościszka – Baraki, Kozielsk, Krzywki – Bratki, Kuczbork – Osada, Mianowo, Niedziałki Sadykierz, Nowa Wieś, Osowa, Sarnowo, Zielona, b)
w gminie Żuromin, miejscowości: Chamsk, Cierpigórz, Dąbrowa, Dąbrowice, Młudzyn, Raczyny, Rozwozin, Sadowo, Tadajówka, c)
w gminie Bieżuń, miejscowości: Adamowo, Dąbrówki, Mak, Małocin, Pełki, Pozga, Stanisławowo, Strzeszewo, Trzaski, Wieluń – Zalesie, Wilewo, Władysławowo, Zgliczyn Pobodzy, d)
w gminie Lubowidz, miejscowości: Biały Dwór, Cieszki, Dziwy, Galumin, Konopaty, Konopaty – Lasy Chłopskie, Lisiny, Lubowidz, Mały Las, Osówka, Pątki, Ruda, Rynowo, Sinogóra, Straszewy, Syberia, Toruniak, Zieluń, Żarnówka, Żelaźnia, e)
w gminie Lutocin, miejscowości: Chromakowo, Głęboka, Felcyn, Jonne, Mojnowo, Obręb, Parlin, Pietrzyk, Przeradz Mały, Przeradz Nowy, Przeradz Wielki, Seroki, Siemcichy, Swojęcin, Szoniec, Zimolza, f)
w gminie Siemiątkowo, miejscowości: Antoniewo, Dzieczewo, Gradzanowo, Nowa Wieś, Nowopole, Pijawnia, Rostowa, Siemiątkowo, Siciarz, Siemiątkowo – Rogale, Sokołowy Kąt, Suwaki, Ziemiany; 2)
w powiecie mławskim: a)
w gminie Szreńsk, miejscowości: Bielawy, Grądek, Kobuszyn, Krzywki – Bośki, Krzywki – Piaski, Mostowo, Nowe Garkowo, Przychód, Pączkowo, Stare Garkowo, Szreńsk, Sławkowo, Wola Proszkowska, Złotowo, Ługi, b)
w gminie Radzanów, miejscowości: Bojanowo, Bębnowo, Cegielnia Ratowska, Luszewo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Ratowo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Radzanów, Wróblewo na północny-zachód od drogi pomiędzy miejscowościami Liberadz i Radzanów, Zgliczyn – Glinki, Zgliczyn Witowy, c)
w gminie Lipowiec Kościelny, miejscowości: Lipowiec Kościelny, Niegocin, Zawady; 3)
w powiecie sierpeckim: a)
w gminie Zawidz, miejscowości: Jaworowo – Kolonia, Jaworowo – Kłódź, Jaworowo – Lipa, Kosemin, b)
w gminie Rościszewo, miejscowości: część miejscowości Lipniki na wschód od rzeki dopływ spod Władysławowa, część miejscowości Polik na wschód od rzeki dopływ spod Władysławowa, Rzeszotary – Chwały, Rzeszotary Rumunki – Stara Wieś, Rzeszotary – Zawady.
W województwie warmińsko-mazurskim:
—
w powiecie działdowskim w gminie Lidzbark, w granicach administracyjnych miejscowości Glinki.
20.11.2025
Further restricted zone:
W województwie mazowieckim: 1)
W powiecie żuromińskim: a)
W gminie Kuczbork-Osada, miejscowości: Bagienice Duże, Łążek, Szronka; b)
W gminie Lubowidz, miejscowości: Goliaty, Huta, Jasiony, Kipichy, Kozilas, Mleczówka, Obórki, Płociczno, Przerodki, Purzyce, Suchy Grunt, Wronka, Wylazłowo, Zatorowizna, Zdrojki c)
W gminie Lutocin, miejscowości: Boguszewiec, Chrapoń, Chrapoń Rudziska, Dębówka, Elżbiecin, Lutocin, Psota, Starcz-Bombol, d)
W gminie Siemiątkowo, miejscowości: Budy Osieckie Nowe, Budy Osieckie Stare, Budy Koziebrodzkie, Gutkowo, Krzeczanowo, Łaszewo, Łaszewo Wietrznik, Ossowa, Wojciechowo, Wola Łaszewska.
20.11.2025
Podlaskie voivodship
PL-ND-2025-00058
PL-ND-2025-00069
Protection zone:
W woj. podlaskim: a)
w powiecie monieckim w gminie Goniądz miejscowości: Krzecze, Klewianka, Smogorówka Dolistowska, Smogorówka Goniądzka, Wroceń, Białosuknia. b)
w powiecie monieckim w gminie Knyszyn, miejscowości: Knyszyn, Grądy, Poniklica, Wodziłówka, Zofiówka.
1.12.2025
Surveillance zone:
W woj. podlaskim: a)
w powiecie monieckim w gminie Goniądz miejscowości: Krzecze, Klewianka, Smogorówka Dolistowska, Smogorówka Goniądzka, Wroceń, Białosuknia. b)
w powiecie monieckim w gminie Knyszyn, miejscowości: Knyszyn, Grądy, Poniklica, Wodziłówka, Zofiówka.
2.12.2025 – 10.12.2025 1)
w powiecie monieckim: a)
w gminie Goniądz miejscowości: Dawidowizna, Dolistowo Nowe, Dolistowo Stare, Doły, Goniądz, Mierkienniki, Owieczki, Piwowary, Szafranki, Wojtówstwo, Wólka Piaseczna, Łazy; b)
w gminie Jaświły miejscowości: Bagno, Dolistowo Nowe, Dolistowo Stare, Dzięciołowo, Gurbicze, Jadeszki, Jaświłki, Jaświły, Mikicin, Mociesze, Moniuszki, Radzie, Romejki, Rutkowskie Duże, Rutkowskie Małe, Szaciły, Szpakowo, Zabiele; c)
w gminie Jasionówka, miejscowości: Brzozówka Folwarczna, Czarnystok, Dobrzyniówka, Górnystok, Jasionówka, Jasionóweczka, Kalinówka Królewska, Krasne Folwarczne, Krasne Małe, Krasne Stare, Kąty, Milewskie, Łękobudy; d)
w gminie Knyszn, miejscowości: Chobotki, Czechowizna, Guzy, Jaskra, Kalinówka Kościelna, Knyszyn Zamek, Nowiny Zdroje, Nowiny Kasjerskie, Ogrodniki, Wojtówce; e)
w gminie Mońki miejscowości: Hornostaje, Jaski, Koleśniki, Kosiorki, Krzeczkowo, Ołdaki, Potoczyzna, Pyzy, Zyburty, Łupichy, Świerzbienie, Żodzie, Dudki, Dudki Kolonia, Konopczyn, Kropiwnica, Przytulanka, Rusaki; f)
w gminie Krypno, miejscowości: Krypno Kościelne, Krypno Wielkie, Ruda, Zastocze; 2)
w powiecie augustowskim w gminie Sztabin miejscowości: Jasionowo Dębowskie, Kopytkowo. 3)
w powiecie białostockim, w gminie Dobrzyniewo Durze, miejscowości: Chraboły, Kulikówka, Kozińce, Borsukówka, Kobuzie, Nowosiółki, Szaciły. 4)
w powiecie sokólskim, w gminie Korycin, miejscowości: Wojtachy, Stok, Czarlona, Brody.
10.12.2025
Wielkopolskie and Lubuskie voivodships
PL-ND-2025-00059
PL-ND-2025-00064
PL-ND-2025-00066
Protection zone:
W woj. wielkopolskim: 1. W powiecie wolsztyńskim, w gminie Wolsztyn, miejscowości: Świętno, Obra, Kębłowo, Krzyż; 2. W powiecie leszczyńskim, w gminie Święciechowa: Długie Stare; 3. W powiecie leszczyńskim, w gminie Wijewo, miejscowości: Wijewo, Brenno, Radomyśl, Przylesie, Potrzebowo, Wilanów.
W woj. lubuskim:
—
w powiecie wschowskim: 1)
w gminie Wschowa, miejscowość Wschowa oraz obszary wiejskie: Dębowa Łęka, Olbrachcice, Przyczyna Dolna, Siedlnica, Łęgoń; 2)
w gminie Sława, miejscowości: Przybyszów, Nowe Strącze, część miejscowości Stare Strącze leżąca na północ od drogi wojewódzkiej 278. W woj. dolnośląskim:
—
w powiecie górowskim, w gminie Niechlów: część obrębu miejscowości Siciny na północ od cieku wodnego Śląski Rów i na zachód od drogi wojewódzkiej nr 305. 21.11.2025
Surveillance zone:
W woj. wielkopolskim: 1. W powiecie wolsztyńskim, w gminie Wolsztyn, miejscowości: Świętno, Obra, Kębłowo, Krzyż; 2. W powiecie leszczyńskim, w gminie Święciechowa: Długie Stare; 3. W powiecie leszczyńskim, w gminie Wijewo, miejscowości: Wijewo, Brenno, Radomyśl, Przylesie, Potrzebowo, Wilanów.
W woj. lubuskim:
—
w powiecie wschowskim: 1)
w gminie Wschowa, miejscowość Wschowa oraz obszary wiejskie: Dębowa Łęka, Olbrachcice, Przyczyna Dolna, Siedlnica, Łęgoń; 2)
w gminie Sława, miejscowości: Przybyszów, Nowe Strącze, część miejscowości Stare Strącze leżąca na północ od drogi wojewódzkiej 278. W woj. dolnośląskim:
—
w powiecie górowskim, w gminie Niechlów: część obrębu miejscowości Siciny na północ od cieku wodnego Śląski Rów i na zachód od drogi wojewódzkiej nr 305. 22.11.2025 – 30.11.2025
Surveillance zone:
W woj. wielkopolskim: 1. W powiecie leszczyńskim, w gminie Wijewo, miejscowości: Miastko, Zaborówiec; 2. W powiecie leszczyńskim, w gminie Włoszakowice, miejscowości: Dominice, Włoszakowice, Koczury, Krzyżowiec, Mścigniew, Tłucznia, Papiernia, Zbarzewo, Daćbogi, Jezierzyce Kościelne; 3. W powiecie leszczyńskim, w gminie Święciechowa, miejscowości: Święciechowa, Piotrowice, Niechłód, Trzebiny, Długie Nowe, Lasocice, Przybyszewo. Henrykowo, Gołanice, Książęcy Las, Ogrody; 4. W powiecie wolsztyńskim, w gminie Przemęt, miejscowości: Wieleń, Osłonin, Olejnica, Radomierz, Starkowo, Górsko, Kaszczor, Mochy, Nowa Wieś, Perkowo, Solec, Solec Nowy, Przemęt-Leśniczówka; 5. W powiecie wolsztyńskim, w gminie Wolsztyn, miejscowości: Adamowo, Komorowo, Niałek Wielki, Nowa Dąbrowa, Nowa Obra, Nowy Widzim, Powodowo, Rudno, Stara Dąbrowa, Stary Widzim, Stradyń, Wilcze, Wroniawy, Berzyna, Borki; 6. W powiecie wolsztyńskim, w gminie Siedlec, miejscowości: Jaromierz, Jażyniec, Kiełkowo, Żodyń, Marianice, Podborowo.
W woj. lubuskim: 1)
w powiecie wschowskim: a)
w gminie Sława, miejscowości: Łupice, Spokojna, Bagno, Szreniawa, Ciosaniec, Droniki, Lipinki, Radzyń, Sława, Lubogoszcz, Gola, Wróblów, Śmieszkowo i część miejscowości Stare Strącze leżąca na południe od drogi wojewódzkiej 278, b)
w gminie Szlichtyngowa, obszar wiejski: Dryżyna, Górczyna, Jędrzychowice, Kowalewo, Stare Drzewce, Zamysłów, c)
w gminie Wschowa, obszar wiejski: Hetmanice, Kandlewo, Konradowo, Nowa Wieś, Osowa Sień, Przyczyna Górna, Tylewice, Łysiny, Wygnańczyce, Lgiń; 2)
w powiecie nowosolskim, w gminie Kolsko, miejscowości: Uście, Tatarki, Jesiona, Sławocin, Tyrszeliny, Kolsko, część miejscowości Konotop na północ od drogi leśnej łączącej m. Głuszyca z drogą pożarową nr 6; 3)
w powiecie zielonogórskim: a)
w gminie Kargowa, miejscowości: Obra Dolna, Nowy Jaromierz, Stary Jaromierz, część miejscowości Karszyn na wschód od drogi gminnej z miejscowości Kargowa do miejscowości Siadcza, b)
w gminie Bojadła, część miejscowości Susłów, na wschód od drogi pożarowej nr 18. W woj. dolnośląskim :
—
w powiecie górowskim: a)
gmina Niechlów – miejscowości: Łękanów, część obrębu miejscowości Siciny na południe od cieku wodnego Śląski Rów i na wschód od drogi wojewódzkiej nr 305, Wronów, Wioska, Tarpno; b)
gmina Góra – miejscowości: Radosław, Nowa Wioska.
30.11.2025
PL-ND-2025-00065
PL-ND-2025-00068
Protection zone:
W woj. wielkopolskim: 1)
w powiecie poznańskim, w gminie Stęszew, miejscowości: Zamysłowo, Stęszew, Wielkawieś, Antoninek, Strykowo, Strykówko, Twardowo, Srocko Małe, Wronczyn, Zaparcin, Witobel, Dębno, Dębienko, Dębina, Krąplewo, Drogosławiec, Sapowice, Trzebaw, Górka, Łódź, Będlewo; 2)
w powiecie poznańskim, w gminie Dopiewo, miejscowości: Lisówki, Trzcielin, Joanka, Podgaj.
30.11.2025
Surveillance zone:
W woj. wielkopolskim: 1)
w powiecie poznańskim, w gminie Stęszew, miejscowości: Zamysłowo, Stęszew, Wielkawieś, Antoninek, Strykowo, Strykówko, Twardowo, Srocko Małe, Wronczyn, Zaparcin, Witobel, Dębno, Dębienko, Dębina, Krąplewo, Drogosławiec, Sapowice, Trzebaw, Górka, Łódź, Będlewo; 2)
w powiecie poznańskim, w gminie Dopiewo, miejscowości: Lisówki, Trzcielin, Joanka, Podgaj.
1.12.2025 – 9.12.2025
Surveillance zone:
W woj. wielkopolskim : 1)
w powiecie poznańskim, w gminie Stęszew, miejscowości: Mirosławki, Rybojedzko, Tomice, Skrzynki, Tomiczki, Jeziorki, Piekary, Słupia, Modrze, Będlewo, Łódź, Górka, Trzebaw; 2)
w powiecie poznańskim, w gminie Dopiewo, miejscowości: Zborowo, Zborówko, Dopiewo, Dopiewiec, Konarzewo, Podłoziny, Gołuski, Żarnowiec; 3)
w powiecie poznańskim, w gminie Komorniki, miejscowości: Rosnówko, Walerianowo, Rosnowo, Chomęcice, Głuchowo, Komorniki, Wiry, Szreniawa, Jarosławiec, Kątnik, Wypalanki; 4)
w powiecie poznańskim, w gminie Mosina, miejscowości: Dymaczewo Nowe, Dymaczewo Stare, Kierzki, Krosinko, Ludwikowo, Pożegowo, Mosina, Borkowice, Bolesławiec, Jeziory, Krosno, Drużyna, Pecna, Konstantynowo; 5)
w powiecie poznańskim, w gminie Buk, miejscowości: Sznyfin, Dakowy Suche, Szewce, Dobra, Dobieżyn, Otusz, Cieśle; 6)
w powiecie kościańskim, w gminie Czempiń, miejscowości: Bieczyny, Sierniki, Głuchowo, Piotrowo Pierwsze, Piotrowo Drugie, Maruszkowo, Zadory, Roszkowo, Srocko Wielkie, część miejscowości Jarogniewice na zachód od drogi S5; 7)
w powiecie grodziskim, w gminie Granowo, miejscowości: Kąkolewo, część miejscowości Granowo na północny-wschód od skrzyżowania DK32 i ulicy Kolejowej, Separowo, Niemierzyce, Strzępiń, Bielawy, Zemsko, Januszewice, część miejscowości Kubaczyn na wschód od drogi powiatowej nr 2498P. 8)
w powiecie poznańskim, gmina Puszczykowo.
9.12.2025
PL-ND-2025-00062
Surveillance zone:
W woj. wielkopolskim: 1)
w powiecie ostrowskim, w gminie Nowe Skalmierzyce, miejscowości: Biskupice Ołoboczne, Ociąż, Fabianów, Skalmierzyce, Śliwniki; 2)
w powiecie ostrowskim, w gminie Sieroszewice, miejscowości: Bilczew, Psary, Latowice, Kowalew, Bibianki, Kęszyce, w miejscowości Rossoszyca obszar na północny zachód od skrzyżowania ul. Kaliskiej z ul. Ostrowską; 3)
w powiecie ostrowskim, w gminie Ostrów Wlkp., miejscowości: Czekanów, Bagatela.
12.11.2025 – 20.11.2025
Surveillance zone: 1)
w powiecie ostrowskim, gmina Nowe Skalmierzyce, na terenie nie objętym obszarem zapowietrzonym; 2)
w powiecie ostrowskim, w gminie Sieroszewice, miejscowości: Parczew, Strzyżew, Sieroszewice, Namysłaki, Wielowieś, Masanów, Miłaszka, Ołobok, Sławin, Westrza, Kaliszkowice, w miejscowości Rososzyca obszar na południowy wschód od skrzyżowania ul. Kaliskiej z ul. Ostrowską; 3)
w powiecie ostrowskim, w gminie Ostrów Wlkp., miejscowości: Gutów, Górzno, Górzenko, Będzieszyn, Młynów, Słaborowice, Kwiatków, Lewków, Kołątajew, Szczury, Franklinów, Karski, Wysocko Wielkie, Wtórek, Nowe Kamienice, Sadowie, Smardowskie Olendry, Trąba, Warszty, Kąkolewo, Biłgoraje, Jamy, Gręblów, Michałków, Stary Staw; 4)
w powiecie ostrowskim, w gminie Przygodzice, miejscowości: Chynowa, Bogufałów; 5)
w powiecie kaliskim, w gminie Godziesze Wielkie, miejscowości: Wola Droszowska, Zadowice, Żydów; 6)
w mieście Kalisz, osiedla: Dobrzec, Dobrzec P, Szczypiorno, Sulisławice, Sulisławice Kolonia, Piwonice, Piwonice Zachód, Nosków, Zagorzynek; 7)
w powiecie pleszewskim, w gminie Gołuchów, miejscowości: Kościelna Wieś, Borczysko.
20.11.2025
Zachodniopomorskie voivodeship
PL-ND-2025-00067
PL-ND.NON-P-2025-00050
Protection zone:
W województwie zachodniopomorskim: 1)
w powiecie białogardzkim część Miasta Białogard znajdująca się w promieniu 3 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 3 km od współrzędnych 54.02053 15.891838; 2)
w powiecie białogardzkim w gminie Białogard miejscowości: Lulewiczki, Redlino, Rościno, Trzebiele; 3)
w powiecie białogardzkim w gminie Karlino miejscowość Karlino..
29.11.2025
Surveillance zone:
W województwie zachodniopomorskim: 1)
w powiecie białogardzkim część Miasta Białogard znajdująca się w promieniu 3 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 3 km od współrzędnych 54.02053 15.891838; 2)
w powiecie białogardzkim w gminie Białogard miejscowości: Lulewiczki, Redlino, Rościno, Trzebiele; 3)
w powiecie białogardzkim w gminie Karlino miejscowość Karlino.
30.11.2025 – 8.12.2025
Surveillance zone:
W województwie zachodniopomorskim: 1)
w powiecie białogardzkim część Miasta Białogard niewymieniona w obszarze zapowietrzonym; 2)
w powiecie białogardzkim w gminie Białogard miejscowości: część obrębu miejscowości Byszyno znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838, Dargikowo, Dargikowo Kolonia, Dębczyno, Gruszewo, Kamosowo, Klępino Białogardzkie, Kościernica, Laski, Leśniki, Lulewice, Łęczenko, Łęczno, Łęczno Kolonia, Łęczynko, Moczyłki, Nasutowo, Nawino, część obrębu miejscowości Nosówko znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838, Pękaninko, Pękanino, Pomianowo, Pomianowo Kolonia, Pustkowo, Pustkówko, Rarwino, Rogowo, Rogowo Kolonia, Rychowo, Rychówko, Sińce, Stanomino, Strzelec, Tarpnowo, Zagórze, Ząbki, Żabiniec, Żelezno Kolonia, Żeleźno, Żelimucha, Żytelkowo; 3)
w powiecie białogardzkim w gminie Karlino, miejscowości: Brzeźno, Chotyń, Czerwięcino, Daszewo, Daszewo Kolonia, Dębolas, część obrębu miejscowości Domacyno znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838, Garnki, część obrębu miejscowości Gościnko znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838, Karlinko, Karścino, Karwin, Kowańcz, Kozia Góra, Krukowo, Krzywopłoty, Lubiechowo, Lubiechowo-Przystanek, Malonowo, Mierzynek, Mierzynek Kolonia, Poczernino, Pobłocie Wielkie, Syrkowice, Ubysławice, Witolub, Zwartowo; 4)
w powiecie kołobrzeskim, w gminie Dygowo miejscowości: część miejscowości Kłopotowo znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838, Łykowo; 5)
w powiecie kołobrzeskim, część gminy Gościno znajdująca się w promieniu 10 km od współrzędnych 54.021433 15.925873 oraz znajdująca się w promieniu 10 km od współrzędnych 54.02053 15.891838; 6)
w powiecie koszalińskim w gminie Biesiekierz miejscowości: Parsowo, Świeminko, Świemino, Warnino.
8.12.2025
’

Council Decision (CFSP) 2025/2357 of 20 November 2025 amending Decision (CFSP) 2024/1484 concerning restrictive measures in view of the situation in Russia

Official Journalof the European Union ENL series
2025/2357 20.11.2025
(1) On 27 May 2024, the Council adopted Decision (CFSP) 2024/1484(1).
(2) The Union remains unwavering in its condemnation of the human rights violations and repressions in Russia.
(3) In view of the gravity of the situation, the Council considers that 10 natural persons should be added to the list of natural and legal persons, entities and bodies set out in the Annex to Decision (CFSP) 2024/1484.
(4) Decision (CFSP) 2024/1484 should therefore be amended accordingly,
Name Identifying information Statement of Reasons Date of listing
‘53. Andrey Viktorovich POLYAKOV(Андрей Викторович ПОЛЯКОВ) Position: Head of the Main Directorate of the Federal Penitentiary Service of the Russian Federation for the Rostov Oblast, Major General of Internal ServiceDOB: 17.6.1970Nationality: RussianGender: malePassport number: series 1815 No 112026INN (Russian Tax ID): 343517128461 Andrey Polyakov is the Head of the Main Directorate of the Federal Penitentiary Service of the Russian Federation for the Rostov Oblast, including pre-trial detention centre in Taganrog (SIZO-2), pre-trial detention centre 1 in Rostov-on-Don (SIZO-1), and colony No. 12 in Kamensk Shakhtinsky.In his position, he is responsible for ensuring the protection of the rights of detainees and their safety and for the maintenance of law and order in the subordinate detention facilities he oversees. In the facilities under Polyakov’s authority, Ukrainian detainees, both civilian and military, as well as other detainees were regularly subjected to beatings by guards, suffered from severe food shortages, and had little to no access to medical care or legal assistance. During interrogations, they faced both psychological and physical coercion, including brutal beatings, electric shocks, and threats, with the aim of forcing them to confess to alleged war crimes, crimes of terrorism, or other offences. The documented instances of torture and ill-treatment include the case of the Ukrainian investigative journalist Victoria Volodymyrivna Roshchyna who died in September 2024 as a result of ill-treatment in Pre-Trial Detention Centre No. 2 of the Main Directorate of the Federal Penitentiary Service for the Rostov Oblast in Taganrog.Therefore, Andrey Polyakov is responsible for serious human rights violations, namely torture and other cruel, inhuman or degrading treatment, for the repression of civil society and for activities seriously undermining the rule of law in Russia. 20.11.2025
54. Andrey Vadimovich MIKHAILICHENKO(Андрей Вадимович МИХАЙЛИЧЕНКО) Position: Deputy Director for Security and Operational Work of Pre-Trial Detention Centre No. 2 of the Main Directorate of the Federal Penitentiary Service for the Rostov Oblast, Russian FederationDOB: 31.3.1992Nationality: RussianGender: malePassport number: Series 6012 No 175625INN (Russian Tax ID): 615490520223 Andrey Mikhailichenko serves as Deputy Director for Security and Operational Work of Pre-Trial Detention Centre No. 2 of the Main Directorate of the Federal Penitentiary Service for the Rostov Oblast (SIZO-2) in Taganrog, Russia. As a member of the management of SIZO-2 Mikhailichenko is responsible for widespread and systematic torture and other cruel, inhuman and degrading treatment of Ukrainian detainees, both civilian and military, as well as other detainees held in that facility.Detainees in SIZO-2 are regularly subjected to beatings by guards, suffer from severe food shortages, and have little to no access to medical care or legal assistance. During interrogations, detainees face both psychological and physical coercion, including brutal beatings, electric shocks, and threats, with the aim of forcing them to confess to alleged war crimes, crimes of terrorism, or other offences all intended to crush resistance to Russia’s aggression against Ukraine. This treatment represents a serious violation or abuse of human rights and is a violation of the principle of rule of law. At least 15 detainees have died as a result of ill-treatment in the facility, including Ukrainian investigative journalist Victoria Volodymyrivna Roshchyna.As Deputy Director for Security and Operational Work of SIZO-2, Andrey Mikhailichenko bears responsibility for the facility’s operations. He is therefore responsible for serious human rights violations, repression of civil society and for activities seriously undermining the rule of law in Russia. 20.11.2025
55. Andrey Sergeevich SAPITSKIY(Андрей Сергеевич САПИЦКИЙ) Position: Deputy Director for Personnel and Educational Work Issues of Pre-Trial Detention Centre No. 2 of the Main Directorate of the Federal Penitentiary Service for the Rostov Oblast, Russian FederationNationality: RussianGender: male Andrey Sapitskiy, serves as Deputy Director for Personnel and Educational Work Issues of Pre-Trial Detention Centre No. 2 of the Main Directorate of the Federal Penitentiary Service for the Rostov Oblast (SIZO-2) in Taganrog, Russia. As a member of the management of SIZO-2, Sapitskiy is responsible for widespread and systematic torture and other cruel, inhuman, and degrading treatment of Ukrainian detainees, both civilian and military, as well as other detainees held in that facility.Detainees in SIZO-2 are regularly subjected to beatings by guards, suffer from severe food shortages, and have little to no access to medical care or legal assistance. During interrogations, detainees face both psychological and physical coercion, including brutal beatings, electric shocks, and threats, with the aim of forcing them to confess to alleged war crimes, crimes of terrorism, or other offences all intended to crush resistance to Russia’s aggression against Ukraine. This treatment represents a serious violation or abuse of human rights and is a violation of the principle of rule of law. At least 15 detainees have died as a result of ill-treatment in the facility, including Ukrainian investigative journalist Victoria Volodymyrivna Roshchyna.As Deputy Director for Personnel and Educational Work Issues of SIZO-2, Andrey Sapitskiy bears responsibility for the facility’s operations. He is therefore responsible for serious human rights violations, repression of civil society, and activities seriously undermining of rule of law in Russia. 20.11.2025
56. Aleksandr Aleksandrovich SHTODA(Александр Александрович ШТОДА) Position: Director of Pre-Trial Detention Centre No. 2 of the Main Directorate of the Federal Penitentiary Service for the Rostov Oblast, Russian FederationDOB: 19.11.1980Nationality: RussianPassport number: series 6001 No419633INN (Russian Tax ID): 611903638423 Aleksander Shtoda, serves as Director of Pre-Trial Detention Centre No. 2 of the Main Directorate of the Federal Penitentiary Service for the Rostov Oblast (SIZO-2) in Taganrog, Russia. Shtoda is responsible for widespread and systematic torture and other cruel, inhuman, and degrading treatment of Ukrainian detainees, both civilian and military, as well as other detainees held in the facility under his command.Detainees in SIZO-2 are regularly subjected to beatings by guards, suffer from severe food shortages, and have little to no access to medical care or legal assistance. During interrogations, detainees face both psychological and physical coercion, including brutal beatings, electric shocks, and threats, with the aim of forcing them to confess to alleged war crimes, crimes of terrorism, or other offences all intended to crush resistance to Russia’s aggression against Ukraine. This treatment represents a serious violation or abuse of human rights and is a violation of the principle of rule of law. At least 15 detainees have died as a result of ill-treatment in the facility, including Ukrainian investigative journalist Victoria Volodymyrivna Roshchyna.As Director of SIZO-2, Aleksander Shtoda holds authority over the facility’s operations. He is therefore responsible for serious human rights violations, repression of civil society, and activities seriously undermining the rule of law in Russia. 20.11.2025
57. Timur Savelevich VAKHRAMEEV(Тимур Савельевич ВАХРАМЕЕВ) Position: Judge of Basmanny District Court, Moscow; FormerMagistrate (Justice of the Peace) in Tagansky district of MoscowDOB: 13.5.1990Nationality: RussianGender: male Timur Vakhrameev, a judge at the Basmanny District Court in Russia, has been involved in a number of politically motivated prosecution cases, imposing disproportionately harsh sentences on several individuals and extending the detention of others.Judge Vakhrameev participated in the unjust and politically motivated prosecution of journalists Kirill Martynov and Dmitry Kolezev, as well as activist Lyusya Shtein, sentencing each of them to several years in prison in an effort to silence independent journalism and civil society in Russia. He also extended the pre-trial detention of lawyers Vadim Kobzev and Alexey Liptser, as well as journalists Konstantin Gabov and Sergei Karelin, in politically motivated cases related to crackdowns on individuals associated with the Anti-Corruption Foundation or Alexei Navalny himself. Additionally, he prolonged the pre-trial detention of Grigory Melkonyants, co-chairman of the Golos movement, Russia’s key independent election watchdog initiative, in an apparent attempt to exert additional pressure on public election monitoring in the country. In all of the aforementioned cases, controversial articles of the Russian Criminal Code on undesirable organisations, discrediting the Russian army, or extremism were applied.Moreover, earlier in 2023, while serving as a justice of the peace in Moscow’s Tagansky District, Timur Vakhrameev also played an active role in penalising international companies such as Wikimedia and Google for failing to remove factual information about Russia’s war of aggression against Ukraine.Timur Vakhrameev is therefore responsible for serious human rights violations, the repression of civil society and democratic opposition and activities seriously undermining democracy and the rule of law in Russia. 20.11.2025
58. Artemy Alexeevich TELMINOV(Артемий Алексеевич ТЕЛЬМИНОВ) Position: Investigator of the Investigative Committee of the Russian FederationDOB: 30.12.1994Nationality: RussianGender: male Artemy Telminov serves as an Investigator of the Investigative Committee of the Russian Federation, and has been involved in a number of politically motivated prosecutions of individuals associated with Alexei Navalny, including, journalists Antonina Favorskaya, Olga Komleva, Konstantin Gabov, and Sergey Karelin, as well as lawyers Vadim Kobzev, Alexei Liptser, and Igor Sergunin. By advocating for the imposition or extension of their detention, he has actively contributed to the Russian regime’s efforts to suppress dissent within the country.All of the individuals mentioned above were investigated and subsequently charged with participation in an extremist community or organisation, or with involvement in its activities. In reality, these charges were based solely on their lawful actions while associated with Alexei Navalny and his Anti-Corruption Foundation. The misuse of legislation related to terrorism and extremism to suppress political opposition and peaceful civil society efforts linked to Navalny has become a widespread practice in Russia. All of the aforementioned cases exhibit a consistent pattern of politically motivated prosecution, including prolonged pre-trial detention and, in some instances, closed court proceedings.Artemy Telminov’s active role in orchestrating the unjust prosecution of Antonina Favorskaya, Olga Komleva, Konstantin Gabov, Sergey Karelin, Vadim Kobzev, Alexei Liptser, and Igor Sergunin constitutes a grave violation of human rights. Therefore, he is directly responsible for serious human rights abuses and for the repression of civil society and democratic opposition in Russia. 20.11.2025
59. Boris Ashirbaevich KOZHEVNIKOV(Борис Аширбаевич КОЖЕВНИКОВ) Position: Deputy Chairman of the Appellate Military Court of RussiaDOB: 31.8.1964Nationality: RussianGender: male Boris Kozhevnikov is a Deputy Chairman of the Appellate Military Court of Russia.As deputy chairman of the Appellate Military Court of Russia, Boris Kozhevnikov rejected the appeal of Alexei Gorinov, a former municipal deputy in the Krasnoselsky district of Moscow, against a politically motivated sentence. In a procedurally flawed trial, Alexei Gorinov was sentenced to three years’ imprisonment in a strict regime penal colony under Article 205.2 of the Russian Criminal Code for “justification of terrorism”. Alexei Gorinov’s sentence was based on statements he made in a conversation with his cellmates in which he allegedly recognised that Crimea was Ukrainian territory and the Azov regiment was part of the Ukrainian army. Furthermore, Kozhevnikov upheld the sentences of imprisonment for Andrei Boyarshinov, Ibragim Orudzhev, Alexei Nuriev and Roman Nasryev on politically motivated charges in alleged terrorism related cases.Therefore, Boris Kozhevnikov is responsible for serious violations of human rights, including violating freedom of opinion and expression, for the repression of civil society and democratic opposition, and for activities which seriously undermine the rule of law in Russia. 20.11.2025
60. Maxim Alexandrovich PANIN(Максим Александрович ПАНИН) Position: Judge of the Appellate Military Court of Russia (Judicial Panel for Criminal Cases)DOB: 22.2.1982Nationality: RussianGender: male Maksim Panin is a judge of the Appellate Military Court of Russia.As a member of the panel of judges of the Appellate Military Court of Russia, Maksim Panin rejected the appeal of Alexei Gorinov, a former municipal deputy in the Krasnoselsky district of Moscow, against a politically motivated sentence. In a procedurally flawed trial, Alexei Gorinov was sentenced to three years’ imprisonment in a strict regime colony under Article 205.2 of the Russian Criminal Code for “justification of terrorism”. Alexei Gorinov’s sentence was based on statements he made in a conversation with his cellmates in which he allegedly recognised that Crimea was Ukrainian territory and the Azov regiment was part of the Ukrainian army.Furthermore, Panin participated in politically motivated prosecutions of other individuals. As a member of the appellate panel, he upheld the conviction of Elena Kotenochkina, who was accused of “justifying terrorism” through a social media post and sentenced, in absentia, to six years and eleven months in a penal colony. Panin also confirmed the extension of the detention period in the cases of Polina Yevtushenko, prosecuted for spreading “fake news” about the Russian army and “rehabilitation of Nazism”, and Enver Krosh, Rinat Aliev and Vilen Temeryanov, Crimean Tatars prosecuted for their alleged involvement in an Islamic group banned in Russia.Therefore, Maksim Panin is responsible for serious violations of human rights, including violating freedom of opinion and expression, for the repression of civil society and democratic opposition, and for activities which seriously undermine the rule of law in Russia. 20.11.2025
61. Marina Viktorovna USHAKOVA(Марина Викторовна УШАКОВА) Position: Judge of the Appellate Military Court of Russia (Judicial Panel for Criminal Cases)DOB: 2.5.1979Nationality: RussianGender: female Marina Ushakova is a judge of the Appellate Military Court of Russia.As a member of the appellate panel of judges of the Appellate Military Court of Russia, Marina Ushakova rejected the appeal of Alexei Gorinov, a former municipal deputy in the Krasnoselsky district of Moscow, against a politically motivated sentence. In a procedurally flawed trial, Alexei. Gorinov was sentenced to three years’ imprisonment in a strict regime colony under Article 205.2 of the Russian Criminal Code for “justification of terrorism”. Alexei Gorinov’s sentence was based on statements he made in a conversation with his cellmates in which he allegedly recognised that Crimea was Ukrainian territory and the Azov regiment was part of the Ukrainian army. Furthermore, Ushakova upheld the convictions of Nikita Tushkanov, Daniil Bondarenko and Stanislav Shevchenko, based on politically motivated charges of “justifying terrorism” in their statements on social media or in private conversations regarding, in particular, the Crimean Bridge explosion.Therefore, Marina Ushakova is responsible for serious violations of human rights, including violating freedom of opinion and expression, for the repression of civil society and democratic opposition, and for activities which seriously undermine the rule of law in Russia. 20.11.2025
62. Svetlana Sergeevna RYGALOVA(Светлана Сергеевна РЫГАЛОВА) Position: Prosecutor of the Criminal Judicial Department of the Prosecutor’s Office of Vladimir Region, Junior Justice CounsellorNationality: RussianGender: female Svetlana Rygalova, serving as a prosecutor of the Prosecutor’s Office of the Vladimir Region, participated in the politically motivated prosecution of Alexei Gorinov, a former municipal deputy in the Krasnoselsky district of Moscow, for expressing his opinion related to Russia’s war of aggression against Ukraine.Prosecutor Rygalova approved the indictment in a criminal case and led the prosecution of Alexei Gorinov under Article 205.2 of the Russian Criminal Code for “justification of terrorism”, proposing that he be sentenced to three and a half years of imprisonment. The prosecution’s case was based on statements Gorinov made in a conversation with his cellmates in which he allegedely recognised that Crimea was Ukrainian territory and the Azov regiment was part of the Ukrainian army. On the basis of Rygalova’s indictment, Gorinov was sentenced to three years of imprisonment.Therefore, Svetlana Rygalova is responsible for serious violations of human rights, including violating freedom of opinion and expression, for the repression of civil society and democratic opposition, and for activities seriously undermining the rule of law in Russia. 20.11.2025’
THE COUNCIL OF THE EUROPEAN UNION,
Having regard to the Treaty on European Union, and in particular Article 29 thereof,
Having regard to the proposal from the High Representative of the Union for Foreign Affairs and Security Policy,
Whereas:
(1) On 27 May 2024, the Council adopted Decision (CFSP) 2024/1484 (1).
(2) The Union remains unwavering in its condemnation of the human rights violations and repressions in Russia.
(3) In view of the gravity of the situation, the Council considers that 10 natural persons should be added to the list of natural and legal persons, entities and bodies set out in the Annex to Decision (CFSP) 2024/1484.
(4) Decision (CFSP) 2024/1484 should therefore be amended accordingly,
HAS ADOPTED THIS DECISION:
The Annex to Decision (CFSP) 2024/1484 is amended in accordance with the Annex to this Decision.
This Decision shall enter into force on the date of its publication in the Official Journal of the European Union.

The following entries are added to the Annex to Decision (CFSP) 2024/1484 under the heading ‘A. Natural persons’:

Name
Identifying information
Statement of Reasons
Date of listing
‘53. Andrey Viktorovich POLYAKOV
(Андрей Викторович ПОЛЯКОВ)
Position: Head of the Main Directorate of the Federal Penitentiary Service of the Russian Federation for the Rostov Oblast, Major General of Internal Service
DOB: 17.6.1970
Nationality: Russian
Gender: male
Passport number: series 1815 No 112026
INN (Russian Tax ID): 343517128461
Andrey Polyakov is the Head of the Main Directorate of the Federal Penitentiary Service of the Russian Federation for the Rostov Oblast, including pre-trial detention centre in Taganrog (SIZO-2), pre-trial detention centre 1 in Rostov-on-Don (SIZO-1), and colony No. 12 in Kamensk Shakhtinsky.
In his position, he is responsible for ensuring the protection of the rights of detainees and their safety and for the maintenance of law and order in the subordinate detention facilities he oversees. In the facilities under Polyakov’s authority, Ukrainian detainees, both civilian and military, as well as other detainees were regularly subjected to beatings by guards, suffered from severe food shortages, and had little to no access to medical care or legal assistance. During interrogations, they faced both psychological and physical coercion, including brutal beatings, electric shocks, and threats, with the aim of forcing them to confess to alleged war crimes, crimes of terrorism, or other offences. The documented instances of torture and ill-treatment include the case of the Ukrainian investigative journalist Victoria Volodymyrivna Roshchyna who died in September 2024 as a result of ill-treatment in Pre-Trial Detention Centre No. 2 of the Main Directorate of the Federal Penitentiary Service for the Rostov Oblast in Taganrog.
Therefore, Andrey Polyakov is responsible for serious human rights violations, namely torture and other cruel, inhuman or degrading treatment, for the repression of civil society and for activities seriously undermining the rule of law in Russia.
20.11.2025 54. Andrey Vadimovich MIKHAILICHENKO
(Андрей Вадимович МИХАЙЛИЧЕНКО)
Position: Deputy Director for Security and Operational Work of Pre-Trial Detention Centre No. 2 of the Main Directorate of the Federal Penitentiary Service for the Rostov Oblast, Russian Federation
DOB: 31.3.1992
Nationality: Russian
Gender: male
Passport number: Series 6012 No 175625
INN (Russian Tax ID): 615490520223
Andrey Mikhailichenko serves as Deputy Director for Security and Operational Work of Pre-Trial Detention Centre No. 2 of the Main Directorate of the Federal Penitentiary Service for the Rostov Oblast (SIZO-2) in Taganrog, Russia. As a member of the management of SIZO-2 Mikhailichenko is responsible for widespread and systematic torture and other cruel, inhuman and degrading treatment of Ukrainian detainees, both civilian and military, as well as other detainees held in that facility.
Detainees in SIZO-2 are regularly subjected to beatings by guards, suffer from severe food shortages, and have little to no access to medical care or legal assistance. During interrogations, detainees face both psychological and physical coercion, including brutal beatings, electric shocks, and threats, with the aim of forcing them to confess to alleged war crimes, crimes of terrorism, or other offences all intended to crush resistance to Russia’s aggression against Ukraine. This treatment represents a serious violation or abuse of human rights and is a violation of the principle of rule of law. At least 15 detainees have died as a result of ill-treatment in the facility, including Ukrainian investigative journalist Victoria Volodymyrivna Roshchyna.
As Deputy Director for Security and Operational Work of SIZO-2, Andrey Mikhailichenko bears responsibility for the facility’s operations. He is therefore responsible for serious human rights violations, repression of civil society and for activities seriously undermining the rule of law in Russia.
20.11.2025 55. Andrey Sergeevich SAPITSKIY
(Андрей Сергеевич САПИЦКИЙ)
Position: Deputy Director for Personnel and Educational Work Issues of Pre-Trial Detention Centre No. 2 of the Main Directorate of the Federal Penitentiary Service for the Rostov Oblast, Russian Federation
Nationality: Russian
Gender: male
Andrey Sapitskiy, serves as Deputy Director for Personnel and Educational Work Issues of Pre-Trial Detention Centre No. 2 of the Main Directorate of the Federal Penitentiary Service for the Rostov Oblast (SIZO-2) in Taganrog, Russia. As a member of the management of SIZO-2, Sapitskiy is responsible for widespread and systematic torture and other cruel, inhuman, and degrading treatment of Ukrainian detainees, both civilian and military, as well as other detainees held in that facility.
Detainees in SIZO-2 are regularly subjected to beatings by guards, suffer from severe food shortages, and have little to no access to medical care or legal assistance. During interrogations, detainees face both psychological and physical coercion, including brutal beatings, electric shocks, and threats, with the aim of forcing them to confess to alleged war crimes, crimes of terrorism, or other offences all intended to crush resistance to Russia’s aggression against Ukraine. This treatment represents a serious violation or abuse of human rights and is a violation of the principle of rule of law. At least 15 detainees have died as a result of ill-treatment in the facility, including Ukrainian investigative journalist Victoria Volodymyrivna Roshchyna.
As Deputy Director for Personnel and Educational Work Issues of SIZO-2, Andrey Sapitskiy bears responsibility for the facility’s operations. He is therefore responsible for serious human rights violations, repression of civil society, and activities seriously undermining of rule of law in Russia.
20.11.2025 56. Aleksandr Aleksandrovich SHTODA
(Александр Александрович ШТОДА)
Position: Director of Pre-Trial Detention Centre No. 2 of the Main Directorate of the Federal Penitentiary Service for the Rostov Oblast, Russian Federation
DOB: 19.11.1980
Nationality: Russian
Passport number: series 6001 No419633
INN (Russian Tax ID): 611903638423
Aleksander Shtoda, serves as Director of Pre-Trial Detention Centre No. 2 of the Main Directorate of the Federal Penitentiary Service for the Rostov Oblast (SIZO-2) in Taganrog, Russia. Shtoda is responsible for widespread and systematic torture and other cruel, inhuman, and degrading treatment of Ukrainian detainees, both civilian and military, as well as other detainees held in the facility under his command.
Detainees in SIZO-2 are regularly subjected to beatings by guards, suffer from severe food shortages, and have little to no access to medical care or legal assistance. During interrogations, detainees face both psychological and physical coercion, including brutal beatings, electric shocks, and threats, with the aim of forcing them to confess to alleged war crimes, crimes of terrorism, or other offences all intended to crush resistance to Russia’s aggression against Ukraine. This treatment represents a serious violation or abuse of human rights and is a violation of the principle of rule of law. At least 15 detainees have died as a result of ill-treatment in the facility, including Ukrainian investigative journalist Victoria Volodymyrivna Roshchyna.
As Director of SIZO-2, Aleksander Shtoda holds authority over the facility’s operations. He is therefore responsible for serious human rights violations, repression of civil society, and activities seriously undermining the rule of law in Russia.
20.11.2025 57. Timur Savelevich VAKHRAMEEV
(Тимур Савельевич ВАХРАМЕЕВ)
Position: Judge of Basmanny District Court, Moscow; FormerMagistrate (Justice of the Peace) in Tagansky district of Moscow
DOB: 13.5.1990
Nationality: Russian
Gender: male
Timur Vakhrameev, a judge at the Basmanny District Court in Russia, has been involved in a number of politically motivated prosecution cases, imposing disproportionately harsh sentences on several individuals and extending the detention of others.
Judge Vakhrameev participated in the unjust and politically motivated prosecution of journalists Kirill Martynov and Dmitry Kolezev, as well as activist Lyusya Shtein, sentencing each of them to several years in prison in an effort to silence independent journalism and civil society in Russia. He also extended the pre-trial detention of lawyers Vadim Kobzev and Alexey Liptser, as well as journalists Konstantin Gabov and Sergei Karelin, in politically motivated cases related to crackdowns on individuals associated with the Anti-Corruption Foundation or Alexei Navalny himself. Additionally, he prolonged the pre-trial detention of Grigory Melkonyants, co-chairman of the Golos movement, Russia’s key independent election watchdog initiative, in an apparent attempt to exert additional pressure on public election monitoring in the country. In all of the aforementioned cases, controversial articles of the Russian Criminal Code on undesirable organisations, discrediting the Russian army, or extremism were applied.
Moreover, earlier in 2023, while serving as a justice of the peace in Moscow’s Tagansky District, Timur Vakhrameev also played an active role in penalising international companies such as Wikimedia and Google for failing to remove factual information about Russia’s war of aggression against Ukraine.
Timur Vakhrameev is therefore responsible for serious human rights violations, the repression of civil society and democratic opposition and activities seriously undermining democracy and the rule of law in Russia.
20.11.2025 58. Artemy Alexeevich TELMINOV
(Артемий Алексеевич ТЕЛЬМИНОВ)
Position: Investigator of the Investigative Committee of the Russian Federation
DOB: 30.12.1994
Nationality: Russian
Gender: male
Artemy Telminov serves as an Investigator of the Investigative Committee of the Russian Federation, and has been involved in a number of politically motivated prosecutions of individuals associated with Alexei Navalny, including, journalists Antonina Favorskaya, Olga Komleva, Konstantin Gabov, and Sergey Karelin, as well as lawyers Vadim Kobzev, Alexei Liptser, and Igor Sergunin. By advocating for the imposition or extension of their detention, he has actively contributed to the Russian regime’s efforts to suppress dissent within the country.
All of the individuals mentioned above were investigated and subsequently charged with participation in an extremist community or organisation, or with involvement in its activities. In reality, these charges were based solely on their lawful actions while associated with Alexei Navalny and his Anti-Corruption Foundation. The misuse of legislation related to terrorism and extremism to suppress political opposition and peaceful civil society efforts linked to Navalny has become a widespread practice in Russia. All of the aforementioned cases exhibit a consistent pattern of politically motivated prosecution, including prolonged pre-trial detention and, in some instances, closed court proceedings.
Artemy Telminov’s active role in orchestrating the unjust prosecution of Antonina Favorskaya, Olga Komleva, Konstantin Gabov, Sergey Karelin, Vadim Kobzev, Alexei Liptser, and Igor Sergunin constitutes a grave violation of human rights. Therefore, he is directly responsible for serious human rights abuses and for the repression of civil society and democratic opposition in Russia.
20.11.2025 59. Boris Ashirbaevich KOZHEVNIKOV
(Борис Аширбаевич КОЖЕВНИКОВ)
Position: Deputy Chairman of the Appellate Military Court of Russia
DOB: 31.8.1964
Nationality: Russian
Gender: male
Boris Kozhevnikov is a Deputy Chairman of the Appellate Military Court of Russia.
As deputy chairman of the Appellate Military Court of Russia, Boris Kozhevnikov rejected the appeal of Alexei Gorinov, a former municipal deputy in the Krasnoselsky district of Moscow, against a politically motivated sentence. In a procedurally flawed trial, Alexei Gorinov was sentenced to three years’ imprisonment in a strict regime penal colony under Article 205.2 of the Russian Criminal Code for “justification of terrorism”. Alexei Gorinov’s sentence was based on statements he made in a conversation with his cellmates in which he allegedly recognised that Crimea was Ukrainian territory and the Azov regiment was part of the Ukrainian army. Furthermore, Kozhevnikov upheld the sentences of imprisonment for Andrei Boyarshinov, Ibragim Orudzhev, Alexei Nuriev and Roman Nasryev on politically motivated charges in alleged terrorism related cases.
Therefore, Boris Kozhevnikov is responsible for serious violations of human rights, including violating freedom of opinion and expression, for the repression of civil society and democratic opposition, and for activities which seriously undermine the rule of law in Russia.
20.11.2025 60. Maxim Alexandrovich PANIN
(Максим Александрович ПАНИН)
Position: Judge of the Appellate Military Court of Russia (Judicial Panel for Criminal Cases)
DOB: 22.2.1982
Nationality: Russian
Gender: male
Maksim Panin is a judge of the Appellate Military Court of Russia.
As a member of the panel of judges of the Appellate Military Court of Russia, Maksim Panin rejected the appeal of Alexei Gorinov, a former municipal deputy in the Krasnoselsky district of Moscow, against a politically motivated sentence. In a procedurally flawed trial, Alexei Gorinov was sentenced to three years’ imprisonment in a strict regime colony under Article 205.2 of the Russian Criminal Code for “justification of terrorism”. Alexei Gorinov’s sentence was based on statements he made in a conversation with his cellmates in which he allegedly recognised that Crimea was Ukrainian territory and the Azov regiment was part of the Ukrainian army.
Furthermore, Panin participated in politically motivated prosecutions of other individuals. As a member of the appellate panel, he upheld the conviction of Elena Kotenochkina, who was accused of “justifying terrorism” through a social media post and sentenced, in absentia, to six years and eleven months in a penal colony. Panin also confirmed the extension of the detention period in the cases of Polina Yevtushenko, prosecuted for spreading “fake news” about the Russian army and “rehabilitation of Nazism”, and Enver Krosh, Rinat Aliev and Vilen Temeryanov, Crimean Tatars prosecuted for their alleged involvement in an Islamic group banned in Russia.
Therefore, Maksim Panin is responsible for serious violations of human rights, including violating freedom of opinion and expression, for the repression of civil society and democratic opposition, and for activities which seriously undermine the rule of law in Russia.
20.11.2025 61. Marina Viktorovna USHAKOVA
(Марина Викторовна УШАКОВА)
Position: Judge of the Appellate Military Court of Russia (Judicial Panel for Criminal Cases)
DOB: 2.5.1979
Nationality: Russian
Gender: female
Marina Ushakova is a judge of the Appellate Military Court of Russia.
As a member of the appellate panel of judges of the Appellate Military Court of Russia, Marina Ushakova rejected the appeal of Alexei Gorinov, a former municipal deputy in the Krasnoselsky district of Moscow, against a politically motivated sentence. In a procedurally flawed trial, Alexei. Gorinov was sentenced to three years’ imprisonment in a strict regime colony under Article 205.2 of the Russian Criminal Code for “justification of terrorism”. Alexei Gorinov’s sentence was based on statements he made in a conversation with his cellmates in which he allegedly recognised that Crimea was Ukrainian territory and the Azov regiment was part of the Ukrainian army. Furthermore, Ushakova upheld the convictions of Nikita Tushkanov, Daniil Bondarenko and Stanislav Shevchenko, based on politically motivated charges of “justifying terrorism” in their statements on social media or in private conversations regarding, in particular, the Crimean Bridge explosion.
Therefore, Marina Ushakova is responsible for serious violations of human rights, including violating freedom of opinion and expression, for the repression of civil society and democratic opposition, and for activities which seriously undermine the rule of law in Russia.
20.11.2025 62. Svetlana Sergeevna RYGALOVA
(Светлана Сергеевна РЫГАЛОВА)
Position: Prosecutor of the Criminal Judicial Department of the Prosecutor’s Office of Vladimir Region, Junior Justice Counsellor
Nationality: Russian
Gender: female
Svetlana Rygalova, serving as a prosecutor of the Prosecutor’s Office of the Vladimir Region, participated in the politically motivated prosecution of Alexei Gorinov, a former municipal deputy in the Krasnoselsky district of Moscow, for expressing his opinion related to Russia’s war of aggression against Ukraine.
Prosecutor Rygalova approved the indictment in a criminal case and led the prosecution of Alexei Gorinov under Article 205.2 of the Russian Criminal Code for “justification of terrorism”, proposing that he be sentenced to three and a half years of imprisonment. The prosecution’s case was based on statements Gorinov made in a conversation with his cellmates in which he allegedely recognised that Crimea was Ukrainian territory and the Azov regiment was part of the Ukrainian army. On the basis of Rygalova’s indictment, Gorinov was sentenced to three years of imprisonment.
Therefore, Svetlana Rygalova is responsible for serious violations of human rights, including violating freedom of opinion and expression, for the repression of civil society and democratic opposition, and for activities seriously undermining the rule of law in Russia.
20.11.2025’

Commission Implementing Decision (EU) 2025/2355 of 13 November 2025 amending Implementing Decision (EU) 2019/450 as regards the publication of references of European Assessment Documents for balcony and terrace glazing systems without vertical frames and external thermal insulation composite systems with rendering system and other construction products

Official Journalof the European Union ENL series
2025/2355 20.11.2025
(1) In accordance with Article 19 of Regulation (EU) No 305/2011, following requests by manufacturers for European Technical Assessments, the organisation of Technical Assessment Bodies has adopted 66 European Assessment Documents.
(2) The 66 European Assessment Documents relate to the following references for construction products:—balcony and terrace glazing systems without vertical frames (superseding technical specification ‘EAD 020002-00-0404’);—external thermal insulation composite systems with rendering system (superseding technical specification ‘EAD 040083-00-0404’);—factory-made products of extruded, foamed polyethylene terephthalate for thermal insulation;—veture kits – prefabricated units for external wall insulation and their fixing devices (superseding technical specification ‘EAD 040914-00-0404’);—kits made of insulation boards with protective finishing for inverted roofs;—pre-wall mounting kits for windows and doors;—thermal insulation elements of fibre-reinforced polymer which form a thermal break between structural elements;—load-bearing thermal insulation elements which form a thermal break between balconies and internal floors (superseding technical specification ‘EAD 050001-00-0301’);—spherical and cylindrical bearings with special sliding material made of ultra-high-molecular-weight polyethylene (superseding technical specification ‘EAD 050004-00-0301’);—spherical and cylindrical bearings with special sliding material made of fluoropolymer (superseding technical specification ‘EAD 050009-00-0301’);—pre-assembled drainage panels made of gabions and geotextile;—kits composed by subframe and fixings for fastening claddings and external wall elements (superseding technical specification ‘EAD 090034-00-0404’);—variant: kits for external wall claddings mechanically fixed – extension of scope;—glass-ceramic panels for external cladding;—full-bodied sintered stone slabs for use in claddings, floorings, pavings, stairs, rainscreens and curtain walling kits;—kits for self-supporting and interconnected ventilated cavity walls;—wood-based composite panel for facades;—rigid seismic sway brace for fire sprinkler pipe work;—flexible plug expansion joints for road bridges with flexible filling based on a synthetic polymer as binder (superseding technical specification ‘EAD 120011-00-0107’);—wood and metal lighting columns;—glued laminated veneer lumber;—glulam strengthened by laminated veneer lumber, glued laminated veneer lumber made of finger-jointed laminations and block-glued glulam made thereof;—special cements – carbonation hardening cements requiring a particular curing process;—blended cements with high filler content, ground granulated blast-furnace slag or pozzolanic material or both, and clinker;—kits for the strengthening of concrete elements by externally bonded and near-surface-mounted carbon fibre-reinforced polymer strips (superseding technical specification ‘EAD 160086-00-0301’);—couplers for mechanical splices of reinforcing steel bars (superseding technical specification ‘EAD 160129-00-0301’);—stud connectors for anchoring in reinforced concrete members as well as for connecting steel members with reinforced concrete members;—compressed solid earth blocks with or without lime or cement and wall kits made of these blocks and natural hydraulic lime mortar;—column shoes for structural connections of reinforced concrete columns;—structural hollow sections of weathering steel;—fiber ropes with end connectors;—thin metal composite sheets (superseding technical specification ‘EAD 210046-00-1201’);—variant: assessment of components for wood-based composite panels not produced by the manufacturers themselves;—non-load-bearing polyvinyl chloride panels for internal and external walls;—low-bitumen-mass shingles, laminated or not, with mineral or synthetic reinforcement (superseding technical specification ‘EAD 220020-00-0402’);—fastening screws with welded or cold-formed set screws;—fixing clips and sliding clips for double standing seam roof;—variant: road marking products – extension of scope;—variant: compound for bitumen and bituminous mixtures based on crumb rubber powder – extension of scope;—stone wool elements used for large-scale water storage in civil works;—adhesives for wall claddings;—products for installation systems for supporting technical building equipment;—variant: anchor channels under fatigue cyclic shear with different lower load level;—variant: anchor channels for controlled impact screwdrivers;—mechanical fasteners for use in concrete (superseding technical specification ‘EAD 330232-01-0601’);—post–installed fasteners in concrete under fatigue cyclic loading (superseding technical specification ‘EAD 330250-00-0601’);—variant: plastic anchors for redundant non-structural systems in concrete and masonry, and for fixing façade claddings through angle brackets under seismic actions in concrete and masonry;—screw anchors for use in masonry;—variant: cast-in anchor bolts under fatigue or seismic actions;—high-strength structural bolting assemblies for hydraulically operated, friction-less and torsion-free tightening;—anchor devices for fastening personal fall protection systems to timber substructures (superseding technical specification ‘EAD 331846-00-0603’);—distance-fixing systems for use in concrete and masonry;—kits for connection of precast concrete façade elements to concrete structures based on anchor channels;—support fixing assemblies;—point fastening kits for roof panels;—anchor devices for fastening personal fall protection systems to steel or aluminium trapezoidal sheeting substructures;—permanent insulating shuttering kits for whole buildings;—load-bearing sandwich panels with foam or polymeric core and skins of structural cement bonded particle boards;—earthquake-resistant kits composed of steel-concrete composite beams, columns and beam-column joints;—variant: non-load-bearing permanent shuttering kits or systems based on hollow blocks or panels of insulating materials and sometimes concrete: hollow blocks resistant to seismic actions;—fibre-reinforced polymer kits made of a pultruded carbon fibre laminate and an epoxy adhesive;—fibre-reinforced polymer kits made of a carbon or glass fabric and an epoxy resin;—structural steel composite wall panels for building systems;—high load-bearing and low load-bearing single anchor earth retaining structures made of steel;—fire-resistant reactive air transfer grilles;—caps with intumescent inlay for recessed luminaires in fire-resistant suspended ceilings. — balcony and terrace glazing systems without vertical frames (superseding technical specification ‘EAD 020002-00-0404’); — external thermal insulation composite systems with rendering system (superseding technical specification ‘EAD 040083-00-0404’); — factory-made products of extruded, foamed polyethylene terephthalate for thermal insulation; — veture kits – prefabricated units for external wall insulation and their fixing devices (superseding technical specification ‘EAD 040914-00-0404’); — kits made of insulation boards with protective finishing for inverted roofs; — pre-wall mounting kits for windows and doors; — thermal insulation elements of fibre-reinforced polymer which form a thermal break between structural elements; — load-bearing thermal insulation elements which form a thermal break between balconies and internal floors (superseding technical specification ‘EAD 050001-00-0301’); — spherical and cylindrical bearings with special sliding material made of ultra-high-molecular-weight polyethylene (superseding technical specification ‘EAD 050004-00-0301’); — spherical and cylindrical bearings with special sliding material made of fluoropolymer (superseding technical specification ‘EAD 050009-00-0301’); — pre-assembled drainage panels made of gabions and geotextile; — kits composed by subframe and fixings for fastening claddings and external wall elements (superseding technical specification ‘EAD 090034-00-0404’); — variant: kits for external wall claddings mechanically fixed – extension of scope; — glass-ceramic panels for external cladding; — full-bodied sintered stone slabs for use in claddings, floorings, pavings, stairs, rainscreens and curtain walling kits; — kits for self-supporting and interconnected ventilated cavity walls; — wood-based composite panel for facades; — rigid seismic sway brace for fire sprinkler pipe work; — flexible plug expansion joints for road bridges with flexible filling based on a synthetic polymer as binder (superseding technical specification ‘EAD 120011-00-0107’); — wood and metal lighting columns; — glued laminated veneer lumber; — glulam strengthened by laminated veneer lumber, glued laminated veneer lumber made of finger-jointed laminations and block-glued glulam made thereof; — special cements – carbonation hardening cements requiring a particular curing process; — blended cements with high filler content, ground granulated blast-furnace slag or pozzolanic material or both, and clinker; — kits for the strengthening of concrete elements by externally bonded and near-surface-mounted carbon fibre-reinforced polymer strips (superseding technical specification ‘EAD 160086-00-0301’); — couplers for mechanical splices of reinforcing steel bars (superseding technical specification ‘EAD 160129-00-0301’); — stud connectors for anchoring in reinforced concrete members as well as for connecting steel members with reinforced concrete members; — compressed solid earth blocks with or without lime or cement and wall kits made of these blocks and natural hydraulic lime mortar; — column shoes for structural connections of reinforced concrete columns; — structural hollow sections of weathering steel; — fiber ropes with end connectors; — thin metal composite sheets (superseding technical specification ‘EAD 210046-00-1201’); — variant: assessment of components for wood-based composite panels not produced by the manufacturers themselves; — non-load-bearing polyvinyl chloride panels for internal and external walls; — low-bitumen-mass shingles, laminated or not, with mineral or synthetic reinforcement (superseding technical specification ‘EAD 220020-00-0402’); — fastening screws with welded or cold-formed set screws; — fixing clips and sliding clips for double standing seam roof; — variant: road marking products – extension of scope; — variant: compound for bitumen and bituminous mixtures based on crumb rubber powder – extension of scope; — stone wool elements used for large-scale water storage in civil works; — adhesives for wall claddings; — products for installation systems for supporting technical building equipment; — variant: anchor channels under fatigue cyclic shear with different lower load level; — variant: anchor channels for controlled impact screwdrivers; — mechanical fasteners for use in concrete (superseding technical specification ‘EAD 330232-01-0601’); — post–installed fasteners in concrete under fatigue cyclic loading (superseding technical specification ‘EAD 330250-00-0601’); — variant: plastic anchors for redundant non-structural systems in concrete and masonry, and for fixing façade claddings through angle brackets under seismic actions in concrete and masonry; — screw anchors for use in masonry; — variant: cast-in anchor bolts under fatigue or seismic actions; — high-strength structural bolting assemblies for hydraulically operated, friction-less and torsion-free tightening; — anchor devices for fastening personal fall protection systems to timber substructures (superseding technical specification ‘EAD 331846-00-0603’); — distance-fixing systems for use in concrete and masonry; — kits for connection of precast concrete façade elements to concrete structures based on anchor channels; — support fixing assemblies; — point fastening kits for roof panels; — anchor devices for fastening personal fall protection systems to steel or aluminium trapezoidal sheeting substructures; — permanent insulating shuttering kits for whole buildings; — load-bearing sandwich panels with foam or polymeric core and skins of structural cement bonded particle boards; — earthquake-resistant kits composed of steel-concrete composite beams, columns and beam-column joints; — variant: non-load-bearing permanent shuttering kits or systems based on hollow blocks or panels of insulating materials and sometimes concrete: hollow blocks resistant to seismic actions; — fibre-reinforced polymer kits made of a pultruded carbon fibre laminate and an epoxy adhesive; — fibre-reinforced polymer kits made of a carbon or glass fabric and an epoxy resin; — structural steel composite wall panels for building systems; — high load-bearing and low load-bearing single anchor earth retaining structures made of steel; — fire-resistant reactive air transfer grilles; — caps with intumescent inlay for recessed luminaires in fire-resistant suspended ceilings.
— balcony and terrace glazing systems without vertical frames (superseding technical specification ‘EAD 020002-00-0404’);
— external thermal insulation composite systems with rendering system (superseding technical specification ‘EAD 040083-00-0404’);
— factory-made products of extruded, foamed polyethylene terephthalate for thermal insulation;
— veture kits – prefabricated units for external wall insulation and their fixing devices (superseding technical specification ‘EAD 040914-00-0404’);
— kits made of insulation boards with protective finishing for inverted roofs;
— pre-wall mounting kits for windows and doors;
— thermal insulation elements of fibre-reinforced polymer which form a thermal break between structural elements;
— load-bearing thermal insulation elements which form a thermal break between balconies and internal floors (superseding technical specification ‘EAD 050001-00-0301’);
— spherical and cylindrical bearings with special sliding material made of ultra-high-molecular-weight polyethylene (superseding technical specification ‘EAD 050004-00-0301’);
— spherical and cylindrical bearings with special sliding material made of fluoropolymer (superseding technical specification ‘EAD 050009-00-0301’);
— pre-assembled drainage panels made of gabions and geotextile;
— kits composed by subframe and fixings for fastening claddings and external wall elements (superseding technical specification ‘EAD 090034-00-0404’);
— variant: kits for external wall claddings mechanically fixed – extension of scope;
— glass-ceramic panels for external cladding;
— full-bodied sintered stone slabs for use in claddings, floorings, pavings, stairs, rainscreens and curtain walling kits;
— kits for self-supporting and interconnected ventilated cavity walls;
— wood-based composite panel for facades;
— rigid seismic sway brace for fire sprinkler pipe work;
— flexible plug expansion joints for road bridges with flexible filling based on a synthetic polymer as binder (superseding technical specification ‘EAD 120011-00-0107’);
— wood and metal lighting columns;
— glued laminated veneer lumber;
— glulam strengthened by laminated veneer lumber, glued laminated veneer lumber made of finger-jointed laminations and block-glued glulam made thereof;
— special cements – carbonation hardening cements requiring a particular curing process;
— blended cements with high filler content, ground granulated blast-furnace slag or pozzolanic material or both, and clinker;
— kits for the strengthening of concrete elements by externally bonded and near-surface-mounted carbon fibre-reinforced polymer strips (superseding technical specification ‘EAD 160086-00-0301’);
— couplers for mechanical splices of reinforcing steel bars (superseding technical specification ‘EAD 160129-00-0301’);
— stud connectors for anchoring in reinforced concrete members as well as for connecting steel members with reinforced concrete members;
— compressed solid earth blocks with or without lime or cement and wall kits made of these blocks and natural hydraulic lime mortar;
— column shoes for structural connections of reinforced concrete columns;
— structural hollow sections of weathering steel;
— fiber ropes with end connectors;
— thin metal composite sheets (superseding technical specification ‘EAD 210046-00-1201’);
— variant: assessment of components for wood-based composite panels not produced by the manufacturers themselves;
— non-load-bearing polyvinyl chloride panels for internal and external walls;
— low-bitumen-mass shingles, laminated or not, with mineral or synthetic reinforcement (superseding technical specification ‘EAD 220020-00-0402’);
— fastening screws with welded or cold-formed set screws;
— fixing clips and sliding clips for double standing seam roof;
— variant: road marking products – extension of scope;
— variant: compound for bitumen and bituminous mixtures based on crumb rubber powder – extension of scope;
— stone wool elements used for large-scale water storage in civil works;
— adhesives for wall claddings;
— products for installation systems for supporting technical building equipment;
— variant: anchor channels under fatigue cyclic shear with different lower load level;
— variant: anchor channels for controlled impact screwdrivers;
— mechanical fasteners for use in concrete (superseding technical specification ‘EAD 330232-01-0601’);
— post–installed fasteners in concrete under fatigue cyclic loading (superseding technical specification ‘EAD 330250-00-0601’);
— variant: plastic anchors for redundant non-structural systems in concrete and masonry, and for fixing façade claddings through angle brackets under seismic actions in concrete and masonry;
— screw anchors for use in masonry;
— variant: cast-in anchor bolts under fatigue or seismic actions;
— high-strength structural bolting assemblies for hydraulically operated, friction-less and torsion-free tightening;
— anchor devices for fastening personal fall protection systems to timber substructures (superseding technical specification ‘EAD 331846-00-0603’);
— distance-fixing systems for use in concrete and masonry;
— kits for connection of precast concrete façade elements to concrete structures based on anchor channels;
— support fixing assemblies;
— point fastening kits for roof panels;
— anchor devices for fastening personal fall protection systems to steel or aluminium trapezoidal sheeting substructures;
— permanent insulating shuttering kits for whole buildings;
— load-bearing sandwich panels with foam or polymeric core and skins of structural cement bonded particle boards;
— earthquake-resistant kits composed of steel-concrete composite beams, columns and beam-column joints;
— variant: non-load-bearing permanent shuttering kits or systems based on hollow blocks or panels of insulating materials and sometimes concrete: hollow blocks resistant to seismic actions;
— fibre-reinforced polymer kits made of a pultruded carbon fibre laminate and an epoxy adhesive;
— fibre-reinforced polymer kits made of a carbon or glass fabric and an epoxy resin;
— structural steel composite wall panels for building systems;
— high load-bearing and low load-bearing single anchor earth retaining structures made of steel;
— fire-resistant reactive air transfer grilles;
— caps with intumescent inlay for recessed luminaires in fire-resistant suspended ceilings.
— balcony and terrace glazing systems without vertical frames (superseding technical specification ‘EAD 020002-00-0404’);
— external thermal insulation composite systems with rendering system (superseding technical specification ‘EAD 040083-00-0404’);
— factory-made products of extruded, foamed polyethylene terephthalate for thermal insulation;
— veture kits – prefabricated units for external wall insulation and their fixing devices (superseding technical specification ‘EAD 040914-00-0404’);
— kits made of insulation boards with protective finishing for inverted roofs;
— pre-wall mounting kits for windows and doors;
— thermal insulation elements of fibre-reinforced polymer which form a thermal break between structural elements;
— load-bearing thermal insulation elements which form a thermal break between balconies and internal floors (superseding technical specification ‘EAD 050001-00-0301’);
— spherical and cylindrical bearings with special sliding material made of ultra-high-molecular-weight polyethylene (superseding technical specification ‘EAD 050004-00-0301’);
— spherical and cylindrical bearings with special sliding material made of fluoropolymer (superseding technical specification ‘EAD 050009-00-0301’);
— pre-assembled drainage panels made of gabions and geotextile;
— kits composed by subframe and fixings for fastening claddings and external wall elements (superseding technical specification ‘EAD 090034-00-0404’);
— variant: kits for external wall claddings mechanically fixed – extension of scope;
— glass-ceramic panels for external cladding;
— full-bodied sintered stone slabs for use in claddings, floorings, pavings, stairs, rainscreens and curtain walling kits;
— kits for self-supporting and interconnected ventilated cavity walls;
— wood-based composite panel for facades;
— rigid seismic sway brace for fire sprinkler pipe work;
— flexible plug expansion joints for road bridges with flexible filling based on a synthetic polymer as binder (superseding technical specification ‘EAD 120011-00-0107’);
— wood and metal lighting columns;
— glued laminated veneer lumber;
— glulam strengthened by laminated veneer lumber, glued laminated veneer lumber made of finger-jointed laminations and block-glued glulam made thereof;
— special cements – carbonation hardening cements requiring a particular curing process;
— blended cements with high filler content, ground granulated blast-furnace slag or pozzolanic material or both, and clinker;
— kits for the strengthening of concrete elements by externally bonded and near-surface-mounted carbon fibre-reinforced polymer strips (superseding technical specification ‘EAD 160086-00-0301’);
— couplers for mechanical splices of reinforcing steel bars (superseding technical specification ‘EAD 160129-00-0301’);
— stud connectors for anchoring in reinforced concrete members as well as for connecting steel members with reinforced concrete members;
— compressed solid earth blocks with or without lime or cement and wall kits made of these blocks and natural hydraulic lime mortar;
— column shoes for structural connections of reinforced concrete columns;
— structural hollow sections of weathering steel;
— fiber ropes with end connectors;
— thin metal composite sheets (superseding technical specification ‘EAD 210046-00-1201’);
— variant: assessment of components for wood-based composite panels not produced by the manufacturers themselves;
— non-load-bearing polyvinyl chloride panels for internal and external walls;
— low-bitumen-mass shingles, laminated or not, with mineral or synthetic reinforcement (superseding technical specification ‘EAD 220020-00-0402’);
— fastening screws with welded or cold-formed set screws;
— fixing clips and sliding clips for double standing seam roof;
— variant: road marking products – extension of scope;
— variant: compound for bitumen and bituminous mixtures based on crumb rubber powder – extension of scope;
— stone wool elements used for large-scale water storage in civil works;
— adhesives for wall claddings;
— products for installation systems for supporting technical building equipment;
— variant: anchor channels under fatigue cyclic shear with different lower load level;
— variant: anchor channels for controlled impact screwdrivers;
— mechanical fasteners for use in concrete (superseding technical specification ‘EAD 330232-01-0601’);
— post–installed fasteners in concrete under fatigue cyclic loading (superseding technical specification ‘EAD 330250-00-0601’);
— variant: plastic anchors for redundant non-structural systems in concrete and masonry, and for fixing façade claddings through angle brackets under seismic actions in concrete and masonry;
— screw anchors for use in masonry;
— variant: cast-in anchor bolts under fatigue or seismic actions;
— high-strength structural bolting assemblies for hydraulically operated, friction-less and torsion-free tightening;
— anchor devices for fastening personal fall protection systems to timber substructures (superseding technical specification ‘EAD 331846-00-0603’);
— distance-fixing systems for use in concrete and masonry;
— kits for connection of precast concrete façade elements to concrete structures based on anchor channels;
— support fixing assemblies;
— point fastening kits for roof panels;
— anchor devices for fastening personal fall protection systems to steel or aluminium trapezoidal sheeting substructures;
— permanent insulating shuttering kits for whole buildings;
— load-bearing sandwich panels with foam or polymeric core and skins of structural cement bonded particle boards;
— earthquake-resistant kits composed of steel-concrete composite beams, columns and beam-column joints;
— variant: non-load-bearing permanent shuttering kits or systems based on hollow blocks or panels of insulating materials and sometimes concrete: hollow blocks resistant to seismic actions;
— fibre-reinforced polymer kits made of a pultruded carbon fibre laminate and an epoxy adhesive;
— fibre-reinforced polymer kits made of a carbon or glass fabric and an epoxy resin;
— structural steel composite wall panels for building systems;
— high load-bearing and low load-bearing single anchor earth retaining structures made of steel;
— fire-resistant reactive air transfer grilles;
— caps with intumescent inlay for recessed luminaires in fire-resistant suspended ceilings.
(3) The 66 European Assessment Documents satisfy the basic requirements for construction works set out in Annex I to Regulation (EU) No 305/2011. It is therefore appropriate to publish the references to those European Assessment Documents in theOfficial Journal of the European Union.
(4) The list of references to European Assessment Documents for construction products is published pursuant to Commission Implementing Decision (EU) 2019/450(2). For reasons of clarity, references to new European Assessment Documents should be added to that list.
(5) Implementing Decision (EU) 2019/450 should therefore be amended accordingly.
(6) In order to enable the use of the 66 European Assessment Documents as early as possible, so that the manufacturers already holding a European Technical Assessment can place their product on the market, this Decision should enter into force on the day of its publication,
‘020002-01-0404 Balcony and terrace glazing systems without vertical frames (superseding technical specification ‘EAD 020002-00-0404’)’
‘040083-01-0404 External thermal insulation composite systems with rendering system (superseding technical specification ‘EAD 040083-00-0404’)’
‘040179-00-1201 Factory-made products of extruded, foamed polyethylene terephthalate for thermal insulation’
‘040914-01-0404 Veture kits – prefabricated units for external wall insulation and their fixing devices (superseding technical specification ‘EAD 040914-00-0404’)’
‘041827-00-0401 Kits made of insulation boards with protective finishing for inverted roofs’
‘041871-00-1201 Pre-wall mounting kits for windows and doors’
‘041877-00-0301 Thermal insulation elements of fibre-reinforced polymer which form a thermal break between structural elements’
‘050001-01-0301 Load-bearing thermal insulation elements which form a thermal break between balconies and internal floors (superseding technical specification ‘EAD 050001-00-0301’)’
‘050004-01-0301 Spherical and cylindrical bearings with special sliding material made of ultra-high-molecular-weight polyethylene (superseding technical specification ‘EAD 050004-00-0301’)’
‘050009-01-0301 Spherical and cylindrical bearings with special sliding material made of fluoropolymer (superseding technical specification ‘EAD 050009-00-0301’)’
‘080007-00-0101 Pre-assembled drainage panels made of gabions and geotextile’
‘090034-01-0404 Kits composed by subframe and fixings for fastening claddings and external wall elements (superseding technical specification ‘EAD 090034-00-0404’)’
‘090062-01-0404-v01 Variant: Kits for external wall claddings mechanically fixed – Extension of scope’
‘090074-00-0504 Glass-ceramic panels for external cladding’
‘090142-00-0404 Full-bodied sintered stone slabs for use in claddings, floorings, pavings, stairs, rainscreens and curtain walling kits’
‘090232-00-0404 Kits for self-supporting and interconnected ventilated cavity walls’
‘090240-00-0404 Wood-based composite panel for facades’
‘100005-00-1106 Rigid seismic sway brace for fire sprinkler pipe work’
‘120011-01-0107 Flexible plug expansion joints for road bridges with flexible filling based on a synthetic polymer as binder (superseding technical specification ‘EAD 120011-00-0107’)’
‘120017-00-0106 Wood and metal lighting columns’
‘130337-00-0304 Glued laminated veneer lumber’
‘130740-00-0304 Glulam strengthened by laminated veneer lumber, glued laminated veneer lumber made of finger-jointed laminations and block-glued glulam made thereof’
‘150035-00-0301 Special cements – Carbonation hardening cements requiring a particular curing process’
‘150080-00-0301 Blended cements with high filler content, ground granulated blast-furnace slag or pozzolanic material or both, and clinker’
‘160086-01-0301 Kits for the strengthening of concrete elements by externally bonded and near-surface-mounted carbon fibre-reinforced polymer strips (superseding technical specification ‘EAD 160086-00-0301’)’
‘160129-01-0301 Couplers for mechanical splices of reinforcing steel bars (superseding technical specification ‘EAD 160129-00-0301’)’
‘160202-00-0301 Stud connectors for anchoring in reinforced concrete members as well as for connecting steel members with reinforced concrete members’
‘170051-00-0305 Compressed solid earth blocks with or without lime or cement and wall kits made of these blocks and natural hydraulic lime mortar’
‘200102-00-0302 Column shoes for structural connections of reinforced concrete columns’
‘200116-00-0302 Structural hollow sections of weathering steel’
‘200379-00-0602 Fiber ropes with end connectors’
‘210046-01-1201 Thin metal composite sheets (superseding technical specification ‘EAD 210046-00-1201’)’
‘210058-00-0504-v01 Variant: Assessment of components for wood-based composite panels not produced by the manufacturers themselves’
‘210080-00-0505 Non-load-bearing polyvinyl chloride panels for internal and external walls’
‘220020-01-0402 Low-bitumen-mass shingles, laminated or not, with mineral or synthetic reinforcement (superseding technical specification ‘EAD 220020-00-0402’)’
‘220169-00-0402 Fastening screws with welded or cold-formed set screws’
‘220183-00-0402 Fixing clips and sliding clips for double standing seam roof’
‘230011-00-0106-v01 Variant: Road marking products – Extension of scope’
‘230145-00-0105-v01 Variant: Compound for bitumen and bituminous mixtures based on crumb rubber powder – Extension of scope’
‘230158-00-0101 Stone wool elements used for large-scale water storage in civil works’
‘250005-00-0606 Adhesives for wall claddings’
‘280016-00-0602 Products for installation systems for supporting technical building equipment’
‘330008-04-0601-v01 Variant: Anchor channels under fatigue cyclic shear with different lower load level’
‘330008-04-0601-v02 Variant: Anchor channels for controlled impact screwdrivers’
‘330232-02-0601 Mechanical fasteners for use in concrete (superseding technical specification ‘EAD 330232-01-0601’)’
‘330250-01-0601 Post–installed fasteners in concrete under fatigue cyclic loading (superseding technical specification ‘EAD 330250-00-0601’)’
‘330284-00-0604-v02 Variant: Plastic anchors for redundant non-structural systems in concrete and masonry, and for fixing façade claddings through angle brackets under seismic actions in concrete and masonry’
‘330460-00-0604 Screw anchors for use in masonry’
‘330924-01-0601-v01 Variant: Cast-in anchor bolts under fatigue or seismic actions’
‘331531-00-0602 High-strength structural bolting assemblies for hydraulically operated, friction-less and torsion-free tightening’
‘331846-01-0603 Anchor devices for fastening personal fall protection systems to timber substructures (superseding technical specification ‘EAD 331846-00-0603’)’
‘331985-00-0604 Distance-fixing systems for use in concrete and masonry’
‘332699-00-0601 Kits for connection of precast concrete façade elements to concrete structures based on anchor channels’
‘332707-00-0602 Support fixing assemblies’
‘333915-00-0601 Point fastening kits for roof panels’
‘334812-00-0602 Anchor devices for fastening personal fall protection systems to steel or aluminium trapezoidal sheeting substructures’
‘340024-00-0103 Permanent insulating shuttering kits for whole buildings’
‘340282-00-0303 Load-bearing sandwich panels with foam or polymeric core and skins of structural cement bonded particle boards’
‘340292-00-0303 Earthquake-resistant kits composed of steel-concrete composite beams, columns and beam-column joints’
‘340309-00-0305-v01 Variant: Non-load-bearing permanent shuttering kits or systems based on hollow blocks or panels of insulating materials and sometimes concrete: hollow blocks resistant to seismic actions’
‘340351-00-0104 Fibre-reinforced polymer kits made of a pultruded carbon fibre laminate and an epoxy adhesive’
‘340352-00-0104 Fibre-reinforced polymer kits made of a carbon or glass fabric and an epoxy resin’
‘340549-00-0204 Structural steel composite wall panels for building systems’
‘340739-00-0106 High load-bearing and low load-bearing single anchor earth retaining structures made of steel’
‘351141-00-1104 Fire-resistant reactive air transfer grilles’
‘351281-00-1104 Caps with intumescent inlay for recessed luminaires in fire-resistant suspended ceilings.’
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) No 305/2011 of the European Parliament and of the Council of 9 March 2011 laying down harmonised conditions for the marketing of construction products and repealing Council Directive 89/106/EEC (1), and in particular Article 22 thereof,
Whereas:
(1) In accordance with Article 19 of Regulation (EU) No 305/2011, following requests by manufacturers for European Technical Assessments, the organisation of Technical Assessment Bodies has adopted 66 European Assessment Documents.
(2) The 66 European Assessment Documents relate to the following references for construction products:
—
balcony and terrace glazing systems without vertical frames (superseding technical specification ‘EAD 020002-00-0404’);
—
external thermal insulation composite systems with rendering system (superseding technical specification ‘EAD 040083-00-0404’);
—
factory-made products of extruded, foamed polyethylene terephthalate for thermal insulation;
—
veture kits – prefabricated units for external wall insulation and their fixing devices (superseding technical specification ‘EAD 040914-00-0404’);
—
kits made of insulation boards with protective finishing for inverted roofs;
—
pre-wall mounting kits for windows and doors;
—
thermal insulation elements of fibre-reinforced polymer which form a thermal break between structural elements;
—
load-bearing thermal insulation elements which form a thermal break between balconies and internal floors (superseding technical specification ‘EAD 050001-00-0301’);
—
spherical and cylindrical bearings with special sliding material made of ultra-high-molecular-weight polyethylene (superseding technical specification ‘EAD 050004-00-0301’);
—
spherical and cylindrical bearings with special sliding material made of fluoropolymer (superseding technical specification ‘EAD 050009-00-0301’);
—
pre-assembled drainage panels made of gabions and geotextile;
—
kits composed by subframe and fixings for fastening claddings and external wall elements (superseding technical specification ‘EAD 090034-00-0404’);
—
variant: kits for external wall claddings mechanically fixed – extension of scope;
—
glass-ceramic panels for external cladding;
—
full-bodied sintered stone slabs for use in claddings, floorings, pavings, stairs, rainscreens and curtain walling kits;
—
kits for self-supporting and interconnected ventilated cavity walls;
—
wood-based composite panel for facades;
—
rigid seismic sway brace for fire sprinkler pipe work;
—
flexible plug expansion joints for road bridges with flexible filling based on a synthetic polymer as binder (superseding technical specification ‘EAD 120011-00-0107’);
—
wood and metal lighting columns;
—
glued laminated veneer lumber;
—
glulam strengthened by laminated veneer lumber, glued laminated veneer lumber made of finger-jointed laminations and block-glued glulam made thereof;
—
special cements – carbonation hardening cements requiring a particular curing process;
—
blended cements with high filler content, ground granulated blast-furnace slag or pozzolanic material or both, and clinker;
—
kits for the strengthening of concrete elements by externally bonded and near-surface-mounted carbon fibre-reinforced polymer strips (superseding technical specification ‘EAD 160086-00-0301’);
—
couplers for mechanical splices of reinforcing steel bars (superseding technical specification ‘EAD 160129-00-0301’);
—
stud connectors for anchoring in reinforced concrete members as well as for connecting steel members with reinforced concrete members;
—
compressed solid earth blocks with or without lime or cement and wall kits made of these blocks and natural hydraulic lime mortar;
—
column shoes for structural connections of reinforced concrete columns;
—
structural hollow sections of weathering steel;
—
fiber ropes with end connectors;
—
thin metal composite sheets (superseding technical specification ‘EAD 210046-00-1201’);
—
variant: assessment of components for wood-based composite panels not produced by the manufacturers themselves;
—
non-load-bearing polyvinyl chloride panels for internal and external walls;
—
low-bitumen-mass shingles, laminated or not, with mineral or synthetic reinforcement (superseding technical specification ‘EAD 220020-00-0402’);
—
fastening screws with welded or cold-formed set screws;
—
fixing clips and sliding clips for double standing seam roof;
—
variant: road marking products – extension of scope;
—
variant: compound for bitumen and bituminous mixtures based on crumb rubber powder – extension of scope;
—
stone wool elements used for large-scale water storage in civil works;
—
adhesives for wall claddings;
—
products for installation systems for supporting technical building equipment;
—
variant: anchor channels under fatigue cyclic shear with different lower load level;
—
variant: anchor channels for controlled impact screwdrivers;
—
mechanical fasteners for use in concrete (superseding technical specification ‘EAD 330232-01-0601’);
—
post–installed fasteners in concrete under fatigue cyclic loading (superseding technical specification ‘EAD 330250-00-0601’);
—
variant: plastic anchors for redundant non-structural systems in concrete and masonry, and for fixing façade claddings through angle brackets under seismic actions in concrete and masonry;
—
screw anchors for use in masonry;
—
variant: cast-in anchor bolts under fatigue or seismic actions;
—
high-strength structural bolting assemblies for hydraulically operated, friction-less and torsion-free tightening;
—
anchor devices for fastening personal fall protection systems to timber substructures (superseding technical specification ‘EAD 331846-00-0603’);
—
distance-fixing systems for use in concrete and masonry;
—
kits for connection of precast concrete façade elements to concrete structures based on anchor channels;
—
support fixing assemblies;
—
point fastening kits for roof panels;
—
anchor devices for fastening personal fall protection systems to steel or aluminium trapezoidal sheeting substructures;
—
permanent insulating shuttering kits for whole buildings;
—
load-bearing sandwich panels with foam or polymeric core and skins of structural cement bonded particle boards;
—
earthquake-resistant kits composed of steel-concrete composite beams, columns and beam-column joints;
—
variant: non-load-bearing permanent shuttering kits or systems based on hollow blocks or panels of insulating materials and sometimes concrete: hollow blocks resistant to seismic actions;
—
fibre-reinforced polymer kits made of a pultruded carbon fibre laminate and an epoxy adhesive;
—
fibre-reinforced polymer kits made of a carbon or glass fabric and an epoxy resin;
—
structural steel composite wall panels for building systems;
—
high load-bearing and low load-bearing single anchor earth retaining structures made of steel;
—
fire-resistant reactive air transfer grilles;
—
caps with intumescent inlay for recessed luminaires in fire-resistant suspended ceilings.
(3) The 66 European Assessment Documents satisfy the basic requirements for construction works set out in Annex I to Regulation (EU) No 305/2011. It is therefore appropriate to publish the references to those European Assessment Documents in the Official Journal of the European Union.
(4) The list of references to European Assessment Documents for construction products is published pursuant to Commission Implementing Decision (EU) 2019/450 (2). For reasons of clarity, references to new European Assessment Documents should be added to that list.
(5) Implementing Decision (EU) 2019/450 should therefore be amended accordingly.
(6) In order to enable the use of the 66 European Assessment Documents as early as possible, so that the manufacturers already holding a European Technical Assessment can place their product on the market, this Decision should enter into force on the day of its publication,
HAS ADOPTED THIS DECISION:
The Annex to Implementing Decision (EU) 2019/450 is amended in accordance with the Annex to this Decision.
This Decision shall enter into force on the day of its publication in the Official Journal of the European Union.

In the Annex to Implementing Decision (EU) 2019/450, the following rows are inserted in sequential order following the order of the reference numbers:

‘020002-01-0404
Balcony and terrace glazing systems without vertical frames (superseding technical specification ‘EAD 020002-00-0404’)’
‘040083-01-0404
External thermal insulation composite systems with rendering system (superseding technical specification ‘EAD 040083-00-0404’)’
‘040179-00-1201
Factory-made products of extruded, foamed polyethylene terephthalate for thermal insulation’
‘040914-01-0404
Veture kits – prefabricated units for external wall insulation and their fixing devices (superseding technical specification ‘EAD 040914-00-0404’)’
‘041827-00-0401
Kits made of insulation boards with protective finishing for inverted roofs’
‘041871-00-1201
Pre-wall mounting kits for windows and doors’
‘041877-00-0301
Thermal insulation elements of fibre-reinforced polymer which form a thermal break between structural elements’
‘050001-01-0301
Load-bearing thermal insulation elements which form a thermal break between balconies and internal floors (superseding technical specification ‘EAD 050001-00-0301’)’
‘050004-01-0301
Spherical and cylindrical bearings with special sliding material made of ultra-high-molecular-weight polyethylene (superseding technical specification ‘EAD 050004-00-0301’)’
‘050009-01-0301
Spherical and cylindrical bearings with special sliding material made of fluoropolymer (superseding technical specification ‘EAD 050009-00-0301’)’
‘080007-00-0101
Pre-assembled drainage panels made of gabions and geotextile’
‘090034-01-0404
Kits composed by subframe and fixings for fastening claddings and external wall elements (superseding technical specification ‘EAD 090034-00-0404’)’
‘090062-01-0404-v01
Variant: Kits for external wall claddings mechanically fixed – Extension of scope’
‘090074-00-0504
Glass-ceramic panels for external cladding’
‘090142-00-0404
Full-bodied sintered stone slabs for use in claddings, floorings, pavings, stairs, rainscreens and curtain walling kits’
‘090232-00-0404
Kits for self-supporting and interconnected ventilated cavity walls’
‘090240-00-0404
Wood-based composite panel for facades’
‘100005-00-1106
Rigid seismic sway brace for fire sprinkler pipe work’
‘120011-01-0107
Flexible plug expansion joints for road bridges with flexible filling based on a synthetic polymer as binder (superseding technical specification ‘EAD 120011-00-0107’)’
‘120017-00-0106
Wood and metal lighting columns’
‘130337-00-0304
Glued laminated veneer lumber’
‘130740-00-0304
Glulam strengthened by laminated veneer lumber, glued laminated veneer lumber made of finger-jointed laminations and block-glued glulam made thereof’
‘150035-00-0301
Special cements – Carbonation hardening cements requiring a particular curing process’
‘150080-00-0301
Blended cements with high filler content, ground granulated blast-furnace slag or pozzolanic material or both, and clinker’
‘160086-01-0301
Kits for the strengthening of concrete elements by externally bonded and near-surface-mounted carbon fibre-reinforced polymer strips (superseding technical specification ‘EAD 160086-00-0301’)’
‘160129-01-0301
Couplers for mechanical splices of reinforcing steel bars (superseding technical specification ‘EAD 160129-00-0301’)’
‘160202-00-0301
Stud connectors for anchoring in reinforced concrete members as well as for connecting steel members with reinforced concrete members’
‘170051-00-0305
Compressed solid earth blocks with or without lime or cement and wall kits made of these blocks and natural hydraulic lime mortar’
‘200102-00-0302
Column shoes for structural connections of reinforced concrete columns’
‘200116-00-0302
Structural hollow sections of weathering steel’
‘200379-00-0602
Fiber ropes with end connectors’
‘210046-01-1201
Thin metal composite sheets (superseding technical specification ‘EAD 210046-00-1201’)’
‘210058-00-0504-v01
Variant: Assessment of components for wood-based composite panels not produced by the manufacturers themselves’
‘210080-00-0505
Non-load-bearing polyvinyl chloride panels for internal and external walls’
‘220020-01-0402
Low-bitumen-mass shingles, laminated or not, with mineral or synthetic reinforcement (superseding technical specification ‘EAD 220020-00-0402’)’
‘220169-00-0402
Fastening screws with welded or cold-formed set screws’
‘220183-00-0402
Fixing clips and sliding clips for double standing seam roof’
‘230011-00-0106-v01
Variant: Road marking products – Extension of scope’
‘230145-00-0105-v01
Variant: Compound for bitumen and bituminous mixtures based on crumb rubber powder – Extension of scope’
‘230158-00-0101
Stone wool elements used for large-scale water storage in civil works’
‘250005-00-0606
Adhesives for wall claddings’
‘280016-00-0602
Products for installation systems for supporting technical building equipment’
‘330008-04-0601-v01
Variant: Anchor channels under fatigue cyclic shear with different lower load level’
‘330008-04-0601-v02
Variant: Anchor channels for controlled impact screwdrivers’
‘330232-02-0601
Mechanical fasteners for use in concrete (superseding technical specification ‘EAD 330232-01-0601’)’
‘330250-01-0601
Post–installed fasteners in concrete under fatigue cyclic loading (superseding technical specification ‘EAD 330250-00-0601’)’
‘330284-00-0604-v02
Variant: Plastic anchors for redundant non-structural systems in concrete and masonry, and for fixing façade claddings through angle brackets under seismic actions in concrete and masonry’
‘330460-00-0604
Screw anchors for use in masonry’
‘330924-01-0601-v01
Variant: Cast-in anchor bolts under fatigue or seismic actions’
‘331531-00-0602
High-strength structural bolting assemblies for hydraulically operated, friction-less and torsion-free tightening’
‘331846-01-0603
Anchor devices for fastening personal fall protection systems to timber substructures (superseding technical specification ‘EAD 331846-00-0603’)’
‘331985-00-0604
Distance-fixing systems for use in concrete and masonry’
‘332699-00-0601
Kits for connection of precast concrete façade elements to concrete structures based on anchor channels’
‘332707-00-0602
Support fixing assemblies’
‘333915-00-0601
Point fastening kits for roof panels’
‘334812-00-0602
Anchor devices for fastening personal fall protection systems to steel or aluminium trapezoidal sheeting substructures’
‘340024-00-0103
Permanent insulating shuttering kits for whole buildings’
‘340282-00-0303
Load-bearing sandwich panels with foam or polymeric core and skins of structural cement bonded particle boards’
‘340292-00-0303
Earthquake-resistant kits composed of steel-concrete composite beams, columns and beam-column joints’
‘340309-00-0305-v01
Variant: Non-load-bearing permanent shuttering kits or systems based on hollow blocks or panels of insulating materials and sometimes concrete: hollow blocks resistant to seismic actions’
‘340351-00-0104
Fibre-reinforced polymer kits made of a pultruded carbon fibre laminate and an epoxy adhesive’
‘340352-00-0104
Fibre-reinforced polymer kits made of a carbon or glass fabric and an epoxy resin’
‘340549-00-0204
Structural steel composite wall panels for building systems’
‘340739-00-0106
High load-bearing and low load-bearing single anchor earth retaining structures made of steel’
‘351141-00-1104
Fire-resistant reactive air transfer grilles’
‘351281-00-1104
Caps with intumescent inlay for recessed luminaires in fire-resistant suspended ceilings.’

Council Decision (CFSP) 2025/2354 of 20 November 2025 in support of enhancing the Organisation for the Prohibition of Chemical Weapons (OPCW) mission activities related to Syria and Ukraine and enhancing OPCW operational effectiveness through satellite imagery

Official Journalof the European Union ENL series
2025/2354 21.11.2025
(1) On 12 December 2003, the European Council adopted the EU Strategy against Proliferation of Weapons of Mass Destruction (the ‘EU Strategy’), Chapter III of which contains a list of measures to combat such proliferation. The EU Strategy underlines the crucial role of the Convention on the Prohibition of the Development, Production, Stockpiling and Use of Chemical Weapons and on their Destruction (CWC) and of the Organisation for the Prohibition of Chemical Weapons (OPCW) in creating a world free of chemical weapons.
(2) On 22 November 2004, the Council adopted Joint Action 2004/797/CFSP(1). That Joint Action was followed, on its expiry, by Council Joint Action 2005/913/CFSP(2), which in turn was followed by Council Joint Action 2007/185/CFSP(3). Joint Action 2007/185/CFSP was followed by Council Decisions 2009/569/CFSP(4), 2012/166/CFSP(5), 2013/726/CFSP(6), (CFSP) 2015/259(7), (CFSP) 2015/2215(8), (CFSP) 2017/2302(9), (CFSP) 2017/2303(10), (CFSP) 2019/538(11), (CFSP) 2021/1026(12)and (CFSP) 2021/2073(13).
(3) Through the implementation of Decisions (CFSP) 2017/2303 and (CFSP) 2021/2073, the OPCW has come to rely on the unique information provided by the European Union Satellite Centre’s (SatCen) imagery analysis both for mission planning and information analysis. Consequently, there is a need to enhance the OPCW operational capacity through the continued provision of SatCen products and services in support of OPCW missions following the end of the implementation period of Decision (CFSP) 2021/2073.
(4) On 26 June 2023, the Council adopted Decision (CFSP) 2023/1344(14). The activities referred to in Decision (CFSP) 2023/1344 primarily relate to the OPCW’s support to Syria, including to non-routine missions.
(5) On 15 July 2024, the Council adopted Decision (CFSP) 2024/1984(15), which focuses on the OPCW-mandated missions, such as deployments, technical visits, trainings and provision of equipment to relevant authorities in Syria. The activities referred to in Decision (CFSP) 2024/1984 primarily relate to the processing of data and knowledge transfer within the OPCW,
(a) contributing to the full internationally verified elimination of the Syrian chemical weapons programme and establishing the facts and identifying the perpetrators related to the use of chemical weapons, in accordance with the relevant decisions of the policy-making organs of the OPCW;
(b) providing assistance consistent with the CWC to enable Ukraine to have the civil technical capabilities necessary to ensure that it can respond effectively to incidents involving chemical warfare agents and toxic industrial chemicals, including on the battlefield in Ukraine; and
(c) expanding the OPCW’s operational capacities through imagery analysis, in support of OPCW-mandated activities, particularly with regard to Syria and Ukraine.
a. to participate to the full internationally verified elimination of the Syrian chemical weapons programme and establish the facts and identify the perpetrators related to the use of chemical weapons, in accordance with the relevant decisions of the policy-making organs of the OPCW;
b. to provide assistance consistent with the CWC to enable Ukraine to have the civil technical capabilities necessary to ensure they can respond effectively to incidents involving chemical warfare agents and toxic industrial chemicals, including the provision of evaluation of samples related to allegations of use of toxic chemicals found on the battlefield in Ukraine;
c. to expand the OPCW’s operational capacities through provision of SatCen products and services, in support of OPCW mandated activities.
a. Syria:i.Activity:Technical team deployments (of one-month duration each) over two years to assist Syrian authorities with:—producing a detailed inventory of chemical weapons, chemical weapons sites(4), equipment, munitions and other components of the Syrian chemical weapons programme. It is estimated that the teams will need to visit and assess more than 100 locations across Syria to collect, translate, verify and analyse documents, as well as to interview relevant personnel who were involved in the former Syrian regime’s chemical weapons programme. The OPCW technical team will issue reports as needed to inform decision-making by the OPCW policy-making organs;—developing plans, modalities and detailed inventory for the verified destruction of Syria’s remaining chemical weapons, including the identification of related equipment and facilities;—determining the use of toxic chemicals as weapons and identifying the perpetrators. The OPCW technical team will issue reports to inform decision-making and action by the OPCW policy-making organs, the Syrian authorities, and other international actors (such as the International, Impartial and Independent Mechanism – IIIM).Outputs:—A full and complete declaration of the Syrian chemical weapons programme pursuant to the obligation that the Syrian caretaker authorities have inherited under the CWC;—Executable chemical weapons destruction plans for formal consideration by the OPCW Executive Council;—The establishment of evidentiary bases of chemical weapons use in Syria for victims to receive justice and perpetrators to be held accountable.Notes: The establishment of the necessary operating facilities (secure office facilities, storage space, communications equipment) to support safe, secure and effective extended deployments by OPCW technical teams as well as support personnel engaged to produce the Syria-related outputs of this project will be required to ensure timely and cost-effective achievement of the results envisioned.The budget will provide a maximum number of expert days, per diem and transport costs to be allotted to these deployment activities. A portion of the budget will also cover any services and equipment needed to carry out these activities, including relevant project office costs. i. Activity:Technical team deployments (of one-month duration each) over two years to assist Syrian authorities with:—producing a detailed inventory of chemical weapons, chemical weapons sites(4), equipment, munitions and other components of the Syrian chemical weapons programme. It is estimated that the teams will need to visit and assess more than 100 locations across Syria to collect, translate, verify and analyse documents, as well as to interview relevant personnel who were involved in the former Syrian regime’s chemical weapons programme. The OPCW technical team will issue reports as needed to inform decision-making by the OPCW policy-making organs;—developing plans, modalities and detailed inventory for the verified destruction of Syria’s remaining chemical weapons, including the identification of related equipment and facilities;—determining the use of toxic chemicals as weapons and identifying the perpetrators. The OPCW technical team will issue reports to inform decision-making and action by the OPCW policy-making organs, the Syrian authorities, and other international actors (such as the International, Impartial and Independent Mechanism – IIIM).Outputs:—A full and complete declaration of the Syrian chemical weapons programme pursuant to the obligation that the Syrian caretaker authorities have inherited under the CWC;—Executable chemical weapons destruction plans for formal consideration by the OPCW Executive Council;—The establishment of evidentiary bases of chemical weapons use in Syria for victims to receive justice and perpetrators to be held accountable.Notes: The establishment of the necessary operating facilities (secure office facilities, storage space, communications equipment) to support safe, secure and effective extended deployments by OPCW technical teams as well as support personnel engaged to produce the Syria-related outputs of this project will be required to ensure timely and cost-effective achievement of the results envisioned.The budget will provide a maximum number of expert days, per diem and transport costs to be allotted to these deployment activities. A portion of the budget will also cover any services and equipment needed to carry out these activities, including relevant project office costs. — producing a detailed inventory of chemical weapons, chemical weapons sites(4), equipment, munitions and other components of the Syrian chemical weapons programme. It is estimated that the teams will need to visit and assess more than 100 locations across Syria to collect, translate, verify and analyse documents, as well as to interview relevant personnel who were involved in the former Syrian regime’s chemical weapons programme. The OPCW technical team will issue reports as needed to inform decision-making by the OPCW policy-making organs; — developing plans, modalities and detailed inventory for the verified destruction of Syria’s remaining chemical weapons, including the identification of related equipment and facilities; — determining the use of toxic chemicals as weapons and identifying the perpetrators. The OPCW technical team will issue reports to inform decision-making and action by the OPCW policy-making organs, the Syrian authorities, and other international actors (such as the International, Impartial and Independent Mechanism – IIIM). — A full and complete declaration of the Syrian chemical weapons programme pursuant to the obligation that the Syrian caretaker authorities have inherited under the CWC; — Executable chemical weapons destruction plans for formal consideration by the OPCW Executive Council; — The establishment of evidentiary bases of chemical weapons use in Syria for victims to receive justice and perpetrators to be held accountable.
i. Activity:Technical team deployments (of one-month duration each) over two years to assist Syrian authorities with:—producing a detailed inventory of chemical weapons, chemical weapons sites(4), equipment, munitions and other components of the Syrian chemical weapons programme. It is estimated that the teams will need to visit and assess more than 100 locations across Syria to collect, translate, verify and analyse documents, as well as to interview relevant personnel who were involved in the former Syrian regime’s chemical weapons programme. The OPCW technical team will issue reports as needed to inform decision-making by the OPCW policy-making organs;—developing plans, modalities and detailed inventory for the verified destruction of Syria’s remaining chemical weapons, including the identification of related equipment and facilities;—determining the use of toxic chemicals as weapons and identifying the perpetrators. The OPCW technical team will issue reports to inform decision-making and action by the OPCW policy-making organs, the Syrian authorities, and other international actors (such as the International, Impartial and Independent Mechanism – IIIM).Outputs:—A full and complete declaration of the Syrian chemical weapons programme pursuant to the obligation that the Syrian caretaker authorities have inherited under the CWC;—Executable chemical weapons destruction plans for formal consideration by the OPCW Executive Council;—The establishment of evidentiary bases of chemical weapons use in Syria for victims to receive justice and perpetrators to be held accountable.Notes: The establishment of the necessary operating facilities (secure office facilities, storage space, communications equipment) to support safe, secure and effective extended deployments by OPCW technical teams as well as support personnel engaged to produce the Syria-related outputs of this project will be required to ensure timely and cost-effective achievement of the results envisioned.The budget will provide a maximum number of expert days, per diem and transport costs to be allotted to these deployment activities. A portion of the budget will also cover any services and equipment needed to carry out these activities, including relevant project office costs. — producing a detailed inventory of chemical weapons, chemical weapons sites(4), equipment, munitions and other components of the Syrian chemical weapons programme. It is estimated that the teams will need to visit and assess more than 100 locations across Syria to collect, translate, verify and analyse documents, as well as to interview relevant personnel who were involved in the former Syrian regime’s chemical weapons programme. The OPCW technical team will issue reports as needed to inform decision-making by the OPCW policy-making organs; — developing plans, modalities and detailed inventory for the verified destruction of Syria’s remaining chemical weapons, including the identification of related equipment and facilities; — determining the use of toxic chemicals as weapons and identifying the perpetrators. The OPCW technical team will issue reports to inform decision-making and action by the OPCW policy-making organs, the Syrian authorities, and other international actors (such as the International, Impartial and Independent Mechanism – IIIM). — A full and complete declaration of the Syrian chemical weapons programme pursuant to the obligation that the Syrian caretaker authorities have inherited under the CWC; — Executable chemical weapons destruction plans for formal consideration by the OPCW Executive Council; — The establishment of evidentiary bases of chemical weapons use in Syria for victims to receive justice and perpetrators to be held accountable.
— producing a detailed inventory of chemical weapons, chemical weapons sites(4), equipment, munitions and other components of the Syrian chemical weapons programme. It is estimated that the teams will need to visit and assess more than 100 locations across Syria to collect, translate, verify and analyse documents, as well as to interview relevant personnel who were involved in the former Syrian regime’s chemical weapons programme. The OPCW technical team will issue reports as needed to inform decision-making by the OPCW policy-making organs;
— developing plans, modalities and detailed inventory for the verified destruction of Syria’s remaining chemical weapons, including the identification of related equipment and facilities;
— determining the use of toxic chemicals as weapons and identifying the perpetrators. The OPCW technical team will issue reports to inform decision-making and action by the OPCW policy-making organs, the Syrian authorities, and other international actors (such as the International, Impartial and Independent Mechanism – IIIM).
— A full and complete declaration of the Syrian chemical weapons programme pursuant to the obligation that the Syrian caretaker authorities have inherited under the CWC;
— Executable chemical weapons destruction plans for formal consideration by the OPCW Executive Council;
— The establishment of evidentiary bases of chemical weapons use in Syria for victims to receive justice and perpetrators to be held accountable.
i. Activity:Technical team deployments (of one-month duration each) over two years to assist Syrian authorities with:—producing a detailed inventory of chemical weapons, chemical weapons sites(4), equipment, munitions and other components of the Syrian chemical weapons programme. It is estimated that the teams will need to visit and assess more than 100 locations across Syria to collect, translate, verify and analyse documents, as well as to interview relevant personnel who were involved in the former Syrian regime’s chemical weapons programme. The OPCW technical team will issue reports as needed to inform decision-making by the OPCW policy-making organs;—developing plans, modalities and detailed inventory for the verified destruction of Syria’s remaining chemical weapons, including the identification of related equipment and facilities;—determining the use of toxic chemicals as weapons and identifying the perpetrators. The OPCW technical team will issue reports to inform decision-making and action by the OPCW policy-making organs, the Syrian authorities, and other international actors (such as the International, Impartial and Independent Mechanism – IIIM).Outputs:—A full and complete declaration of the Syrian chemical weapons programme pursuant to the obligation that the Syrian caretaker authorities have inherited under the CWC;—Executable chemical weapons destruction plans for formal consideration by the OPCW Executive Council;—The establishment of evidentiary bases of chemical weapons use in Syria for victims to receive justice and perpetrators to be held accountable.Notes: The establishment of the necessary operating facilities (secure office facilities, storage space, communications equipment) to support safe, secure and effective extended deployments by OPCW technical teams as well as support personnel engaged to produce the Syria-related outputs of this project will be required to ensure timely and cost-effective achievement of the results envisioned.The budget will provide a maximum number of expert days, per diem and transport costs to be allotted to these deployment activities. A portion of the budget will also cover any services and equipment needed to carry out these activities, including relevant project office costs. — producing a detailed inventory of chemical weapons, chemical weapons sites(4), equipment, munitions and other components of the Syrian chemical weapons programme. It is estimated that the teams will need to visit and assess more than 100 locations across Syria to collect, translate, verify and analyse documents, as well as to interview relevant personnel who were involved in the former Syrian regime’s chemical weapons programme. The OPCW technical team will issue reports as needed to inform decision-making by the OPCW policy-making organs; — developing plans, modalities and detailed inventory for the verified destruction of Syria’s remaining chemical weapons, including the identification of related equipment and facilities; — determining the use of toxic chemicals as weapons and identifying the perpetrators. The OPCW technical team will issue reports to inform decision-making and action by the OPCW policy-making organs, the Syrian authorities, and other international actors (such as the International, Impartial and Independent Mechanism – IIIM). — A full and complete declaration of the Syrian chemical weapons programme pursuant to the obligation that the Syrian caretaker authorities have inherited under the CWC; — Executable chemical weapons destruction plans for formal consideration by the OPCW Executive Council; — The establishment of evidentiary bases of chemical weapons use in Syria for victims to receive justice and perpetrators to be held accountable.
— producing a detailed inventory of chemical weapons, chemical weapons sites(4), equipment, munitions and other components of the Syrian chemical weapons programme. It is estimated that the teams will need to visit and assess more than 100 locations across Syria to collect, translate, verify and analyse documents, as well as to interview relevant personnel who were involved in the former Syrian regime’s chemical weapons programme. The OPCW technical team will issue reports as needed to inform decision-making by the OPCW policy-making organs;
— developing plans, modalities and detailed inventory for the verified destruction of Syria’s remaining chemical weapons, including the identification of related equipment and facilities;
— determining the use of toxic chemicals as weapons and identifying the perpetrators. The OPCW technical team will issue reports to inform decision-making and action by the OPCW policy-making organs, the Syrian authorities, and other international actors (such as the International, Impartial and Independent Mechanism – IIIM).
— A full and complete declaration of the Syrian chemical weapons programme pursuant to the obligation that the Syrian caretaker authorities have inherited under the CWC;
— Executable chemical weapons destruction plans for formal consideration by the OPCW Executive Council;
— The establishment of evidentiary bases of chemical weapons use in Syria for victims to receive justice and perpetrators to be held accountable.
— producing a detailed inventory of chemical weapons, chemical weapons sites(4), equipment, munitions and other components of the Syrian chemical weapons programme. It is estimated that the teams will need to visit and assess more than 100 locations across Syria to collect, translate, verify and analyse documents, as well as to interview relevant personnel who were involved in the former Syrian regime’s chemical weapons programme. The OPCW technical team will issue reports as needed to inform decision-making by the OPCW policy-making organs;
— developing plans, modalities and detailed inventory for the verified destruction of Syria’s remaining chemical weapons, including the identification of related equipment and facilities;
— determining the use of toxic chemicals as weapons and identifying the perpetrators. The OPCW technical team will issue reports to inform decision-making and action by the OPCW policy-making organs, the Syrian authorities, and other international actors (such as the International, Impartial and Independent Mechanism – IIIM).
— A full and complete declaration of the Syrian chemical weapons programme pursuant to the obligation that the Syrian caretaker authorities have inherited under the CWC;
— Executable chemical weapons destruction plans for formal consideration by the OPCW Executive Council;
— The establishment of evidentiary bases of chemical weapons use in Syria for victims to receive justice and perpetrators to be held accountable.
b. Ukraine:i.Activity 1:Provision of tailored technical trainings and related protective and analytical equipment in Ukraine and outside of Ukraine at specialised facilities (such as the OPCW Centre for Chemistry and Technology) for Ukrainian first responders, investigators, and other relevant experts in the areas of incident response, collection of evidence, and analysis:—Trainings: four training sessions are planned for 20 Ukrainian participants during the EU Action period. The trainings will cover expertise in Chemical Weapons (CW) and chemical agent detection, protection, decontamination, and sampling and analysis.—Equipment Types: the equipment to complement the trainings will be provided, such as ‘FirstDefender’ and related CW detection materials/devices, protective suits, protective masks, mask fit test kits, decontamination kits, sampling and analysis kits, auxiliary field work tool kits (e.g., GPS).Output:Ukrainian first responders, investigators, and relevant experts are able, through enhanced expertise and preparedness, to deal more effectively with instances and allegations of toxic chemical use, prevent loss of life and injury and promoting transparency and accountability.ii.Activity 2:Provision of technical assistance visits (TAV) if and when requested by Ukraine to receive and analyse samples, through the independent and internationally certified OPCW Designated Laboratories network, collected by Ukrainian investigators and related to allegations of use of toxic chemicals as weapons, including with regard to allegations of use of Riot Control Agents along the frontline.Outputs:Provision of reports to Ukrainian authorities for Ukraine to further decide on how to use such reports in their national investigations of use of toxic chemical as weapons, including provision of evaluation of samples related to allegations of use of toxic chemicals found on the battlefield in Ukraine, as well as for the international community, supporting the protection of the CWC and accountability efforts. i. Activity 1:Provision of tailored technical trainings and related protective and analytical equipment in Ukraine and outside of Ukraine at specialised facilities (such as the OPCW Centre for Chemistry and Technology) for Ukrainian first responders, investigators, and other relevant experts in the areas of incident response, collection of evidence, and analysis:—Trainings: four training sessions are planned for 20 Ukrainian participants during the EU Action period. The trainings will cover expertise in Chemical Weapons (CW) and chemical agent detection, protection, decontamination, and sampling and analysis.—Equipment Types: the equipment to complement the trainings will be provided, such as ‘FirstDefender’ and related CW detection materials/devices, protective suits, protective masks, mask fit test kits, decontamination kits, sampling and analysis kits, auxiliary field work tool kits (e.g., GPS).Output:Ukrainian first responders, investigators, and relevant experts are able, through enhanced expertise and preparedness, to deal more effectively with instances and allegations of toxic chemical use, prevent loss of life and injury and promoting transparency and accountability. — Trainings: four training sessions are planned for 20 Ukrainian participants during the EU Action period. The trainings will cover expertise in Chemical Weapons (CW) and chemical agent detection, protection, decontamination, and sampling and analysis. — Equipment Types: the equipment to complement the trainings will be provided, such as ‘FirstDefender’ and related CW detection materials/devices, protective suits, protective masks, mask fit test kits, decontamination kits, sampling and analysis kits, auxiliary field work tool kits (e.g., GPS). ii. Activity 2:Provision of technical assistance visits (TAV) if and when requested by Ukraine to receive and analyse samples, through the independent and internationally certified OPCW Designated Laboratories network, collected by Ukrainian investigators and related to allegations of use of toxic chemicals as weapons, including with regard to allegations of use of Riot Control Agents along the frontline.Outputs:Provision of reports to Ukrainian authorities for Ukraine to further decide on how to use such reports in their national investigations of use of toxic chemical as weapons, including provision of evaluation of samples related to allegations of use of toxic chemicals found on the battlefield in Ukraine, as well as for the international community, supporting the protection of the CWC and accountability efforts.
i. Activity 1:Provision of tailored technical trainings and related protective and analytical equipment in Ukraine and outside of Ukraine at specialised facilities (such as the OPCW Centre for Chemistry and Technology) for Ukrainian first responders, investigators, and other relevant experts in the areas of incident response, collection of evidence, and analysis:—Trainings: four training sessions are planned for 20 Ukrainian participants during the EU Action period. The trainings will cover expertise in Chemical Weapons (CW) and chemical agent detection, protection, decontamination, and sampling and analysis.—Equipment Types: the equipment to complement the trainings will be provided, such as ‘FirstDefender’ and related CW detection materials/devices, protective suits, protective masks, mask fit test kits, decontamination kits, sampling and analysis kits, auxiliary field work tool kits (e.g., GPS).Output:Ukrainian first responders, investigators, and relevant experts are able, through enhanced expertise and preparedness, to deal more effectively with instances and allegations of toxic chemical use, prevent loss of life and injury and promoting transparency and accountability. — Trainings: four training sessions are planned for 20 Ukrainian participants during the EU Action period. The trainings will cover expertise in Chemical Weapons (CW) and chemical agent detection, protection, decontamination, and sampling and analysis. — Equipment Types: the equipment to complement the trainings will be provided, such as ‘FirstDefender’ and related CW detection materials/devices, protective suits, protective masks, mask fit test kits, decontamination kits, sampling and analysis kits, auxiliary field work tool kits (e.g., GPS).
— Trainings: four training sessions are planned for 20 Ukrainian participants during the EU Action period. The trainings will cover expertise in Chemical Weapons (CW) and chemical agent detection, protection, decontamination, and sampling and analysis.
— Equipment Types: the equipment to complement the trainings will be provided, such as ‘FirstDefender’ and related CW detection materials/devices, protective suits, protective masks, mask fit test kits, decontamination kits, sampling and analysis kits, auxiliary field work tool kits (e.g., GPS).
ii. Activity 2:Provision of technical assistance visits (TAV) if and when requested by Ukraine to receive and analyse samples, through the independent and internationally certified OPCW Designated Laboratories network, collected by Ukrainian investigators and related to allegations of use of toxic chemicals as weapons, including with regard to allegations of use of Riot Control Agents along the frontline.Outputs:Provision of reports to Ukrainian authorities for Ukraine to further decide on how to use such reports in their national investigations of use of toxic chemical as weapons, including provision of evaluation of samples related to allegations of use of toxic chemicals found on the battlefield in Ukraine, as well as for the international community, supporting the protection of the CWC and accountability efforts.
i. Activity 1:Provision of tailored technical trainings and related protective and analytical equipment in Ukraine and outside of Ukraine at specialised facilities (such as the OPCW Centre for Chemistry and Technology) for Ukrainian first responders, investigators, and other relevant experts in the areas of incident response, collection of evidence, and analysis:—Trainings: four training sessions are planned for 20 Ukrainian participants during the EU Action period. The trainings will cover expertise in Chemical Weapons (CW) and chemical agent detection, protection, decontamination, and sampling and analysis.—Equipment Types: the equipment to complement the trainings will be provided, such as ‘FirstDefender’ and related CW detection materials/devices, protective suits, protective masks, mask fit test kits, decontamination kits, sampling and analysis kits, auxiliary field work tool kits (e.g., GPS).Output:Ukrainian first responders, investigators, and relevant experts are able, through enhanced expertise and preparedness, to deal more effectively with instances and allegations of toxic chemical use, prevent loss of life and injury and promoting transparency and accountability. — Trainings: four training sessions are planned for 20 Ukrainian participants during the EU Action period. The trainings will cover expertise in Chemical Weapons (CW) and chemical agent detection, protection, decontamination, and sampling and analysis. — Equipment Types: the equipment to complement the trainings will be provided, such as ‘FirstDefender’ and related CW detection materials/devices, protective suits, protective masks, mask fit test kits, decontamination kits, sampling and analysis kits, auxiliary field work tool kits (e.g., GPS).
— Trainings: four training sessions are planned for 20 Ukrainian participants during the EU Action period. The trainings will cover expertise in Chemical Weapons (CW) and chemical agent detection, protection, decontamination, and sampling and analysis.
— Equipment Types: the equipment to complement the trainings will be provided, such as ‘FirstDefender’ and related CW detection materials/devices, protective suits, protective masks, mask fit test kits, decontamination kits, sampling and analysis kits, auxiliary field work tool kits (e.g., GPS).
— Trainings: four training sessions are planned for 20 Ukrainian participants during the EU Action period. The trainings will cover expertise in Chemical Weapons (CW) and chemical agent detection, protection, decontamination, and sampling and analysis.
— Equipment Types: the equipment to complement the trainings will be provided, such as ‘FirstDefender’ and related CW detection materials/devices, protective suits, protective masks, mask fit test kits, decontamination kits, sampling and analysis kits, auxiliary field work tool kits (e.g., GPS).
ii. Activity 2:Provision of technical assistance visits (TAV) if and when requested by Ukraine to receive and analyse samples, through the independent and internationally certified OPCW Designated Laboratories network, collected by Ukrainian investigators and related to allegations of use of toxic chemicals as weapons, including with regard to allegations of use of Riot Control Agents along the frontline.Outputs:Provision of reports to Ukrainian authorities for Ukraine to further decide on how to use such reports in their national investigations of use of toxic chemical as weapons, including provision of evaluation of samples related to allegations of use of toxic chemicals found on the battlefield in Ukraine, as well as for the international community, supporting the protection of the CWC and accountability efforts.
c. SatCen(5):i.Activity:Provision of SatCen(6)products and services to support the safe and effective operational planning of OPCW technical teams preparing for deployments to any contingency operations, to conduct investigations, training or other activities as mandated under the Convention by the OPCW policy-making organs or requested by States Parties.Output:OPCW technical team deployments are conducted with maximum efficiency, safety and security; and products and services provide useful indications to the substantiation of evidentiary findings reported by OPCW technical teams. i. Activity:Provision of SatCen(6)products and services to support the safe and effective operational planning of OPCW technical teams preparing for deployments to any contingency operations, to conduct investigations, training or other activities as mandated under the Convention by the OPCW policy-making organs or requested by States Parties.Output:OPCW technical team deployments are conducted with maximum efficiency, safety and security; and products and services provide useful indications to the substantiation of evidentiary findings reported by OPCW technical teams.
i. Activity:Provision of SatCen(6)products and services to support the safe and effective operational planning of OPCW technical teams preparing for deployments to any contingency operations, to conduct investigations, training or other activities as mandated under the Convention by the OPCW policy-making organs or requested by States Parties.Output:OPCW technical team deployments are conducted with maximum efficiency, safety and security; and products and services provide useful indications to the substantiation of evidentiary findings reported by OPCW technical teams.
i. Activity:Provision of SatCen(6)products and services to support the safe and effective operational planning of OPCW technical teams preparing for deployments to any contingency operations, to conduct investigations, training or other activities as mandated under the Convention by the OPCW policy-making organs or requested by States Parties.Output:OPCW technical team deployments are conducted with maximum efficiency, safety and security; and products and services provide useful indications to the substantiation of evidentiary findings reported by OPCW technical teams.
a. CWC States Parties;
b. Government officials and experts in Syria and Ukraine;
c. Victims of chemical weapons use in Syria and Ukraine;
d. OPCW personnel deploying on contingency missions.
THE COUNCIL OF THE EUROPEAN UNION,
Having regard to the Treaty on European Union, and in particular Article 28(1) and Article 31(1) thereof,
Having regard to the proposal from the High Representative of the Union for Foreign Affairs and Security Policy,
Whereas:
(1) On 12 December 2003, the European Council adopted the EU Strategy against Proliferation of Weapons of Mass Destruction (the ‘EU Strategy’), Chapter III of which contains a list of measures to combat such proliferation. The EU Strategy underlines the crucial role of the Convention on the Prohibition of the Development, Production, Stockpiling and Use of Chemical Weapons and on their Destruction (CWC) and of the Organisation for the Prohibition of Chemical Weapons (OPCW) in creating a world free of chemical weapons.
(2) On 22 November 2004, the Council adopted Joint Action 2004/797/CFSP (1). That Joint Action was followed, on its expiry, by Council Joint Action 2005/913/CFSP (2), which in turn was followed by Council Joint Action 2007/185/CFSP (3). Joint Action 2007/185/CFSP was followed by Council Decisions 2009/569/CFSP (4), 2012/166/CFSP (5), 2013/726/CFSP (6), (CFSP) 2015/259 (7), (CFSP) 2015/2215 (8), (CFSP) 2017/2302 (9), (CFSP) 2017/2303 (10), (CFSP) 2019/538 (11), (CFSP) 2021/1026 (12) and (CFSP) 2021/2073 (13).
(3) Through the implementation of Decisions (CFSP) 2017/2303 and (CFSP) 2021/2073, the OPCW has come to rely on the unique information provided by the European Union Satellite Centre’s (SatCen) imagery analysis both for mission planning and information analysis. Consequently, there is a need to enhance the OPCW operational capacity through the continued provision of SatCen products and services in support of OPCW missions following the end of the implementation period of Decision (CFSP) 2021/2073.
(4) On 26 June 2023, the Council adopted Decision (CFSP) 2023/1344 (14). The activities referred to in Decision (CFSP) 2023/1344 primarily relate to the OPCW’s support to Syria, including to non-routine missions.
(5) On 15 July 2024, the Council adopted Decision (CFSP) 2024/1984 (15), which focuses on the OPCW-mandated missions, such as deployments, technical visits, trainings and provision of equipment to relevant authorities in Syria. The activities referred to in Decision (CFSP) 2024/1984 primarily relate to the processing of data and knowledge transfer within the OPCW,
HAS ADOPTED THIS DECISION:
1. For the purpose of contributing to international peace and security, confidence and transparency, and to the implementation of the EU strategy against the Proliferation of Weapons of Mass Destruction, the Union shall support mission activities related to Syria and Ukraine to ensure, through the Organisation for the Prohibition of Chemical Weapons (OPCW), effective responses to the risks of chemical weapons proliferation and use, also empowering States Parties to the Convention on the Prohibition of the Development, Production, Stockpiling and Use of Chemical Weapons and on their Destruction (CWC) to ensure accountability in cases of use of chemical weapons, on the basis of the work and reports of the OPCW. The provision of satellite products and services by the European Union Satellite Centre (SatCen) seeks to enhance the capacities for those OPCW-mandated activities for security and verification accuracy with the following objectives:
(a) contributing to the full internationally verified elimination of the Syrian chemical weapons programme and establishing the facts and identifying the perpetrators related to the use of chemical weapons, in accordance with the relevant decisions of the policy-making organs of the OPCW;
(b) providing assistance consistent with the CWC to enable Ukraine to have the civil technical capabilities necessary to ensure that it can respond effectively to incidents involving chemical warfare agents and toxic industrial chemicals, including on the battlefield in Ukraine; and
(c) expanding the OPCW’s operational capacities through imagery analysis, in support of OPCW-mandated activities, particularly with regard to Syria and Ukraine.

2. A detailed description of the Union-supported activities of the OPCW referred to in paragraph 1 is set out in the Project Document.

1. The High Representative of the Union for Foreign Affairs and Security Policy (the ‘High Representative’) shall be responsible for implementing this Decision.

2. Technical implementation of the project set out in the Project Document referred to in Article 1 shall be carried out by the OPCW Technical Secretariat (the ‘Technical Secretariat’). It shall perform that task under the responsibility and the control of the High Representative. For that purpose, the High Representative shall enter into the necessary arrangements with the Technical Secretariat.

1. The financial reference amount for the implementation of the operational action referred to in Article 1 shall be EUR 4 447 748,18.
2. The expenditure financed by the amount set out in paragraph 1 shall be managed in accordance with the rules and procedures applicable to the general budget of the Union.

3. The Commission shall supervise the proper management of the expenditure referred to in paragraph 2. For that purpose, it shall conclude the necessary agreement with the Technical Secretariat. That agreement shall stipulate that the Technical Secretariat is to ensure visibility of the Union contribution, commensurate with the size of the contribution.

4. The Commission shall endeavour to conclude the agreement referred to in paragraph 3 as soon as possible after the entry into force of this Decision. It shall inform the Council of any difficulties in that process and of the date of conclusion of the agreement.

1. The High Representative shall report to the Council on the implementation of this Decision on the basis of regular reports prepared by the Technical Secretariat. The High Representative reports shall form the basis for the evaluation carried out by the Council.

2. The Commission shall provide information on the financial aspects of the project set out in the Project Document referred to in Article 1.

1. This Decision shall enter into force on the date of its adoption.

2. This Decision shall expire 24 months from the date of conclusion of the agreement referred to in Article 3(3). However, it shall expire six months after its entry into force if that agreement has not been concluded by that time.

PROJECT DOCUMENT
Action in support of OPCW mission activities related to Syria and Ukraine and enhancing OPCW operational effectiveness through SATCEN products and services 1. BACKGROUND AND RATIONALE
The Organisation for the Prohibition of Chemical Weapons (the ‘OPCW’) is the implementing body of the Convention on the Prohibition of the Development, Production, Stockpiling and Use of Chemical Weapons and on Their Destruction (the ‘CWC’). The CWC entered into force on 29 April 1997 and there are currently 193 States Parties reflecting nearly universal membership.
The mission of the OPCW is to achieve a world free of chemical weapons through the verified destruction of declared chemical weapons stockpiles and the prevention of re-emergence of the production and use of chemical weapons. Since 1997, the OPCW has verified the destruction of all stockpiled chemical weapons declared by countries around the world corresponding to 72 304 metric tonnes.
The OPCW has consistently received support from the European Union (EU) through the Common Foreign and Security Policy (CFSP) budget since 2004. The EU-OPCW Memorandum of Understanding of 20 February 2024 has further reinforced this crucial partnership that has been essential in promoting and implementing the OPCW’s core objectives, contributing to international peace and security. Recent developments, such as the fall of the Assad regime in Syria and the ongoing war in Ukraine, underscore the importance of the OPCW’s mandates and missions.
In Syria, the Secretariat has been operating since October 2013, when Syria joined the Convention, through, inter alia, dedicated missions – the Declaration Assessment Team (DAT), the Fact-Finding Mission in Syria (FFM), and the Investigation and Identification Team (IIT) – in line with mandates received under the Convention and through OPCW policy-making organs decisions and relevant United Nations Security Council resolutions. Since the fall of the Assad regime on 8 December 2024 and the presence of an interim government willing to engage on the Syrian chemical weapons dossier, contrary to the previous authorities, there is a need and at the same time an opportunity to finally access all information not declared by the previous authorities related to their chemical weapon programme, to secure chemical weapons related sites and their content, and to have any relevant element destroyed by Syria and verified as such by the OPCW Secretariat. There is also an opportunity to continue investigations related to use of chemical weapons in Syria, including identification of perpetrators, as expressed by the Interim President of Syria during his meeting in Damascus with the OPCW Director-General on 8 February 2025. In Ukraine, the threat of use of chemical weapons continues and the OPCW’s activities, including technical assistance as requested by Ukraine, are essential, from the provision of protective and detection equipment and training of first responders, to the provision of evaluation of samples related to allegations of use of toxic chemicals found on the battlefield in Ukraine.
Since 2021 the EU provides valuable support to the OPCW through the provision of products and services supplied by SatCen. For the operational effectiveness of OPCW, it is important that SatCen products and services support is sustained, once the Council Decision (CFSP) 2021/2073 of 25 November 2021
(1) expires.
Therefore, this proposal is to be considered in conjunction with the Council Decision (CFSP) 2023/1344 of 26 June 2023
(2) and the activities under Output 3 (‘Effective responses to allegations of chemical weapons use’), as well as in conjunction with the Council Decision (CFSP) 2024/1984 of 15 July 2024
(3). Activities in the Council Decision (CFSP) 2023/1344 are primarily in relation to OPCW’s operations within headquarters, while this proposal focuses on OPCW’s operations outside headquarters (deployments, technical visits, trainings and provision of equipment to relevant authorities in Syria and Ukraine). Activities in the Council Decision (CFSP) 2024/1984 are primarily in relation to the processing of data and knowledge transfer within the Organisation, while this proposal focuses on the deployment of missions and the provision of equipment to Syria and Ukraine. 2. OVERALL OBJECTIVE
The overall objective of this action is to contribute to international peace and security, confidence and transparency, and to the implementation of the EU strategy against the Proliferation of Weapons of Mass Destruction by supporting mission activities related to Syria and Ukraine to ensure, through the OPCW, effective responses to the risks of chemical weapons proliferation and use, also empowering States Parties to ensure accountability in cases of use of chemical weapons, on the basis of the work and reports of the OPCW. The provision of SatCen products and services enhances the capacities for these OPCW-mandated activities as well as security and verification accuracy. 3. SPECIFIC OBJECTIVES
The specific objectives of the action are:
a.
to participate to the full internationally verified elimination of the Syrian chemical weapons programme and establish the facts and identify the perpetrators related to the use of chemical weapons, in accordance with the relevant decisions of the policy-making organs of the OPCW;
b.
to provide assistance consistent with the CWC to enable Ukraine to have the civil technical capabilities necessary to ensure they can respond effectively to incidents involving chemical warfare agents and toxic industrial chemicals, including the provision of evaluation of samples related to allegations of use of toxic chemicals found on the battlefield in Ukraine;
c.
to expand the OPCW’s operational capacities through provision of SatCen products and services, in support of OPCW mandated activities. 4. ACTIVITIES AND OUTPUTS
a.
Syria:
i.
Activity: Technical team deployments (of one-month duration each) over two years to assist Syrian authorities with:
—
producing a detailed inventory of chemical weapons, chemical weapons sites (4), equipment, munitions and other components of the Syrian chemical weapons programme. It is estimated that the teams will need to visit and assess more than 100 locations across Syria to collect, translate, verify and analyse documents, as well as to interview relevant personnel who were involved in the former Syrian regime’s chemical weapons programme. The OPCW technical team will issue reports as needed to inform decision-making by the OPCW policy-making organs;
—
developing plans, modalities and detailed inventory for the verified destruction of Syria’s remaining chemical weapons, including the identification of related equipment and facilities;
—
determining the use of toxic chemicals as weapons and identifying the perpetrators. The OPCW technical team will issue reports to inform decision-making and action by the OPCW policy-making organs, the Syrian authorities, and other international actors (such as the International, Impartial and Independent Mechanism – IIIM).
Outputs:
—
A full and complete declaration of the Syrian chemical weapons programme pursuant to the obligation that the Syrian caretaker authorities have inherited under the CWC;
—
Executable chemical weapons destruction plans for formal consideration by the OPCW Executive Council;
—
The establishment of evidentiary bases of chemical weapons use in Syria for victims to receive justice and perpetrators to be held accountable.
Notes: The establishment of the necessary operating facilities (secure office facilities, storage space, communications equipment) to support safe, secure and effective extended deployments by OPCW technical teams as well as support personnel engaged to produce the Syria-related outputs of this project will be required to ensure timely and cost-effective achievement of the results envisioned.
The budget will provide a maximum number of expert days, per diem and transport costs to be allotted to these deployment activities. A portion of the budget will also cover any services and equipment needed to carry out these activities, including relevant project office costs.
b.
Ukraine:
i.
Activity 1: Provision of tailored technical trainings and related protective and analytical equipment in Ukraine and outside of Ukraine at specialised facilities (such as the OPCW Centre for Chemistry and Technology) for Ukrainian first responders, investigators, and other relevant experts in the areas of incident response, collection of evidence, and analysis:
—
Trainings: four training sessions are planned for 20 Ukrainian participants during the EU Action period. The trainings will cover expertise in Chemical Weapons (CW) and chemical agent detection, protection, decontamination, and sampling and analysis.
—
Equipment Types: the equipment to complement the trainings will be provided, such as ‘FirstDefender’ and related CW detection materials/devices, protective suits, protective masks, mask fit test kits, decontamination kits, sampling and analysis kits, auxiliary field work tool kits (e.g., GPS).
Output: Ukrainian first responders, investigators, and relevant experts are able, through enhanced expertise and preparedness, to deal more effectively with instances and allegations of toxic chemical use, prevent loss of life and injury and promoting transparency and accountability.
ii.
Activity 2: Provision of technical assistance visits (TAV) if and when requested by Ukraine to receive and analyse samples, through the independent and internationally certified OPCW Designated Laboratories network, collected by Ukrainian investigators and related to allegations of use of toxic chemicals as weapons, including with regard to allegations of use of Riot Control Agents along the frontline.
Outputs: Provision of reports to Ukrainian authorities for Ukraine to further decide on how to use such reports in their national investigations of use of toxic chemical as weapons, including provision of evaluation of samples related to allegations of use of toxic chemicals found on the battlefield in Ukraine, as well as for the international community, supporting the protection of the CWC and accountability efforts.
c.
SatCen (5):
i.
Activity: Provision of SatCen (6) products and services to support the safe and effective operational planning of OPCW technical teams preparing for deployments to any contingency operations, to conduct investigations, training or other activities as mandated under the Convention by the OPCW policy-making organs or requested by States Parties.
Output: OPCW technical team deployments are conducted with maximum efficiency, safety and security; and products and services provide useful indications to the substantiation of evidentiary findings reported by OPCW technical teams. 5. FINAL BENEFICIARIES
a.
CWC States Parties;
b.
Government officials and experts in Syria and Ukraine;
c.
Victims of chemical weapons use in Syria and Ukraine;
d.
OPCW personnel deploying on contingency missions. 6. DURATION
The total estimated duration of the action is 24 months.

(1) Council Decision (CFSP) 2021/2073 of 25 November 2021 in support of enhancing the operational effectiveness of the Organisation for the Prohibition of Chemical Weapons (OPCW) through satellite imagery (OJ L 421, 26.11.2021, p. 65).

(2) Council Decision (CFSP) 2023/1344 of 26 June 2023 in support of enhancing the operational effectiveness of the Organisation for the Prohibition of Chemical Weapons (OPCW) (OJ L 168, 3.7.2023, p. 27).

(3) Council Decision (CFSP) 2024/1984 of 15 July 2024 in support of the Institutional Transitional Planning for Non-Routine Missions and Investigative Capacities of the Organisation for the Prohibition of Chemical Weapons (OPCW) (OJ L, 2024/1984, 16.7.2024, ELI: http://data.europa.eu/eli/dec/2024/1984/oj).

(4) The sites to be visited include all sites declared by Syria, as activities at these sites – such as full-scale production of chemical weapons were not fully declared by the former Syrian authorities. In some cases, Syria declared only research and development activities, while evidence suggests that actual production took place. Additionally, the visits will cover sites identified in OPCW policy-making organs decisions, such as airfields and other facilities involved, inter alia, in the production of sarin and chlorine. In addition, all undeclared sites suspected of involvement in Syria’s chemical weapons program will also be inspected. The goal is to determine what was produced, when, with what equipment, in what quantities, and what has happened to these weapons – to prevent their proliferation and ensure their destruction is verified.

(5) Implementation of SatCen activities under this new project are to start from the day after the Council Decision (CFSP) 2021/2073 of 25 November 2021 expires.

(6) Implementation of SatCen activities will be in full compliance with Council Decision 2014/401/CFSP of 26 June 2014 on the European Union Satellite Centre and take place under article 2.2(iii). It will be without prejudice to the role of the PSC and of the HR, as set out in Article 3 of the Decision.

Council Decision (EU) 2025/2350 of 13 November 2025 on the position to be taken on behalf of the European Union within the Committee of Ministers of the Council of Europe on the Draft Recommendation on equality and artificial intelligence

Official Journalof the European Union ENL series
2025/2350 17.11.2025
(1) The Council of Europe aims to adopt a recommendation to address the impact of artificial intelligence (‘AI’) systems, their potential for promoting equality, including gender equality, and the risks they may cause in relation to non-discrimination (the ‘Recommendation’). The Recommendation is due to be approved by the Council of Europe’s Gender Equality Commission (‘GEC’) and the Steering Committee on Anti-Discrimination, Diversity and Inclusion (‘CDADI’), during their joint plenary session in November 2025 and is due to be formally adopted by the Committee of Ministers of the Council of Europe.
(2) The Recommendation aims to assist the Council of Europe Member States to promote equality, including gender equality, and to prevent and combat all forms of discrimination, in all their activities and those of public and private sector actors within the lifecycle of AI systems. The Recommendation focuses on equality and artificial intelligence and, while it is not an implementing instrument, it seeks to maintain coherence with the scope and content of the Council of Europe Framework Convention on Artificial Intelligence and Human Rights, Democracy and the Rule of Law (the ‘Framework Convention’), which was signed by the Union pursuant to Council Decision (EU) 2024/2218(1).
(3) The Framework Convention lays down general principles and obligations that parties to the Framework Convention should observe to ensure the protection of human rights, democracy, and the rule of law in relation to the activities within the lifecycle of AI systems. The Commission has proposed that the Union conclude the Framework Convention. The Council decision for conclusion of the Framework Convention is in the process of being adopted by the Council.
(4) On 13 June 2024, the European Parliament and Council adopted, on the basis of Articles 16 and 114 of the Treaty on the Functioning of the European Union (TFEU), Regulation (EU) 2024/1689 of the European Parliament and the Council(2), which lays down harmonised rules, generally based on full harmonisation, that regulate the placing on the market, the putting into service and the use of AI systems in the Union. Those rules are directly applicable in the Member States, unless explicitly provided otherwise.
(5) The Framework Convention is to be implemented in the Union exclusively through Regulation (EU) 2024/1689 and other relevant Unionacquis, where applicable.
(6) The Recommendation is legally non-binding for the Member States of the Council of Europe. It will be capable of producing legal effects, namely in the context of the implementation of Regulation (EU) 2024/1689, where it is capable of decisively influencing Union legislation as referred to in Articles 40(3) and 56(1) of that Regulation. Therefore, it is appropriate to establish the position to be taken on the Union's behalf on the Recommendation in the joint plenary session of the GEC and the CDADI, as well as in the Committee of Ministers. This Decision is without prejudice to any other recommendation or other instrument that may be adopted in the future under the auspices of the Council of Europe or in other international fora.
(7) The personal and material scope of the Recommendation overlaps, to a large extent, with Regulation (EU) 2024/1689, which lays down rules for AI that are generally based on full harmonisation within the Union.
(8) The Union should ensure that the Recommendation is consistent with Union law, in particular with Regulation (EU) 2024/1689. For specific recommendations that concern the development and use of AI systems that are fully harmonised in the Union, the Union should aim to ensure that the Recommendation is consistent with Regulation (EU) 2024/1689 and the principles set out in the Framework Convention.
(9) Provided that these conditions are met, the Recommendation may be approved on behalf of the Union at the joint plenary session of the GEC and the CDADI that is scheduled to take place in November 2025 and be adopted at a subsequent meeting of the Committee of Ministers.
(10) As the Union is not a member of the Council of Europe but all Member States are, the Union’s position is to be expressed by its Member States, acting jointly,
THE COUNCIL OF THE EUROPEAN UNION,
Having regard to the Treaty on the Functioning of the European Union, and in particular Article 114, in conjunction with Article 218(9) thereof,
Having regard to the proposal from the European Commission,
Whereas:
(1) The Council of Europe aims to adopt a recommendation to address the impact of artificial intelligence (‘AI’) systems, their potential for promoting equality, including gender equality, and the risks they may cause in relation to non-discrimination (the ‘Recommendation’). The Recommendation is due to be approved by the Council of Europe’s Gender Equality Commission (‘GEC’) and the Steering Committee on Anti-Discrimination, Diversity and Inclusion (‘CDADI’), during their joint plenary session in November 2025 and is due to be formally adopted by the Committee of Ministers of the Council of Europe.
(2) The Recommendation aims to assist the Council of Europe Member States to promote equality, including gender equality, and to prevent and combat all forms of discrimination, in all their activities and those of public and private sector actors within the lifecycle of AI systems. The Recommendation focuses on equality and artificial intelligence and, while it is not an implementing instrument, it seeks to maintain coherence with the scope and content of the Council of Europe Framework Convention on Artificial Intelligence and Human Rights, Democracy and the Rule of Law (the ‘Framework Convention’), which was signed by the Union pursuant to Council Decision (EU) 2024/2218 (1).
(3) The Framework Convention lays down general principles and obligations that parties to the Framework Convention should observe to ensure the protection of human rights, democracy, and the rule of law in relation to the activities within the lifecycle of AI systems. The Commission has proposed that the Union conclude the Framework Convention. The Council decision for conclusion of the Framework Convention is in the process of being adopted by the Council.
(4) On 13 June 2024, the European Parliament and Council adopted, on the basis of Articles 16 and 114 of the Treaty on the Functioning of the European Union (TFEU), Regulation (EU) 2024/1689 of the European Parliament and the Council (2), which lays down harmonised rules, generally based on full harmonisation, that regulate the placing on the market, the putting into service and the use of AI systems in the Union. Those rules are directly applicable in the Member States, unless explicitly provided otherwise.
(5) The Framework Convention is to be implemented in the Union exclusively through Regulation (EU) 2024/1689 and other relevant Union acquis, where applicable.
(6) The Recommendation is legally non-binding for the Member States of the Council of Europe. It will be capable of producing legal effects, namely in the context of the implementation of Regulation (EU) 2024/1689, where it is capable of decisively influencing Union legislation as referred to in Articles 40(3) and 56(1) of that Regulation. Therefore, it is appropriate to establish the position to be taken on the Union’s behalf on the Recommendation in the joint plenary session of the GEC and the CDADI, as well as in the Committee of Ministers. This Decision is without prejudice to any other recommendation or other instrument that may be adopted in the future under the auspices of the Council of Europe or in other international fora.
(7) The personal and material scope of the Recommendation overlaps, to a large extent, with Regulation (EU) 2024/1689, which lays down rules for AI that are generally based on full harmonisation within the Union.
(8) The Union should ensure that the Recommendation is consistent with Union law, in particular with Regulation (EU) 2024/1689. For specific recommendations that concern the development and use of AI systems that are fully harmonised in the Union, the Union should aim to ensure that the Recommendation is consistent with Regulation (EU) 2024/1689 and the principles set out in the Framework Convention.
(9) Provided that these conditions are met, the Recommendation may be approved on behalf of the Union at the joint plenary session of the GEC and the CDADI that is scheduled to take place in November 2025 and be adopted at a subsequent meeting of the Committee of Ministers.
(10) As the Union is not a member of the Council of Europe but all Member States are, the Union’s position is to be expressed by its Member States, acting jointly,
HAS ADOPTED THIS DECISION:
The position to be taken on the Union’s behalf in the joint plenary session of the Council of Europe’s Gender Equality Commission (‘GEC’) and the Steering Committee on Anti-Discrimination, Diversity and Inclusion (‘CDADI’), as well as at the meeting of the Committee of Ministers, shall be to not object to the approval and adoption of the Recommendation on equality and artificial intelligence given that, although it is non-binding, the Recommendation is capable of producing legal effects in the Union legal order, provided that no changes recommending measures that would be inconsistent with or exceed the obligations on providers and deployers of AI systems established under Regulation (EU) 2024/1689 are made to the text of the draft Recommendation (3).
The position referred to in Article 1 shall be expressed by the Member States of the Union, acting jointly.
This Decision shall enter into force on the date of its adoption.

Council Decision (EU) 2025/2336 of 7 November 2025 on the position to be taken on behalf of the European Union at the ninth session of the Meeting of the Parties to the Agreement on the Conservation of African-Eurasian Migratory Waterbirds, as regards an amendment to Table 1 of Annex 3 to the Agreement

Official Journalof the European Union ENL series
2025/2336 18.11.2025
(1) The Agreement on the Conservation of African-Eurasian Migratory Waterbirds(1)(the ‘Agreement’) was approved on behalf of the European Union by Council Decision 2006/871/EC(2), and entered into force on 1 November 1999.
(2) Pursuant to Article X, paragraph 5 of the Agreement, the Meeting of the Parties may adopt amendments to Annexes to the Agreement.
(3) During its ninth session, which is to take place from 11 to 14 November 2025, the Meeting of Parties to the Agreement (the ‘MOP’) is expected to adopt a resolution on the adoption of amendments to the Annexes to the Agreement. The proposed amendment to Table 1 of Annex 3 to the Agreement concerning the species Grey Plover (Pluvialis squatarola squatarola) would, if adopted, require amendment of Directive 2009/147/EC of the European Parliament and of the Council(3). Therefore, the proposed amendment falls outside the scope of the amendments that can be approved by the Commission pursuant to Article 3(1) of Decision 2006/871/EC in conjunction with Article 3(3) thereof.
(4) It is appropriate to establish the position to be taken on the Union’s behalf at the MOP as regards the proposed amendment to Table 1 of Annex 3 to the Agreement concerning the Grey Plover, as that amendment will be binding on the Union and capable of decisively influencing the content of Union law, namely Directive 2009/147/EC.
(5) The proposed amendment to Table 1 of Annex 3 to the Agreement, submitted by the United Kingdom and set out in draft Resolution 9.1 of the MOP concerning the Grey Plover, should be approved on behalf of the Union, as it will help achieve a higher degree of protection of that species’ populations, which are in decline. However, in accordance with Article 3(4) of Decision 2006/871/EC, the Commission should enter a reservation with regard to the proposed amendment, since it would require an amendment to Directive 2009/147/EC, which would not be feasible within 90 days of the date of adoption of Resolution 9.1 by the MOP,
THE COUNCIL OF THE EUROPEAN UNION,
Having regard to the Treaty on the Functioning of the European Union, and in particular Article 192(1), in conjunction with Article 218(9) thereof,
Having regard to the proposal from the European Commission,
Whereas:
(1) The Agreement on the Conservation of African-Eurasian Migratory Waterbirds (1) (the ‘Agreement’) was approved on behalf of the European Union by Council Decision 2006/871/EC (2), and entered into force on 1 November 1999.
(2) Pursuant to Article X, paragraph 5 of the Agreement, the Meeting of the Parties may adopt amendments to Annexes to the Agreement.
(3) During its ninth session, which is to take place from 11 to 14 November 2025, the Meeting of Parties to the Agreement (the ‘MOP’) is expected to adopt a resolution on the adoption of amendments to the Annexes to the Agreement. The proposed amendment to Table 1 of Annex 3 to the Agreement concerning the species Grey Plover (Pluvialis squatarola squatarola) would, if adopted, require amendment of Directive 2009/147/EC of the European Parliament and of the Council (3). Therefore, the proposed amendment falls outside the scope of the amendments that can be approved by the Commission pursuant to Article 3(1) of Decision 2006/871/EC in conjunction with Article 3(3) thereof.
(4) It is appropriate to establish the position to be taken on the Union’s behalf at the MOP as regards the proposed amendment to Table 1 of Annex 3 to the Agreement concerning the Grey Plover, as that amendment will be binding on the Union and capable of decisively influencing the content of Union law, namely Directive 2009/147/EC.
(5) The proposed amendment to Table 1 of Annex 3 to the Agreement, submitted by the United Kingdom and set out in draft Resolution 9.1 of the MOP concerning the Grey Plover, should be approved on behalf of the Union, as it will help achieve a higher degree of protection of that species’ populations, which are in decline. However, in accordance with Article 3(4) of Decision 2006/871/EC, the Commission should enter a reservation with regard to the proposed amendment, since it would require an amendment to Directive 2009/147/EC, which would not be feasible within 90 days of the date of adoption of Resolution 9.1 by the MOP,
HAS ADOPTED THIS DECISION:
The position to be taken on behalf of the European Union at the ninth session of the Meeting of the Parties to the Agreement on the Conservation of African-Eurasian Migratory Waterbirds (the ‘Agreement’) shall be to approve the amendment to Table 1 of Annex 3 to the Agreement, submitted by the United Kingdom and set out in draft Resolution 9.1 of the ninth session of the Meeting of the Parties to the Agreement, concerning the Grey Plover (Pluvialis squatarola squatarola).
This Decision shall enter into force on the date of its adoption.

Commission Implementing Decision (EU) 2025/2334 of 19 November 2025 excluding from European Union financing certain expenditure incurred by certain Member States under the European Agricultural Guarantee Fund (EAGF) and under the European Agricultural Fund for Rural Development (EAFRD) (notified under document C(2025) 7762)

Official Journalof the European Union ENL series
2025/2334 21.11.2025
(1) Article 4(1), point (b), Article 5, Article 7(3), Articles 9, 17, 21 and 34, Article 35(4), Articles 36, 37, 38, 40 to 43, 51, 52, 54, 56, 59, 63, 64, 67, 68, 70 to 75, 77, 91 to 97, 99 and 100, Article 102(2) and Articles 110 and 111 of Regulation (EU) No 1306/2013 continue to apply, as regards the European Agricultural Guarantee Fund (EAGF) and the European Agricultural Fund for Rural Development (EAFRD), in relation to expenditure as referred to in Article 104(1), second subparagraph, point (a), of Regulation (EU) 2021/2116.
(2) In accordance with Article 52 of Regulation (EU) No 1306/2013 and Article 55 of Regulation (EU) 2021/2116, the Commission is to carry out the necessary verifications, communicate to the Member States the results of those verifications, take note of the comments of the Member States, initiate a bilateral discussion so that an agreement may be reached with the Member States in question and formally communicate its conclusions to them.
(3) In accordance with Article 52(3), second subparagraph, of Regulation (EU) No 1306/2013 and Article 34(3), third subparagraph, and Article 40 of Commission Implementing Regulation (EU) No 908/2014(3), and Article 55(3), second subparagraph, of Regulation (EU) 2021/2116 and Article 37(3), third subparagraph, and Article 43 of Commission Implementing Regulation (EU) 2022/128(4), some Member States made use of the conciliation procedure. The Commission has examined the reports issued by the Conciliation Body on the outcome of these conciliation procedures.
(4) In accordance with Regulation (EU) No 1306/2013 and Regulation (EU) 2021/2116, only agricultural expenditure which has been incurred in a way that has not infringed Union law may be financed, subject to, as regards expenditure incurred under Regulation (EU) 2021/2116, certain limitations in Article 55(1), second and third subparagraphs, of that Regulation.
(5) In the light of the verifications carried out, the outcome of the bilateral discussions and the conciliation procedures, part of the expenditure declared by certain Member States does not fulfil this requirement and can therefore not be financed under the EAGF and the EAFRD.
(6) The Commission should indicate the amounts that are not recognised as being chargeable to the EAGF and the EAFRD. Those amounts do not relate to expenditure incurred more than 24 months before the Commission's written notification of the results of the verifications to those Member States, except where otherwise provided for in Article 52(4), points (b) and (c), and Article 52(5) of Regulation (EU) No 1306/2013 and Article 55(4), points (b) and (c), and Article 55(5) of Regulation (EU) 2021/2116.
(7) The amounts excluded from Union financing by the present Decision should also take into account any reductions or suspensions in accordance with Article 41 of Regulation (EU) No 1306/2013 due to the fact that such reductions or suspensions are of a provisional nature and without prejudice to decisions taken pursuant to Articles 51 or 52 of that Regulation.
(8) As regards the cases covered by this decision, the Commission notified the assessment of the amounts to be excluded on grounds of non-compliance with Union law to the Member States concerned in the summary report on the subject(5).
(9) This Decision is without prejudice to any financial conclusions that the Commission may draw from the judgments of the Court of Justice of the European Union in cases pending on 26 August 2025,
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
DK EU School Scheme 2024 Deficiencies in 2 key controls (FY 2024). FLAT RATE 5,00 % EUR -91 026,69 0,00 -91 026,69
EU School Scheme 2025 Deficiencies in 2 key controls (FY 2025). FLAT RATE 5,00 % EUR – 104 294,02 0,00 – 104 294,02
EU School Scheme 2022 Deficiencies in 2 key controls (FYs 2022-2023). FLAT RATE 5,00 % EUR -83 466,94 0,00 -83 466,94
EU School Scheme 2023 Deficiencies in 2 key controls (FYs 2022-2023). FLAT RATE 5,00 % EUR – 135 331,44 0,00 – 135 331,44
Total DK: EUR – 414 119,09 0,00 – 414 119,09
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
EE EU School Scheme 2022 Checks to establish the eligibility of the aid (key control).Compliance with provisions regarding administrative checks of the aid applications and documentary evidence for the supply and distribution of products.FY 2022 (SY 2021/22). ONE OFF EUR -26 917,27 0,00 -26 917,27
EU School Scheme 2023 Checks to establish the eligibility of the aid (key control).Compliance with provisions regarding administrative checks of the aid applications and documentary evidence.FYs 2023 and 2024 (SYs 2022/23 and 2023/24). ONE OFF EUR -34 679,37 0,00 -34 679,37
EU School Scheme 2024 Checks to establish the eligibility of the aid (key control).Compliance with provisions regarding administrative checks of the aid applications and documentary evidence.FYs 2023 and 2024 (SYs 2022/23 and 2023/24). ONE OFF EUR -30 904,10 0,00 -30 904,10
Total EE: EUR -92 500,74 0,00 -92 500,74
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
ES Clearance of Accounts – Financial Clearance 2022 1.1.Execution of a guarantee in the context of a recovery procedure1.2.Time limit to launch and follow up recovery procedures (irregularities reported under Annex II of Regulation (EU) No 908/2014)1.3.Irrecoverable amount 1.1. Execution of a guarantee in the context of a recovery procedure 1.2. Time limit to launch and follow up recovery procedures (irregularities reported under Annex II of Regulation (EU) No 908/2014) 1.3. Irrecoverable amount ONE OFF EUR -2 149 745,24 0,00 -2 149 745,24
1.1. Execution of a guarantee in the context of a recovery procedure
1.2. Time limit to launch and follow up recovery procedures (irregularities reported under Annex II of Regulation (EU) No 908/2014)
1.3. Irrecoverable amount
Decoupled Direct Aids 2023 BPS – CY 2022 – all PAs ONE OFF EUR -17 908,57 0,00 -17 908,57
Clearance of Accounts – Financial Clearance 2017 Financial errors identified by the CB ONE OFF EUR -31 212,95 0,00 -31 212,95
Clearance of Accounts – Financial Clearance 2022 Financial errors identified by the CB ONE OFF EUR -26 890,97 0,00 -26 890,97
Decoupled Direct Aids 2023 GREENING – CY 2022 – all PAs ONE OFF EUR -10 879,09 0,00 -10 879,09
Decoupled Direct Aids 2023 YFP – CY 2022 – 5 PAs ONE OFF EUR – 251 421,29 0,00 – 251 421,29
Decoupled Direct Aids 2023 YFP – CY 2022 – all PAs ONE OFF EUR -2 519 577,06 0,00 -2 519 577,06
Total ES: EUR -5 007 635,17 0,00 -5 007 635,17
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
IT Clearance of Accounts – Financial Clearance 2020 Debt management – EAGF – debt recognition and registration – debt recovery and reporting of debts ONE OFF EUR -1 426 671,94 0,00 -1 426 671,94
EU School Scheme 2020 Deficiency in KC 'Checks to establish the eligibility of the aid' – Reasonableness of the cost-based system – F&V and milk parts of the scheme – FYs 2020, 2021 and 2022 FLAT RATE 5,00 % EUR -60 672,95 0,00 -60 672,95
EU School Scheme 2021 Deficiency in KC 'Checks to establish the eligibility of the aid' – Reasonableness of the cost-based system – F&V and milk parts of the scheme – FYs 2020, 2021 and 2022 FLAT RATE 5,00 % EUR – 101 884,30 0,00 – 101 884,30
EU School Scheme 2022 Deficiency in KC 'Checks to establish the eligibility of the aid' – Reasonableness of the cost-based system – F&V and milk parts of the scheme – FYs 2020, 2021 and 2022 FLAT RATE 5,00 % EUR -25 923,55 0,00 -25 923,55
EU School Scheme 2021 Deficiency in KC 'Checks to establish the eligibility of the aid' – Respect of limits and ceilings (Annex V products) – Milk part of the scheme – FYs 2021 and 2022 ONE OFF EUR -1 454 557,16 0,00 -1 454 557,16
EU School Scheme 2022 Deficiency in KC 'Checks to establish the eligibility of the aid' – Respect of limits and ceilings (Annex V products) – Milk part of the scheme – FYs 2021 and 2022 ONE OFF EUR -1 008 514,70 0,00 -1 008 514,70
Clearance of Accounts – Financial Clearance 2020 EAGF debt management ONE OFF EUR -34 401 844,77 0,00 -34 401 844,77
Clearance of Accounts – Financial Clearance 2023 EAGF debt management ONE OFF EUR -69 505,75 0,00 -69 505,75
Clearance of Accounts – Financial Clearance 2020 EAGF flat-rate 10% (debt management) FLAT RATE 10,00 % EUR -1 541 550,41 0,00 -1 541 550,41
Clearance of Accounts – Financial Clearance 2020 Legality and regularity ONE OFF EUR -2 676,83 0,00 -2 676,83
Clearance of Accounts – Financial Clearance 2020 Milk quota sector ONE OFF EUR -67 948,53 0,00 -67 948,53
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.1. of the COL – OP2018 – Appropriate performance of the administrative checks to establish the eligibility of operational programmes and aid applications (key control) – AGEA Regions FLAT RATE 5,00 % EUR -1 503 595,41 0,00 -1 503 595,41
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.1. of the COL – OP2019 – Appropriate performance of the administrative checks to establish the eligibility of operational programmes and aid applications (key control) – AGEA Regions FLAT RATE 5,00 % EUR – 532 090,40 0,00 – 532 090,40
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.1. of the COL – OP2019 – Appropriate performance of the administrative checks to establish the eligibility of operational programmes and aid applications (key control) – AGEA Regions FLAT RATE 5,00 % EUR -1 898 925,51 0,00 -1 898 925,51
Fruit and Vegetables – Operational programmes incl withdrawals 2021 Point 1.1.1. of the COL – OP2019 – Appropriate performance of the administrative checks to establish the eligibility of operational programmes and aid applications (key control) – AGEA Regions FLAT RATE 5,00 % EUR -2 755,16 0,00 -2 755,16
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.1. of the COL – OP2020 – Appropriate performance of the administrative checks to establish the eligibility of operational programmes and aid applications (key control) – AGEA Regions FLAT RATE 5,00 % EUR – 551 042,39 0,00 – 551 042,39
Fruit and Vegetables – Operational programmes incl withdrawals 2021 Point 1.1.1. of the COL – OP2020 – Appropriate performance of the administrative checks to establish the eligibility of operational programmes and aid applications (key control) – AGEA Regions FLAT RATE 5,00 % EUR -1 947 771,35 0,00 -1 947 771,35
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.1. of the COL – Whole Italy – PA AGEA OP2018 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR -73 241,10 0,00 -73 241,10
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.1. of the COL – Whole Italy – PA AGEA OP2018 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR – 137 236,61 0,00 – 137 236,61
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.1. of the COL – Whole Italy – PA AGEA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR -34 373,44 0,00 -34 373,44
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.1. of the COL – Whole Italy – PA AGEA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR – 122 672,00 0,00 – 122 672,00
Fruit and Vegetables – Operational programmes incl withdrawals 2021 Point 1.1.2.1. of the COL – Whole Italy – PA AGEA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR – 177,98 0,00 – 177,98
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.1. of the COL – Whole Italy – PA AGEA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR -56 569,77 0,00 -56 569,77
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.1. of the COL – Whole Italy – PA AGEA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR – 201 886,33 0,00 – 201 886,33
Fruit and Vegetables – Operational programmes incl withdrawals 2021 Point 1.1.2.1. of the COL – Whole Italy – PA AGEA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR – 292,92 0,00 – 292,92
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.1. of the COL – Whole Italy – PA AGEA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR -39 055,79 0,00 -39 055,79
Fruit and Vegetables – Operational programmes incl withdrawals 2021 Point 1.1.2.1. of the COL – Whole Italy – PA AGEA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR – 138 050,64 0,00 – 138 050,64
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.1. of the COL – Whole Italy – PA AGEA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR -78 834,09 0,00 -78 834,09
Fruit and Vegetables – Operational programmes incl withdrawals 2021 Point 1.1.2.1. of the COL – Whole Italy – PA AGEA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR – 278 655,10 0,00 – 278 655,10
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.1. of the COL – Whole Italy – PA AGREA OP2018 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR -9 720,54 0,00 -9 720,54
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.1. of the COL – Whole Italy – PA AGREA OP2018 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR -45 861,35 0,00 -45 861,35
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.1. of the COL – Whole Italy – PA AGREA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR -5 329,28 0,00 -5 329,28
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.1. of the COL – Whole Italy – PA AGREA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR -22 389,43 0,00 -22 389,43
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.1. of the COL – Whole Italy – PA AGREA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR -29 110,02 0,00 -29 110,02
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.1. of the COL – Whole Italy – PA AGREA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR – 122 297,27 0,00 – 122 297,27
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.1. of the COL – Whole Italy – PA AGREA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR -11 789,04 0,00 -11 789,04
Fruit and Vegetables – Operational programmes incl withdrawals 2021 Point 1.1.2.1. of the COL – Whole Italy – PA AGREA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR -30 500,99 0,00 -30 500,99
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.1. of the COL – Whole Italy – PA AGREA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR -51 403,52 0,00 -51 403,52
Fruit and Vegetables – Operational programmes incl withdrawals 2021 Point 1.1.2.1. of the COL – Whole Italy – PA AGREA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR – 132 992,83 0,00 – 132 992,83
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.1. of the COL – Whole Italy – PA ARTEA OP2018 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR -3 863,70 0,00 -3 863,70
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.1. of the COL – Whole Italy – PA ARTEA OP2018 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR -8 817,28 -1 991,42 -6 825,86
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.1. of the COL – Whole Italy – PA ARTEA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR -2 970,54 0,00 -2 970,54
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.1. of the COL – Whole Italy – PA ARTEA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR – 904,46 0,00 – 904,46
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.1. of the COL – Whole Italy – PA ARTEA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR -12 647,15 0,00 -12 647,15
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.1. of the COL – Whole Italy – PA ARTEA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR -3 850,77 -2 448,32 -1 402,45
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.1. of the COL – Whole Italy – PA ARTEA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR -2 617,78 0,00 -2 617,78
Fruit and Vegetables – Operational programmes incl withdrawals 2021 Point 1.1.2.1. of the COL – Whole Italy – PA ARTEA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR -1 251,90 0,00 -1 251,90
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.1. of the COL – Whole Italy – PA ARTEA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR -11 618,66 0,00 -11 618,66
Fruit and Vegetables – Operational programmes incl withdrawals 2021 Point 1.1.2.1. of the COL – Whole Italy – PA ARTEA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR -5 556,39 0,00 -5 556,39
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.1. of the COL – Whole Italy – PA AVEPA OP2018 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR -5 387,59 -58,57 -5 329,02
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.1. of the COL – Whole Italy – PA AVEPA OP2018 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR -37 474,35 -37 202,78 – 271,57
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.1. of the COL – Whole Italy – PA AVEPA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR – 546,42 – 327,85 – 218,57
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.1. of the COL – Whole Italy – PA AVEPA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR -6 742,44 -59,19 -6 683,25
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.1. of the COL – Whole Italy – PA AVEPA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR -3 643,50 -2 186,10 -1 457,40
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.1. of the COL – Whole Italy – PA AVEPA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR -44 958,18 -44 695,06 – 263,12
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.1. of the COL – Whole Italy – PA AVEPA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR -1 594,71 0,00 -1 594,71
Fruit and Vegetables – Operational programmes incl withdrawals 2021 Point 1.1.2.1. of the COL – Whole Italy – PA AVEPA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR -7 619,91 0,00 -7 619,91
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.1. of the COL – Whole Italy – PA AVEPA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR -8 439,91 0,00 -8 439,91
Fruit and Vegetables – Operational programmes incl withdrawals 2021 Point 1.1.2.1. of the COL – Whole Italy – PA AVEPA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR -40 328,05 0,00 -40 328,05
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.1. of the COL – Whole Italy – PA OPLO OP2018 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR -7 348,41 0,00 -7 348,41
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.1. of the COL – Whole Italy – PA OPLO OP2018 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR 0,00 0,00 0,00
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.1. of the COL – Whole Italy – PA OPLO OP2018 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR -25 962,90 -23 161,34 -2 801,56
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.1. of the COL – Whole Italy – PA OPLO OP2018 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR 0,01 0,00 0,01
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.1. of the COL – Whole Italy – PA OPLO OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR -1 367,95 0,00 -1 367,95
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.1. of the COL – Whole Italy – PA OPLO OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR -5 332,63 0,00 -5 332,63
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.1. of the COL – Whole Italy – PA OPLO OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR -11 777,71 0,00 -11 777,71
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.1. of the COL – Whole Italy – PA OPLO OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR -45 912,43 -26 892,44 -19 019,99
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.1. of the COL – Whole Italy – PA OPLO OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR – 976,17 0,00 – 976,17
Fruit and Vegetables – Operational programmes incl withdrawals 2021 Point 1.1.2.1. of the COL – Whole Italy – PA OPLO OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA FLAT RATE 5,00 % EUR -6 922,25 0,00 -6 922,25
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.1. of the COL – Whole Italy – PA OPLO OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR -6 859,55 0,00 -6 859,55
Fruit and Vegetables – Operational programmes incl withdrawals 2021 Point 1.1.2.1. of the COL – Whole Italy – PA OPLO OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA FLAT RATE 5,00 % EUR -48 642,06 0,00 -48 642,06
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.2. of the COL – Whole Italy – PA AGEA OP2018 – Ineligible costs for the FV POs scheme ONE OFF EUR -1 160 116,53 0,00 -1 160 116,53
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.2. of the COL – Whole Italy – PA AGEA OP2019 – Ineligible costs for the FV POs scheme ONE OFF EUR – 551 184,87 0,00 – 551 184,87
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.2. of the COL – Whole Italy – PA AGEA OP2019 – Ineligible costs for the FV POs scheme ONE OFF EUR -1 967 069,93 0,00 -1 967 069,93
Fruit and Vegetables – Operational programmes incl withdrawals 2021 Point 1.1.2.2. of the COL – Whole Italy – PA AGEA OP2019 – Ineligible costs for the FV POs scheme ONE OFF EUR -2 854,03 0,00 -2 854,03
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.2. of the COL – Whole Italy – PA AGEA OP2020 – Ineligible costs for the FV POs scheme ONE OFF EUR – 100 129,47 0,00 – 100 129,47
Fruit and Vegetables – Operational programmes incl withdrawals 2021 Point 1.1.2.2. of the COL – Whole Italy – PA AGEA OP2020 – Ineligible costs for the FV POs scheme ONE OFF EUR – 353 927,94 0,00 – 353 927,94
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.2. of the COL – Whole Italy – PA AGREA OP2018 – Ineligible costs for the FV POs scheme ONE OFF EUR -1 079 775,07 0,00 -1 079 775,07
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.2. of the COL – Whole Italy – PA AGREA OP2019 – Ineligible costs for the FV POs scheme ONE OFF EUR – 842 092,55 0,00 – 842 092,55
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.2. of the COL – Whole Italy – PA AGREA OP2019 – Ineligible costs for the FV POs scheme ONE OFF EUR -3 537 806,24 0,00 -3 537 806,24
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.2. of the COL – Whole Italy – PA AGREA OP2020 – Ineligible costs for the FV POs scheme ONE OFF EUR -1 190 974,95 0,00 -1 190 974,95
Fruit and Vegetables – Operational programmes incl withdrawals 2021 Point 1.1.2.2. of the COL – Whole Italy – PA AGREA OP2020 – Ineligible costs for the FV POs scheme ONE OFF EUR -3 081 328,69 0,00 -3 081 328,69
Fruit and Vegetables – Operational programmes incl withdrawals 2022 Point 1.1.2.2. of the COL – Whole Italy – PA AGREA OP2020 – Ineligible costs for the FV POs scheme ONE OFF EUR 0,00 0,00 0,00
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.2. of the COL – Whole Italy – PA ARTEA OP2018 – Ineligible costs for the FV POs scheme ONE OFF EUR – 170 560,20 0,00 – 170 560,20
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.2. of the COL – Whole Italy – PA ARTEA OP2019 – Ineligible costs for the FV POs scheme ONE OFF EUR – 180 637,90 0,00 – 180 637,90
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.2. of the COL – Whole Italy – PA ARTEA OP2019 – Ineligible costs for the FV POs scheme ONE OFF EUR -55 000,08 0,00 -55 000,08
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.2. of the COL – Whole Italy – PA ARTEA OP2020 – Ineligible costs for the FV POs scheme ONE OFF EUR – 148 846,30 0,00 – 148 846,30
Fruit and Vegetables – Operational programmes incl withdrawals 2021 Point 1.1.2.2. of the COL – Whole Italy – PA ARTEA OP2020 – Ineligible costs for the FV POs scheme ONE OFF EUR -71 182,82 0,00 -71 182,82
Fruit and Vegetables – Operational programmes incl withdrawals 2022 Point 1.1.2.2. of the COL – Whole Italy – PA ARTEA OP2020 – Ineligible costs for the FV POs scheme ONE OFF EUR 0,00 0,00 0,00
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.2. of the COL – Whole Italy – PA AVEPA OP2018 – Ineligible costs for the FV POs scheme ONE OFF EUR -36 168,43 -19,66 -36 148,77
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.2. of the COL – Whole Italy – PA AVEPA OP2019 – Ineligible costs for the FV POs scheme ONE OFF EUR -4 555,36 0,00 -4 555,36
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.2. of the COL – Whole Italy – PA AVEPA OP2019 – Ineligible costs for the FV POs scheme ONE OFF EUR -56 210,04 -2 485,84 -53 724,20
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.2. of the COL – Whole Italy – PA AVEPA OP2020 – Ineligible costs for the FV POs scheme ONE OFF EUR -43 045,51 0,00 -43 045,51
Fruit and Vegetables – Operational programmes incl withdrawals 2021 Point 1.1.2.2. of the COL – Whole Italy – PA AVEPA OP2020 – Ineligible costs for the FV POs scheme ONE OFF EUR – 205 682,34 0,00 – 205 682,34
Fruit and Vegetables – Operational programmes incl withdrawals 2022 Point 1.1.2.2. of the COL – Whole Italy – PA AVEPA OP2020 – Ineligible costs for the FV POs scheme ONE OFF EUR 0,00 0,00 0,00
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.2. of the COL – Whole Italy – PA OPLO OP2018 – Ineligible costs for the FV POs scheme ONE OFF EUR – 487 137,43 0,00 – 487 137,43
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.2. of the COL – Whole Italy – PA OPLO OP2018 – Ineligible costs for the FV POs scheme ONE OFF EUR 0,09 0,00 0,09
Fruit and Vegetables – Operational programmes incl withdrawals 2019 Point 1.1.2.2. of the COL – Whole Italy – PA OPLO OP2019 – Ineligible costs for the FV POs scheme ONE OFF EUR -94 172,96 0,00 -94 172,96
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.2. of the COL – Whole Italy – PA OPLO OP2019 – Ineligible costs for the FV POs scheme ONE OFF EUR – 821 977,35 0,00 – 821 977,35
Fruit and Vegetables – Operational programmes incl withdrawals 2021 Point 1.1.2.2. of the COL – Whole Italy – PA OPLO OP2019 – Ineligible costs for the FV POs scheme ONE OFF EUR 0,00 0,00 0,00
Fruit and Vegetables – Operational programmes incl withdrawals 2020 Point 1.1.2.2. of the COL – Whole Italy – PA OPLO OP2020 – Ineligible costs for the FV POs scheme ONE OFF EUR – 179 151,90 0,00 – 179 151,90
Fruit and Vegetables – Operational programmes incl withdrawals 2021 Point 1.1.2.2. of the COL – Whole Italy – PA OPLO OP2020 – Ineligible costs for the FV POs scheme ONE OFF EUR -1 270 393,96 0,00 -1 270 393,96
Fruit and Vegetables – Operational programmes incl withdrawals 2022 Point 1.1.2.2. of the COL – Whole Italy – PA OPLO OP2020 – Ineligible costs for the FV POs scheme ONE OFF EUR -6 003,51 0,00 -6 003,51
Scrutiny of transactions 2017 Scrutiny 0,5% 2017 2018 2019 FLAT RATE 0,50 % EUR – 870 976,83 -10 005,58 – 860 971,25
Scrutiny of transactions 2018 Scrutiny 0,5% 2017 2018 2019 FLAT RATE 0,50 % EUR – 898 224,71 -33 108,67 – 865 116,04
Scrutiny of transactions 2019 Scrutiny 0,5% 2017 2018 2019 FLAT RATE 0,50 % EUR – 802 973,05 -7 333,76 – 795 639,29
Scrutiny of transactions 2017 Scrutiny 2,5% 2017 2018 2019 FLAT RATE 2,50 % EUR -95 524,10 0,00 -95 524,10
Scrutiny of transactions 2018 Scrutiny 2,5% 2017 2018 2019 FLAT RATE 2,50 % EUR -56 134,65 0,00 -56 134,65
Scrutiny of transactions 2019 Scrutiny 2,5% 2017 2018 2019 FLAT RATE 2,50 % EUR -12 587,14 0,00 -12 587,14
Clearance of Accounts – Financial Clearance 2018 Weaknesses accreditation criterion delegation FY 2018 FLAT RATE 2,00 % EUR -5 058 890,26 – 851 343,93 -4 207 546,33
Clearance of Accounts – Financial Clearance 2019 Weaknesses accreditation criterion delegation FY 2019 FLAT RATE 2,00 % EUR -44 633 922,68 -2 901 092,51 -41 732 830,17
Clearance of Accounts – Financial Clearance 2020 Weaknesses accreditation criterion delegation FY 2020 FLAT RATE 2,00 % EUR -42 182 221,19 – 851 560,43 -41 330 660,76
Total IT: EUR – 160 901 747,77 -4 795 973,45 – 156 105 774,32
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
LT EU School Scheme 2022 Checks to establish the eligibility of the aid (key control).Fair and verifiable calculation method of aid rates for the supply and distribution of fruit & vegetables.FY 2022 (SY 2021/22). FLAT RATE 5,00 % EUR -33 084,98 0,00 -33 084,98
EU School Scheme 2023 Checks to establish the eligibility of the aid (key control).Fair and verifiable calculation method of aid rates for the supply and distribution of fruit & vegetables.FYs 2023 and 2024 (SYs 2022/23 and 2023/24). FLAT RATE 5,00 % EUR -45 089,81 0,00 -45 089,81
EU School Scheme 2024 Checks to establish the eligibility of the aid (key control).Fair and verifiable calculation method of aid rates for the supply and distribution of fruit & vegetables.FYs 2023 and 2024 (SYs 2022/23 and 2023/24). FLAT RATE 5,00 % EUR -44 115,68 0,00 -44 115,68
Total LT: EUR – 122 290,47 0,00 – 122 290,47
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
NL Voluntary Coupled Support 2023 VCS – animals CY2022 ESTIMATED BY PERCENTAGE 100,00 % EUR -1 552 847,80 0,00 -1 552 847,80
Total NL: EUR -1 552 847,80 0,00 -1 552 847,80
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
PL Clearance of Accounts – Financial Clearance 2014 EAGF, EAFRD – not recovered financial errors ONE OFF EUR -17 956,12 -17 956,12 0,00
Clearance of Accounts – Financial Clearance 2015 EAGF, EAFRD – not recovered financial errors ONE OFF EUR -49 017,75 -49 017,75 0,00
Clearance of Accounts – Financial Clearance 2017 EAGF, EAFRD – not recovered financial errors ONE OFF EUR – 797,04 0,00 – 797,04
Clearance of Accounts – Financial Clearance 2020 Financial errors identified by the CB in debt management ONE OFF EUR -77 095,42 0,00 -77 095,42
Clearance of Accounts – Financial Clearance 2020 Issues related to Debt Management – Decision not to pursue recovery (EAGF) ONE OFF EUR -7 777,31 0,00 -7 777,31
Clearance of Accounts – Financial Clearance 2020 Issues related to Debt Management – Non-respect of the time limit for launching recovery procedure ONE OFF EUR – 327 328,11 0,00 – 327 328,11
Total PL: EUR – 479 971,75 -66 973,87 – 412 997,88
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
PT Wine – Harvest Insurance and Mutual Funds 2021 Appropriate performance of the administrative checks covering all aid applications and payment claims to ensure compliance with the legislation governing Union support schemes (KC) – FYs 2021 to 2023 ONE OFF EUR -72 372,00 0,00 -72 372,00
Wine – Harvest Insurance and Mutual Funds 2022 Appropriate performance of the administrative checks covering all aid applications and payment claims to ensure compliance with the legislation governing Union support schemes (KC) – FYs 2021 to 2023 ONE OFF EUR -72 290,23 0,00 -72 290,23
Wine – Harvest Insurance and Mutual Funds 2023 Appropriate performance of the administrative checks covering all aid applications and payment claims to ensure compliance with the legislation governing Union support schemes (KC) – FYs 2021 to 2023 ONE OFF EUR – 104 798,00 0,00 – 104 798,00
POSEI (2014+) 2021 FY2021 Absence in provisions concerning the national measures necessary to ensure compliance with the POSEI legal framework and appropriate measures to check that the advantage is passed on to the end user for the population =< EUR 40 000 FLAT RATE 10,00 % EUR -12 299,12 0,00 -12 299,12
POSEI (2014+) 2022 FY2022 Absence in provisions concerning the national measures necessary to ensure compliance with the POSEI legal framework and appropriate measures to check that the advantage is passed on to the end user for the population =< EUR 40 000 FLAT RATE 10,00 % EUR -35 361,70 0,00 -35 361,70
POSEI (2014+) 2023 FY2023 Absence in provisions concerning the national measures necessary to ensure compliance with the POSEI legal framework and appropriate measures to check that the advantage is passed on to the end user for the population =< EUR 40 000 FLAT RATE 10,00 % EUR -30 873,75 0,00 -30 873,75
Wine – Harvest Insurance and Mutual Funds 2021 Performance of on-the-spot checks – OTSC of sufficient quality (KC) – weaknesses in FY 2021 to FY 2023 FLAT RATE 5,00 % EUR -96 654,74 0,00 -96 654,74
Wine – Harvest Insurance and Mutual Funds 2022 Performance of on-the-spot checks – OTSC of sufficient quality (KC) – weaknesses in FY 2021 to FY 2023 FLAT RATE 5,00 % EUR -99 028,28 0,00 -99 028,28
Wine – Harvest Insurance and Mutual Funds 2023 Performance of on-the-spot checks – OTSC of sufficient quality (KC) – weaknesses in FY 2021 to FY 2023 FLAT RATE 5,00 % EUR – 101 280,73 0,00 – 101 280,73
Total PT: EUR – 624 958,55 0,00 – 624 958,55
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
RO Scrutiny of transactions 2020 FY 2020 Period 2021-2022 (0,5%) FLAT RATE 0,50 % EUR -26 971,42 -14,04 -26 957,38
Scrutiny of transactions 2020 FY 2020 Period 2021-2022 1,5% FLAT RATE 1,50 % EUR – 272 162,03 0,00 – 272 162,03
Scrutiny of transactions 2020 FY 2020 Period 2021-2022 2,5 % FLAT RATE 2,50 % EUR -56 431,34 0,00 -56 431,34
Scrutiny of transactions 2021 FY 2021 Period 2022-2023 (0,5%) FLAT RATE 0,50 % EUR -17 944,04 0,00 -17 944,04
Scrutiny of transactions 2021 FY 2021 Period 2022-2023 (1%) FLAT RATE 1,00 % EUR -26 265,56 0,00 -26 265,56
Scrutiny of transactions 2021 FY 2021 Period 2022-2023 2,5% FLAT RATE 2,50 % EUR -9 755,68 0,00 -9 755,68
Clearance of Accounts – Financial Clearance 2021 Potential irregularities identified and finally confirmed ONE OFF EUR -3 784,69 0,00 -3 784,69
Total RO: EUR – 413 314,76 -14,04 – 413 300,72
1.1. Execution of a guarantee in the context of a recovery procedure
1.2. Time limit to launch and follow up recovery procedures (irregularities reported under Annex II of Regulation (EU) No 908/2014)
1.3. Irrecoverable amount
Currency Gross Amount Deductions Net Decided
EUR – 169 609 386,10 -4 862 961,36 – 164 746 424,74
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
CZ Cross-compliance 2023 CY 2022 – FY 2023-2024 FLAT RATE 2,00 % EUR -1 320 290,30 0,00 -1 320 290,30
Cross-compliance 2024 CY 2022 – FY 2023-2024 FLAT RATE 2,00 % EUR – 124,69 0,00 – 124,69
Total CZ: EUR -1 320 414,99 0,00 -1 320 414,99
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
HU Cross-compliance 2022 CY 2021 a – FY 2022-2023 FLAT RATE 5,00 % EUR -1 910 965,51 -4 158,28 -1 906 807,23
Cross-compliance 2023 CY 2021 a – FY 2022-2023 FLAT RATE 5,00 % EUR -1 487,96 0,00 -1 487,96
Cross-compliance 2024 CY 2021 a – FY 2024 FLAT RATE 5,00 % EUR -1 056,43 0,00 -1 056,43
Cross-compliance 2022 CY 2021 b – FY 2022-2023 FLAT RATE 2,00 % EUR -1 714 521,74 -95,06 -1 714 426,68
Cross-compliance 2023 CY 2021 b – FY 2022-2023 FLAT RATE 2,00 % EUR -2 870,37 0,00 -2 870,37
Cross-compliance 2024 CY 2021 b – FY 2024 FLAT RATE 2,00 % EUR – 437,36 0,00 – 437,36
Cross-compliance 2023 CY 2022 a – FY 2022-2023 FLAT RATE 5,00 % EUR – 494 333,71 0,00 – 494 333,71
Cross-compliance 2024 CY 2022 a – FY 2024 FLAT RATE 5,00 % EUR -8 307,96 0,00 -8 307,96
Cross-compliance 2023 CY 2022 b – FY 2022-2023 FLAT RATE 2,00 % EUR -1 757 734,51 0,00 -1 757 734,51
Cross-compliance 2024 CY 2022 b – FY 2024 FLAT RATE 2,00 % EUR -2 583,73 0,00 -2 583,73
Total HU: EUR -5 894 299,28 -4 253,34 -5 890 045,94
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
IT Cross-compliance 2021 CY 2020 FLAT RATE 10,00 % EUR – 388 525,69 – 270,41 – 388 255,28
Cross-compliance 2022 CY 2021 FLAT RATE 10,00 % EUR – 423 897,61 -36,66 – 423 860,95
Cross-compliance 2023 CY 2021 FLAT RATE 10,00 % EUR -4 612,83 0,00 -4 612,83
Cross-compliance 2023 CY 2022 FLAT RATE 10,00 % EUR – 425 347,98 0,00 – 425 347,98
Total IT: EUR -1 242 384,11 – 307,07 -1 242 077,04
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
LT Cross-compliance 2021 CY 2020 – with land FLAT RATE 2,00 % EUR -1 010 712,03 -36 791,99 – 973 920,04
Cross-compliance 2022 CY 2020 – with land FLAT RATE 2,00 % EUR – 353,45 0,00 – 353,45
Cross-compliance 2023 CY 2020 – with land FLAT RATE 2,00 % EUR -41,08 0,00 -41,08
Cross-compliance 2021 CY 2020 – without land ONE OFF EUR -3 272,50 – 117,05 -3 155,45
Cross-compliance 2022 CY 2020 – without land ONE OFF EUR -1,13 0,00 -1,13
Cross-compliance 2023 CY 2020 – without land ONE OFF EUR -0,13 0,00 -0,13
Cross-compliance 2022 CY 2021 – with land FLAT RATE 2,00 % EUR -1 119 773,74 0,00 -1 119 773,74
Cross-compliance 2023 CY 2021 – with land FLAT RATE 2,00 % EUR – 469,02 0,00 – 469,02
Cross-compliance 2023 CY 2022 – with land FLAT RATE 2,00 % EUR -1 151 983,50 0,00 -1 151 983,50
Total LT: EUR -3 286 606,58 -36 909,04 -3 249 697,54
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
SK Cross-compliance 2021 CY 2020 a FY 2021-2023 FLAT RATE 5,00 % EUR – 139 851,99 – 391,54 – 139 460,45
Cross-compliance 2022 CY 2020 a FY 2021-2023 FLAT RATE 5,00 % EUR -17 469,19 0,00 -17 469,19
Cross-compliance 2023 CY 2020 a FY 2021-2023 FLAT RATE 5,00 % EUR – 147,04 0,00 – 147,04
Cross-compliance 2024 CY 2020 a FY 2024 FLAT RATE 5,00 % EUR -41,07 0,00 -41,07
Cross-compliance 2021 CY 2020 b FY 2021-2023 FLAT RATE 2,00 % EUR -18 120,39 -12,62 -18 107,77
Cross-compliance 2022 CY 2020 b FY 2021-2023 FLAT RATE 2,00 % EUR – 683,44 0,00 – 683,44
Cross-compliance 2023 CY 2020 b FY 2021-2023 FLAT RATE 2,00 % EUR – 215,95 0,00 – 215,95
Cross-compliance 2024 CY 2020 b FY 2024 FLAT RATE 2,00 % EUR -7,05 0,00 -7,05
Cross-compliance 2022 CY 2021 a FY 2022-2023 FLAT RATE 5,00 % EUR -1 151 682,97 -4 509,99 -1 147 172,98
Cross-compliance 2023 CY 2021 a FY 2022-2023 FLAT RATE 5,00 % EUR – 882,87 0,00 – 882,87
Cross-compliance 2024 CY 2021 a FY 2024 FLAT RATE 5,00 % EUR – 248,66 0,00 – 248,66
Cross-compliance 2021 CY 2021 b FY 2021-2023 FLAT RATE 2,00 % EUR – 100,40 0,00 – 100,40
Cross-compliance 2022 CY 2021 b FY 2021-2023 FLAT RATE 2,00 % EUR – 169 817,59 -67,04 – 169 750,55
Cross-compliance 2023 CY 2021 b FY 2021-2023 FLAT RATE 2,00 % EUR – 148,53 0,00 – 148,53
Cross-compliance 2024 CY 2021 b FY 2024 FLAT RATE 2,00 % EUR -36,86 0,00 -36,86
Cross-compliance 2023 CY 2022 a FY 2023 FLAT RATE 5,00 % EUR -1 070 016,36 0,00 -1 070 016,36
Cross-compliance 2024 CY 2022 a FY 2024 FLAT RATE 5,00 % EUR -12 321,30 0,00 -12 321,30
Cross-compliance 2023 CY 2022 b FY 2022-2023 FLAT RATE 2,00 % EUR – 169 059,66 0,00 – 169 059,66
Cross-compliance 2024 CY 2022 b FY 2024 FLAT RATE 2,00 % EUR -1 376,49 0,00 -1 376,49
Total SK: EUR -2 752 227,81 -4 981,19 -2 747 246,62
Currency Gross Amount Deductions Net Decided
EUR -14 495 932,77 -46 450,64 -14 449 482,13
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
HU Rural Development EAFRD measures subject to IACS 2022 One-off correction for M12 – NAT 2000 & WFD ONE OFF EUR -27 923,13 0,00 -27 923,13
Total HU: EUR -27 923,13 0,00 -27 923,13
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
RO Rural Development EAFRD measures subject to IACS 2023 Maximum Eligible Area (MEA): eligibility of parcels – M10 – CY2022 ONE OFF EUR – 317 298,00 0,00 – 317 298,00
Rural Development EAFRD measures subject to IACS 2024 Maximum Eligible Area (MEA): eligibility of parcels – M10 – CY2023 ONE OFF EUR – 158 290,36 0,00 – 158 290,36
Clearance of Accounts – Financial Clearance 2022 Projected Incompliance Rate EAFRD NIACS ESTIMATED BY AMOUNT EUR -1 591 064,79 0,00 -1 591 064,79
Total RO: EUR -2 066 653,15 0,00 -2 066 653,15
Currency Gross Amount Deductions Net Decided
EUR -2 094 576,28 0,00 -2 094 576,28
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
BE Rural Development EAFRD Leader 2021 Enquête CEB/2023/003/BE concernant le suivi du rapport de l'organisme de certifcation pourles exercices financiers 2021 à 2023 FLAT RATE 10,00 % EUR -29 305,01 0,00 -29 305,01
Rural Development EAFRD Leader 2022 Enquête CEB/2023/003/BE concernant le suivi du rapport de l'organisme de certifcation pourles exercices financiers 2021 à 2023 FLAT RATE 10,00 % EUR -60 010,95 0,00 -60 010,95
Rural Development EAFRD Leader 2023 Enquête CEB/2023/003/BE concernant le suivi du rapport de l'organisme de certifcation pourles exercices financiers 2021 à 2023 FLAT RATE 10,00 % EUR – 110 069,55 0,00 – 110 069,55
Rural Development EAFRD Leader 2024 Enquête CEB/2023/003/BE concernant le suivi du rapport de l'organisme de certifcation pour l'exerccie financier 2024 FLAT RATE 10,00 % EUR – 112 711,32 0,00 – 112 711,32
Total BE: EUR – 312 096,83 0,00 – 312 096,83
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
ES Clearance of Accounts – Financial Clearance 2022 Weeknesses in reccovery of debts – debt cases declared irrecoverable ONE OFF EUR -4 254 534,73 0,00 -4 254 534,73
Total ES: EUR -4 254 534,73 0,00 -4 254 534,73
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
GR Rural Development EAFRD Measures with flat-rate support 2023 Calculated correction for Measure 22 ONE OFF EUR -50 842,16 0,00 -50 842,16
Total GR: EUR -50 842,16 0,00 -50 842,16
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
HU Clearance of Accounts – Financial Clearance 2022 EAFRD Debtors ONE OFF EUR – 810 600,48 0,00 – 810 600,48
Rural Development EAFRD NIACS forestry measures 2021 EAFRD Non-IACS Forestry measures M.8.6.2. Deficiencies found in OTSC and verification of payments claims. FLAT RATE 5,00 % EUR -9 089,56 0,00 -9 089,56
Rural Development EAFRD NIACS forestry measures 2022 EAFRD Non-IACS Forestry measures M.8.6.2. Deficiencies found in OTSC and verification of payments claims. FLAT RATE 5,00 % EUR -28 074,01 0,00 -28 074,01
Rural Development EAFRD NIACS forestry measures 2023 EAFRD Non-IACS Forestry measures M.8.6.2. Deficiencies found in OTSC and verification of payments claims. FLAT RATE 5,00 % EUR -2 874,84 – 661,11 -2 213,73
Total HU: EUR – 850 638,89 – 661,11 – 849 977,78
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
IT Clearance of Accounts – Financial Clearance 2020 Advances and securities ONE OFF EUR -6 244 067,26 0,00 -6 244 067,26
Clearance of Accounts – Financial Clearance 2020 Debt management – EAFRD – debt recognition and registration – debt recovery and reporting of debts ONE OFF EUR -1 329 000,32 0,00 -1 329 000,32
Clearance of Accounts – Financial Clearance 2020 EAFRD debt management ONE OFF EUR -4 098 613,53 0,00 -4 098 613,53
Clearance of Accounts – Financial Clearance 2023 EAFRD debt management ONE OFF EUR – 120 826,85 0,00 – 120 826,85
Clearance of Accounts – Financial Clearance 2020 EAFRD flat rate 10% (debt management) FLAT RATE 10,00 % EUR – 977 606,50 0,00 – 977 606,50
Clearance of Accounts – Financial Clearance 2018 Weaknesses accreditation criterion delegation FY 2018 FLAT RATE 2,00 % EUR -3 923 544,98 – 954 975,31 -2 968 569,67
Clearance of Accounts – Financial Clearance 2019 Weaknesses accreditation criterion delegation FY 2019 FLAT RATE 2,00 % EUR -18 331 173,05 – 819 620,69 -17 511 552,36
Clearance of Accounts – Financial Clearance 2020 Weaknesses accreditation criterion delegation FY 2020 FLAT RATE 2,00 % EUR -20 275 089,10 -91 898,94 -20 183 190,16
Total IT: EUR -55 299 921,59 -1 866 494,94 -53 433 426,65
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
PL Clearance of Accounts – Financial Clearance 2019 EAFRD Non-IACS – financial errors ONE OFF EUR – 117 068,85 0,00 – 117 068,85
Clearance of Accounts – Financial Clearance 2020 EAFRD Non-IACS – financial errors ONE OFF EUR -26 494,93 0,00 -26 494,93
Clearance of Accounts – Financial Clearance 2016 EAGF, EAFRD – not recovered financial errors ONE OFF EUR -56 505,61 0,00 -56 505,61
Clearance of Accounts – Financial Clearance 2020 Financial errors identified by the CB in debt management ONE OFF EUR -26 258,43 0,00 -26 258,43
Clearance of Accounts – Financial Clearance 2020 Issues related to Debt Management – Decision not to pursue recovery (EAFRD) ONE OFF EUR -77 759,38 0,00 -77 759,38
Clearance of Accounts – Financial Clearance 2020 Issues related to Debt Management – Non-respect of the time limit for launching recovery procedure (EAFRD) ONE OFF EUR – 651 578,10 0,00 – 651 578,10
Total PL: EUR – 955 665,30 0,00 – 955 665,30
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
RO Clearance of Accounts – Financial Clearance 2021 Audit objective 1: debt management ONE OFF EUR -3 847 171,40 0,00 -3 847 171,40
Clearance of Accounts – Financial Clearance 2021 Audit objective 2: financial & known errors ONE OFF EUR -7 137,92 0,00 -7 137,92
Clearance of Accounts – Financial Clearance 2022 Debt management errors ONE OFF EUR -45 281,39 0,00 -45 281,39
Rural Development EAFRD forestry measures 2021 Inappropriate checks on double-financing M8.1 – CY2020-2021-2022 ONE OFF EUR -2 108,28 -1 020,81 -1 087,47
Rural Development EAFRD forestry measures 2022 Inappropriate checks on double-financing M8.1 – CY2020-2021-2022 ONE OFF EUR -3 483,43 – 867,02 -2 616,41
Rural Development EAFRD forestry measures 2023 Inappropriate checks on double-financing M8.1 – CY2020-2021-2022 ONE OFF EUR -7 410,58 – 140,61 -7 269,97
Rural Development EAFRD measures subject to IACS 2017 Inappropriate checks on the compliance with long-term commitments ONE OFF EUR -50 904,47 -55 686,59 4 782,12
Rural Development EAFRD measures subject to IACS 2018 Inappropriate checks on the compliance with long-term commitments ONE OFF EUR -85 318,08 -14 106,22 -71 211,86
Rural Development EAFRD measures subject to IACS 2019 Inappropriate checks on the compliance with long-term commitments ONE OFF EUR – 185 758,08 -24 205,78 – 161 552,30
Rural Development EAFRD measures subject to IACS 2020 Inappropriate checks on the compliance with long-term commitments ONE OFF EUR – 216 981,12 -40 540,51 – 176 440,61
Rural Development EAFRD measures subject to IACS 2021 Inappropriate checks on the compliance with long-term commitments ONE OFF EUR -28 116,40 – 664,02 -27 452,38
Clearance of Accounts – Financial Clearance 2022 Known errors EAFRD IACS ONE OFF EUR -5 438,37 0,00 -5 438,37
Clearance of Accounts – Financial Clearance 2022 Known errors EAFRD NIACS ONE OFF EUR – 149 403,47 0,00 – 149 403,47
Rural Development EAFRD measures subject to IACS 2021 Maximum Eligible Area (MEA): eligibility of parcels – M10 – CY2020 ONE OFF EUR – 292 907,28 – 167 944,64 – 124 962,64
Rural Development EAFRD measures subject to IACS 2022 Maximum Eligible Area (MEA): eligibility of parcels – M10 – CY2021 ONE OFF EUR – 496 021,92 – 194 307,63 – 301 714,29
Rural Development EAFRD measures subject to IACS 2023 Maximum Eligible Area (MEA): eligibility of parcels – M10 – CY2022 ONE OFF EUR – 267 927,66 -5 619,43 – 262 308,23
Rural Development EAFRD measures subject to IACS 2024 Maximum Eligible Area (MEA): eligibility of parcels – M10 – CY2023 ONE OFF EUR – 447 795,06 0,00 – 447 795,06
Rural Development EAFRD measures subject to IACS 2021 Maximum Eligible Area (MEA): eligibility of parcels – M13 – CY2020 ONE OFF EUR – 789 753,32 – 468 339,60 – 321 413,72
Rural Development EAFRD measures subject to IACS 2022 Maximum Eligible Area (MEA): eligibility of parcels – M13 – CY2021 ONE OFF EUR – 890 983,60 – 462 602,59 – 428 381,01
Rural Development EAFRD measures subject to IACS 2023 Maximum Eligible Area (MEA): eligibility of parcels – M13 – CY2022 ONE OFF EUR – 893 272,63 – 460 037,74 – 433 234,89
Rural Development EAFRD measures subject to IACS 2024 Maximum Eligible Area (MEA): eligibility of parcels – M13 – CY2023 ONE OFF EUR – 284 138,16 0,00 – 284 138,16
Clearance of Accounts – Financial Clearance 2022 Projected Incompliance Rate EAFRD IACS ESTIMATED BY AMOUNT EUR -8 687 477,53 0,00 -8 687 477,53
Clearance of Accounts – Financial Clearance 2022 Projected Incompliance Rate EAFRD NIACS ESTIMATED BY AMOUNT EUR -3 685 693,68 0,00 -3 685 693,68
Total RO: EUR -21 370 483,83 -1 896 083,19 -19 474 400,64
Currency Gross Amount Deductions Net Decided
EUR -83 094 183,33 -3 763 239,24 -79 330 944,09
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
CZ Cross-compliance 2023 CY 2022 – FY 2023-2024 FLAT RATE 2,00 % EUR -49 012,58 0,00 -49 012,58
Cross-compliance 2024 CY 2022 – FY 2023-2024 FLAT RATE 2,00 % EUR – 165,02 0,00 – 165,02
Cross-compliance 2025 CY 2022 – FY 2025 FLAT RATE 2,00 % EUR -1,33 0,00 -1,33
Total CZ: EUR -49 178,93 0,00 -49 178,93
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
HU Cross-compliance 2022 CY 2021 a – FY 2022-2023 FLAT RATE 5,00 % EUR -66 212,42 0,00 -66 212,42
Cross-compliance 2023 CY 2021 a – FY 2022-2023 FLAT RATE 5,00 % EUR – 216,65 0,00 – 216,65
Cross-compliance 2024 CY 2021 a – FY 2024 FLAT RATE 5,00 % EUR -91,21 0,00 -91,21
Cross-compliance 2022 CY 2021 b – FY 2022-2023 FLAT RATE 2,00 % EUR -50 591,72 0,00 -50 591,72
Cross-compliance 2023 CY 2021 b – FY 2022-2023 FLAT RATE 2,00 % EUR – 182,91 0,00 – 182,91
Cross-compliance 2023 CY 2022 a – FY 2022-2023 FLAT RATE 5,00 % EUR – 135 736,16 0,00 – 135 736,16
Cross-compliance 2024 CY 2022 a – FY 2024 FLAT RATE 5,00 % EUR – 871,90 0,00 – 871,90
Cross-compliance 2023 CY 2022 b – FY 2022-2023 FLAT RATE 2,00 % EUR -70 727,18 0,00 -70 727,18
Cross-compliance 2024 CY 2022 b – FY 2024 FLAT RATE 2,00 % EUR – 123,11 0,00 – 123,11
Cross-compliance 2024 CY 2023 – FY 2024 FLAT RATE 5,00 % EUR -7 245,17 0,00 -7 245,17
Total HU: EUR – 331 998,43 0,00 – 331 998,43
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
IT Cross-compliance 2022 CY 2021 FLAT RATE 10,00 % EUR -57 741,75 0,00 -57 741,75
Cross-compliance 2023 CY 2021 FLAT RATE 10,00 % EUR – 506,94 0,00 – 506,94
Total IT: EUR -58 248,69 0,00 -58 248,69
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
SK Cross-compliance 2022 CY 2021 a FY 2022-2023 FLAT RATE 5,00 % EUR -78 830,36 0,00 -78 830,36
Cross-compliance 2023 CY 2021 a FY 2022-2023 FLAT RATE 5,00 % EUR – 852,06 0,00 – 852,06
Cross-compliance 2022 CY 2021 b FY 2021-2023 FLAT RATE 2,00 % EUR -6 092,29 0,00 -6 092,29
Cross-compliance 2023 CY 2021 b FY 2021-2023 FLAT RATE 2,00 % EUR – 160,46 0,00 – 160,46
Cross-compliance 2024 CY 2021 b FY 2024 FLAT RATE 2,00 % EUR -2,68 0,00 -2,68
Cross-compliance 2023 CY 2022 a FY 2023 FLAT RATE 5,00 % EUR -83 927,46 0,00 -83 927,46
Cross-compliance 2024 CY 2022 a FY 2024 FLAT RATE 5,00 % EUR -2 993,89 0,00 -2 993,89
Cross-compliance 2023 CY 2022 b FY 2022-2023 FLAT RATE 2,00 % EUR -5 516,22 0,00 -5 516,22
Cross-compliance 2024 CY 2022 b FY 2024 FLAT RATE 2,00 % EUR – 320,33 0,00 – 320,33
Total SK: EUR – 178 695,75 0,00 – 178 695,75
Currency Gross Amount Deductions Net Decided
EUR – 618 121,80 0,00 – 618 121,80
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
CZ Cross-compliance 2023 CY 2022 – FY 2023-2024 FLAT RATE 2,00 % EUR – 313 465,59 0,00 – 313 465,59
Cross-compliance 2024 CY 2022 – FY 2023-2024 FLAT RATE 2,00 % EUR – 169,93 0,00 – 169,93
Cross-compliance 2025 CY 2022 – FY 2025 FLAT RATE 2,00 % EUR -0,02 0,00 -0,02
Total CZ: EUR – 313 635,54 0,00 – 313 635,54
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
HU Cross-compliance 2022 CY 2021 a – FY 2022-2023 FLAT RATE 5,00 % EUR – 247 106,01 -6,56 – 247 099,45
Cross-compliance 2023 CY 2021 a – FY 2022-2023 FLAT RATE 5,00 % EUR – 390,75 -0,24 – 390,51
Cross-compliance 2024 CY 2021 a – FY 2024 FLAT RATE 5,00 % EUR – 373,60 0,00 – 373,60
Cross-compliance 2022 CY 2021 b – FY 2022-2023 FLAT RATE 2,00 % EUR – 124 568,16 -23,37 – 124 544,79
Cross-compliance 2023 CY 2021 b – FY 2022-2023 FLAT RATE 2,00 % EUR – 575,58 -0,36 – 575,22
Cross-compliance 2024 CY 2021 b – FY 2024 FLAT RATE 2,00 % EUR -33,87 0,00 -33,87
Cross-compliance 2023 CY 2022 a – FY 2022-2023 FLAT RATE 5,00 % EUR – 644 509,00 -9,34 – 644 499,66
Cross-compliance 2024 CY 2022 a – FY 2024 FLAT RATE 5,00 % EUR -5 228,30 0,00 -5 228,30
Cross-compliance 2023 CY 2022 b – FY 2022-2023 FLAT RATE 2,00 % EUR – 407 286,79 -21,91 – 407 264,88
Cross-compliance 2024 CY 2022 b – FY 2024 FLAT RATE 2,00 % EUR -2 164,38 0,00 -2 164,38
Cross-compliance 2024 CY 2023 – FY 2024 FLAT RATE 5,00 % EUR -2 353,16 0,00 -2 353,16
Total HU: EUR -1 434 589,60 -61,78 -1 434 527,82
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
IT Cross-compliance 2021 CY 2020 FLAT RATE 10,00 % EUR – 102 835,41 0,00 – 102 835,41
Cross-compliance 2022 CY 2020 FLAT RATE 10,00 % EUR – 519,36 0,00 – 519,36
Cross-compliance 2022 CY 2021 FLAT RATE 10,00 % EUR – 169 558,46 0,00 – 169 558,46
Cross-compliance 2023 CY 2021 FLAT RATE 10,00 % EUR -2 364,41 0,00 -2 364,41
Cross-compliance 2023 CY 2022 FLAT RATE 10,00 % EUR – 168 463,39 0,00 – 168 463,39
Total IT: EUR – 443 741,03 0,00 – 443 741,03
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
LT Cross-compliance 2020 CY 2020 – with land FLAT RATE 2,00 % EUR -5,25 0,00 -5,25
Cross-compliance 2021 CY 2020 – with land FLAT RATE 2,00 % EUR -78 207,50 0,00 -78 207,50
Cross-compliance 2022 CY 2020 – with land FLAT RATE 2,00 % EUR -7,14 0,00 -7,14
Cross-compliance 2023 CY 2020 – with land FLAT RATE 2,00 % EUR -0,04 0,00 -0,04
Cross-compliance 2020 CY 2020 – without land ONE OFF EUR -0,02 0,00 -0,02
Cross-compliance 2021 CY 2020 – without land ONE OFF EUR – 253,22 0,00 – 253,22
Cross-compliance 2022 CY 2020 – without land ONE OFF EUR -0,02 0,00 -0,02
Cross-compliance 2023 CY 2022 – with land FLAT RATE 2,00 % EUR – 166 280,04 0,00 – 166 280,04
Total LT: EUR – 244 753,23 0,00 – 244 753,23
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
SK Cross-compliance 2021 CY 2020 a FY 2021-2023 FLAT RATE 5,00 % EUR – 170 690,33 0,00 – 170 690,33
Cross-compliance 2022 CY 2020 a FY 2021-2023 FLAT RATE 5,00 % EUR -5 837,11 0,00 -5 837,11
Cross-compliance 2023 CY 2020 a FY 2021-2023 FLAT RATE 5,00 % EUR -11,32 0,00 -11,32
Cross-compliance 2021 CY 2020 b FY 2021-2023 FLAT RATE 2,00 % EUR -13 803,52 0,00 -13 803,52
Cross-compliance 2022 CY 2020 b FY 2021-2023 FLAT RATE 2,00 % EUR – 276,40 0,00 – 276,40
Cross-compliance 2023 CY 2020 b FY 2021-2023 FLAT RATE 2,00 % EUR -91,20 0,00 -91,20
Cross-compliance 2024 CY 2020 b FY 2024 FLAT RATE 2,00 % EUR -15,69 0,00 -15,69
Cross-compliance 2022 CY 2021 a FY 2022-2023 FLAT RATE 5,00 % EUR – 341 452,03 0,00 – 341 452,03
Cross-compliance 2023 CY 2021 a FY 2022-2023 FLAT RATE 5,00 % EUR -3 283,00 0,00 -3 283,00
Cross-compliance 2024 CY 2021 a FY 2024 FLAT RATE 5,00 % EUR -27,23 0,00 -27,23
Cross-compliance 2022 CY 2021 b FY 2021-2023 FLAT RATE 2,00 % EUR -32 066,84 0,00 -32 066,84
Cross-compliance 2023 CY 2021 b FY 2021-2023 FLAT RATE 2,00 % EUR -10,42 0,00 -10,42
Cross-compliance 2024 CY 2021 b FY 2024 FLAT RATE 2,00 % EUR -1,22 0,00 -1,22
Cross-compliance 2023 CY 2022 a FY 2023 FLAT RATE 5,00 % EUR – 324 855,59 0,00 – 324 855,59
Cross-compliance 2024 CY 2022 a FY 2024 FLAT RATE 5,00 % EUR -5 747,24 0,00 -5 747,24
Cross-compliance 2022 CY 2022 b FY 2022-2023 FLAT RATE 2,00 % EUR -1,94 0,00 -1,94
Cross-compliance 2023 CY 2022 b FY 2022-2023 FLAT RATE 2,00 % EUR -29 644,57 0,00 -29 644,57
Cross-compliance 2024 CY 2022 b FY 2024 FLAT RATE 2,00 % EUR – 453,20 0,00 – 453,20
Total SK: EUR – 928 268,85 0,00 – 928 268,85
Currency Gross Amount Deductions Net Decided
EUR -3 364 988,25 -61,78 -3 364 926,47
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
PL Clearance of Accounts – Financial Clearance 2020 Issues related to Debt Management – Decision not to pursue recovery (EAFRD) ONE OFF EUR -24 361,86 0,00 -24 361,86
Clearance of Accounts – Financial Clearance 2020 Issues related to Debt Management – Non-respect of the time limit for launching recovery procedure (TRDI) ONE OFF EUR -33 717,54 0,00 -33 717,54
Total PL: EUR -58 079,40 0,00 -58 079,40
Currency Gross Amount Deductions Net Decided
EUR -58 079,40 0,00 -58 079,40
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided Lifted Suspensions
RO Rural Development EAFRD measures subject to IACS 2022 Lifting FY2022 M10-M13 C(2022)7819 C(2023)854 Lifting of Suspension EUR 0,00 0,00 0,00 707 515,11
Rural Development EAFRD measures subject to IACS 2023 Lifting FY2023 M10-M13 C(2023)5576 C(2024)814 Lifting of Suspension EUR 0,00 0,00 0,00 618 699,37
Rural Development EAFRD measures subject to IACS 2024 Suspension of interim payments Art.41(1) of R.1306/2013 – C(2024)8138 – FY 2024 – M10, M10 EURI & M13 Lifting of Suspension EUR 0,00 0,00 0,00 414 820,48
Total RO: EUR 0,00 0,00 0,00 1 741 034,96
Currency Gross Amount Deductions Net Decided Lifted Suspensions
EUR 0,00 0,00 0,00 1 741 034,96
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided Lifted Suspensions
RO Rural Development EAFRD measures subject to IACS 2023 Lifting FY2023 M10-M13 C(2023)5576 C(2024)814 Lifting of Suspension EUR 0,00 0,00 0,00 300 139,64
Rural Development EAFRD measures subject to IACS 2024 Suspension of interim payments Art.41(1) of R.1306/2013 – C(2024)8138 – FY 2024 – M10, M10 EURI & M13 Lifting of Suspension EUR 0,00 0,00 0,00 60 433,37
Total RO: EUR 0,00 0,00 0,00 360 573,01
Currency Gross Amount Deductions Net Decided Lifted Suspensions
EUR 0,00 0,00 0,00 360 573,01
Member State Measure FY Reason Type Correction % Currency Gross Amount Deductions Net Decided
IT Scrutiny of transactions 2017 Scrutiny 0,5% Negative Amount 2017 – 2019 FLAT RATE 0,50 % EUR 1 772,28 0,00 1 772,28
Scrutiny of transactions 2019 Scrutiny 0,5% Negative Amount 2017 – 2019 FLAT RATE 0,50 % EUR 21,67 0,00 21,67
Total IT: EUR 1 793,95 0,00 1 793,95
Currency Gross Amount Deductions Net Decided
EUR 1 793,95 0,00 1 793,95
Financial Corrections Total Net Decided
EAGF Financial corrections – excluding cross-compliance – 164 746 424,74
EAGF Financial corrections from cross-compliance -14 449 482,13
EAFRD Financial corrections – excluding cross-compliance -81 425 520,37
EAFRD Financial corrections from cross-compliance -3 983 048,27
TRDI Financial corrections – excluding cross-compliance -58 079,40
TOTAL: – 264 662 554,91
Reimbursements Total Net Decided
EAGF 1 793,95
TOTAL: 1 793,95
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) 2021/2116 of the European Parliament and of the Council of 2 December 2021 on the financing, management and monitoring of the common agricultural policy and repealing Regulation (EU) No 1306/2013 (1), and in particular Articles 55 and 104 thereof,
Having regard to Regulation (EU) No 1306/2013 of the European Parliament and of the Council of 17 December 2013 on the financing, management and monitoring of the common agricultural policy and repealing Council Regulations (EEC) No 352/78, (EC) No 165/94, (EC) No 2799/98, (EC) No 814/2000, (EC) No 1290/2005 and (EC) No 485/2008 (2), and in particular Article 52 thereof,
After consulting the Committee on the Agricultural Funds,
Whereas:
(1) Article 4(1), point (b), Article 5, Article 7(3), Articles 9, 17, 21 and 34, Article 35(4), Articles 36, 37, 38, 40 to 43, 51, 52, 54, 56, 59, 63, 64, 67, 68, 70 to 75, 77, 91 to 97, 99 and 100, Article 102(2) and Articles 110 and 111 of Regulation (EU) No 1306/2013 continue to apply, as regards the European Agricultural Guarantee Fund (EAGF) and the European Agricultural Fund for Rural Development (EAFRD), in relation to expenditure as referred to in Article 104(1), second subparagraph, point (a), of Regulation (EU) 2021/2116.
(2) In accordance with Article 52 of Regulation (EU) No 1306/2013 and Article 55 of Regulation (EU) 2021/2116, the Commission is to carry out the necessary verifications, communicate to the Member States the results of those verifications, take note of the comments of the Member States, initiate a bilateral discussion so that an agreement may be reached with the Member States in question and formally communicate its conclusions to them.
(3) In accordance with Article 52(3), second subparagraph, of Regulation (EU) No 1306/2013 and Article 34(3), third subparagraph, and Article 40 of Commission Implementing Regulation (EU) No 908/2014 (3), and Article 55(3), second subparagraph, of Regulation (EU) 2021/2116 and Article 37(3), third subparagraph, and Article 43 of Commission Implementing Regulation (EU) 2022/128 (4), some Member States made use of the conciliation procedure. The Commission has examined the reports issued by the Conciliation Body on the outcome of these conciliation procedures.
(4) In accordance with Regulation (EU) No 1306/2013 and Regulation (EU) 2021/2116, only agricultural expenditure which has been incurred in a way that has not infringed Union law may be financed, subject to, as regards expenditure incurred under Regulation (EU) 2021/2116, certain limitations in Article 55(1), second and third subparagraphs, of that Regulation.
(5) In the light of the verifications carried out, the outcome of the bilateral discussions and the conciliation procedures, part of the expenditure declared by certain Member States does not fulfil this requirement and can therefore not be financed under the EAGF and the EAFRD.
(6) The Commission should indicate the amounts that are not recognised as being chargeable to the EAGF and the EAFRD. Those amounts do not relate to expenditure incurred more than 24 months before the Commission’s written notification of the results of the verifications to those Member States, except where otherwise provided for in Article 52(4), points (b) and (c), and Article 52(5) of Regulation (EU) No 1306/2013 and Article 55(4), points (b) and (c), and Article 55(5) of Regulation (EU) 2021/2116.
(7) The amounts excluded from Union financing by the present Decision should also take into account any reductions or suspensions in accordance with Article 41 of Regulation (EU) No 1306/2013 due to the fact that such reductions or suspensions are of a provisional nature and without prejudice to decisions taken pursuant to Articles 51 or 52 of that Regulation.
(8) As regards the cases covered by this decision, the Commission notified the assessment of the amounts to be excluded on grounds of non-compliance with Union law to the Member States concerned in the summary report on the subject (5).
(9) This Decision is without prejudice to any financial conclusions that the Commission may draw from the judgments of the Court of Justice of the European Union in cases pending on 26 August 2025,
HAS ADOPTED THIS DECISION:
The amounts set out in the Annex and related to expenditure incurred by the Member States’ accredited paying agencies and declared under the EAGF or the EAFRD shall be excluded from Union financing.
This Decision is addressed to the Kingdom of Belgium, the Czech Republic, the Kingdom of Denmark, the Republic of Estonia, the Hellenic Republic, the Kingdom of Spain, the Italian Republic, the Republic of Lithuania, Hungary, the Kingdom of the Netherlands, the Republic of Poland, the Portuguese Republic, Romania and the Slovak Republic.

Financial Corrections

EAGF

Financial corrections – excluding cross-compliance

Budget Item: 6200

Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
DK
EU School Scheme
2024
Deficiencies in 2 key controls (FY 2024).
FLAT RATE
5,00 %
EUR
-91 026,69
0,00
-91 026,69

EU School Scheme
2025
Deficiencies in 2 key controls (FY 2025).
FLAT RATE
5,00 %
EUR
– 104 294,02
0,00
– 104 294,02

EU School Scheme
2022
Deficiencies in 2 key controls (FYs 2022-2023).
FLAT RATE
5,00 %
EUR
-83 466,94
0,00
-83 466,94

EU School Scheme
2023
Deficiencies in 2 key controls (FYs 2022-2023).
FLAT RATE
5,00 %
EUR
– 135 331,44
0,00
– 135 331,44

Total DK:
EUR
– 414 119,09
0,00
– 414 119,09
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
EE
EU School Scheme
2022
Checks to establish the eligibility of the aid (key control).
Compliance with provisions regarding administrative checks of the aid applications and documentary evidence for the supply and distribution of products.
FY 2022 (SY 2021/22).
ONE OFF

EUR
-26 917,27
0,00
-26 917,27

EU School Scheme
2023
Checks to establish the eligibility of the aid (key control).
Compliance with provisions regarding administrative checks of the aid applications and documentary evidence.
FYs 2023 and 2024 (SYs 2022/23 and 2023/24).
ONE OFF

EUR
-34 679,37
0,00
-34 679,37

EU School Scheme
2024
Checks to establish the eligibility of the aid (key control).
Compliance with provisions regarding administrative checks of the aid applications and documentary evidence.
FYs 2023 and 2024 (SYs 2022/23 and 2023/24).
ONE OFF

EUR
-30 904,10
0,00
-30 904,10

Total EE:
EUR
-92 500,74
0,00
-92 500,74
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
ES
Clearance of Accounts – Financial Clearance
2022
1.1. Execution of a guarantee in the context of a recovery procedure
1.2. Time limit to launch and follow up recovery procedures (irregularities reported under Annex II of Regulation (EU) No 908/2014)
1.3. Irrecoverable amount
ONE OFF

EUR
-2 149 745,24
0,00
-2 149 745,24

Decoupled Direct Aids
2023
BPS – CY 2022 – all PAs
ONE OFF

EUR
-17 908,57
0,00
-17 908,57

Clearance of Accounts – Financial Clearance
2017
Financial errors identified by the CB
ONE OFF

EUR
-31 212,95
0,00
-31 212,95

Clearance of Accounts – Financial Clearance
2022
Financial errors identified by the CB
ONE OFF

EUR
-26 890,97
0,00
-26 890,97

Decoupled Direct Aids
2023
GREENING – CY 2022 – all PAs
ONE OFF

EUR
-10 879,09
0,00
-10 879,09

Decoupled Direct Aids
2023
YFP – CY 2022 – 5 PAs
ONE OFF

EUR
– 251 421,29
0,00
– 251 421,29

Decoupled Direct Aids
2023
YFP – CY 2022 – all PAs
ONE OFF

EUR
-2 519 577,06
0,00
-2 519 577,06

Total ES:
EUR
-5 007 635,17
0,00
-5 007 635,17
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
IT
Clearance of Accounts – Financial Clearance
2020
Debt management – EAGF – debt recognition and registration – debt recovery and reporting of debts
ONE OFF

EUR
-1 426 671,94
0,00
-1 426 671,94

EU School Scheme
2020
Deficiency in KC ‘Checks to establish the eligibility of the aid’ – Reasonableness of the cost-based system – F&V and milk parts of the scheme – FYs 2020, 2021 and 2022
FLAT RATE
5,00 %
EUR
-60 672,95
0,00
-60 672,95

EU School Scheme
2021
Deficiency in KC ‘Checks to establish the eligibility of the aid’ – Reasonableness of the cost-based system – F&V and milk parts of the scheme – FYs 2020, 2021 and 2022
FLAT RATE
5,00 %
EUR
– 101 884,30
0,00
– 101 884,30

EU School Scheme
2022
Deficiency in KC ‘Checks to establish the eligibility of the aid’ – Reasonableness of the cost-based system – F&V and milk parts of the scheme – FYs 2020, 2021 and 2022
FLAT RATE
5,00 %
EUR
-25 923,55
0,00
-25 923,55

EU School Scheme
2021
Deficiency in KC ‘Checks to establish the eligibility of the aid’ – Respect of limits and ceilings (Annex V products) – Milk part of the scheme – FYs 2021 and 2022
ONE OFF

EUR
-1 454 557,16
0,00
-1 454 557,16

EU School Scheme
2022
Deficiency in KC ‘Checks to establish the eligibility of the aid’ – Respect of limits and ceilings (Annex V products) – Milk part of the scheme – FYs 2021 and 2022
ONE OFF

EUR
-1 008 514,70
0,00
-1 008 514,70

Clearance of Accounts – Financial Clearance
2020
EAGF debt management
ONE OFF

EUR
-34 401 844,77
0,00
-34 401 844,77

Clearance of Accounts – Financial Clearance
2023
EAGF debt management
ONE OFF

EUR
-69 505,75
0,00
-69 505,75

Clearance of Accounts – Financial Clearance
2020
EAGF flat-rate 10% (debt management)
FLAT RATE
10,00 %
EUR
-1 541 550,41
0,00
-1 541 550,41

Clearance of Accounts – Financial Clearance
2020
Legality and regularity
ONE OFF

EUR
-2 676,83
0,00
-2 676,83

Clearance of Accounts – Financial Clearance
2020
Milk quota sector
ONE OFF

EUR
-67 948,53
0,00
-67 948,53

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.1. of the COL – OP2018 – Appropriate performance of the administrative checks to establish the eligibility of operational programmes and aid applications (key control) – AGEA Regions
FLAT RATE
5,00 %
EUR
-1 503 595,41
0,00
-1 503 595,41

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.1. of the COL – OP2019 – Appropriate performance of the administrative checks to establish the eligibility of operational programmes and aid applications (key control) – AGEA Regions
FLAT RATE
5,00 %
EUR
– 532 090,40
0,00
– 532 090,40

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.1. of the COL – OP2019 – Appropriate performance of the administrative checks to establish the eligibility of operational programmes and aid applications (key control) – AGEA Regions
FLAT RATE
5,00 %
EUR
-1 898 925,51
0,00
-1 898 925,51

Fruit and Vegetables – Operational programmes incl withdrawals
2021
Point 1.1.1. of the COL – OP2019 – Appropriate performance of the administrative checks to establish the eligibility of operational programmes and aid applications (key control) – AGEA Regions
FLAT RATE
5,00 %
EUR
-2 755,16
0,00
-2 755,16

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.1. of the COL – OP2020 – Appropriate performance of the administrative checks to establish the eligibility of operational programmes and aid applications (key control) – AGEA Regions
FLAT RATE
5,00 %
EUR
– 551 042,39
0,00
– 551 042,39

Fruit and Vegetables – Operational programmes incl withdrawals
2021
Point 1.1.1. of the COL – OP2020 – Appropriate performance of the administrative checks to establish the eligibility of operational programmes and aid applications (key control) – AGEA Regions
FLAT RATE
5,00 %
EUR
-1 947 771,35
0,00
-1 947 771,35

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.1. of the COL – Whole Italy – PA AGEA OP2018 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
-73 241,10
0,00
-73 241,10

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.1. of the COL – Whole Italy – PA AGEA OP2018 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
– 137 236,61
0,00
– 137 236,61

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.1. of the COL – Whole Italy – PA AGEA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
-34 373,44
0,00
-34 373,44

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.1. of the COL – Whole Italy – PA AGEA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
– 122 672,00
0,00
– 122 672,00

Fruit and Vegetables – Operational programmes incl withdrawals
2021
Point 1.1.2.1. of the COL – Whole Italy – PA AGEA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
– 177,98
0,00
– 177,98

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.1. of the COL – Whole Italy – PA AGEA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
-56 569,77
0,00
-56 569,77

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.1. of the COL – Whole Italy – PA AGEA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
– 201 886,33
0,00
– 201 886,33

Fruit and Vegetables – Operational programmes incl withdrawals
2021
Point 1.1.2.1. of the COL – Whole Italy – PA AGEA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
– 292,92
0,00
– 292,92

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.1. of the COL – Whole Italy – PA AGEA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
-39 055,79
0,00
-39 055,79

Fruit and Vegetables – Operational programmes incl withdrawals
2021
Point 1.1.2.1. of the COL – Whole Italy – PA AGEA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
– 138 050,64
0,00
– 138 050,64

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.1. of the COL – Whole Italy – PA AGEA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
-78 834,09
0,00
-78 834,09

Fruit and Vegetables – Operational programmes incl withdrawals
2021
Point 1.1.2.1. of the COL – Whole Italy – PA AGEA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
– 278 655,10
0,00
– 278 655,10

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.1. of the COL – Whole Italy – PA AGREA OP2018 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
-9 720,54
0,00
-9 720,54

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.1. of the COL – Whole Italy – PA AGREA OP2018 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
-45 861,35
0,00
-45 861,35

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.1. of the COL – Whole Italy – PA AGREA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
-5 329,28
0,00
-5 329,28

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.1. of the COL – Whole Italy – PA AGREA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
-22 389,43
0,00
-22 389,43

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.1. of the COL – Whole Italy – PA AGREA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
-29 110,02
0,00
-29 110,02

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.1. of the COL – Whole Italy – PA AGREA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
– 122 297,27
0,00
– 122 297,27

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.1. of the COL – Whole Italy – PA AGREA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
-11 789,04
0,00
-11 789,04

Fruit and Vegetables – Operational programmes incl withdrawals
2021
Point 1.1.2.1. of the COL – Whole Italy – PA AGREA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
-30 500,99
0,00
-30 500,99

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.1. of the COL – Whole Italy – PA AGREA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
-51 403,52
0,00
-51 403,52

Fruit and Vegetables – Operational programmes incl withdrawals
2021
Point 1.1.2.1. of the COL – Whole Italy – PA AGREA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
– 132 992,83
0,00
– 132 992,83

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.1. of the COL – Whole Italy – PA ARTEA OP2018 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
-3 863,70
0,00
-3 863,70

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.1. of the COL – Whole Italy – PA ARTEA OP2018 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
-8 817,28
-1 991,42
-6 825,86

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.1. of the COL – Whole Italy – PA ARTEA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
-2 970,54
0,00
-2 970,54

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.1. of the COL – Whole Italy – PA ARTEA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
– 904,46
0,00
– 904,46

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.1. of the COL – Whole Italy – PA ARTEA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
-12 647,15
0,00
-12 647,15

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.1. of the COL – Whole Italy – PA ARTEA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
-3 850,77
-2 448,32
-1 402,45

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.1. of the COL – Whole Italy – PA ARTEA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
-2 617,78
0,00
-2 617,78

Fruit and Vegetables – Operational programmes incl withdrawals
2021
Point 1.1.2.1. of the COL – Whole Italy – PA ARTEA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
-1 251,90
0,00
-1 251,90

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.1. of the COL – Whole Italy – PA ARTEA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
-11 618,66
0,00
-11 618,66

Fruit and Vegetables – Operational programmes incl withdrawals
2021
Point 1.1.2.1. of the COL – Whole Italy – PA ARTEA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
-5 556,39
0,00
-5 556,39

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.1. of the COL – Whole Italy – PA AVEPA OP2018 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
-5 387,59
-58,57
-5 329,02

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.1. of the COL – Whole Italy – PA AVEPA OP2018 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
-37 474,35
-37 202,78
– 271,57

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.1. of the COL – Whole Italy – PA AVEPA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
– 546,42
– 327,85
– 218,57

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.1. of the COL – Whole Italy – PA AVEPA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
-6 742,44
-59,19
-6 683,25

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.1. of the COL – Whole Italy – PA AVEPA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
-3 643,50
-2 186,10
-1 457,40

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.1. of the COL – Whole Italy – PA AVEPA OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
-44 958,18
-44 695,06
– 263,12

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.1. of the COL – Whole Italy – PA AVEPA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
-1 594,71
0,00
-1 594,71

Fruit and Vegetables – Operational programmes incl withdrawals
2021
Point 1.1.2.1. of the COL – Whole Italy – PA AVEPA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
-7 619,91
0,00
-7 619,91

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.1. of the COL – Whole Italy – PA AVEPA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
-8 439,91
0,00
-8 439,91

Fruit and Vegetables – Operational programmes incl withdrawals
2021
Point 1.1.2.1. of the COL – Whole Italy – PA AVEPA OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
-40 328,05
0,00
-40 328,05

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.1. of the COL – Whole Italy – PA OPLO OP2018 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
-7 348,41
0,00
-7 348,41

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.1. of the COL – Whole Italy – PA OPLO OP2018 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
0,00
0,00
0,00

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.1. of the COL – Whole Italy – PA OPLO OP2018 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
-25 962,90
-23 161,34
-2 801,56

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.1. of the COL – Whole Italy – PA OPLO OP2018 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
0,01
0,00
0,01

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.1. of the COL – Whole Italy – PA OPLO OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
-1 367,95
0,00
-1 367,95

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.1. of the COL – Whole Italy – PA OPLO OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
-5 332,63
0,00
-5 332,63

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.1. of the COL – Whole Italy – PA OPLO OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
-11 777,71
0,00
-11 777,71

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.1. of the COL – Whole Italy – PA OPLO OP2019 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
-45 912,43
-26 892,44
-19 019,99

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.1. of the COL – Whole Italy – PA OPLO OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
– 976,17
0,00
– 976,17

Fruit and Vegetables – Operational programmes incl withdrawals
2021
Point 1.1.2.1. of the COL – Whole Italy – PA OPLO OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values above the one validated ISMEA
FLAT RATE
5,00 %
EUR
-6 922,25
0,00
-6 922,25

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.1. of the COL – Whole Italy – PA OPLO OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
-6 859,55
0,00
-6 859,55

Fruit and Vegetables – Operational programmes incl withdrawals
2021
Point 1.1.2.1. of the COL – Whole Italy – PA OPLO OP2020 – Calculation and use of flat rates, scales of unit and specific costs – values not validated ISMEA
FLAT RATE
5,00 %
EUR
-48 642,06
0,00
-48 642,06

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.2. of the COL – Whole Italy – PA AGEA OP2018 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
-1 160 116,53
0,00
-1 160 116,53

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.2. of the COL – Whole Italy – PA AGEA OP2019 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
– 551 184,87
0,00
– 551 184,87

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.2. of the COL – Whole Italy – PA AGEA OP2019 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
-1 967 069,93
0,00
-1 967 069,93

Fruit and Vegetables – Operational programmes incl withdrawals
2021
Point 1.1.2.2. of the COL – Whole Italy – PA AGEA OP2019 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
-2 854,03
0,00
-2 854,03

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.2. of the COL – Whole Italy – PA AGEA OP2020 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
– 100 129,47
0,00
– 100 129,47

Fruit and Vegetables – Operational programmes incl withdrawals
2021
Point 1.1.2.2. of the COL – Whole Italy – PA AGEA OP2020 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
– 353 927,94
0,00
– 353 927,94

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.2. of the COL – Whole Italy – PA AGREA OP2018 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
-1 079 775,07
0,00
-1 079 775,07

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.2. of the COL – Whole Italy – PA AGREA OP2019 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
– 842 092,55
0,00
– 842 092,55

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.2. of the COL – Whole Italy – PA AGREA OP2019 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
-3 537 806,24
0,00
-3 537 806,24

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.2. of the COL – Whole Italy – PA AGREA OP2020 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
-1 190 974,95
0,00
-1 190 974,95

Fruit and Vegetables – Operational programmes incl withdrawals
2021
Point 1.1.2.2. of the COL – Whole Italy – PA AGREA OP2020 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
-3 081 328,69
0,00
-3 081 328,69

Fruit and Vegetables – Operational programmes incl withdrawals
2022
Point 1.1.2.2. of the COL – Whole Italy – PA AGREA OP2020 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
0,00
0,00
0,00

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.2. of the COL – Whole Italy – PA ARTEA OP2018 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
– 170 560,20
0,00
– 170 560,20

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.2. of the COL – Whole Italy – PA ARTEA OP2019 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
– 180 637,90
0,00
– 180 637,90

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.2. of the COL – Whole Italy – PA ARTEA OP2019 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
-55 000,08
0,00
-55 000,08

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.2. of the COL – Whole Italy – PA ARTEA OP2020 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
– 148 846,30
0,00
– 148 846,30

Fruit and Vegetables – Operational programmes incl withdrawals
2021
Point 1.1.2.2. of the COL – Whole Italy – PA ARTEA OP2020 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
-71 182,82
0,00
-71 182,82

Fruit and Vegetables – Operational programmes incl withdrawals
2022
Point 1.1.2.2. of the COL – Whole Italy – PA ARTEA OP2020 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
0,00
0,00
0,00

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.2. of the COL – Whole Italy – PA AVEPA OP2018 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
-36 168,43
-19,66
-36 148,77

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.2. of the COL – Whole Italy – PA AVEPA OP2019 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
-4 555,36
0,00
-4 555,36

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.2. of the COL – Whole Italy – PA AVEPA OP2019 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
-56 210,04
-2 485,84
-53 724,20

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.2. of the COL – Whole Italy – PA AVEPA OP2020 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
-43 045,51
0,00
-43 045,51

Fruit and Vegetables – Operational programmes incl withdrawals
2021
Point 1.1.2.2. of the COL – Whole Italy – PA AVEPA OP2020 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
– 205 682,34
0,00
– 205 682,34

Fruit and Vegetables – Operational programmes incl withdrawals
2022
Point 1.1.2.2. of the COL – Whole Italy – PA AVEPA OP2020 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
0,00
0,00
0,00

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.2. of the COL – Whole Italy – PA OPLO OP2018 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
– 487 137,43
0,00
– 487 137,43

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.2. of the COL – Whole Italy – PA OPLO OP2018 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
0,09
0,00
0,09

Fruit and Vegetables – Operational programmes incl withdrawals
2019
Point 1.1.2.2. of the COL – Whole Italy – PA OPLO OP2019 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
-94 172,96
0,00
-94 172,96

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.2. of the COL – Whole Italy – PA OPLO OP2019 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
– 821 977,35
0,00
– 821 977,35

Fruit and Vegetables – Operational programmes incl withdrawals
2021
Point 1.1.2.2. of the COL – Whole Italy – PA OPLO OP2019 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
0,00
0,00
0,00

Fruit and Vegetables – Operational programmes incl withdrawals
2020
Point 1.1.2.2. of the COL – Whole Italy – PA OPLO OP2020 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
– 179 151,90
0,00
– 179 151,90

Fruit and Vegetables – Operational programmes incl withdrawals
2021
Point 1.1.2.2. of the COL – Whole Italy – PA OPLO OP2020 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
-1 270 393,96
0,00
-1 270 393,96

Fruit and Vegetables – Operational programmes incl withdrawals
2022
Point 1.1.2.2. of the COL – Whole Italy – PA OPLO OP2020 – Ineligible costs for the FV POs scheme
ONE OFF

EUR
-6 003,51
0,00
-6 003,51

Scrutiny of transactions
2017
Scrutiny 0,5% 2017 2018 2019
FLAT RATE
0,50 %
EUR
– 870 976,83
-10 005,58
– 860 971,25

Scrutiny of transactions
2018
Scrutiny 0,5% 2017 2018 2019
FLAT RATE
0,50 %
EUR
– 898 224,71
-33 108,67
– 865 116,04

Scrutiny of transactions
2019
Scrutiny 0,5% 2017 2018 2019
FLAT RATE
0,50 %
EUR
– 802 973,05
-7 333,76
– 795 639,29

Scrutiny of transactions
2017
Scrutiny 2,5% 2017 2018 2019
FLAT RATE
2,50 %
EUR
-95 524,10
0,00
-95 524,10

Scrutiny of transactions
2018
Scrutiny 2,5% 2017 2018 2019
FLAT RATE
2,50 %
EUR
-56 134,65
0,00
-56 134,65

Scrutiny of transactions
2019
Scrutiny 2,5% 2017 2018 2019
FLAT RATE
2,50 %
EUR
-12 587,14
0,00
-12 587,14

Clearance of Accounts – Financial Clearance
2018
Weaknesses accreditation criterion delegation FY 2018
FLAT RATE
2,00 %
EUR
-5 058 890,26
– 851 343,93
-4 207 546,33

Clearance of Accounts – Financial Clearance
2019
Weaknesses accreditation criterion delegation FY 2019
FLAT RATE
2,00 %
EUR
-44 633 922,68
-2 901 092,51
-41 732 830,17

Clearance of Accounts – Financial Clearance
2020
Weaknesses accreditation criterion delegation FY 2020
FLAT RATE
2,00 %
EUR
-42 182 221,19
– 851 560,43
-41 330 660,76

Total IT:
EUR
– 160 901 747,77
-4 795 973,45
– 156 105 774,32
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
LT
EU School Scheme
2022
Checks to establish the eligibility of the aid (key control).
Fair and verifiable calculation method of aid rates for the supply and distribution of fruit & vegetables.
FY 2022 (SY 2021/22).
FLAT RATE
5,00 %
EUR
-33 084,98
0,00
-33 084,98

EU School Scheme
2023
Checks to establish the eligibility of the aid (key control).
Fair and verifiable calculation method of aid rates for the supply and distribution of fruit & vegetables.
FYs 2023 and 2024 (SYs 2022/23 and 2023/24).
FLAT RATE
5,00 %
EUR
-45 089,81
0,00
-45 089,81

EU School Scheme
2024
Checks to establish the eligibility of the aid (key control).
Fair and verifiable calculation method of aid rates for the supply and distribution of fruit & vegetables.
FYs 2023 and 2024 (SYs 2022/23 and 2023/24).
FLAT RATE
5,00 %
EUR
-44 115,68
0,00
-44 115,68

Total LT:
EUR
– 122 290,47
0,00
– 122 290,47
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
NL
Voluntary Coupled Support
2023
VCS – animals CY2022
ESTIMATED BY PERCENTAGE
100,00 %
EUR
-1 552 847,80
0,00
-1 552 847,80

Total NL:
EUR
-1 552 847,80
0,00
-1 552 847,80
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
PL
Clearance of Accounts – Financial Clearance
2014
EAGF, EAFRD – not recovered financial errors
ONE OFF

EUR
-17 956,12
-17 956,12
0,00

Clearance of Accounts – Financial Clearance
2015
EAGF, EAFRD – not recovered financial errors
ONE OFF

EUR
-49 017,75
-49 017,75
0,00

Clearance of Accounts – Financial Clearance
2017
EAGF, EAFRD – not recovered financial errors
ONE OFF

EUR
– 797,04
0,00
– 797,04

Clearance of Accounts – Financial Clearance
2020
Financial errors identified by the CB in debt management
ONE OFF

EUR
-77 095,42
0,00
-77 095,42

Clearance of Accounts – Financial Clearance
2020
Issues related to Debt Management – Decision not to pursue recovery (EAGF)
ONE OFF

EUR
-7 777,31
0,00
-7 777,31

Clearance of Accounts – Financial Clearance
2020
Issues related to Debt Management – Non-respect of the time limit for launching recovery procedure
ONE OFF

EUR
– 327 328,11
0,00
– 327 328,11

Total PL:
EUR
– 479 971,75
-66 973,87
– 412 997,88
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
PT
Wine – Harvest Insurance and Mutual Funds
2021
Appropriate performance of the administrative checks covering all aid applications and payment claims to ensure compliance with the legislation governing Union support schemes (KC) – FYs 2021 to 2023
ONE OFF

EUR
-72 372,00
0,00
-72 372,00

Wine – Harvest Insurance and Mutual Funds
2022
Appropriate performance of the administrative checks covering all aid applications and payment claims to ensure compliance with the legislation governing Union support schemes (KC) – FYs 2021 to 2023
ONE OFF

EUR
-72 290,23
0,00
-72 290,23

Wine – Harvest Insurance and Mutual Funds
2023
Appropriate performance of the administrative checks covering all aid applications and payment claims to ensure compliance with the legislation governing Union support schemes (KC) – FYs 2021 to 2023
ONE OFF

EUR
– 104 798,00
0,00
– 104 798,00

POSEI (2014+)
2021
FY2021 Absence in provisions concerning the national measures necessary to ensure compliance with the POSEI legal framework and appropriate measures to check that the advantage is passed on to the end user for the population =< EUR 40 000
FLAT RATE
10,00 %
EUR
-12 299,12
0,00
-12 299,12

POSEI (2014+)
2022
FY2022 Absence in provisions concerning the national measures necessary to ensure compliance with the POSEI legal framework and appropriate measures to check that the advantage is passed on to the end user for the population =< EUR 40 000
FLAT RATE
10,00 %
EUR
-35 361,70
0,00
-35 361,70

POSEI (2014+)
2023
FY2023 Absence in provisions concerning the national measures necessary to ensure compliance with the POSEI legal framework and appropriate measures to check that the advantage is passed on to the end user for the population =< EUR 40 000
FLAT RATE
10,00 %
EUR
-30 873,75
0,00
-30 873,75

Wine – Harvest Insurance and Mutual Funds
2021
Performance of on-the-spot checks – OTSC of sufficient quality (KC) – weaknesses in FY 2021 to FY 2023
FLAT RATE
5,00 %
EUR
-96 654,74
0,00
-96 654,74

Wine – Harvest Insurance and Mutual Funds
2022
Performance of on-the-spot checks – OTSC of sufficient quality (KC) – weaknesses in FY 2021 to FY 2023
FLAT RATE
5,00 %
EUR
-99 028,28
0,00
-99 028,28

Wine – Harvest Insurance and Mutual Funds
2023
Performance of on-the-spot checks – OTSC of sufficient quality (KC) – weaknesses in FY 2021 to FY 2023
FLAT RATE
5,00 %
EUR
– 101 280,73
0,00
– 101 280,73

Total PT:
EUR
– 624 958,55
0,00
– 624 958,55
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
RO
Scrutiny of transactions
2020
FY 2020 Period 2021-2022 (0,5%)
FLAT RATE
0,50 %
EUR
-26 971,42
-14,04
-26 957,38

Scrutiny of transactions
2020
FY 2020 Period 2021-2022 1,5%
FLAT RATE
1,50 %
EUR
– 272 162,03
0,00
– 272 162,03

Scrutiny of transactions
2020
FY 2020 Period 2021-2022 2,5 %
FLAT RATE
2,50 %
EUR
-56 431,34
0,00
-56 431,34

Scrutiny of transactions
2021
FY 2021 Period 2022-2023 (0,5%)
FLAT RATE
0,50 %
EUR
-17 944,04
0,00
-17 944,04

Scrutiny of transactions
2021
FY 2021 Period 2022-2023 (1%)
FLAT RATE
1,00 %
EUR
-26 265,56
0,00
-26 265,56

Scrutiny of transactions
2021
FY 2021 Period 2022-2023 2,5%
FLAT RATE
2,50 %
EUR
-9 755,68
0,00
-9 755,68

Clearance of Accounts – Financial Clearance
2021
Potential irregularities identified and finally confirmed
ONE OFF

EUR
-3 784,69
0,00
-3 784,69

Total RO:
EUR
– 413 314,76
-14,04
– 413 300,72

Currency
Gross Amount
Deductions
Net Decided
EUR
– 169 609 386,10
-4 862 961,36
– 164 746 424,74

Financial corrections from cross-compliance

Budget Item: 6200

Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
CZ
Cross-compliance
2023
CY 2022 – FY 2023-2024
FLAT RATE
2,00 %
EUR
-1 320 290,30
0,00
-1 320 290,30

Cross-compliance
2024
CY 2022 – FY 2023-2024
FLAT RATE
2,00 %
EUR
– 124,69
0,00
– 124,69

Total CZ:
EUR
-1 320 414,99
0,00
-1 320 414,99
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
HU
Cross-compliance
2022
CY 2021 a – FY 2022-2023
FLAT RATE
5,00 %
EUR
-1 910 965,51
-4 158,28
-1 906 807,23

Cross-compliance
2023
CY 2021 a – FY 2022-2023
FLAT RATE
5,00 %
EUR
-1 487,96
0,00
-1 487,96

Cross-compliance
2024
CY 2021 a – FY 2024
FLAT RATE
5,00 %
EUR
-1 056,43
0,00
-1 056,43

Cross-compliance
2022
CY 2021 b – FY 2022-2023
FLAT RATE
2,00 %
EUR
-1 714 521,74
-95,06
-1 714 426,68

Cross-compliance
2023
CY 2021 b – FY 2022-2023
FLAT RATE
2,00 %
EUR
-2 870,37
0,00
-2 870,37

Cross-compliance
2024
CY 2021 b – FY 2024
FLAT RATE
2,00 %
EUR
– 437,36
0,00
– 437,36

Cross-compliance
2023
CY 2022 a – FY 2022-2023
FLAT RATE
5,00 %
EUR
– 494 333,71
0,00
– 494 333,71

Cross-compliance
2024
CY 2022 a – FY 2024
FLAT RATE
5,00 %
EUR
-8 307,96
0,00
-8 307,96

Cross-compliance
2023
CY 2022 b – FY 2022-2023
FLAT RATE
2,00 %
EUR
-1 757 734,51
0,00
-1 757 734,51

Cross-compliance
2024
CY 2022 b – FY 2024
FLAT RATE
2,00 %
EUR
-2 583,73
0,00
-2 583,73

Total HU:
EUR
-5 894 299,28
-4 253,34
-5 890 045,94
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
IT
Cross-compliance
2021
CY 2020
FLAT RATE
10,00 %
EUR
– 388 525,69
– 270,41
– 388 255,28

Cross-compliance
2022
CY 2021
FLAT RATE
10,00 %
EUR
– 423 897,61
-36,66
– 423 860,95

Cross-compliance
2023
CY 2021
FLAT RATE
10,00 %
EUR
-4 612,83
0,00
-4 612,83

Cross-compliance
2023
CY 2022
FLAT RATE
10,00 %
EUR
– 425 347,98
0,00
– 425 347,98

Total IT:
EUR
-1 242 384,11
– 307,07
-1 242 077,04
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
LT
Cross-compliance
2021
CY 2020 – with land
FLAT RATE
2,00 %
EUR
-1 010 712,03
-36 791,99
– 973 920,04

Cross-compliance
2022
CY 2020 – with land
FLAT RATE
2,00 %
EUR
– 353,45
0,00
– 353,45

Cross-compliance
2023
CY 2020 – with land
FLAT RATE
2,00 %
EUR
-41,08
0,00
-41,08

Cross-compliance
2021
CY 2020 – without land
ONE OFF

EUR
-3 272,50
– 117,05
-3 155,45

Cross-compliance
2022
CY 2020 – without land
ONE OFF

EUR
-1,13
0,00
-1,13

Cross-compliance
2023
CY 2020 – without land
ONE OFF

EUR
-0,13
0,00
-0,13

Cross-compliance
2022
CY 2021 – with land
FLAT RATE
2,00 %
EUR
-1 119 773,74
0,00
-1 119 773,74

Cross-compliance
2023
CY 2021 – with land
FLAT RATE
2,00 %
EUR
– 469,02
0,00
– 469,02

Cross-compliance
2023
CY 2022 – with land
FLAT RATE
2,00 %
EUR
-1 151 983,50
0,00
-1 151 983,50

Total LT:
EUR
-3 286 606,58
-36 909,04
-3 249 697,54
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
SK
Cross-compliance
2021
CY 2020 a FY 2021-2023
FLAT RATE
5,00 %
EUR
– 139 851,99
– 391,54
– 139 460,45

Cross-compliance
2022
CY 2020 a FY 2021-2023
FLAT RATE
5,00 %
EUR
-17 469,19
0,00
-17 469,19

Cross-compliance
2023
CY 2020 a FY 2021-2023
FLAT RATE
5,00 %
EUR
– 147,04
0,00
– 147,04

Cross-compliance
2024
CY 2020 a FY 2024
FLAT RATE
5,00 %
EUR
-41,07
0,00
-41,07

Cross-compliance
2021
CY 2020 b FY 2021-2023
FLAT RATE
2,00 %
EUR
-18 120,39
-12,62
-18 107,77

Cross-compliance
2022
CY 2020 b FY 2021-2023
FLAT RATE
2,00 %
EUR
– 683,44
0,00
– 683,44

Cross-compliance
2023
CY 2020 b FY 2021-2023
FLAT RATE
2,00 %
EUR
– 215,95
0,00
– 215,95

Cross-compliance
2024
CY 2020 b FY 2024
FLAT RATE
2,00 %
EUR
-7,05
0,00
-7,05

Cross-compliance
2022
CY 2021 a FY 2022-2023
FLAT RATE
5,00 %
EUR
-1 151 682,97
-4 509,99
-1 147 172,98

Cross-compliance
2023
CY 2021 a FY 2022-2023
FLAT RATE
5,00 %
EUR
– 882,87
0,00
– 882,87

Cross-compliance
2024
CY 2021 a FY 2024
FLAT RATE
5,00 %
EUR
– 248,66
0,00
– 248,66

Cross-compliance
2021
CY 2021 b FY 2021-2023
FLAT RATE
2,00 %
EUR
– 100,40
0,00
– 100,40

Cross-compliance
2022
CY 2021 b FY 2021-2023
FLAT RATE
2,00 %
EUR
– 169 817,59
-67,04
– 169 750,55

Cross-compliance
2023
CY 2021 b FY 2021-2023
FLAT RATE
2,00 %
EUR
– 148,53
0,00
– 148,53

Cross-compliance
2024
CY 2021 b FY 2024
FLAT RATE
2,00 %
EUR
-36,86
0,00
-36,86

Cross-compliance
2023
CY 2022 a FY 2023
FLAT RATE
5,00 %
EUR
-1 070 016,36
0,00
-1 070 016,36

Cross-compliance
2024
CY 2022 a FY 2024
FLAT RATE
5,00 %
EUR
-12 321,30
0,00
-12 321,30

Cross-compliance
2023
CY 2022 b FY 2022-2023
FLAT RATE
2,00 %
EUR
– 169 059,66
0,00
– 169 059,66

Cross-compliance
2024
CY 2022 b FY 2024
FLAT RATE
2,00 %
EUR
-1 376,49
0,00
-1 376,49

Total SK:
EUR
-2 752 227,81
-4 981,19
-2 747 246,62

Currency
Gross Amount
Deductions
Net Decided
EUR
-14 495 932,77
-46 450,64
-14 449 482,13

EAFRD

Financial corrections – excluding cross-compliance

Budget Item: 5040

Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
HU
Rural Development EAFRD measures subject to IACS
2022
One-off correction for M12 – NAT 2000 & WFD
ONE OFF

EUR
-27 923,13
0,00
-27 923,13

Total HU:
EUR
-27 923,13
0,00
-27 923,13
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
RO
Rural Development EAFRD measures subject to IACS
2023
Maximum Eligible Area (MEA): eligibility of parcels – M10 – CY2022
ONE OFF

EUR
– 317 298,00
0,00
– 317 298,00

Rural Development EAFRD measures subject to IACS
2024
Maximum Eligible Area (MEA): eligibility of parcels – M10 – CY2023
ONE OFF

EUR
– 158 290,36
0,00
– 158 290,36

Clearance of Accounts – Financial Clearance
2022
Projected Incompliance Rate EAFRD NIACS
ESTIMATED BY AMOUNT

EUR
-1 591 064,79
0,00
-1 591 064,79

Total RO:
EUR
-2 066 653,15
0,00
-2 066 653,15

Currency
Gross Amount
Deductions
Net Decided
EUR
-2 094 576,28
0,00
-2 094 576,28

Budget Item: 6201

Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
BE
Rural Development EAFRD Leader
2021
Enquête CEB/2023/003/BE concernant le suivi du rapport de l’organisme de certifcation pourles exercices financiers 2021 à 2023
FLAT RATE
10,00 %
EUR
-29 305,01
0,00
-29 305,01

Rural Development EAFRD Leader
2022
Enquête CEB/2023/003/BE concernant le suivi du rapport de l’organisme de certifcation pourles exercices financiers 2021 à 2023
FLAT RATE
10,00 %
EUR
-60 010,95
0,00
-60 010,95

Rural Development EAFRD Leader
2023
Enquête CEB/2023/003/BE concernant le suivi du rapport de l’organisme de certifcation pourles exercices financiers 2021 à 2023
FLAT RATE
10,00 %
EUR
– 110 069,55
0,00
– 110 069,55

Rural Development EAFRD Leader
2024
Enquête CEB/2023/003/BE concernant le suivi du rapport de l’organisme de certifcation pour l’exerccie financier 2024
FLAT RATE
10,00 %
EUR
– 112 711,32
0,00
– 112 711,32

Total BE:
EUR
– 312 096,83
0,00
– 312 096,83
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
ES
Clearance of Accounts – Financial Clearance
2022
Weeknesses in reccovery of debts – debt cases declared irrecoverable
ONE OFF

EUR
-4 254 534,73
0,00
-4 254 534,73

Total ES:
EUR
-4 254 534,73
0,00
-4 254 534,73
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
GR
Rural Development EAFRD Measures with flat-rate support
2023
Calculated correction for Measure 22
ONE OFF

EUR
-50 842,16
0,00
-50 842,16

Total GR:
EUR
-50 842,16
0,00
-50 842,16
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
HU
Clearance of Accounts – Financial Clearance
2022
EAFRD Debtors
ONE OFF

EUR
– 810 600,48
0,00
– 810 600,48

Rural Development EAFRD NIACS forestry measures
2021
EAFRD Non-IACS Forestry measures M.8.6.2. Deficiencies found in OTSC and verification of payments claims.
FLAT RATE
5,00 %
EUR
-9 089,56
0,00
-9 089,56

Rural Development EAFRD NIACS forestry measures
2022
EAFRD Non-IACS Forestry measures M.8.6.2. Deficiencies found in OTSC and verification of payments claims.
FLAT RATE
5,00 %
EUR
-28 074,01
0,00
-28 074,01

Rural Development EAFRD NIACS forestry measures
2023
EAFRD Non-IACS Forestry measures M.8.6.2. Deficiencies found in OTSC and verification of payments claims.
FLAT RATE
5,00 %
EUR
-2 874,84
– 661,11
-2 213,73

Total HU:
EUR
– 850 638,89
– 661,11
– 849 977,78
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
IT
Clearance of Accounts – Financial Clearance
2020
Advances and securities
ONE OFF

EUR
-6 244 067,26
0,00
-6 244 067,26

Clearance of Accounts – Financial Clearance
2020
Debt management – EAFRD – debt recognition and registration – debt recovery and reporting of debts
ONE OFF

EUR
-1 329 000,32
0,00
-1 329 000,32

Clearance of Accounts – Financial Clearance
2020
EAFRD debt management
ONE OFF

EUR
-4 098 613,53
0,00
-4 098 613,53

Clearance of Accounts – Financial Clearance
2023
EAFRD debt management
ONE OFF

EUR
– 120 826,85
0,00
– 120 826,85

Clearance of Accounts – Financial Clearance
2020
EAFRD flat rate 10% (debt management)
FLAT RATE
10,00 %
EUR
– 977 606,50
0,00
– 977 606,50

Clearance of Accounts – Financial Clearance
2018
Weaknesses accreditation criterion delegation FY 2018
FLAT RATE
2,00 %
EUR
-3 923 544,98
– 954 975,31
-2 968 569,67

Clearance of Accounts – Financial Clearance
2019
Weaknesses accreditation criterion delegation FY 2019
FLAT RATE
2,00 %
EUR
-18 331 173,05
– 819 620,69
-17 511 552,36

Clearance of Accounts – Financial Clearance
2020
Weaknesses accreditation criterion delegation FY 2020
FLAT RATE
2,00 %
EUR
-20 275 089,10
-91 898,94
-20 183 190,16

Total IT:
EUR
-55 299 921,59
-1 866 494,94
-53 433 426,65
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
PL
Clearance of Accounts – Financial Clearance
2019
EAFRD Non-IACS – financial errors
ONE OFF

EUR
– 117 068,85
0,00
– 117 068,85

Clearance of Accounts – Financial Clearance
2020
EAFRD Non-IACS – financial errors
ONE OFF

EUR
-26 494,93
0,00
-26 494,93

Clearance of Accounts – Financial Clearance
2016
EAGF, EAFRD – not recovered financial errors
ONE OFF

EUR
-56 505,61
0,00
-56 505,61

Clearance of Accounts – Financial Clearance
2020
Financial errors identified by the CB in debt management
ONE OFF

EUR
-26 258,43
0,00
-26 258,43

Clearance of Accounts – Financial Clearance
2020
Issues related to Debt Management – Decision not to pursue recovery (EAFRD)
ONE OFF

EUR
-77 759,38
0,00
-77 759,38

Clearance of Accounts – Financial Clearance
2020
Issues related to Debt Management – Non-respect of the time limit for launching recovery procedure (EAFRD)
ONE OFF

EUR
– 651 578,10
0,00
– 651 578,10

Total PL:
EUR
– 955 665,30
0,00
– 955 665,30
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
RO
Clearance of Accounts – Financial Clearance
2021
Audit objective 1: debt management
ONE OFF

EUR
-3 847 171,40
0,00
-3 847 171,40

Clearance of Accounts – Financial Clearance
2021
Audit objective 2: financial & known errors
ONE OFF

EUR
-7 137,92
0,00
-7 137,92

Clearance of Accounts – Financial Clearance
2022
Debt management errors
ONE OFF

EUR
-45 281,39
0,00
-45 281,39

Rural Development EAFRD forestry measures
2021
Inappropriate checks on double-financing M8.1 – CY2020-2021-2022
ONE OFF

EUR
-2 108,28
-1 020,81
-1 087,47

Rural Development EAFRD forestry measures
2022
Inappropriate checks on double-financing M8.1 – CY2020-2021-2022
ONE OFF

EUR
-3 483,43
– 867,02
-2 616,41

Rural Development EAFRD forestry measures
2023
Inappropriate checks on double-financing M8.1 – CY2020-2021-2022
ONE OFF

EUR
-7 410,58
– 140,61
-7 269,97

Rural Development EAFRD measures subject to IACS
2017
Inappropriate checks on the compliance with long-term commitments
ONE OFF

EUR
-50 904,47
-55 686,59
4 782,12

Rural Development EAFRD measures subject to IACS
2018
Inappropriate checks on the compliance with long-term commitments
ONE OFF

EUR
-85 318,08
-14 106,22
-71 211,86

Rural Development EAFRD measures subject to IACS
2019
Inappropriate checks on the compliance with long-term commitments
ONE OFF

EUR
– 185 758,08
-24 205,78
– 161 552,30

Rural Development EAFRD measures subject to IACS
2020
Inappropriate checks on the compliance with long-term commitments
ONE OFF

EUR
– 216 981,12
-40 540,51
– 176 440,61

Rural Development EAFRD measures subject to IACS
2021
Inappropriate checks on the compliance with long-term commitments
ONE OFF

EUR
-28 116,40
– 664,02
-27 452,38

Clearance of Accounts – Financial Clearance
2022
Known errors EAFRD IACS
ONE OFF

EUR
-5 438,37
0,00
-5 438,37

Clearance of Accounts – Financial Clearance
2022
Known errors EAFRD NIACS
ONE OFF

EUR
– 149 403,47
0,00
– 149 403,47

Rural Development EAFRD measures subject to IACS
2021
Maximum Eligible Area (MEA): eligibility of parcels – M10 – CY2020
ONE OFF

EUR
– 292 907,28
– 167 944,64
– 124 962,64

Rural Development EAFRD measures subject to IACS
2022
Maximum Eligible Area (MEA): eligibility of parcels – M10 – CY2021
ONE OFF

EUR
– 496 021,92
– 194 307,63
– 301 714,29

Rural Development EAFRD measures subject to IACS
2023
Maximum Eligible Area (MEA): eligibility of parcels – M10 – CY2022
ONE OFF

EUR
– 267 927,66
-5 619,43
– 262 308,23

Rural Development EAFRD measures subject to IACS
2024
Maximum Eligible Area (MEA): eligibility of parcels – M10 – CY2023
ONE OFF

EUR
– 447 795,06
0,00
– 447 795,06

Rural Development EAFRD measures subject to IACS
2021
Maximum Eligible Area (MEA): eligibility of parcels – M13 – CY2020
ONE OFF

EUR
– 789 753,32
– 468 339,60
– 321 413,72

Rural Development EAFRD measures subject to IACS
2022
Maximum Eligible Area (MEA): eligibility of parcels – M13 – CY2021
ONE OFF

EUR
– 890 983,60
– 462 602,59
– 428 381,01

Rural Development EAFRD measures subject to IACS
2023
Maximum Eligible Area (MEA): eligibility of parcels – M13 – CY2022
ONE OFF

EUR
– 893 272,63
– 460 037,74
– 433 234,89

Rural Development EAFRD measures subject to IACS
2024
Maximum Eligible Area (MEA): eligibility of parcels – M13 – CY2023
ONE OFF

EUR
– 284 138,16
0,00
– 284 138,16

Clearance of Accounts – Financial Clearance
2022
Projected Incompliance Rate EAFRD IACS
ESTIMATED BY AMOUNT

EUR
-8 687 477,53
0,00
-8 687 477,53

Clearance of Accounts – Financial Clearance
2022
Projected Incompliance Rate EAFRD NIACS
ESTIMATED BY AMOUNT

EUR
-3 685 693,68
0,00
-3 685 693,68

Total RO:
EUR
-21 370 483,83
-1 896 083,19
-19 474 400,64

Currency
Gross Amount
Deductions
Net Decided
EUR
-83 094 183,33
-3 763 239,24
-79 330 944,09

Financial corrections from cross-compliance

Budget Item: 5040

Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
CZ
Cross-compliance
2023
CY 2022 – FY 2023-2024
FLAT RATE
2,00 %
EUR
-49 012,58
0,00
-49 012,58

Cross-compliance
2024
CY 2022 – FY 2023-2024
FLAT RATE
2,00 %
EUR
– 165,02
0,00
– 165,02

Cross-compliance
2025
CY 2022 – FY 2025
FLAT RATE
2,00 %
EUR
-1,33
0,00
-1,33

Total CZ:
EUR
-49 178,93
0,00
-49 178,93
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
HU
Cross-compliance
2022
CY 2021 a – FY 2022-2023
FLAT RATE
5,00 %
EUR
-66 212,42
0,00
-66 212,42

Cross-compliance
2023
CY 2021 a – FY 2022-2023
FLAT RATE
5,00 %
EUR
– 216,65
0,00
– 216,65

Cross-compliance
2024
CY 2021 a – FY 2024
FLAT RATE
5,00 %
EUR
-91,21
0,00
-91,21

Cross-compliance
2022
CY 2021 b – FY 2022-2023
FLAT RATE
2,00 %
EUR
-50 591,72
0,00
-50 591,72

Cross-compliance
2023
CY 2021 b – FY 2022-2023
FLAT RATE
2,00 %
EUR
– 182,91
0,00
– 182,91

Cross-compliance
2023
CY 2022 a – FY 2022-2023
FLAT RATE
5,00 %
EUR
– 135 736,16
0,00
– 135 736,16

Cross-compliance
2024
CY 2022 a – FY 2024
FLAT RATE
5,00 %
EUR
– 871,90
0,00
– 871,90

Cross-compliance
2023
CY 2022 b – FY 2022-2023
FLAT RATE
2,00 %
EUR
-70 727,18
0,00
-70 727,18

Cross-compliance
2024
CY 2022 b – FY 2024
FLAT RATE
2,00 %
EUR
– 123,11
0,00
– 123,11

Cross-compliance
2024
CY 2023 – FY 2024
FLAT RATE
5,00 %
EUR
-7 245,17
0,00
-7 245,17

Total HU:
EUR
– 331 998,43
0,00
– 331 998,43
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
IT
Cross-compliance
2022
CY 2021
FLAT RATE
10,00 %
EUR
-57 741,75
0,00
-57 741,75

Cross-compliance
2023
CY 2021
FLAT RATE
10,00 %
EUR
– 506,94
0,00
– 506,94

Total IT:
EUR
-58 248,69
0,00
-58 248,69
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
SK
Cross-compliance
2022
CY 2021 a FY 2022-2023
FLAT RATE
5,00 %
EUR
-78 830,36
0,00
-78 830,36

Cross-compliance
2023
CY 2021 a FY 2022-2023
FLAT RATE
5,00 %
EUR
– 852,06
0,00
– 852,06

Cross-compliance
2022
CY 2021 b FY 2021-2023
FLAT RATE
2,00 %
EUR
-6 092,29
0,00
-6 092,29

Cross-compliance
2023
CY 2021 b FY 2021-2023
FLAT RATE
2,00 %
EUR
– 160,46
0,00
– 160,46

Cross-compliance
2024
CY 2021 b FY 2024
FLAT RATE
2,00 %
EUR
-2,68
0,00
-2,68

Cross-compliance
2023
CY 2022 a FY 2023
FLAT RATE
5,00 %
EUR
-83 927,46
0,00
-83 927,46

Cross-compliance
2024
CY 2022 a FY 2024
FLAT RATE
5,00 %
EUR
-2 993,89
0,00
-2 993,89

Cross-compliance
2023
CY 2022 b FY 2022-2023
FLAT RATE
2,00 %
EUR
-5 516,22
0,00
-5 516,22

Cross-compliance
2024
CY 2022 b FY 2024
FLAT RATE
2,00 %
EUR
– 320,33
0,00
– 320,33

Total SK:
EUR
– 178 695,75
0,00
– 178 695,75

Currency
Gross Amount
Deductions
Net Decided
EUR
– 618 121,80
0,00
– 618 121,80

Budget Item: 6201

Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
CZ
Cross-compliance
2023
CY 2022 – FY 2023-2024
FLAT RATE
2,00 %
EUR
– 313 465,59
0,00
– 313 465,59

Cross-compliance
2024
CY 2022 – FY 2023-2024
FLAT RATE
2,00 %
EUR
– 169,93
0,00
– 169,93

Cross-compliance
2025
CY 2022 – FY 2025
FLAT RATE
2,00 %
EUR
-0,02
0,00
-0,02

Total CZ:
EUR
– 313 635,54
0,00
– 313 635,54
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
HU
Cross-compliance
2022
CY 2021 a – FY 2022-2023
FLAT RATE
5,00 %
EUR
– 247 106,01
-6,56
– 247 099,45

Cross-compliance
2023
CY 2021 a – FY 2022-2023
FLAT RATE
5,00 %
EUR
– 390,75
-0,24
– 390,51

Cross-compliance
2024
CY 2021 a – FY 2024
FLAT RATE
5,00 %
EUR
– 373,60
0,00
– 373,60

Cross-compliance
2022
CY 2021 b – FY 2022-2023
FLAT RATE
2,00 %
EUR
– 124 568,16
-23,37
– 124 544,79

Cross-compliance
2023
CY 2021 b – FY 2022-2023
FLAT RATE
2,00 %
EUR
– 575,58
-0,36
– 575,22

Cross-compliance
2024
CY 2021 b – FY 2024
FLAT RATE
2,00 %
EUR
-33,87
0,00
-33,87

Cross-compliance
2023
CY 2022 a – FY 2022-2023
FLAT RATE
5,00 %
EUR
– 644 509,00
-9,34
– 644 499,66

Cross-compliance
2024
CY 2022 a – FY 2024
FLAT RATE
5,00 %
EUR
-5 228,30
0,00
-5 228,30

Cross-compliance
2023
CY 2022 b – FY 2022-2023
FLAT RATE
2,00 %
EUR
– 407 286,79
-21,91
– 407 264,88

Cross-compliance
2024
CY 2022 b – FY 2024
FLAT RATE
2,00 %
EUR
-2 164,38
0,00
-2 164,38

Cross-compliance
2024
CY 2023 – FY 2024
FLAT RATE
5,00 %
EUR
-2 353,16
0,00
-2 353,16

Total HU:
EUR
-1 434 589,60
-61,78
-1 434 527,82
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
IT
Cross-compliance
2021
CY 2020
FLAT RATE
10,00 %
EUR
– 102 835,41
0,00
– 102 835,41

Cross-compliance
2022
CY 2020
FLAT RATE
10,00 %
EUR
– 519,36
0,00
– 519,36

Cross-compliance
2022
CY 2021
FLAT RATE
10,00 %
EUR
– 169 558,46
0,00
– 169 558,46

Cross-compliance
2023
CY 2021
FLAT RATE
10,00 %
EUR
-2 364,41
0,00
-2 364,41

Cross-compliance
2023
CY 2022
FLAT RATE
10,00 %
EUR
– 168 463,39
0,00
– 168 463,39

Total IT:
EUR
– 443 741,03
0,00
– 443 741,03
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
LT
Cross-compliance
2020
CY 2020 – with land
FLAT RATE
2,00 %
EUR
-5,25
0,00
-5,25

Cross-compliance
2021
CY 2020 – with land
FLAT RATE
2,00 %
EUR
-78 207,50
0,00
-78 207,50

Cross-compliance
2022
CY 2020 – with land
FLAT RATE
2,00 %
EUR
-7,14
0,00
-7,14

Cross-compliance
2023
CY 2020 – with land
FLAT RATE
2,00 %
EUR
-0,04
0,00
-0,04

Cross-compliance
2020
CY 2020 – without land
ONE OFF

EUR
-0,02
0,00
-0,02

Cross-compliance
2021
CY 2020 – without land
ONE OFF

EUR
– 253,22
0,00
– 253,22

Cross-compliance
2022
CY 2020 – without land
ONE OFF

EUR
-0,02
0,00
-0,02

Cross-compliance
2023
CY 2022 – with land
FLAT RATE
2,00 %
EUR
– 166 280,04
0,00
– 166 280,04

Total LT:
EUR
– 244 753,23
0,00
– 244 753,23
Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
SK
Cross-compliance
2021
CY 2020 a FY 2021-2023
FLAT RATE
5,00 %
EUR
– 170 690,33
0,00
– 170 690,33

Cross-compliance
2022
CY 2020 a FY 2021-2023
FLAT RATE
5,00 %
EUR
-5 837,11
0,00
-5 837,11

Cross-compliance
2023
CY 2020 a FY 2021-2023
FLAT RATE
5,00 %
EUR
-11,32
0,00
-11,32

Cross-compliance
2021
CY 2020 b FY 2021-2023
FLAT RATE
2,00 %
EUR
-13 803,52
0,00
-13 803,52

Cross-compliance
2022
CY 2020 b FY 2021-2023
FLAT RATE
2,00 %
EUR
– 276,40
0,00
– 276,40

Cross-compliance
2023
CY 2020 b FY 2021-2023
FLAT RATE
2,00 %
EUR
-91,20
0,00
-91,20

Cross-compliance
2024
CY 2020 b FY 2024
FLAT RATE
2,00 %
EUR
-15,69
0,00
-15,69

Cross-compliance
2022
CY 2021 a FY 2022-2023
FLAT RATE
5,00 %
EUR
– 341 452,03
0,00
– 341 452,03

Cross-compliance
2023
CY 2021 a FY 2022-2023
FLAT RATE
5,00 %
EUR
-3 283,00
0,00
-3 283,00

Cross-compliance
2024
CY 2021 a FY 2024
FLAT RATE
5,00 %
EUR
-27,23
0,00
-27,23

Cross-compliance
2022
CY 2021 b FY 2021-2023
FLAT RATE
2,00 %
EUR
-32 066,84
0,00
-32 066,84

Cross-compliance
2023
CY 2021 b FY 2021-2023
FLAT RATE
2,00 %
EUR
-10,42
0,00
-10,42

Cross-compliance
2024
CY 2021 b FY 2024
FLAT RATE
2,00 %
EUR
-1,22
0,00
-1,22

Cross-compliance
2023
CY 2022 a FY 2023
FLAT RATE
5,00 %
EUR
– 324 855,59
0,00
– 324 855,59

Cross-compliance
2024
CY 2022 a FY 2024
FLAT RATE
5,00 %
EUR
-5 747,24
0,00
-5 747,24

Cross-compliance
2022
CY 2022 b FY 2022-2023
FLAT RATE
2,00 %
EUR
-1,94
0,00
-1,94

Cross-compliance
2023
CY 2022 b FY 2022-2023
FLAT RATE
2,00 %
EUR
-29 644,57
0,00
-29 644,57

Cross-compliance
2024
CY 2022 b FY 2024
FLAT RATE
2,00 %
EUR
– 453,20
0,00
– 453,20

Total SK:
EUR
– 928 268,85
0,00
– 928 268,85

Currency
Gross Amount
Deductions
Net Decided
EUR
-3 364 988,25
-61,78
-3 364 926,47

TRDI

Financial corrections – excluding cross-compliance

Budget Item: 6201

Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
PL
Clearance of Accounts – Financial Clearance
2020
Issues related to Debt Management – Decision not to pursue recovery (EAFRD)
ONE OFF

EUR
-24 361,86
0,00
-24 361,86

Clearance of Accounts – Financial Clearance
2020
Issues related to Debt Management – Non-respect of the time limit for launching recovery procedure (TRDI)
ONE OFF

EUR
-33 717,54
0,00
-33 717,54

Total PL:
EUR
-58 079,40
0,00
-58 079,40

Currency
Gross Amount
Deductions
Net Decided
EUR
-58 079,40
0,00
-58 079,40

Lifting of suspensions

EAFRD

Budget Item: 08030102

Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
Lifted Suspensions
RO
Rural Development EAFRD measures subject to IACS
2022
Lifting FY2022 M10-M13 C(2022)7819 C(2023)854
Lifting of Suspension

EUR
0,00
0,00
0,00
707 515,11

Rural Development EAFRD measures subject to IACS
2023
Lifting FY2023 M10-M13 C(2023)5576 C(2024)814
Lifting of Suspension

EUR
0,00
0,00
0,00
618 699,37

Rural Development EAFRD measures subject to IACS
2024
Suspension of interim payments Art.41(1) of R.1306/2013 – C(2024)8138 – FY 2024 – M10, M10 EURI & M13
Lifting of Suspension

EUR
0,00
0,00
0,00
414 820,48

Total RO:
EUR
0,00
0,00
0,00
1 741 034,96

Currency
Gross Amount
Deductions
Net Decided
Lifted Suspensions
EUR
0,00
0,00
0,00
1 741 034,96

Budget Item: 08030103

Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
Lifted Suspensions
RO
Rural Development EAFRD measures subject to IACS
2023
Lifting FY2023 M10-M13 C(2023)5576 C(2024)814
Lifting of Suspension

EUR
0,00
0,00
0,00
300 139,64

Rural Development EAFRD measures subject to IACS
2024
Suspension of interim payments Art.41(1) of R.1306/2013 – C(2024)8138 – FY 2024 – M10, M10 EURI & M13
Lifting of Suspension

EUR
0,00
0,00
0,00
60 433,37

Total RO:
EUR
0,00
0,00
0,00
360 573,01

Currency
Gross Amount
Deductions
Net Decided
Lifted Suspensions
EUR
0,00
0,00
0,00
360 573,01

Reimbursements

EAGF

Budget Item: 08020601

Member State
Measure
FY
Reason
Type
Correction %
Currency
Gross Amount
Deductions
Net Decided
IT
Scrutiny of transactions
2017
Scrutiny 0,5% Negative Amount 2017 – 2019
FLAT RATE
0,50 %
EUR
1 772,28
0,00
1 772,28

Scrutiny of transactions
2019
Scrutiny 0,5% Negative Amount 2017 – 2019
FLAT RATE
0,50 %
EUR
21,67
0,00
21,67

Total IT:
EUR
1 793,95
0,00
1 793,95

Currency
Gross Amount
Deductions
Net Decided
EUR
1 793,95
0,00
1 793,95

Financial Corrections
Total Net Decided
EAGF
Financial corrections – excluding cross-compliance
– 164 746 424,74
EAGF
Financial corrections from cross-compliance
-14 449 482,13
EAFRD
Financial corrections – excluding cross-compliance
-81 425 520,37
EAFRD
Financial corrections from cross-compliance
-3 983 048,27
TRDI
Financial corrections – excluding cross-compliance
-58 079,40
TOTAL:

– 264 662 554,91

Reimbursements
Total Net Decided
EAGF
1 793,95
TOTAL:
1 793,95

Council Decision (EU) 2025/2324 of 13 November 2025 on the financial contributions to be paid by the parties to the European Development Fund to finance that fund, setting out the ceiling for the annual amount of the contribution for 2027, the annual amount of the contribution for 2026, the amount of the first instalment of the contribution for 2026 and an indicative, non-binding forecast for the expected annual amounts of contributions for the years 2028 and 2029

Official Journalof the European Union ENL series
2025/2324 14.11.2025
(1) The contribution key for each party to the European Development Fund (EDF) is established by Article 1 of the Internal Agreement.
(2) In accordance with Article 46 of Regulation (EU) 2018/1877, the European Investment Bank (EIB) is to send to the Commission its updated estimates of commitments and payments under the instruments it manages.
(3) In accordance with Article 19(2) of Regulation (EU) 2018/1877, the Commission is to present a proposal by 15 October 2025 setting out the ceiling for the annual amount of the contribution for 2027, the annual amount of the contribution for 2026, the amount of the first instalment of the contribution for 2026 and an indicative, non-binding forecast for the expected annual amounts of contributions for the years 2028 and 2029.
(4) Pursuant to Article 20(1) of Regulation (EU) 2018/1877, calls for contributions are to first use up the amounts laid down for previous EDFs. Therefore, a call for contributions pursuant to Regulation (EU) 2018/1877 for the Commission and for the EIB should be made.
(5) Pursuant to Article 152 of the Agreement on the withdrawal of the United Kingdom of Great Britain and Northern Ireland from the European Union and from the European Atomic Energy Community(3)(the ‘Withdrawal Agreement’), the United Kingdom of Great Britain and Northern Ireland (the ‘United Kingdom’) is to remain party to the EDF until the closure of the 11th EDF and all previous unclosed EDFs. However, pursuant to Article 153 of the Withdrawal Agreement, the United Kingdom’s share in decommitted funds from projects under the 11th EDF, where those funds have been decommitted after 31 December 2020, or under previous EDFs, is not to be reused.
(6) Council Decision (EU) 2024/2906(4)sets the ceiling for the annual amount of the contribution to be paid by the parties to the EDF for 2026 at EUR 700 000 000 for the Commission only, as the EIB called all its share of the 11th EDF in 2025.
(7) In order to allow for the prompt application of the measures provided for in this Decision, it should enter into force on the date of its publication in theOfficial Journal of the European Union,
MEMBER STATES & UK 9th EDF key (%) 11th EDF key (%) 11th EDF contribution 9th EDF refund 11th EDF contribution minus 9th EDF refund
BELGIUM 3,92 3,24927 9 747 810 47 040 9 700 770
BULGARIA 0,21853 655 590 655 590
CZECHIA 0,79745 2 392 350 2 392 350
DENMARK 2,14 1,98045 5 941 350 25 680 5 915 670
GERMANY 23,36 20,57980 61 739 400 280 320 61 459 080
ESTONIA 0,08635 259 050 259 050
IRELAND 0,62 0,94006 2 820 180 7 440 2 812 740
GREECE 1,25 1,50735 4 522 050 15 000 4 507 050
SPAIN 5,84 7,93248 23 797 440 70 080 23 727 360
FRANCE 24,30 17,81269 53 438 070 291 600 53 146 470
CROATIA 0,22518 675 540 675 540
ITALY 12,54 12,53009 37 590 270 150 480 37 439 790
LATVIA 0,11612 348 360 348 360
LITHUANIA 0,18077 542 310 542 310
LUXEMBOURG 0,29 0,25509 765 270 3 480 761 790
HUNGARY 0,61456 1 843 680 1 843 680
MALTA 0,03801 114 030 114 030
NETHERLANDS 5,22 4,77678 14 330 340 62 640 14 267 700
AUSTRIA 2,65 2,39757 7 192 710 31 800 7 160 910
POLAND 2,00734 6 022 020 6 022 020
PORTUGAL 0,97 1,19679 3 590 370 11 640 3 578 730
ROMANIA 0,71815 2 154 450 2 154 450
SLOVENIA 0,22452 673 560 673 560
SLOVAKIA 0,37616 1 128 480 1 128 480
FINLAND 1,48 1,50909 4 527 270 17 760 4 509 510
SWEDEN 2,73 2,93911 8 817 330 32 760 8 784 570
UNITED KINGDOM 12,69 14,67862 44 035 860 152 280 43 883 580
TOTAL EU-27 & UK 100,00 100,00 300 000 000 1 200 000 298 800 000
THE COUNCIL OF THE EUROPEAN UNION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to the Internal Agreement between the Representatives of the Governments of the Member States of the European Union, meeting within the Council, on the financing of European Union aid under the multiannual financial framework for the period 2014 to 2020, in accordance with the ACP-EU Partnership Agreement, and on the allocation of financial assistance for the Overseas Countries and Territories to which Part Four of the Treaty on the Functioning of the European Union applies (1) (the ‘Internal Agreement’), and in particular Article 7(2) in conjunction with Article 14(3) thereof,
Having regard to Council Regulation (EU) 2018/1877 of 26 November 2018 on the financial regulation applicable to the 11th European Development Fund, and repealing Regulation (EU) 2015/323 (2), and in particular Article 19(2) thereof,
Having regard to the proposal from the European Commission,
Whereas:
(1) The contribution key for each party to the European Development Fund (EDF) is established by Article 1 of the Internal Agreement.
(2) In accordance with Article 46 of Regulation (EU) 2018/1877, the European Investment Bank (EIB) is to send to the Commission its updated estimates of commitments and payments under the instruments it manages.
(3) In accordance with Article 19(2) of Regulation (EU) 2018/1877, the Commission is to present a proposal by 15 October 2025 setting out the ceiling for the annual amount of the contribution for 2027, the annual amount of the contribution for 2026, the amount of the first instalment of the contribution for 2026 and an indicative, non-binding forecast for the expected annual amounts of contributions for the years 2028 and 2029.
(4) Pursuant to Article 20(1) of Regulation (EU) 2018/1877, calls for contributions are to first use up the amounts laid down for previous EDFs. Therefore, a call for contributions pursuant to Regulation (EU) 2018/1877 for the Commission and for the EIB should be made.
(5) Pursuant to Article 152 of the Agreement on the withdrawal of the United Kingdom of Great Britain and Northern Ireland from the European Union and from the European Atomic Energy Community (3) (the ‘Withdrawal Agreement’), the United Kingdom of Great Britain and Northern Ireland (the ‘United Kingdom’) is to remain party to the EDF until the closure of the 11th EDF and all previous unclosed EDFs. However, pursuant to Article 153 of the Withdrawal Agreement, the United Kingdom’s share in decommitted funds from projects under the 11th EDF, where those funds have been decommitted after 31 December 2020, or under previous EDFs, is not to be reused.
(6) Council Decision (EU) 2024/2906 (4) sets the ceiling for the annual amount of the contribution to be paid by the parties to the EDF for 2026 at EUR 700 000 000 for the Commission only, as the EIB called all its share of the 11th EDF in 2025.
(7) In order to allow for the prompt application of the measures provided for in this Decision, it should enter into force on the date of its publication in the Official Journal of the European Union,
HAS ADOPTED THIS DECISION:
The ceiling for the annual amount of the contributions to be paid by the parties to the European Development Fund (EDF) for 2027 is hereby set at EUR 460 000 000 for the Commission.
The annual amount of the contributions to be paid by the parties to the EDF for 2026 is hereby set at EUR 700 000 000 for the Commission.
The amount of the contributions to be paid by the parties to the EDF as a first instalment for 2026 is hereby set at EUR 300 000 000.
An amount of EUR 1 200 000 from uncommitted or decommitted funds from projects under the 9th EDF shall be refunded to the parties to the EDF by a reduction of payment against the first instalment for 2026 set in Article 3.
The indicative, non-binding forecast for the expected annual amount of contributions for 2028 is hereby set at EUR 400 000 000 for the Commission. The indicative, non-binding forecast for the expected annual amount of contributions for 2029 is hereby set at EUR 300 000 000 for the Commission.
This Decision shall enter into force on the date of its publication in the Official Journal of the European Union.

MEMBER STATES & UK
9th EDF key (%)
11th EDF key (%)
11th EDF contribution
9th EDF refund
11th EDF contribution minus 9th EDF refund
BELGIUM
3,92
3,24927
9 747 810
47 040
9 700 770
BULGARIA

0,21853
655 590

655 590
CZECHIA

0,79745
2 392 350

2 392 350
DENMARK
2,14
1,98045
5 941 350
25 680
5 915 670
GERMANY
23,36
20,57980
61 739 400
280 320
61 459 080
ESTONIA

0,08635
259 050

259 050
IRELAND
0,62
0,94006
2 820 180
7 440
2 812 740
GREECE
1,25
1,50735
4 522 050
15 000
4 507 050
SPAIN
5,84
7,93248
23 797 440
70 080
23 727 360
FRANCE
24,30
17,81269
53 438 070
291 600
53 146 470
CROATIA

0,22518
675 540

675 540
ITALY
12,54
12,53009
37 590 270
150 480
37 439 790
LATVIA

0,11612
348 360

348 360
LITHUANIA

0,18077
542 310

542 310
LUXEMBOURG
0,29
0,25509
765 270
3 480
761 790
HUNGARY

0,61456
1 843 680

1 843 680
MALTA

0,03801
114 030

114 030
NETHERLANDS
5,22
4,77678
14 330 340
62 640
14 267 700
AUSTRIA
2,65
2,39757
7 192 710
31 800
7 160 910
POLAND

2,00734
6 022 020

6 022 020
PORTUGAL
0,97
1,19679
3 590 370
11 640
3 578 730
ROMANIA

0,71815
2 154 450

2 154 450
SLOVENIA

0,22452
673 560

673 560
SLOVAKIA

0,37616
1 128 480

1 128 480
FINLAND
1,48
1,50909
4 527 270
17 760
4 509 510
SWEDEN
2,73
2,93911
8 817 330
32 760
8 784 570
UNITED KINGDOM
12,69
14,67862
44 035 860
152 280
43 883 580
TOTAL EU-27 & UK
100,00
100,00
300 000 000
1 200 000
298 800 000

(1) The EIB called all its share of the 11th EDF in 2025.